CN109272229A - Power station deviation electricity calculation method based on virtual reservoir - Google Patents

Power station deviation electricity calculation method based on virtual reservoir Download PDF

Info

Publication number
CN109272229A
CN109272229A CN201811076473.4A CN201811076473A CN109272229A CN 109272229 A CN109272229 A CN 109272229A CN 201811076473 A CN201811076473 A CN 201811076473A CN 109272229 A CN109272229 A CN 109272229A
Authority
CN
China
Prior art keywords
electricity
virtual
bank
amendment
reservoir
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811076473.4A
Other languages
Chinese (zh)
Other versions
CN109272229B (en
Inventor
张慧
唐勇
唐红兵
赵云发
王玉华
任新楷
王文军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Yangtze Power Co Ltd
Original Assignee
China Yangtze Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Yangtze Power Co Ltd filed Critical China Yangtze Power Co Ltd
Priority to CN202110542585.XA priority Critical patent/CN113327177B/en
Priority to CN201811076473.4A priority patent/CN109272229B/en
Publication of CN109272229A publication Critical patent/CN109272229A/en
Application granted granted Critical
Publication of CN109272229B publication Critical patent/CN109272229B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0637Strategic management or analysis, e.g. setting a goal or target of an organisation; Planning actions based on goals; Analysis or evaluation of effectiveness of goals

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Educational Administration (AREA)
  • Marketing (AREA)
  • Theoretical Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

Power station deviation electricity calculation method based on virtual reservoir, in the case where left and right power station reality generated energy is unsatisfactory for constraint condition, increase electricity to meeting constraint condition, the increased electricity in the part is calculated as left and right bank amendment electricity, real generated energy adds amendment electricity to be the virtual electricity in power station, carries out the calculating of deviation electricity with left and right virtual electricity, deviation electricity in the Zuo right phase: in point multiple electricity of electric ratio Zuo An right bank, if the numerical value is positive, need left bank right bank also supply electricity to right bank left bank;If the numerical value is negative, need right bank left bank also supply electricity to left bank right bank.It is left right amendment electricity: it is left Right Bank Hydropower Station in the case where being unsatisfactory for constraint condition, calculate it is left right day amendment electricity, if meeting constraint, it is left right bank amendment electricity be 0.The present invention establishes the deviation electricity calculation method for fully considering that power station undertakes comprehensive task, has accomplished the quick, scientific of deviation electricity, fair computation on virtual Reservoir Foundation.

Description

Power station deviation electricity calculation method based on virtual reservoir
Technical field
The present invention relates to water conservancy and hydropower technical field, specifically a kind of power station deviation electricity calculating side based on virtual reservoir Method.
Background technique
Xiluodu reservoir is located at Jinsha jiang River downstream, is located at Sichuan and Yunnan intersection, and left and right banks power scheduling adheres to country separately Power grid and south electric network, two power station independent operatings, centre are connected without electric appliance.The left and right banks power station that National Energy Board assigns Dividing electric ratio dry season (November~December, 1~May) is 42:58, and the wet season (6~October) is 50:50.According to two power grids With the agreement of Xi Luodu power plant: when practical left and right banks generated energy does not balance to scale, needing statistic bias electricity, deviation Electricity follows in principle per diem to be counted, handles by month to date, processing in secondary month, rich withered respective balance mode.
In real time execution, two power grids are forecast from reservoir inflow, reservoir operation constrains, power grid power demand, line maintenance Angularly comprehensively consider with power grid security, does not absolutely arrange left and right banks power output in a point electric ratio.
According to the agreement that national grid, south electric network and Xi Luodu power plant sign, the deviation that left and right bank electricity station generates is electric Amount, needs optionally to be rolled adjustment, meets a point electric ratio as far as possible, therefore deviation electricity is to realize left and right bank electricity station electricity The important foundation data balanced in proportion.
There are two types of existing deviation electricity calculation methods:
[1], the deviation electricity calculation method of monthly plan is assigned based on two power grids:
In actual operation, two it is off the net be unsatisfactory for a point electricity ratio up to left and right bank yearly plan and monthly plan, cause the later period to run In, practical electricity is difficult by point electric proportional balancing method;This method day benchmark electricity basis be two power grids assign monthly plan, and The imbalance for assigning monthly plan causes a day imbalance for benchmark electricity.The calculating for according to said method carrying out deviation electricity fails correctly The actual electricity deviation situation in two power stations of reaction.
[2], the direct deviation electricity calculation method based on real generated energy:
Day, benchmark electricity was that actual power generation is allocated in a point electric ratio, and reaction left and right banks power station that can be rough is actually inclined Poor charge condition.Xiluodu project takes into account the power station of more comprehensive task based on generating electricity, and left and right banks power station is obtaining power generation effect While beneficial, also need to undertake corresponding comprehensive task.Direct deviation electricity calculation method based on real generated energy does not consider left and right Bank electricity station needs justice to undertake comprehensive task, undertakes the deviation electricity that the side power station more than comprehensive task thinks that the method calculates and slightly loses It is fair.
The numerous comprehensive task of complicated operation of power networks and power station makes original two kinds of deviation electricity calculation method not The actual conditions of the fair reflection power station operation of energy science, carry out two power grids not by the deviation electricity of both methods calculating The adjustment for balancing electricity, cannot get the consistent approval of two power grids.
It is complicated and changeable due to generating deviation electricity, and its caused consequence is not reproducible, and can not carry out deviation True Reservoir Operation Conditions comparative analysis whether electricity generates, in addition deviation electricity also has accumulation to imitate over time and space It answers, how quickly, accurately, scientific calculating deviation electricity there is no successful precedent that can follow so far, become management and running and need to solve Problem certainly.
Summary of the invention
The present invention provides a kind of power station deviation electricity calculation method based on virtual reservoir and builds on virtual Reservoir Foundation The deviation electricity calculation method for fully considering that power station undertakes comprehensive task has been found, has accomplished the quick, scientific, fair of deviation electricity It calculates.
The technical scheme adopted by the invention is as follows:
Power station deviation electricity calculation method based on virtual reservoir,
In the case where left and right power station reality generated energy is unsatisfactory for constraint condition, increases electricity to constraint condition is met, which is increased The electricity added is calculated as left and right bank amendment electricity, and real generated energy adds amendment electricity to be the virtual electricity in power station, with left and right virtual electricity Carry out the calculating of deviation electricity;
It is left deviation electricity in the right phase: in point electric ratio left bank the multiple electricity of right bank, if the numerical value is positive, need left bank Right bank also supply electricity to right bank left bank;If the numerical value is negative, need right bank left bank also supply electricity to left bank right bank;
It is left right amendment electricity: it is left Right Bank Hydropower Station in the case where being unsatisfactory for constraint condition, calculate it is left right day amendment electricity, if full Foot constraint, then it is left right bank amendment electricity be 0.
Reservoir is run by stages, and deviation electricity carries out rolling calculation within the phase, is only calculated and day is corrected electricity, and amendment in the phase is carried out Electricity statistics calculates.
The electric ratio in left and right banks power station point is crossed in small stream Lip river: according to National Energy Board issue " Xiangjiabahydropower project electric energy is crossed in small stream Lip river Consumption scheme ", the electricity at the left and right bank electricity station Xi Luodu dry season (May November to next year) in 42:58 ratio consumption, Wet season (June to October) is dissolved in the ratio of 50:50.Xiluodu project actual power generation by rich, the withered phase in national grid and South electric network balances according to the above ratio.
Practical reservoir operation, can be all multiple constraints by constraints such as shipping, water supply, construction, library bank safety, lower reservoir operations Condition is reduced to 5 kinds of constraint conditions, including minimum discharge constraint, maximum stream flow constraint, lowest water level constraint, peak level are about Beam, range of stage constraint;Real reservoir traffic constraints are converted into the virtual traffic constraints of left and right bank with a point electric pro rate;Water level Constraint, using virtual water level as the foundation for judging whether to meet constraint.The calculating of the virtual water level is established in the practical tune of reservoir For degree on the basis of, the general same day utilizes the management and running data of proxima luce (prox. luc), calculates the virtual water level of proxima luce (prox. luc).
The power station small stream Luo Du is divided into dry season and wet season in dividing electric ratio different, by reservoir operation, and electricity clearing are with certainly Right year is the period, is in the reservoir drawdown phase in June in the wet season, is in flood season in July, August, and September is in the water storage phase, in September under The high water level runtime is in after ten days water storage, reservoir operation mode conversion is very fast.It can be in point electric a ratio, operation characteristic, electricity Reservoir operation calendar year is divided into several runtimes by the factors such as billing cycle, and deviation electricity can roll continuous meter within the phase It calculates.
A kind of power station deviation electricity calculation method based on virtual reservoir of the present invention, has the beneficial effect that:
1: the present invention establishes the deviation electricity calculating for fully considering that power station undertakes comprehensive task on virtual Reservoir Foundation Method has accomplished the quick, scientific of deviation electricity, fair computation.
2: the present invention passes through the calculating of deviation electricity, and undertake comprehensive task returns electricity more less, undertakes comprehensive appoint less The need of business return electricity more, reasonable to power grid rewards and punishments, technically promote power grid actively to optimize the operation of oneself side power station, favorably Safe operation in power station.
3: with the development of China's hydropower, being located at national boundaries and provincial boundaries reservoir is more and more, based on the inclined of virtual reservoir Poor electricity calculation method will be with certain promotional value in evaluation after these reservoir operations for adhering to different interests body separately.
Specific embodiment
Power station deviation electricity calculation method based on virtual reservoir, principle are as follows:
The concept of virtual reservoir will that is, based on abbreviation " dividing water with electricity " behind point principle of electric pro rate reservoir resources Incoming water quantity, reservoir capacity etc. are allocated in a point electric ratio, and the virtual reservoir of left and right bank is established at corresponding left and right bank electricity station respectively.
Virtual reservoir thinks that two reservoirs of left and right bank are completely independent, and does not support mutually, and virtual reservoir operation must be by a point electric ratio Example undertakes comprehensive task, if when the method for operation possibility Breakthrough restrictions condition in side power station, being adjusted in Real-Time Scheduling;But It is pressed in the calculating of virtual reservoir and meets constraint calculating, abandoned automatically to meet the raw virtual outbound water of constraint fecund depending on a side, from It is rejected in the water of distribution.
Practical reservoir operation, can be all multiple constraints by constraints such as shipping, water supply, construction, library bank safety, lower reservoir operations Be reduced to 5 kinds of constraints: minimum discharge constraint, maximum stream flow constraint, lowest water level constraint, peak level constraint and range of stage are about Beam, real reservoir flow related constraint are converted into the virtual traffic constraints of left and right banks with a point electric pro rate, water level related constraint with Virtual water level is as the foundation for judging whether to meet constraint.
The calculating of virtual water level is established in reservoir actual schedule data basis, using initial actual water level as initial water level, Using virtual water level in actual power operating condition measuring and calculating continuing phase, it is specifically shown in Table 1 by stages.The general same day utilizes the tune of proxima luce (prox. luc) Spend the virtual water level that operation data calculates proxima luce (prox. luc).Within the phase, reach the consistent of the virtual water level in both sides as far as possible, it, can if inconsistent By count it is left deviation electricity in the right bank phase, instruct the later period to run.
In the calculating of deviation electricity, with the virtual water level of the virtual reservoir of left and right banks and virtual flow to determine whether meeting Constraint.In the case where left and right power station reality generated energy is unsatisfactory for constraint condition, increases electricity to constraint condition is met, which is increased Electricity be calculated as left and right bank amendment electricity (be abbreviated as electricity is repaired on a left side, electricity is repaired on the right side).Real generated energy adds amendment electricity to be that power station is empty Quasi- electricity carries out the calculating of deviation electricity with left and right virtual electricity.
It is left deviation electricity in the right phase: in point electric ratio left bank the multiple electricity of right bank, if the numerical value is positive, need left bank Right bank also supply electricity to right bank left bank, if the numerical value is negative, need right bank left bank also supply electricity to left bank right bank.
It is left right amendment electricity: it is left Right Bank Hydropower Station in the case where being unsatisfactory for constraint condition, calculate it is left right day amendment electricity, if full Foot constraint then it is left right bank amendment electricity be 0.
By stages by the operation of reservoir shown in table 1, deviation electricity carries out rolling calculation within the phase, because of two sides power station reality generated energy Objective reality need to only calculate day amendment electricity in actual operation, carry out amendment electricity statistics in the phase and calculate.
Segmentation table in 1 small stream Luo Du of the table virtual water level phase
Deviation electricity calculation method of the invention is as follows:
1 fundamental formular:
1.1 reservoir inflows, which are less than, completely sends out flow:
VEi=Eqi+XEi (1)
In formula 1:
VEiFor the virtual electricity of the virtual reservoir in side;
EqiFor side actual power generation;
XEiElectricity is corrected for side;It is the virtual reservoir in left bank when 1,2 be the virtual reservoir of right bank.
In formula 2:
SEiFor side benchmark electricity;
VEiFor the virtual electricity of the virtual reservoir in side;
piFor point electric ratio of the virtual reservoir in side.
DEi=VEi-SEi (3)
In formula 3:
DEiFor side deviation electricity;
DE1=-DE2 (4)
In formula 4:
DE1For left bank deviation electricity;
DE2For right bank deviation electricity.
1.2 reservoir inflows, which are greater than, completely sends out flow:
The deviation electricity of the left and right sides is 0.
1. a day amendment electricity calculates:
1.1. reservoir inflow is less than the day amendment electricity calculating for completely sending out flow:
It is adjustable for the operation of withered season reservoir by factor constraints such as shipping, water supply, construction, library bank safety, lower reservoir operations Space is smaller, it is left Right Bank Hydropower Station in the case where being unsatisfactory for constraint condition, calculate amendment electricity.Amendment electricity is divided into three types: amendment ElectricityMinimum discharge, amendment electricityThe super upper limit of water levelWith amendment electricityThe super lower limit of water level
1) minimum discharge limits:
Only left bank is not up to the minimum discharge distributed:
(XE1,t)min q=E (△ q1,t) (5)
Only right bank is not up to the minimum discharge distributed:
(XE2,t)min q=E (△ q2,t) (6)
The minimum discharge that left/right bank not up to distributes:
Left/right bank reaches the minimum discharge of distribution:
(XEi,t)min q=0 (7)
In formula 5,6,7:
(XEi,t)minqIt is violated for side and the day that minimum discharge constraint generates corrects electricity;
E(△qi,t) daily electricity that virtual storage outflow generates, electricity, which is corresponded to, for side minimum discharge subtracts actual power Amount.
2) peak level limits:
The super upper limit of the virtual water level in left bank, right bank do not transfinite:
(XE1,t)max h=E (△ q1,t) (8)
The super upper limit of the virtual water level of right bank, left bank are not transfinited:
(XE2,t)max h=E (△ q2,t) (9)
The super upper limit of the virtual water level of left/right bank:
The not super upper limit of the virtual water level of left/right bank:
(XEi,t)max h=0 (10)
In formula 8,9,10:
(XEi,t)maxhIt is violated for side and the day that peak level constraint generates corrects electricity;
E(△qi,t) daily electricity that generates of virtual storage outflow, be side to avoid virtually abandoning water in practical storage outflow base The corresponding daily electricity of increased flow on plinth;
3), lowest water level limits:
The virtual water level in left bank is lower than lower limit, and the virtual water level of right bank is higher than lower limit
(XE1,t)min h=F1,t-1-F1,t (11)
The virtual water level of right bank is lower than lower limit, and the virtual water level in left bank is higher than lower limit
(XE2,t)min h=F2,t-1-F2,t (12)
The virtual water level of left/right bank is below lower limit:
The virtual water level of left/right bank is above lower limit:
(XEi,t)min h=0 (13)
In formula 11,12,13:
(XEi,t)minhElectricity is corrected due to violating the day that minimum constraint generates for side;
Fi,t-1For the corresponding accumulation of energy electricity of the side virtual water level of reservoir proxima luce (prox. luc);
Fi,tFor the corresponding accumulation of energy electricity of the side reservoir same day virtual water level.
1.2. reservoir inflow is greater than the day amendment electricity calculating for completely sending out flow:
Reservoir inflow, which is greater than, completely sends out flow, and two sides power station generates electricity according to maximum capacity, after the uneven electricity that early period generates Phase impotentia is balanced, therefore deviation electricity is 0 in the case.
2. correcting electricity algorithm in the phase:
2.1. storage, which is less than, completely sends out flow:
In view of needing to violate the cushion space of combustion adjustment after constraint to two power grids, electricity minimum stream is corrected in the phase The super upper limit of electricity is corrected in amount, phase and threshold value is respectively set in the amendment super lower limit of electricity in the phase, and amendment electricity surpasses in mid-term Limit and the phase interior amendment super lower limit of electricity correct electric quantity accumulation calculating day in scheduling to last, and the water level upper limit of the day amendment super upper limit of electricity is to set The fixed water level upper limit adds threshold value, and the water level for the water level lower limit setting that the super lower limit of amendment electricity calculates in the phase subtracts threshold value;Phase Interior amendment electricity minimum discharge is just to be included in after aggregate-value is greater than the given threshold of such electricity.The determination of dependent thresholds by Two power grids and power plant determine after negotiating.
In formula 14:
XEiElectricity is corrected in phase for the virtual reservoir in side;
(XEi,t)minqIt is violated for side and the day that minimum discharge constraint generates corrects electricity;
(XEi,t)minhIt is violated for side and the day that lowest water level constraint generates corrects electricity;
(XEi,t)maxhIt is violated for side and the day that peak level constraint generates corrects electricity;
(DEi)minqFor the threshold value for correcting electricity minimum discharge in the phase of side;
(DHi)minhFor the corresponding threshold value of side lowest water level;
(DHi)maxhFor the corresponding threshold value of side peak level;
2.2. storage, which is greater than, completely sends out flow:
It does not calculate and corrects electricity in the accumulative phase, deviation electricity is 0.
3. calculated examples:
20.2 hundred million kW.h of the withered left hypergeometric example power generation righter than small stream of season small stream in 2016 as can be seen from Table 2, but correct electricity and be 4.11 hundred million kW.h, 10.15 hundred million kW.h fewer than the small stream right side, the new algorithm calculating ratio original algorithm deviation electricity by considering Comprehensive Responsibility are few 3.61 hundred million kW.h greatly reduce the right electricity of return small stream in small stream left withered season, have encouraged more to undertake comprehensive task and lack range power station about One side of beam.
Left and right banks power station deviation electricity measure and calculate table is crossed in 2 2016 years small stream Lip rivers of table
Remarks: a: deviation electricity (real generate) be directly be added using the real generated energy in left and right it is electric as benchmark multiplied by point electric ratio Amount, it is deviation electricity that side's reality generated energy, which subtracts benchmark electricity,;
B: deviation electricity is (virtual) based on virtual reservoir, to calculate amendment electricity, considers that the combination of amendment electricity is real Generated energy calculates deviation electricity method, has both invented the new method of proposition.

Claims (6)

1. the power station deviation electricity calculation method based on virtual reservoir, it is characterised in that:
In the case where left and right power station reality generated energy is unsatisfactory for constraint condition, increase electricity to meeting constraint condition, the part is increased Electricity is calculated as left and right bank amendment electricity, and real generated energy is added amendment electricity to be the virtual electricity in power station, carried out with left and right virtual electricity Deviation electricity calculates;
It is left deviation electricity in the right phase: in point electric ratio left bank the multiple electricity of right bank, if the numerical value is positive, need left bank right bank Also supply electricity to right bank left bank;If the numerical value is negative, need right bank left bank also supply electricity to left bank right bank;
It is left right amendment electricity: it is left Right Bank Hydropower Station in the case where being unsatisfactory for constraint condition, calculate it is left right day amendment electricity, if meeting about Beam, then it is left right bank amendment electricity be 0.
2. the power station deviation electricity calculation method based on virtual reservoir according to claim 2, it is characterised in that: reservoir operation By stages, deviation electricity carries out rolling calculation within the phase, only calculates and day corrects electricity, carries out amendment electricity statistics in the phase and calculates.
3. the power station deviation electricity calculation method based on virtual reservoir, characterized by comprising:
1: Zuo right bank deviation electricity calculates;
2: day corrects electricity and calculates;
3: electricity algorithm is corrected in the phase.
4. the power station deviation electricity calculation method based on virtual reservoir according to claim 3, it is characterised in that: Zuo right bank Deviation electricity calculates
1.1. reservoir inflow, which is less than, completely sends out flow:
VEi=Eqi+XEi (1)
In formula 1:
VEiFor the virtual electricity of the virtual reservoir in side;
EqiFor side actual power generation;
XEiElectricity is corrected for side;It is the virtual reservoir in left bank when 1,2 be the virtual reservoir of right bank;
In formula 2:
SEiFor side benchmark electricity;
VEiFor the virtual electricity of the virtual reservoir in side;
piFor point electric ratio of the virtual reservoir in side;
DEi=VEi-SEi (3)
In formula 3:
DEiFor side deviation electricity;
DE1=-DE2 (4)
In formula 4:
DE1For left bank deviation electricity;
DE2For right bank deviation electricity;
1.2. reservoir inflow, which is greater than, completely sends out flow:
The deviation electricity of the left and right sides is 0.
5. the power station deviation electricity calculation method based on virtual reservoir according to claim 3, it is characterised in that:
The day amendment electricity, which calculates, includes:
2.1 reservoir inflows are less than the day amendment electricity calculating for completely sending out flow:
For withered season reservoir operation by shipping, water supply, construction, library bank safety, lower reservoir run factor constraints, it is left right bank electricity It stands in the case where being unsatisfactory for constraint condition, calculates amendment electricity;Amendment electricity is divided into three types: amendment electricityMinimum discharge, amendment electricity AmountThe super upper limit of water levelWith amendment electricityThe super lower limit of water level
1) minimum discharge limits:
Only left bank is not up to the minimum discharge distributed:
(XE1,t)min q=E (△ q1,t) (5)
Only right bank is not up to the minimum discharge distributed:
(XE2,t)min q=E (△ q2,t) (6)
Other situations:
(XEi,t)min q=0 (7)
In formula 5,6,7:
(XEi,t)minqIt is violated for side and the day that minimum discharge constraint generates corrects electricity;
E(△qi,t) daily electricity that virtual storage outflow generates, electricity, which is corresponded to, for side minimum discharge subtracts actual power generation;
2) peak level limits:
The super upper limit of the virtual water level in left bank, right bank do not transfinite:
(XE1,t)max h=E (△ q1,t) (8)
The super upper limit of the virtual water level of right bank, left bank are not transfinited:
(XE2,t)max h=E (△ q2,t) (9)
Other situations:
(XEi,t)max h=0 (10)
In formula 8,9,10:
(XEi,t)maxhIt is violated for side and the day that peak level constraint generates corrects electricity;
E(△qi,t) daily electricity that generates of virtual storage outflow, be side to avoid virtually abandoning water on the basis of practical storage outflow The corresponding daily electricity of increased flow;
3) lowest water level limits:
The virtual water level in left bank is lower than lower limit, and the virtual water level of right bank is higher than lower limit:
(XE1,t)min h=F1,t-1-F1,t (11)
The virtual water level of right bank is lower than lower limit, and the virtual water level in left bank is higher than lower limit:
(XE2,t)min h=F2,t-1-F2,t (12)
Other situations:
(XEi,t)min h=0 (13)
In formula 11,12,13:
(XEi,t)minhElectricity is corrected due to violating the day that minimum constraint generates for side;
Fi,t-1For the corresponding accumulation of energy electricity of the side virtual water level of reservoir proxima luce (prox. luc);
Fi,tFor the corresponding accumulation of energy electricity of the side reservoir same day virtual water level;
2.2 reservoir inflows are greater than the day amendment electricity calculating for completely sending out flow:
Reservoir inflow, which is greater than, completely sends out flow, and two sides power station generates electricity according to maximum capacity, the uneven electricity later period that early period generates without Ability is balanced, therefore deviation electricity is 0 in the case.
6. the power station deviation electricity calculation method based on virtual reservoir according to claim 3, it is characterised in that: in the phase Correcting electricity algorithm includes:
3.1 storages, which are less than, completely sends out flow:
In view of needing to violate the cushion space of combustion adjustment after constraint to two power grids, electricity minimum discharge, phase are corrected in the phase The super upper limit of interior amendment electricity and threshold value is respectively set in the amendment super lower limit of electricity in the phase, corrects the super upper limit of electricity and phase in mid-term The super lower limit of interior amendment electricity corrects electric quantity accumulation calculating day in scheduling to last, and the water level upper limit of the day amendment super upper limit of electricity is the water of setting The position upper limit adds threshold value, and the water level for the water level lower limit setting that the super lower limit of amendment electricity calculates in the phase subtracts threshold value;Amendment in phase Electricity minimum discharge is just to be included in, the determination of dependent thresholds is by two electricity after aggregate-value is greater than the given threshold of such electricity Net and power plant determine after negotiating;
In formula 14:
XEiElectricity is corrected in phase for the virtual reservoir in side;
(XEi,t)minqIt is violated for side and the day that minimum discharge constraint generates corrects electricity;
(XEi,t)minhIt is violated for side and the day that lowest water level constraint generates corrects electricity;
(XEi,t)maxhIt is violated for side and the day that peak level constraint generates corrects electricity;
(DEi)minqFor the threshold value for correcting electricity minimum discharge in the phase of side;
(DHi)minhFor the corresponding threshold value of side lowest water level;
(DHi)maxhFor the corresponding threshold value of side peak level;
3.2 storages, which are greater than, completely sends out flow:
It does not calculate and corrects electricity in the accumulative phase, deviation electricity is 0.
CN201811076473.4A 2018-09-14 2018-09-14 Power station deviation electric quantity calculation method based on virtual reservoir Active CN109272229B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN202110542585.XA CN113327177B (en) 2018-09-14 2018-09-14 Left and right shore power station deviation electric quantity calculation method based on virtual reservoir water level and flow
CN201811076473.4A CN109272229B (en) 2018-09-14 2018-09-14 Power station deviation electric quantity calculation method based on virtual reservoir

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811076473.4A CN109272229B (en) 2018-09-14 2018-09-14 Power station deviation electric quantity calculation method based on virtual reservoir

Related Child Applications (1)

Application Number Title Priority Date Filing Date
CN202110542585.XA Division CN113327177B (en) 2018-09-14 2018-09-14 Left and right shore power station deviation electric quantity calculation method based on virtual reservoir water level and flow

Publications (2)

Publication Number Publication Date
CN109272229A true CN109272229A (en) 2019-01-25
CN109272229B CN109272229B (en) 2021-07-06

Family

ID=65188451

Family Applications (2)

Application Number Title Priority Date Filing Date
CN201811076473.4A Active CN109272229B (en) 2018-09-14 2018-09-14 Power station deviation electric quantity calculation method based on virtual reservoir
CN202110542585.XA Active CN113327177B (en) 2018-09-14 2018-09-14 Left and right shore power station deviation electric quantity calculation method based on virtual reservoir water level and flow

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN202110542585.XA Active CN113327177B (en) 2018-09-14 2018-09-14 Left and right shore power station deviation electric quantity calculation method based on virtual reservoir water level and flow

Country Status (1)

Country Link
CN (2) CN109272229B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109933892A (en) * 2019-03-12 2019-06-25 中国电建集团中南勘测设计研究院有限公司 A kind of modification method of water temperature model power station letdown flow boundary condition

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130318118A1 (en) * 2012-05-24 2013-11-28 Alibaba Group Holding Limited Completing application interfaces
CN103745023A (en) * 2013-11-22 2014-04-23 华中科技大学 Coupling modeling method for hydropower station power generated output scheme making and optimal load distribution
CN105303318A (en) * 2015-10-30 2016-02-03 国家电网公司 Trans-regional power grid transaction settlement processing method based on deviation electric quantity responsibility judgment
CN106570744A (en) * 2016-10-26 2017-04-19 清华大学 Electric power transaction settlement method considering deviation electric quantity hierarchical processing and transaction component ranking
CN107392432A (en) * 2017-06-27 2017-11-24 东南大学 The frequency modulation electric reserve market implementation method of long-term electricity contract energy decomposition in consideration

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103971181B (en) * 2014-05-20 2017-09-19 河海大学 A kind of economic load dispatching method a few days ago for virtual plant
JPWO2017154096A1 (en) * 2016-03-08 2018-06-28 三菱電機株式会社 Laser light source device and control method thereof
CN108470249B (en) * 2018-03-16 2019-04-09 大连理工大学 A kind of Hydropower Stations short-term electricity generation dispatching method coupling clustering and decision tree

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130318118A1 (en) * 2012-05-24 2013-11-28 Alibaba Group Holding Limited Completing application interfaces
CN103745023A (en) * 2013-11-22 2014-04-23 华中科技大学 Coupling modeling method for hydropower station power generated output scheme making and optimal load distribution
CN105303318A (en) * 2015-10-30 2016-02-03 国家电网公司 Trans-regional power grid transaction settlement processing method based on deviation electric quantity responsibility judgment
CN106570744A (en) * 2016-10-26 2017-04-19 清华大学 Electric power transaction settlement method considering deviation electric quantity hierarchical processing and transaction component ranking
CN107392432A (en) * 2017-06-27 2017-11-24 东南大学 The frequency modulation electric reserve market implementation method of long-term electricity contract energy decomposition in consideration

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109933892A (en) * 2019-03-12 2019-06-25 中国电建集团中南勘测设计研究院有限公司 A kind of modification method of water temperature model power station letdown flow boundary condition
CN109933892B (en) * 2019-03-12 2023-04-07 中国电建集团中南勘测设计研究院有限公司 Correction method for boundary condition of lower discharge of water temperature model power station

Also Published As

Publication number Publication date
CN113327177A (en) 2021-08-31
CN109272229B (en) 2021-07-06
CN113327177B (en) 2022-04-19

Similar Documents

Publication Publication Date Title
Albadi et al. Overview of wind power intermittency impacts on power systems
CN109636674B (en) Large-scale hydropower station group monthly transaction electric quantity decomposition and checking method
CN106682810B (en) Long-term operation method of cross-basin cascade hydropower station group under dynamic production of giant hydropower station
CN109063901B (en) Method for analyzing medium-term and long-term power generation capacity of provincial power grid hydropower system
CN109492861A (en) A kind of Hydropower Stations mid-term electricity trading program decomposition method
CN110348599A (en) A kind of across basin water station group peak regulation Optimization Scheduling for considering to abandon water risk
CN108133322A (en) Power and electric quantity balance index calculation method based on time sequence operation simulation
CN106786791B (en) A kind of generation method of wind power output scene
CN109829742B (en) Thermal power generating unit optimal quotation calculation method and system based on declared price settlement
CN105335561A (en) Ultra short-term scheduling method for cascade hydropower station group sequencing based on indexes
Nam et al. Assessment of irrigation efficiencies using smarter water management
CN115271304A (en) Cross-basin water transfer engineering optimal scheduling method based on climate change
CN114707403A (en) Multi-energy coordination optimization scheduling method for regional power distribution network based on pumped storage adjustment
Bai et al. Efficient deployment of solar photovoltaic stations in China: An economic and environmental perspective
CN109272229A (en) Power station deviation electricity calculation method based on virtual reservoir
Coletta et al. Optimal design of energy communities in the italian regulatory framework
Ptashkina-Girina et al. Technical-economic assessment of small hydro-power units
CN115809585B (en) Method and system for determining ecological flow of radial hydropower station by balancing WEE relationship
CN108053083A (en) A kind of hydro plant with reservoir non-flood period combined optimization power generation dispatching method
CN111242438A (en) Evaluation method and system for flexibility adjustment capability of power generation and utilization resources of self-contained power plant
CN114548609B (en) Water resource collaborative allocation method for ecological power generation and water supply
Acharya et al. Current status of micro†hydro technology in Nepal
CN109117592A (en) Virtual model of reservoir and virtual reservoir level calculation method
CN104408557B (en) A kind of flood season water power enrichment power network saves balancing power plant electric quantity of power supply distribution method
Frew Optimizing the integration of renewable energy in the united states

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant