CN109262195A - A kind of wind power tower flange group is to device of tyre and method - Google Patents

A kind of wind power tower flange group is to device of tyre and method Download PDF

Info

Publication number
CN109262195A
CN109262195A CN201811401410.1A CN201811401410A CN109262195A CN 109262195 A CN109262195 A CN 109262195A CN 201811401410 A CN201811401410 A CN 201811401410A CN 109262195 A CN109262195 A CN 109262195A
Authority
CN
China
Prior art keywords
support rod
tire column
tire
sleeve
wind power
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811401410.1A
Other languages
Chinese (zh)
Inventor
徐春华
米劲臣
夏海龙
田兆斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Zhongche Tongli Steel Co Ltd
Original Assignee
Shandong Zhongche Tongli Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Zhongche Tongli Steel Co Ltd filed Critical Shandong Zhongche Tongli Steel Co Ltd
Priority to CN201811401410.1A priority Critical patent/CN109262195A/en
Publication of CN109262195A publication Critical patent/CN109262195A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
    • B23K37/04Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
    • B23K37/053Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work aligning cylindrical work; Clamping devices therefor

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Wind Motors (AREA)

Abstract

The present invention relates to test apparatus technical field, more particularly to a kind of wind power tower flange group to device of tyre and method, including tire column and multiple support rod components, the tire column for realizing support rod component positioning;The support rod component is radially distributed to be set to tire column lateral surface, and the one end of the support rod component far from tire column is equidistant with tire column central axis;The multiple one end of support rod component far from tire column can stretch isometric distance under the driving of driving portion, the tire column is columnar structured, the support rod component includes sleeve, one end of the sleeve is fixedly installed on tire column lateral surface, multiple radial arrangements of sleeve, support rod is provided in the sleeve, the support rod can reciprocatingly slide along sleeve axis and be fixed on setting position.The present invention is able to solve shell ring in production process and is not easy school circle, and using jack, group is justified to the problem for causing welding rear flange flatness poor in school by force.

Description

A kind of wind power tower flange group is to device of tyre and method
Technical field
The invention belongs to technical field of wind power, and in particular to a kind of wind power tower flange group is to device of tyre and method.
Background technique
Steel wind power tower is welded by steel construction shell ring group, is generally divided into 3-6 sections, each section of both ends needs group weldering Upper steel flanges realize the connection between different sections of shell rings by flange, and the flatness of end face of flange directly affects the peace of pylon Fill difficulty and installation quality.
In the actual production process, often have the biggish shell ring of part plate thickness can not school circle, when shell ring and flange are installed, nothing Method is directly organized pair, often using jack open it is equal organize mode completion group pair by force, but this method has stress after strong group Residual, in welding, huge heat input can allow residual stress at strong group to release, and welding stress and residual stress are not Acting rules cause planeness of flange after the completion of flange welding very poor, in this case can only be by the way of flame locally roasting tune Correct, it is very time-consuming and laborious, and using flame it is roasting adjust number be more than twice after be affected to material property, there is peace Full blast danger.
Summary of the invention
For overcome the deficiencies in the prior art, the present invention provides a kind of wind power tower flange groups to device of tyre and method, Be able to solve shell ring in production process be not easy school circle, using jack by force school circle group to cause welding rear flange flatness it is poor The problem of.
The present invention adopts the following technical solutions: a kind of wind power tower flange group is to device of tyre, including tire column and multiple supports Bar assembly, the tire column for realizing support rod component positioning;The support rod component is radially distributed to be set to tire column Lateral surface, the one end of the support rod component far from tire column are equidistant with tire column central axis;Multiple support rod components are remote One end from tire column can stretch under the driving of driving portion it is isometric with a distance from.
Using telescopic support rod component, the one end of multiple support rod components far from tire column and tire column central axis away from From equal, so that multiple support rod component outermost ends are located on the circular arc of the same circle, when correcting the non-round position of shell ring, shell ring In other same as the position of support rod component touch understand stress.Reduce in this way local pressure it is excessive caused by answer Power residual can reduce the stress deformation of flange and shell ring in welding.
Further, the tire column is columnar structured, and the bottom face of tire column is fixedly connected with tire column pedestal.
It is columnar structured that support rod component can be facilitated to form radiation by matrix of tire column using columnar structured tire column Shape structure, it can be ensured that the angle of two neighboring support rod component is met the requirements.
Further, the support rod component includes sleeve, and one end of the sleeve is fixedly installed on tire column lateral surface, multiple Sleeve radial arrangement is provided with support rod in the sleeve, and the support rod can reciprocatingly slide and fix along sleeve axis In setting position.
Support bar group part is formed using support rod and sleeve, under the premise of sleeve and fixed tire column, support rod still is able to The correction of shell ring is realized along slip expansion, sleeve plays the role of limit and guiding, so that the correction of support rod component More effectively.
Further, the driving portion is using one of hydraulic pump, motor or cylinder.Pass through hydraulic pump, motor or gas What any one driving part in cylinder can be convenient realizes support rod along the sliding of sleeve.
Further, one end that the support rod is located at sleeve inner is provided with support rod piston, the support rod piston with Oil liquid space is formed between tire column, tire column side is equipped with multiple oilholes, and each oilhole is connected with one by sealing silk plug One end of hydraulic oil pipe, the hydraulic oil pipe is connected to oil liquid space, and the other end is connected to hydraulic pump, and the hydraulic pump is set to In tire column.
Using hydraulic pump as driving device, the oil liquid space in multiple support rods passes through hydraulic oil pipe and hydraulic pump respectively Connection, when hydraulic pump works, it can be achieved that the synchronization telescope of multiple support rods, can guarantee the support plate of multiple support rod ends On the circular arc of the same circle, stress caused by avoiding shell ring local pressure excessive is concentrated.
Further, one end that the support rod is located at cartridge exterior is provided with support plate, and the support plate is arc panel, institute State the medial surface of the form fit shell ring to be installed of support plate.
The shell ring medial surface shape being in contact with it using the form fit of the support plate of arcuate structure, and support plate, is made It obtains the pressure that supporting bar top applies and is fully transmitted to shell ring side wall, and the area of support plate is greater than support rod end cross-sectional Product, improves the forced area of shell ring medial surface.
Further, the tire column pedestal is fixed on erecting bed upper surface, the erecting bed be used to support tire column pedestal and to The flange of group pair.
The present invention also provides given a kind of wind power tower flange group to method, comprising the following steps:
Step 1: tire column pedestal and tire column being placed in the erecting bed upper surface of horizontal leveling, starting hydraulic pump to prop up Strut bounces back to extreme position along sleeve;
Step 2: flange being lifted to erecting bed upper surface and flange and the axle center of tire column are overlapped;
Step 3: shell ring is lifted by crane to and made shell ring lower end surface engagement flange upper surface, shell ring and flange arranged concentric;
Step 4: the circularity of shell ring is observed, if discovery shell ring and the portion circularity of flange welding endface are not able to satisfy It is required that starting hydraulic pump, hydraulic pump works drive hydraulic oil to enter oil liquid space, support rod is under the action of piston and pressure oil Stretch out set distance.
Step 5: the support plate of more support boom ends presses closer at shell ring medial surface simultaneously, and the non-round place of shell ring is propped up Fagging correction.
Compared with prior art, the beneficial effects of the present invention are:
The application carries out holding out against for the multiple positions of shell ring inner sidewall, multiple support rod ends using multiple support rod components simultaneously The support plate at end is located on the circular arc of the same circle, so that the circularity of shell ring is met the requirements after correction.
Linkage while can be realized multiple support rod components using the cooperation of hydraulic cylinder and hydraulic oil pipe, piston, i.e., it is more What a support rod stretched out is equidistant, and avoids outreach difference, shell ring circularity school caused by more support rods of independent driving The case where positive failure.
Group clock synchronization between shell ring and flange welding is by the way of Supplements, in the primary correction of support rod component The circularity correction for realizing multiple positions in the process, can be avoided using shell ring local pressure caused by the correction of independent hydraulic jack It is excessive, stress-retained larger, the larger situation of flange distortion in welding.
Detailed description of the invention
The accompanying drawings constituting a part of this application is used to provide further understanding of the present application, and the application's shows Meaning property embodiment and its explanation are not constituted an undue limitation on the present application for explaining the application.
Fig. 1 is overall structure diagram top view of the invention;
Fig. 2 is the schematic diagram that flange and cylinder are formed a team in the present invention.
In figure: 1, support plate;2, support rod;3, support rod piston;4, sleeve;5, hydraulic oil;6, tire column;7, sealing filament It is stifled;8, hydraulic oil pipe;9, hydraulic pump;10, tire column pedestal;11, flange;12, shell ring.
Specific embodiment
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
A kind of exemplary embodiment of the application, as shown in Figs. 1-2,11 groups of a kind of wind power tower flange to device of tyre, packet Include 2 component of tire column 6 and multiple support rods, the tire column 6 for realizing 2 component of support rod positioning;
2 component of support rod is radially distributed to be set to 6 lateral surface of tire column, and 2 component of support rod is far from tire column 6 One end and 6 central axis of tire column be equidistant;
The one end of multiple 2 components of support rod far from tire column 6 can stretch isometric distance under the driving of driving portion.
The tire column 6 be it is columnar structured, the bottom face of tire column 6 is fixedly connected with tire column pedestal 10.
2 component of support rod includes sleeve 4, and one end of the sleeve 4 is fixedly installed on 6 lateral surface of tire column, Duo Getao 4 radial arrangements of cylinder, are provided with support rod 2 in the sleeve 4, the support rod 2 can reciprocatingly slide and consolidate along 4 axis of sleeve It is scheduled on setting position.
The driving portion is using one of hydraulic pump 9, motor or cylinder.
Specifically, special swivel nut, the output shaft of motor can be arranged on support rod 2 when driving portion uses motor It is fixedly connected by shaft coupling with lead screw, lead screw and swivel nut cooperation adapt to, and realize swivel nut along the past of lead screw by the rotation of motor It is multiple mobile, the reciprocating movement of support rod 2 is driven by swivel nut, specific structure setting and attached drawing, the application repeat no more, ability Field technique personnel can be not construed as unclear with self-setting.When driving portion uses cylinder, a support rod is only utilized 2, support rod 2 is mounted on the extension bar end of cylinder, each 2 component of support rod drives its reciprocal telescopic to transport by a cylinder It is dynamic.
One end that the support rod 2 is located inside sleeve 4 is provided with support rod piston 3;
Specifically, support rod piston 3 should be sealed with 4 medial surface of sleeve and support rod piston 3 divides sleeve 4 not connect mutually Logical two parts.
Oil liquid space is formed between the support rod piston 3 and tire column 6,6 side of tire column is equipped with multiple oilholes, each Oilhole is connected with a hydraulic oil pipe 8 by sealing silk plug 7, and one end of the hydraulic oil pipe 8 is connected to oil liquid space, the other end It is connected to hydraulic pump 9, the hydraulic pump 9 is set in tire column 6.
Specifically, the connecting end surface of sleeve 4 and tire column 6 is answered sealed set and oil liquid space only to pass through oilhole and is connected with outside It is logical.The oil liquid outlet of hydraulic pump 9 is connected to multiple hydraulic oil pipes 8 respectively by multiple way union.It i.e. can by a hydraulic pump 9 It is simultaneously the oil liquid space fuel feeding of multiple 2 components of support rod.
The tire column pedestal 10 is fixed on erecting bed upper surface, and the erecting bed is used to support tire column pedestal 10 and wait organize pair Flange 11.
One end that the support rod 2 is located at outside sleeve 4 is provided with support plate 1, and the support plate 1 is arc panel, described The medial surface of the form fit of support plate 1 shell ring 12 to be installed.
Specifically, flexible material can be used in support plate 1, support plate 1 is avoided to scratch cylinder when holding out against cylinder medial surface.
The present invention also provides given it is a kind of 11 groups of wind power tower flange to method, comprising the following steps:
Step 1: tire column pedestal 10 and tire column 6 being placed in the erecting bed upper surface of horizontal leveling, starting hydraulic pump 9 makes It obtains support rod 2 and bounces back to extreme position along sleeve 4;
Step 2: flange 11 being lifted to erecting bed upper surface and flange 11 and the axle center of tire column 6 are overlapped;
Step 3: shell ring 12 being lifted by crane to and made 12 lower end surface engagement flange of shell ring, 11 upper surface, shell ring 12 and flange 11 are same Heart arrangement;
Step 4: the circularity of observation shell ring 12, if the portion circularity at discovery shell ring 12 and 11 welding end surface of flange is not It is able to satisfy requirement, starts hydraulic pump 9,9 work belt hydrodynamic pressure oil 5 of hydraulic pump enters oil liquid space, and support rod 2 is in piston and pressure Set distance is stretched out under the action of oil.
Step 5: the support plate 1 of more 2 ends of support rod presses closer at 12 medial surface of shell ring simultaneously, the non-round ground of shell ring 12 Side is supported the correction of plate 1.
Above-mentioned, although the foregoing specific embodiments of the present invention is described with reference to the accompanying drawings, not protects model to the present invention The limitation enclosed, those skilled in the art should understand that, based on the technical solutions of the present invention, those skilled in the art are not Need to make the creative labor the various modifications or changes that can be made still within protection scope of the present invention.

Claims (8)

1. a kind of wind power tower flange group is to device of tyre, characterized in that including,
Tire column, the tire column for realizing support rod component positioning;
Multiple support rod components, the support rod component is radially distributed to be set to tire column lateral surface, the support rod component Far from one end of tire column and being equidistant for tire column central axis;
The multiple one end of support rod component far from tire column can stretch isometric distance under the driving of driving portion.
2. wind power tower flange group as described in claim 1 is to device of tyre, characterized in that the tire column be it is columnar structured, The bottom face of tire column is fixedly connected with tire column pedestal.
3. wind power tower flange group as claimed in claim 2 is to device of tyre, characterized in that the support rod component includes set Cylinder, one end of the sleeve are fixedly installed on tire column lateral surface, multiple radial arrangements of sleeve, are provided with branch in the sleeve Strut, the support rod can reciprocatingly slide along sleeve axis and be fixed on setting position.
4. wind power tower flange group as described in claim 1 is to device of tyre, characterized in that the driving portion using hydraulic pump, One of motor or cylinder.
5. wind power tower flange group as described in claim 1 is to device of tyre, characterized in that the support rod is located at sleeve inner One end be provided with support rod piston;
Oil liquid space is formed between the support rod piston and tire column, tire column side is equipped with multiple oilholes, and each oilhole is logical Cross that sealing filament is stifled to be connected with a hydraulic oil pipe, one end of the hydraulic oil pipe is connected to oil liquid space, the other end and hydraulic pump Connection, the hydraulic pump are set in tire column.
6. wind power tower flange group as described in claim 1 is to device of tyre, characterized in that the support rod is located at cartridge exterior One end be provided with support plate, the support plate is arc panel, the medial surface of the form fit of support plate shell ring to be installed.
7. wind power tower flange group as described in claim 1 is to device of tyre, characterized in that the tire column pedestal is fixed on installation Platform upper surface, the erecting bed are used to support tire column pedestal and the flange wait organize pair.
8. a kind of wind power tower flange group utilizes the wind power tower flange as described in any one of claim 1-7 to method Group is to device of tyre, comprising the following steps:
Step 1: tire column pedestal and tire column being placed in the erecting bed upper surface of horizontal leveling, starting hydraulic pump makes support rod Extreme position is bounced back to along sleeve;
Step 2: flange being lifted to erecting bed upper surface and flange and the axle center of tire column are overlapped;
Step 3: shell ring is lifted by crane to and made shell ring lower end surface engagement flange upper surface, shell ring and flange arranged concentric;
Step 4: the circularity of shell ring is observed, if the portion circularity of discovery shell ring and flange welding endface is not able to satisfy and wants It asks, starts hydraulic pump, hydraulic pump works drive hydraulic oil to enter oil liquid space, and support rod is stretched under the action of piston and pressure oil Set distance out;
Step 5: the support plate of more support boom ends presses closer at shell ring medial surface simultaneously, and the non-round place of shell ring is supported plate Correction.
CN201811401410.1A 2018-11-22 2018-11-22 A kind of wind power tower flange group is to device of tyre and method Pending CN109262195A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811401410.1A CN109262195A (en) 2018-11-22 2018-11-22 A kind of wind power tower flange group is to device of tyre and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811401410.1A CN109262195A (en) 2018-11-22 2018-11-22 A kind of wind power tower flange group is to device of tyre and method

Publications (1)

Publication Number Publication Date
CN109262195A true CN109262195A (en) 2019-01-25

Family

ID=65190526

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811401410.1A Pending CN109262195A (en) 2018-11-22 2018-11-22 A kind of wind power tower flange group is to device of tyre and method

Country Status (1)

Country Link
CN (1) CN109262195A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110039217A (en) * 2019-06-06 2019-07-23 贵州建工集团第六建筑工程有限责任公司 A kind of upside-down mounting mode storage tank concentricity, ovality control construction method
CN111015047A (en) * 2019-10-14 2020-04-17 武汉船用机械有限责任公司 Welding tool and welding method for combustion chamber shell of gas turbine
CN111547333A (en) * 2020-05-06 2020-08-18 哈尔滨电机厂有限责任公司 Oil blocking pipe fixing device of large vertical hydraulic generator
CN111922506A (en) * 2020-07-30 2020-11-13 北京九天行歌航天科技有限公司 Thin-wall revolving body tightening device

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050019974A (en) * 2003-08-19 2005-03-04 현대중공업 주식회사 Fit-up machine for ring frame
KR20090056529A (en) * 2007-11-30 2009-06-03 김성진 A apparatus having functions restoring deformed conduits as well as repairing damaged conduits
CN202301244U (en) * 2011-10-12 2012-07-04 李祥 Small-size power-driven hydraulic expansion device
CN103302440A (en) * 2013-06-28 2013-09-18 中国有色(沈阳)冶金机械有限公司 Detachably combined supporting device for large tube processing
CN203371222U (en) * 2013-07-29 2014-01-01 陈明先 Shell ring expanded circular ring seam fitting-up machine
CN103753083A (en) * 2013-12-26 2014-04-30 新疆新能钢结构有限责任公司 Flange assembling platform
CN204476930U (en) * 2015-03-12 2015-07-15 盐城工业职业技术学院 Dibit synchronization telescope oil hydraulic cylinder
KR101549196B1 (en) * 2014-06-05 2015-09-04 삼성중공업 주식회사 Installation method for offshore wind tower
CN204747888U (en) * 2015-07-21 2015-11-11 无锡市阳通机械设备有限公司 Welded platform of cylinder and flange on wind tower line
CN105873718A (en) * 2015-07-29 2016-08-17 洛阳德平科技股份有限公司 Gas shielded welding internal welding machine for pipelines
CN207553127U (en) * 2017-08-08 2018-06-29 青岛中电新材料有限公司 A kind of dichotomous steel pipe pile foundation
CN209239380U (en) * 2018-11-22 2019-08-13 山东中车同力钢构有限公司 A kind of wind power tower flange group is to device of tyre

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20050019974A (en) * 2003-08-19 2005-03-04 현대중공업 주식회사 Fit-up machine for ring frame
KR20090056529A (en) * 2007-11-30 2009-06-03 김성진 A apparatus having functions restoring deformed conduits as well as repairing damaged conduits
CN202301244U (en) * 2011-10-12 2012-07-04 李祥 Small-size power-driven hydraulic expansion device
CN103302440A (en) * 2013-06-28 2013-09-18 中国有色(沈阳)冶金机械有限公司 Detachably combined supporting device for large tube processing
CN203371222U (en) * 2013-07-29 2014-01-01 陈明先 Shell ring expanded circular ring seam fitting-up machine
CN103753083A (en) * 2013-12-26 2014-04-30 新疆新能钢结构有限责任公司 Flange assembling platform
KR101549196B1 (en) * 2014-06-05 2015-09-04 삼성중공업 주식회사 Installation method for offshore wind tower
CN204476930U (en) * 2015-03-12 2015-07-15 盐城工业职业技术学院 Dibit synchronization telescope oil hydraulic cylinder
CN204747888U (en) * 2015-07-21 2015-11-11 无锡市阳通机械设备有限公司 Welded platform of cylinder and flange on wind tower line
CN105873718A (en) * 2015-07-29 2016-08-17 洛阳德平科技股份有限公司 Gas shielded welding internal welding machine for pipelines
CN207553127U (en) * 2017-08-08 2018-06-29 青岛中电新材料有限公司 A kind of dichotomous steel pipe pile foundation
CN209239380U (en) * 2018-11-22 2019-08-13 山东中车同力钢构有限公司 A kind of wind power tower flange group is to device of tyre

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110039217A (en) * 2019-06-06 2019-07-23 贵州建工集团第六建筑工程有限责任公司 A kind of upside-down mounting mode storage tank concentricity, ovality control construction method
CN111015047A (en) * 2019-10-14 2020-04-17 武汉船用机械有限责任公司 Welding tool and welding method for combustion chamber shell of gas turbine
CN111015047B (en) * 2019-10-14 2022-08-23 武汉船用机械有限责任公司 Welding tool and welding method for combustion chamber shell of gas turbine
CN111547333A (en) * 2020-05-06 2020-08-18 哈尔滨电机厂有限责任公司 Oil blocking pipe fixing device of large vertical hydraulic generator
CN111922506A (en) * 2020-07-30 2020-11-13 北京九天行歌航天科技有限公司 Thin-wall revolving body tightening device
CN111922506B (en) * 2020-07-30 2022-02-22 北京九天行歌航天科技有限公司 Thin-wall revolving body tightening device

Similar Documents

Publication Publication Date Title
CN109262195A (en) A kind of wind power tower flange group is to device of tyre and method
CN209239380U (en) A kind of wind power tower flange group is to device of tyre
CN202655402U (en) Device for adjusting roundness of penstock and supporting penstock
CN203795947U (en) Hydraulic lifting, inverting and constructing device for single inner steel cylinder of chimney
CN112855194A (en) Shield machine and shield thereof
CN101845956A (en) Combined steel formwork of curved tunnel concrete liner
CN204954202U (en) Blast furnace stove outer covering inner wall welded platform
CN204276581U (en) A kind of pipe connecting flange post welding distortion means for correcting
CN208744760U (en) A kind of gearbox lifting disassemblerassembler remanufactured for automatic gearbox of vehicles
CN107649848B (en) A kind of Dual-drum storage tank double-station socket unit and method
CN102615147B (en) Splicing flange leveling device of wind driven generator tower cylinder
CN214560622U (en) L-shaped assembly platform for bottom of hot blast stove
CN205709666U (en) A kind of jib fittable slackening device
CN212704212U (en) Be used for forged novel high temperature heating furnace
CN209407762U (en) A kind of hoisting ring welding fixture
JP2014070359A (en) Method for constructing cylindrical type tank
CN218310155U (en) Ring piece correcting device
CN208528421U (en) A kind of pairing device of wind power tower drum and flange
CN203547103U (en) Easily assembled and disassembled telescoping construction platform
CN110202040A (en) Steel pipe socket molding machine
CN206824915U (en) A kind of axle sleeve assembles device
CN212772388U (en) Coordinatable transverse supporting system suitable for deep foundation pit
US3694893A (en) Method for constructing cylindrical structures such as steel chimneys
CN115162698B (en) Steel structure platform for installing chimney
CN210985885U (en) Motor rotor gear disassembling tool

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination