CN109252736A - Road safety job execution barrier structure - Google Patents
Road safety job execution barrier structure Download PDFInfo
- Publication number
- CN109252736A CN109252736A CN201811355181.4A CN201811355181A CN109252736A CN 109252736 A CN109252736 A CN 109252736A CN 201811355181 A CN201811355181 A CN 201811355181A CN 109252736 A CN109252736 A CN 109252736A
- Authority
- CN
- China
- Prior art keywords
- steel structure
- car body
- spud pile
- hinged
- leading portion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000004888 barrier function Effects 0.000 title claims abstract description 49
- 230000003447 ipsilateral effect Effects 0.000 claims abstract description 8
- 229910000831 Steel Inorganic materials 0.000 claims description 172
- 239000010959 steel Substances 0.000 claims description 172
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims description 11
- 230000032258 transport Effects 0.000 claims description 2
- 238000009434 installation Methods 0.000 abstract description 3
- 238000010276 construction Methods 0.000 description 26
- 238000010586 diagram Methods 0.000 description 9
- 238000000034 method Methods 0.000 description 5
- 230000015572 biosynthetic process Effects 0.000 description 3
- 238000003032 molecular docking Methods 0.000 description 3
- 239000011152 fibreglass Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 206010039203 Road traffic accident Diseases 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012545 processing Methods 0.000 description 1
- 238000004064 recycling Methods 0.000 description 1
- 238000007592 spray painting technique Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
- E04H17/16—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/26—Devices for erecting or removing fences
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01F—ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
- E01F8/00—Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
- E01F8/0005—Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
- E01F8/0088—Suspended, e.g. ropes or mesh
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/343—Structures characterised by movable, separable, or collapsible parts, e.g. for transport
- E04B1/34336—Structures movable as a whole, e.g. mobile home structures
- E04B1/34352—Base structures or supporting means therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/62—Insulation or other protection; Elements or use of specified material therefor
- E04B1/74—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
- E04B1/82—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to sound only
- E04B1/8227—Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to sound only screens ; Arrangements of sound-absorbing elements, e.g. baffles
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Acoustics & Sound (AREA)
- Electromagnetism (AREA)
- Mechanical Engineering (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
The invention discloses road safety job execution barrier structures, including drawing platform, hydraulic leg is installed below the traction platform, the traction platform is divided into leading portion car body and back segment car body, it is characterized in that, quadrangle on the traction platform is equipped with spud pile, reel is installed on the spud pile, wherein: 2 reels are mounted on each spud pile, reel level height above each spud pile is identical, and is located above two ipsilateral spud piles and is connected with wirerope between the reel of same level height;The utility model has the advantages that the present invention is specifically applied to surrounding baffle Fast Installation, mechanization is built and removed the arrangement achieves surrounding baffle, and speed is fast, high degree of automation, reduces manual operation and saves human cost, and is highly-safe, is suitble to promote the use of.
Description
Technical field
The present invention relates to civil engineering detection fields, and in particular to a kind of road safety job execution barrier structure and its applies
Work method.
Background technique
Surrounding baffle be a kind of a kind of building site maintenance after the processing such as machine die mould, spray painting, bending and with the external world every
From a kind of profile, be suitable for construction site, highway maintenance, the light-duty plate that is isolated from the outside of one kind of construction site.It is prevented fires,
Waterproof, it is moisture-proof light-weight the features such as be widely used.
If Publication No. CN103306227A is disclosed the present invention relates to field of road construction, specifically providing one kind can live
The dynamic reflective enclosing folded, including multiple surrounding baffles side by side.It is connected between adjacent surrounding baffle by articulate, surrounding baffle
It is folded and unfolded by hinge realization.The surface of surrounding baffle surrounding baffle is provided with reflector block, for passing by one's way vehicle in warning at night.
The bottom of surrounding baffle is provided with pulley blocks, the operation that edge surrounding baffle folds and unfolds.Present invention can apply to various needs to set
The occasion of enclosing is set, convenient for storage and transport.When night, the present invention, which can remind, passes by driver's hot work in progress at this,
Improve safety.
For another example Publication No. CN203441168U, which discloses a kind of the utility model and discloses a kind of construction site glass reinforced plastic, encloses
Gear, including surrounding baffle, surrounding baffle are made of glass reinforced plastic, and enclosing back is uniformly provided with pedestal, base end face and surrounding baffle bottom surface
Concordantly, base upper surface is equipped with support rod, and wherein one end is set to base upper surface, the other end and enclosing backboard to the support rod
Face connection, pedestal are equipped with connecting plate far from one end of surrounding baffle, are provided with screw hole, position of the surrounding baffle front close to top on connecting plate
It sets and is uniformly provided with hook, lighting device is connected with by bracket at the top of surrounding baffle, the bracket is telescopic sleeve structure.This is practical
The novel service life is long, is difficult to be deformed being hit.
Existing surrounding baffle is all to be packaged to be transported to building site, is then barricaded as barricade by one piece of block splicing of construction personnel, this
Sample has two, 1, construction personnel it is higher in build process risk, be easy to appear traffic accident;2, existing surrounding baffle is built
A large amount of manpowers are needed, the speed built and removed is very slow, influences construction speed.
Summary of the invention
The present invention overcomes problem of the existing technology, propose a kind of road safety job execution barrier structure and its
Construction method, the present apparatus are specifically applied to surrounding baffle Fast Installation, and mechanization is built and removed the arrangement achieves surrounding baffle,
Speed is fast, high degree of automation, reduces manual operation and saves human cost, and is highly-safe.
The specific technical solution of the present invention is as follows:
Road safety job execution barrier structure, including platform is drawn, hydraulic branch is installed below the traction platform
Leg, the traction platform are divided into leading portion car body and back segment car body, which is characterized in that
Quadrangle on the traction platform is equipped with spud pile, is equipped with reel on the spud pile, in which: each fixation
2 reels are mounted in stake, the reel level height above each spud pile is identical, and is located above two ipsilateral spud piles
Wirerope is connected between the reel of same level height;
Top plate is installed on the traction platform, track strip is uniformly installed, noise barrier is by leading above the top plate
It is uniformly lifted below top plate into cam insertion track strip;The two sides of the noise barrier are symmetrically arranged with wirerope abaculus, institute
It states and is also equipped with pulley one on the inside of wirerope abaculus;
Described is to be equipped with conduit on leading portion car body and back segment car body, and the tail portion of the leading portion car body is laid with connection
Column is equipped with the mechanical gripper for holding connecting column on the back segment car body;Rotation connection steel structure be symmetrically mounted on back segment car body and
On leading portion car body;
The rotation connection steel structure includes the pedestal being mounted on conduit, and steel structure two is hinged on pedestal, and steel structure two is hinged
Steel structure one is also hinged on the steel structure two and stretches hydraulic cylinder two, in which: steel structure two and one hinged place center of steel structure are hollow knot
Structure stretches the hinged steel structure two in one one end of hydraulic cylinder, the hinged steel structure one of the other end;The steel structure one is equipped with connecting hole, and steel structure connects
Fishplate bar penetrates connecting hole by pin and adjacent rotation is connected the locking connection of steel structure.
Preferentially, it is equipped with working light placing frame on the noise barrier and spud pile, noise barrier bottom is also equipped with
Pulley two (305)
Preferentially, the inside of the steel structure one is also hinged with hydraulic cylinder temporary support foot.
It further include slidingtype connection steel structure, the slidingtype connection steel structure is for replacing for a modification of the present invention
Laying connect steel structure with the rotation on leading portion car body, and the slidingtype connection steel structure includes being mounted on the conduit of leading portion car body
Railroad shoe;One section in the railroad shoe is equipped with lower part steel structure, and upper steel structure is mounted on the steel structure of lower part, the lower part steel structure and
It is connected with connecting rod between upper steel structure, is equipped in the lower part steel structure and the steel wire cable that makes rotating motion is driven by motor, even
Bar is stuck on steel wire cable, and the upper steel structure pulls link motion to fall to and is in same with lower part steel structure by steel wire cable
One horizontal position is spliced, and also is provided with penetrating connection by pin for steel structure connecting plate on the upper steel structure and lower part steel structure
Hole.
Based on above-mentioned apparatus, the invention also provides a kind of construction method of road safety job execution barrier structure,
It is characterized in that, includes the following steps:
A, specified construction site is drawn to for platform is drawn by tractor, is adjusted to suitable position;
B, unclamping connecting column by control mechanical gripper separates leading portion car body and back segment car body;
C, ipsilateral by the way that symmetrically arranged rotation connection steel structure to be moved to, hydraulic cylinder one is stretched by control later and is extended
So that steel structure one and steel structure two is articulated and connected is straight line, then makes steel structure one by stretching hydraulic cylinder two and shrinking to forget about it steel structure two
It is horizontally placed on leading portion car body and back segment car body with steel structure two;
D, steel structure connecting plate is penetrated in connecting hole by pin by rotation connection steel structure locking connection;By hydraulic leg and
Hydraulic cylinder temporary support foot opens support on ground;
E, wirerope is mounted between the reel of same level height and is tensed;
F, the item that de-orbits is moved by the way that noise barrier is manually forced through track strip, wirerope abaculus is directly embedding at this time
Enter on wirerope;
G, noise barrier moves back and forth neat arranged in parallel formation construction barrier on a steel cord, and construction terminates.
The utility model has the advantages that the present invention is specifically applied to surrounding baffle Fast Installation, builds and tear open the arrangement achieves surrounding baffle
Except mechanization, speed is fast, high degree of automation, reduces manual operation and saves human cost, and is highly-safe, is suitble to promote
It uses.
Detailed description of the invention
Fig. 1 is one structural schematic diagram of road safety job execution barrier structure embodiment of the present invention;
Fig. 2 is two structural schematic diagram of road safety job execution barrier structure embodiment of the present invention;
Fig. 3 is structural schematic diagram when road safety job execution barrier structure embodiment two of the present invention is constructed;
Fig. 4 is that road safety work of the present invention construction barrier device installs noise barrier structural schematic diagram;
Fig. 5 is the structural schematic diagram that slidingtype of the present invention connects steel structure;
Fig. 6 is connecting rod of the present invention and steel wire cable connection relationship diagram;
Fig. 7 is the structural schematic diagram of present invention rotation connection steel structure;
Fig. 8 is the structural schematic diagram that present invention rotation connection steel structure splicing is completed;
Fig. 9 is the structural schematic diagram of noise barrier of the present invention
Figure 10 is the side view of noise barrier of the present invention.
Specific embodiment
In order to allow those skilled in the art to more fully understand technical solution of the present invention, with reference to the accompanying drawing to the present invention
It is further elaborated.
Embodiment 1
As shown, road safety job execution barrier structure, including traction platform 10, the lower section of the traction platform 10
Hydraulic leg 9 is installed, the traction platform 10 divides for leading portion car body 8 and back segment car body 15, four drawn on platform 10
Angle is equipped with spud pile 6, is equipped with reel 7 on the spud pile 6, in which: 2 reels 7 are mounted on each spud pile 6,
7 level height of reel above each spud pile 6 is identical, and is located at the reel 7 of same level height above two ipsilateral spud piles 6
Between be connected with wirerope 14.
Top plate 5 is installed, the top plate 5 is uniformly equipped with track strip 51 above, and noise barrier 3 passes through on traction platform 10
Guide cam 301 is embedded in track strip 51 and is uniformly lifted below top plate 5;The two sides of the noise barrier 3 are symmetrically arranged with steel wire
Rope abaculus 304, the inside of the wirerope abaculus 304 is also equipped with pulley 1.It is equipped on noise barrier 3 and spud pile 6
Working light placing frame 302, working light placing frame 302 provide warning for placing traffic flash lamp for vehicle at night.Noise barrier
Bottom is also equipped with pulley 2 305, and construction personnel is in moving process, it is only necessary to noise barrier 3 is gently pushed, by adopting
Noise barrier 3 is fast moved can with guide cam 301 and pulley 2 305, saves manpower.
Conduit 2 is equipped on leading portion car body 8 and back segment car body 15, the tail portion of the leading portion car body 8 is laid with connecting column
1201, the mechanical gripper 1202 for holding connecting column 1201 is installed on the back segment car body 15;The present invention can pass through scene
Condition of construction adjusts the length of traction platform 10, it is only necessary to which unclamping connecting column 1201 by mechanical gripper 1202 makes leading portion car body 8
It is separated with back segment car body 15, site operation is met to increase the length of traction platform 10 by rotation connection steel structure 1 splicing
It is required that rotation connection steel structure 1 is symmetrically mounted on back segment car body 15 and leading portion car body 8.
Rotation connection steel structure 1 includes the pedestal 106 being mounted on conduit 2, and rotation connection steel structure 1 can come on conduit 2
The docking requirement for meeting back segment car body 15 and leading portion car body 8 is moved in return, is hinged with steel structure 2 105, steel structure 2 105 on pedestal 106
Hinged steel structure 1 is also hinged on the steel structure 2 105 and stretches hydraulic cylinder 2 107, in which: steel structure 2 105 and steel structure one
103 hinged places center are hollow structure 108, and stretching hydraulic cylinder 1 in this way can be through in steel structure 2 105 and steel structure 1
Splicing (asking emphasis refering to Fig. 8) is straightened in the two;Stretch the hinged steel structure 2 105 in one 102 one end of hydraulic cylinder, the hinged steel structure of the other end
One 103;The steel structure 1 is equipped with connecting hole 109, and steel structure connecting plate 13 penetrates connecting hole 109 by pin will be adjacent
The rotation connection locking connection of steel structure 1.The inside of steel structure 1 is also hinged with hydraulic cylinder temporary support foot 104.
Based on above-mentioned apparatus, the invention also provides a kind of construction method of road safety job execution barrier structure,
It is characterized in that, includes the following steps:
A, specified construction site is drawn to for platform 10 is drawn by tractor, is adjusted to suitable position;
B, unclamping connecting column 1201 by control mechanical gripper 1202 separates leading portion car body 8 and back segment car body 15;
C, ipsilateral by the way that symmetrically arranged rotation connection steel structure 1 to be moved to, hydraulic cylinder 1 is stretched by control later
It is straight line that elongation, which makes steel structure 1 and steel structure 2 105 be articulated and connected, then is shunk by stretching hydraulic cylinder 2 107 by steel structure
2 105 forget about it and are horizontally placed at steel structure 1 and steel structure 2 105 on leading portion car body 8 and back segment car body 15;
D, steel structure connecting plate 13 is penetrated in connecting hole 109 by pin by the rotation connection locking connection of steel structure 1;It will be hydraulic
Supporting leg 9 and hydraulic cylinder temporary support foot 104 open support on ground;
E, wirerope 14 is mounted between the reel 7 of same level height and is tensed;
F, the item 51 that de-orbits is moved by the way that noise barrier 3 is manually forced through track strip 51, at this time wirerope abaculus
304 are directly embedded on wirerope 14;
G, noise barrier 3 moves back and forth neat arranged in parallel formation construction barrier on wirerope 14, and construction terminates.
Embodiment 2
As shown, road safety job execution barrier structure, including traction platform 10, the lower section of the traction platform 10
Hydraulic leg 9 is installed, the traction platform 10 divides for leading portion car body 8 and back segment car body 15, four drawn on platform 10
Angle is equipped with spud pile 6, is equipped with reel 7 on the spud pile 6, in which: 2 reels 7 are mounted on each spud pile 6,
7 level height of reel above each spud pile 6 is identical, and is located at the reel 7 of same level height above two ipsilateral spud piles 6
Between be connected with wirerope 14.
Top plate 5 is installed, the top plate 5 is uniformly equipped with track strip 51 above, and noise barrier 3 passes through on traction platform 10
Guide cam 301 is embedded in track strip 51 and is uniformly lifted below top plate 5;The two sides of the noise barrier 3 are symmetrically arranged with steel wire
Rope abaculus 304, the inside of the wirerope abaculus 304 is also equipped with pulley 1.It is equipped on noise barrier 3 and spud pile 6
Working light placing frame 302, working light placing frame 302 provide warning for placing traffic flash lamp for vehicle at night.Noise barrier
Bottom is also equipped with pulley 2 305, and construction personnel is in moving process, it is only necessary to noise barrier 3 is gently pushed, by adopting
Noise barrier 3 is fast moved can with guide cam 301 and pulley 2 305, saves manpower.
Conduit 2 is equipped on leading portion car body 8 and back segment car body 15, the tail portion of the leading portion car body 8 is laid with connecting column
1201, the mechanical gripper 1202 for holding connecting column 1201 is installed on the back segment car body 15;The present invention can pass through scene
Condition of construction adjusts the length of traction platform 10, it is only necessary to which unclamping connecting column 1201 by mechanical gripper 1202 makes leading portion car body 8
It is separated with back segment car body 15, site operation is met to increase the length of traction platform 10 by rotation connection steel structure 1 splicing
It is required that rotation connection steel structure 1 is mounted on back segment car body 15, slidingtype connection steel structure 11 is installed on leading portion car body 8.
Rotation connection steel structure 1 includes the pedestal 106 being mounted on conduit 2, and rotation connection steel structure 1 can come on conduit 2
The docking requirement for meeting back segment car body 15 and leading portion car body 8 is moved in return, is hinged with steel structure 2 105, steel structure 2 105 on pedestal 106
Hinged steel structure 1 is also hinged on the steel structure 2 105 and stretches hydraulic cylinder 2 107, in which: steel structure 2 105 and steel structure one
103 hinged places center are hollow structure 108, and stretching hydraulic cylinder 1 in this way can be through in steel structure 2 105 and steel structure 1
Splicing (asking emphasis refering to Fig. 8) is straightened in the two;Stretch the hinged steel structure 2 105 in one 102 one end of hydraulic cylinder, the hinged steel structure of the other end
One 103;The steel structure 1 is equipped with connecting hole 109, and steel structure connecting plate 13 penetrates connecting hole 109 by pin will be adjacent
The rotation connection locking connection of steel structure 1.The inside of steel structure 1 is also hinged with hydraulic cylinder temporary support foot 104.
Slidingtype connection steel structure 11 includes the railroad shoe 1105 being mounted on the conduit 2 of leading portion car body 8;The railroad shoe
One section in 1105 is equipped with lower part steel structure 1104, and upper steel structure 1103 is mounted on lower part steel structure 1104, upper steel structure 1103
Bottom is equipped with pulley and is embedded in on 1104 track of lower part steel structure, is connected between the lower part steel structure 1104 and upper steel structure 1103
Connecting rod 1102 is equipped in the lower part steel structure 1104 and is made rotating motion steel wire cable 1101 by motor drive, connecting rod 1102
(ask emphasis refering to Fig. 6) on stuck steel wire cable 1101, such upper steel structure 1103 pulls connecting rod by steel wire cable 1101
1102 movements and fall to and be in the same horizontal position with lower part steel structure 1104 and spliced, the upper steel structure 1103 and lower part
It also is provided with penetrating connecting hole 109 by pin for steel structure connecting plate 13 on steel structure 1104.
In addition, further including the loop wheel machine 4 being mounted on 1104 track of lower part steel structure, loop wheel machine 4 can be in 1104 rail of lower part steel structure
Move back and forth on road, when preparing recycling after the completion of the slidingtype connection construction of steel structure 11, upper steel structure is sling by loop wheel machine 4
1103, by manually docking, make upper steel structure 1103 on the track for returning to lower part steel structure 1104.
Based on above-mentioned apparatus, the invention also provides a kind of construction method of road safety job execution barrier structure,
It is characterized in that, includes the following steps:
A, specified construction site is drawn to for platform 10 is drawn by tractor, is adjusted to suitable position;
B, unclamping connecting column 1201 by control mechanical gripper 1202 separates leading portion car body 8 and back segment car body 15,
By will rotate connection steel structure 1 connect with slidingtype steel structure 11 be moved to it is ipsilateral;
C, stretching the elongation of hydraulic cylinder 1 steel structure 1 and steel structure 2 105 is made to be articulated and connected through control is one straight
Line, then so that steel structure 1 and steel structure 2 105 is horizontally placed at back segment by stretching hydraulic cylinder 2 107 and shrinking to forget about it steel structure 2 105
On car body 15, steel structure connecting plate 13 is respectively penetrated by pin will in the connecting hole 109 of lower part steel structure 1104 and steel structure 1
Rotation connection steel structure 1 connects the locking connection of both steel structures 11 with slidingtype;Or
Stretching the elongation of hydraulic cylinder 1 steel structure 1 and steel structure 2 105 is made to be articulated and connected through control is straight line,
Steel structure 1 and steel structure 2 105 is set to be horizontally placed at back segment vehicle by stretching hydraulic cylinder 2 107 and shrinking to forget about it steel structure 2 105 again
On body 15, drives steel wire cable 1101 to move by the motor in lower part steel structure 1104, pushed so that drive link 1102 is advanced
Upper steel structure 1103 advances, and finally falls on down and is in the same horizontal position with lower part steel structure 1104 and is spliced, later by steel structure
Connecting plate 13 is respectively penetrated in the connecting hole 109 of upper steel structure 1103 and steel structure 1 by pin rotation connecting 1 He of steel structure
Slidingtype connects the locking connection of both steel structures 11;
E, hydraulic leg 9 and hydraulic cylinder temporary support foot 104 are opened into support on ground, wirerope 14 is mounted on same level
It is tensed between the reel 7 of height;
F, the item 51 that de-orbits is moved by the way that noise barrier 3 is manually forced through track strip 51, at this time wirerope abaculus
304 are directly embedded on wirerope 14;
G, noise barrier 3 moves back and forth neat arranged in parallel formation construction barrier on wirerope 14, and construction terminates.
Claims (2)
1. road safety job execution barrier structure, including platform (10) are drawn, it is equipped with below the traction platform (10)
Hydraulic leg (9), the traction platform (10) are divided into leading portion car body (8) and back segment car body (15), which is characterized in that the traction
Quadrangle on platform (10) is equipped with spud pile (6), is equipped with reel (7) on the spud pile (6), in which: each spud pile
(6) 2 reels (7) are mounted on, reel (7) level height of each spud pile (6) above is identical, and is located at ipsilateral two
Spud pile (6) is connected with wirerope (14) between the reel (7) of same level height above;It is equipped on the traction platform (10)
Top plate (5), the top plate (5) are uniformly equipped with track strip (51) above, and noise barrier (3) is embedded in by guide cam (301)
Top plate (5) is uniformly lifted in track strip (51) below;The two sides of the noise barrier (3) are symmetrically arranged with wirerope abaculus
(304), pulley one (303) is also equipped on the inside of the wirerope abaculus (304);
Described is to be equipped with conduit (2) on leading portion car body (8) and back segment car body (15), and the tail portion of the leading portion car body (8) is uniformly distributed
Equipped with connecting column (1201), the mechanical gripper (1202) for holding connecting column (1201) is installed on the back segment car body (15);Rotation
Turn connection steel structure and be mounted on back segment car body, slidingtype connection steel structure is installed on leading portion car body;
Rotation connection steel structure (1) includes the pedestal (106) being mounted on conduit (2), and pedestal is hinged with steel structure two on (106)
(105), steel structure two (105) hinged steel structure one (103) is also hinged on the steel structure two (105) and stretches hydraulic cylinder two (107),
Wherein: steel structure two (105) is hollow structure (108) with steel structure one (103) hinged place center, stretches hydraulic cylinder one (102) one end
Hinged steel structure two (105), the hinged steel structure one (103) of the other end;The steel structure one (103) is equipped with connecting hole (109), and steel structure connects
Fishplate bar (13) penetrates connecting hole (109) for adjacent rotation connection steel structure (1) locking connection by pin;
Slidingtype connection steel structure 11 includes the railroad shoe being mounted on the conduit of leading portion car body;One section in the railroad shoe is equipped with
Lower part steel structure, upper steel structure are mounted on the steel structure of lower part, and the bottom of upper steel structure is equipped with pulley and is embedded in and lower part steel structure track
On, it is connected with connecting rod between the lower part steel structure and upper steel structure, is equipped with to do by motor drive in the lower part steel structure and revolve
It transports and moves steel wire cable, on the stuck steel wire cable of connecting rod, such upper steel structure pulls link motion to fall by steel wire cable
Spliced to the same horizontal position is in lower part steel structure, also is provided with connecting for steel structure on the upper steel structure and lower part steel structure
Fishplate bar penetrates connecting hole by pin.
2. road safety job execution barrier structure according to claim 1, which is characterized in that the noise barrier (3)
With working light placing frame (302) are equipped on spud pile (6), noise barrier (3) bottom is also equipped with pulley two (305).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811355181.4A CN109252736B (en) | 2017-07-07 | 2017-07-07 | Road safety operation construction barrier structure |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811355181.4A CN109252736B (en) | 2017-07-07 | 2017-07-07 | Road safety operation construction barrier structure |
CN201710551009.5A CN107269114B (en) | 2017-07-07 | 2017-07-07 | Road safety job execution barrier structure and its construction method |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710551009.5A Division CN107269114B (en) | 2017-07-07 | 2017-07-07 | Road safety job execution barrier structure and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109252736A true CN109252736A (en) | 2019-01-22 |
CN109252736B CN109252736B (en) | 2020-06-12 |
Family
ID=60072699
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811355183.3A Active CN109252737B (en) | 2017-07-07 | 2017-07-07 | Road safety operation construction barrier structure and construction method thereof |
CN201710551009.5A Expired - Fee Related CN107269114B (en) | 2017-07-07 | 2017-07-07 | Road safety job execution barrier structure and its construction method |
CN201811355181.4A Expired - Fee Related CN109252736B (en) | 2017-07-07 | 2017-07-07 | Road safety operation construction barrier structure |
Family Applications Before (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811355183.3A Active CN109252737B (en) | 2017-07-07 | 2017-07-07 | Road safety operation construction barrier structure and construction method thereof |
CN201710551009.5A Expired - Fee Related CN107269114B (en) | 2017-07-07 | 2017-07-07 | Road safety job execution barrier structure and its construction method |
Country Status (1)
Country | Link |
---|---|
CN (3) | CN109252737B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111140074A (en) * | 2019-11-01 | 2020-05-12 | 吴瑞祺 | Anti-riot guardrail |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109252735B (en) * | 2018-11-08 | 2019-08-06 | 四川大学 | A kind of municipal administration overhead construction protective fence and its installation apparatus |
CN110093840B (en) * | 2019-05-27 | 2021-04-16 | 淮阴工学院 | Novel pavement laying auxiliary plate erecting device, erecting method and disassembling method |
CN110130230B (en) * | 2019-06-24 | 2021-05-18 | 中铁二局集团有限公司 | Construction method for installing sound barrier by automatic traveling lifting lane-changing type trolley |
CN110748235B (en) * | 2019-09-23 | 2020-12-01 | 江西省连城建筑工程有限公司 | Building workpiece installation construction method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110082363A (en) * | 2010-01-11 | 2011-07-19 | 노용규 | System support mold installation lift |
CN201901854U (en) * | 2010-12-25 | 2011-07-20 | 常熟华东汽车有限公司 | Vehicle and barrier separating mechanism for combined type net barrier |
CN202064293U (en) * | 2011-05-12 | 2011-12-07 | 中铁二十局集团第一工程有限公司 | Traction system used for steel trussed beam cantilever hauling construction |
CN202990563U (en) * | 2013-01-16 | 2013-06-12 | 明光市浩淼消防科技发展有限公司 | Net casting and recovery device of knife stabbing net |
CN205330278U (en) * | 2016-01-26 | 2016-06-22 | 国网安徽省电力公司检修公司 | Electronic car of arranging of primary equipment safety measure |
GB2534295A (en) * | 2015-01-18 | 2016-07-20 | Mowatt Bryce John | Improved post driver |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102004018385A1 (en) * | 2004-04-16 | 2005-11-03 | Rationelle Technik Im Maschinenbau Rtm Gmbh | Component e.g. post, setting device for making e.g. guard rail, is designed as steerable vehicle which carries post setting and loading devices, where setting and loading devices have control units that are coupled with drive units |
CN100408758C (en) * | 2006-07-14 | 2008-08-06 | 常熟华东汽车有限公司 | Road barricade vehicle |
CN103470097B (en) * | 2013-09-25 | 2015-11-18 | 北京安龙特种车辆有限公司 | A kind of transport vehicle of isolating mesh sheet and loading isolation mesh sheet |
-
2017
- 2017-07-07 CN CN201811355183.3A patent/CN109252737B/en active Active
- 2017-07-07 CN CN201710551009.5A patent/CN107269114B/en not_active Expired - Fee Related
- 2017-07-07 CN CN201811355181.4A patent/CN109252736B/en not_active Expired - Fee Related
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20110082363A (en) * | 2010-01-11 | 2011-07-19 | 노용규 | System support mold installation lift |
CN201901854U (en) * | 2010-12-25 | 2011-07-20 | 常熟华东汽车有限公司 | Vehicle and barrier separating mechanism for combined type net barrier |
CN202064293U (en) * | 2011-05-12 | 2011-12-07 | 中铁二十局集团第一工程有限公司 | Traction system used for steel trussed beam cantilever hauling construction |
CN202990563U (en) * | 2013-01-16 | 2013-06-12 | 明光市浩淼消防科技发展有限公司 | Net casting and recovery device of knife stabbing net |
GB2534295A (en) * | 2015-01-18 | 2016-07-20 | Mowatt Bryce John | Improved post driver |
CN205330278U (en) * | 2016-01-26 | 2016-06-22 | 国网安徽省电力公司检修公司 | Electronic car of arranging of primary equipment safety measure |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111140074A (en) * | 2019-11-01 | 2020-05-12 | 吴瑞祺 | Anti-riot guardrail |
CN111140074B (en) * | 2019-11-01 | 2022-06-03 | 吴瑞祺 | Anti-riot guardrail |
Also Published As
Publication number | Publication date |
---|---|
CN109252737A (en) | 2019-01-22 |
CN109252737B (en) | 2020-02-28 |
CN107269114B (en) | 2019-05-24 |
CN109252736B (en) | 2020-06-12 |
CN107269114A (en) | 2017-10-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107269114B (en) | Road safety job execution barrier structure and its construction method | |
CN211314243U (en) | Integrated construction trolley for hanging cloth in tunnel | |
CN101891121B (en) | Crane backstay spreader | |
CN107514264A (en) | A kind of new Multifunctional performing machine for constructing tunnel | |
CN103996992B (en) | Mobile quick crossing frame | |
CN202186798U (en) | Automatic retractable device for attached cables of heading machine | |
CN207348868U (en) | A kind of new Multifunctional performing machine for constructing tunnel | |
CN109812129B (en) | Municipal road construction baffle mounting structure and construction method thereof | |
US4846445A (en) | Hydraulic fence post puller | |
CN116516837A (en) | Prefabricated box girder paving device and paving method | |
CN115596463A (en) | Arch frame installation device for repairing operated tunnel defects | |
CN204940111U (en) | A kind of bridge detecting device | |
CN109458045A (en) | Construction of the highway coaming plate auto-erecting structure and its construction method | |
CN111733872B (en) | Pipe gallery construction method | |
CN2755282Y (en) | Apparatus for restoring machines from comprehensive coal face | |
CN209704586U (en) | Coal mine roadway prefabricated section is laid with apparatus for work | |
KR100635134B1 (en) | Wrecker | |
CN205036389U (en) | Novel tunnel water proofing board is spread and is hung platform truck | |
CN107476556A (en) | A kind of packaged type automatic lifting operating platform | |
CN201078199Y (en) | Earth surface operating apparatus of continues sucker rod | |
CN110065888A (en) | A kind of cable crane main rope Demolition Construction method | |
CN2830157Y (en) | Movable stage vehicle | |
CN208122420U (en) | A kind of antihunting stereo parking facility | |
CN208416564U (en) | Two grommets with mobile arc track are to reinforcing steel bar laying trolley | |
CN108708746B (en) | Reinforcing steel bar installation equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200511 Address after: 410000 room 1410, Yuncheng building, No. 413, Youyi Road, Tianxin District, Changsha City, Hunan Province Applicant after: Hunan Zhuda Construction Engineering Co., Ltd. Address before: 277500 No. 174, Bashangcun, Guanqiao Town, Tengzhou City, Zaozhuang City, Shandong Province Applicant before: Channel Chengming |
|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200612 Termination date: 20200707 |