CN107269114B - Road safety job execution barrier structure and its construction method - Google Patents

Road safety job execution barrier structure and its construction method Download PDF

Info

Publication number
CN107269114B
CN107269114B CN201710551009.5A CN201710551009A CN107269114B CN 107269114 B CN107269114 B CN 107269114B CN 201710551009 A CN201710551009 A CN 201710551009A CN 107269114 B CN107269114 B CN 107269114B
Authority
CN
China
Prior art keywords
steel structure
car body
wirerope
spud pile
hinged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710551009.5A
Other languages
Chinese (zh)
Other versions
CN107269114A (en
Inventor
渠承明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Rongli Real Estate Investment Co Ltd
Original Assignee
Nanjing Rongli Real Estate Investment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Rongli Real Estate Investment Co Ltd filed Critical Nanjing Rongli Real Estate Investment Co Ltd
Priority to CN201811355181.4A priority Critical patent/CN109252736B/en
Priority to CN201811355183.3A priority patent/CN109252737B/en
Priority to CN201710551009.5A priority patent/CN107269114B/en
Publication of CN107269114A publication Critical patent/CN107269114A/en
Application granted granted Critical
Publication of CN107269114B publication Critical patent/CN107269114B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • E04H17/16Fences constructed of rigid elements, e.g. with additional wire fillings or with posts using prefabricated panel-like elements, e.g. wired frames
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/14Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H17/00Fencing, e.g. fences, enclosures, corrals
    • E04H17/26Devices for erecting or removing fences
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F8/00Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic
    • E01F8/0005Arrangements for absorbing or reflecting air-transmitted noise from road or railway traffic used in a wall type arrangement
    • E01F8/0088Suspended, e.g. ropes or mesh
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/343Structures characterised by movable, separable, or collapsible parts, e.g. for transport
    • E04B1/34336Structures movable as a whole, e.g. mobile home structures
    • E04B1/34352Base structures or supporting means therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/82Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to sound only
    • E04B1/8227Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to sound only screens ; Arrangements of sound-absorbing elements, e.g. baffles
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Acoustics & Sound (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention discloses road safety job execution barrier structures, including drawing platform, hydraulic leg is installed below the traction platform, the traction platform is divided into leading portion car body and back segment car body, it is characterized in that, quadrangle on the traction platform is equipped with spud pile, reel is installed on the spud pile, wherein: 2 reels are mounted on each spud pile, reel level height above each spud pile is identical, and is located above two ipsilateral spud piles and is connected with wirerope between the reel of same level height;The utility model has the advantages that the present invention is specifically applied to surrounding baffle Fast Installation, mechanization is built and removed the arrangement achieves surrounding baffle, and speed is fast, high degree of automation, reduces manual operation and saves human cost, and is highly-safe, is suitble to promote the use of.

Description

Road safety job execution barrier structure and its construction method
Technical field
The present invention relates to civil engineering detection fields, and in particular to a kind of road safety job execution barrier structure and its applies Work method.
Background technique
Surrounding baffle be a kind of a kind of building site maintenance after the processing such as machine die mould, spray painting, bending and with the external world every From a kind of profile, be suitable for construction site, highway maintenance, the light-duty plate that is isolated from the outside of one kind of construction site.It is prevented fires, Waterproof, it is moisture-proof light-weight the features such as be widely used.
If Publication No. CN103306227A is disclosed the present invention relates to field of road construction, specifically providing one kind can live The dynamic reflective enclosing folded, including multiple surrounding baffles side by side.It is connected between adjacent surrounding baffle by articulate, surrounding baffle It is folded and unfolded by hinge realization.The surface of surrounding baffle surrounding baffle is provided with reflector block, for passing by one's way vehicle in warning at night. The bottom of surrounding baffle is provided with pulley blocks, the operation that edge surrounding baffle folds and unfolds.Present invention can apply to various needs to set The occasion of enclosing is set, convenient for storage and transport.When night, the present invention, which can remind, passes by driver's hot work in progress at this, Improve safety.
For another example Publication No. CN203441168U, which discloses a kind of the utility model and discloses a kind of construction site glass reinforced plastic, encloses Gear, including surrounding baffle, surrounding baffle are made of glass reinforced plastic, and enclosing back is uniformly provided with pedestal, base end face and surrounding baffle bottom surface Concordantly, base upper surface is equipped with support rod, and wherein one end is set to base upper surface, the other end and enclosing backboard to the support rod Face connection, pedestal are equipped with connecting plate far from one end of surrounding baffle, are provided with screw hole, position of the surrounding baffle front close to top on connecting plate It sets and is uniformly provided with hook, lighting device is connected with by bracket at the top of surrounding baffle, the bracket is telescopic sleeve structure.This is practical The novel service life is long, is difficult to be deformed being hit.
Existing surrounding baffle is all to be packaged to be transported to building site, is then barricaded as barricade by one piece of block splicing of construction personnel, this Sample has two, 1, construction personnel it is higher in build process risk, be easy to appear traffic accident;2, existing surrounding baffle is built A large amount of manpowers are needed, the speed built and removed is very slow, influences construction speed.
Summary of the invention
The present invention overcomes problem of the existing technology, propose a kind of road safety job execution barrier structure and its Construction method, the present apparatus are specifically applied to surrounding baffle Fast Installation, and mechanization is built and removed the arrangement achieves surrounding baffle, Speed is fast, high degree of automation, reduces manual operation and saves human cost, and is highly-safe.
The specific technical solution of the present invention is as follows:
Road safety job execution barrier structure, including platform is drawn, hydraulic branch is installed below the traction platform Leg, the traction platform are divided into leading portion car body and back segment car body, which is characterized in that
Quadrangle on the traction platform is equipped with spud pile, is equipped with reel on the spud pile, in which: each fixation 2 reels are mounted in stake, the reel level height above each spud pile is identical, and is located above two ipsilateral spud piles Wirerope is connected between the reel of same level height;
Top plate is installed on the traction platform, track strip is uniformly installed, noise barrier is by leading above the top plate It is uniformly lifted below top plate into cam insertion track strip;The two sides of the noise barrier are symmetrically arranged with wirerope abaculus, institute It states and is also equipped with pulley one on the inside of wirerope abaculus;
Described is to be equipped with conduit on leading portion car body and back segment car body, and the tail portion of the leading portion car body is laid with connection Column is equipped with the mechanical gripper for holding connecting column on the back segment car body;Rotation connection steel structure be symmetrically mounted on back segment car body and On leading portion car body;
The rotation connection steel structure includes the pedestal being mounted on conduit, and steel structure two is hinged on pedestal, and steel structure two is hinged Steel structure one is also hinged on the steel structure two and stretches hydraulic cylinder two, in which: steel structure two and one hinged place center of steel structure are hollow knot Structure stretches the hinged steel structure two in one one end of hydraulic cylinder, the hinged steel structure one of the other end;The steel structure one is equipped with connecting hole, and steel structure connects Fishplate bar penetrates connecting hole by pin and adjacent rotation is connected the locking connection of steel structure.
Preferentially, it is equipped with working light placing frame on the noise barrier and spud pile, noise barrier bottom is also equipped with Pulley two (305)
Preferentially, the inside of the steel structure one is also hinged with hydraulic cylinder temporary support foot.
It further include slidingtype connection steel structure, the slidingtype connection steel structure is for replacing for a modification of the present invention Laying connect steel structure with the rotation on leading portion car body, and the slidingtype connection steel structure includes being mounted on the conduit of leading portion car body Railroad shoe;One section in the railroad shoe is equipped with lower part steel structure, and upper steel structure is mounted on the steel structure of lower part, the lower part steel structure and It is connected with connecting rod between upper steel structure, is equipped in the lower part steel structure and the steel wire cable that makes rotating motion is driven by motor, even Bar is stuck on steel wire cable, and the upper steel structure pulls link motion to fall to and is in same with lower part steel structure by steel wire cable One horizontal position is spliced, and also is provided with penetrating connection by pin for steel structure connecting plate on the upper steel structure and lower part steel structure Hole.
Based on above-mentioned apparatus, the invention also provides a kind of construction method of road safety job execution barrier structure, It is characterized in that, includes the following steps:
A, specified construction site is drawn to for platform is drawn by tractor, is adjusted to suitable position;
B, unclamping connecting column by control mechanical gripper separates leading portion car body and back segment car body;
C, ipsilateral by the way that symmetrically arranged rotation connection steel structure to be moved to, hydraulic cylinder one is stretched by control later and is extended So that steel structure one and steel structure two is articulated and connected is straight line, then makes steel structure one by stretching hydraulic cylinder two and shrinking to forget about it steel structure two It is horizontally placed on leading portion car body and back segment car body with steel structure two;
D, steel structure connecting plate is penetrated in connecting hole by pin by rotation connection steel structure locking connection;By hydraulic leg and Hydraulic cylinder temporary support foot opens support on ground;
E, wirerope is mounted between the reel of same level height and is tensed;
F, the item that de-orbits is moved by the way that noise barrier is manually forced through track strip, wirerope abaculus is directly embedding at this time Enter on wirerope;
G, noise barrier moves back and forth neat arranged in parallel formation construction barrier on a steel cord, and construction terminates.
The utility model has the advantages that the present invention is specifically applied to surrounding baffle Fast Installation, builds and tear open the arrangement achieves surrounding baffle Except mechanization, speed is fast, high degree of automation, reduces manual operation and saves human cost, and is highly-safe, is suitble to promote It uses.
Detailed description of the invention
Fig. 1 is one structural schematic diagram of road safety job execution barrier structure embodiment of the present invention;
Fig. 2 is two structural schematic diagram of road safety job execution barrier structure embodiment of the present invention;
Fig. 3 is structural schematic diagram when road safety job execution barrier structure embodiment two of the present invention is constructed;
Fig. 4 is that road safety work of the present invention construction barrier device installs noise barrier structural schematic diagram;
Fig. 5 is the structural schematic diagram that slidingtype of the present invention connects steel structure;
Fig. 6 is connecting rod of the present invention and steel wire cable connection relationship diagram;
Fig. 7 is the structural schematic diagram of present invention rotation connection steel structure;
Fig. 8 is the structural schematic diagram that present invention rotation connection steel structure splicing is completed;
Fig. 9 is the structural schematic diagram of noise barrier of the present invention
Figure 10 is the side view of noise barrier of the present invention.
Specific embodiment
In order to allow those skilled in the art to more fully understand technical solution of the present invention, with reference to the accompanying drawing to the present invention It is further elaborated.
Embodiment 1
As shown, road safety job execution barrier structure, including traction platform 10, the lower section of the traction platform 10 Hydraulic leg 9 is installed, the traction platform 10 divides for leading portion car body 8 and back segment car body 15, four drawn on platform 10 Angle is equipped with spud pile 6, is equipped with reel 7 on the spud pile 6, in which: 2 reels 7 are mounted on each spud pile 6, 7 level height of reel above each spud pile 6 is identical, and is located at the reel 7 of same level height above two ipsilateral spud piles 6 Between be connected with wirerope 14.
Top plate 5 is installed, the top plate 5 is uniformly equipped with track strip 51 above, and noise barrier 3 passes through on traction platform 10 Guide cam 301 is embedded in track strip 51 and is uniformly lifted below top plate 5;The two sides of the noise barrier 3 are symmetrically arranged with steel wire Rope abaculus 304, the inside of the wirerope abaculus 304 is also equipped with pulley 1.It is equipped on noise barrier 3 and spud pile 6 Working light placing frame 302, working light placing frame 302 provide warning for placing traffic flash lamp for vehicle at night.Noise barrier Bottom is also equipped with pulley 2 305, and construction personnel is in moving process, it is only necessary to noise barrier 3 is gently pushed, by adopting Noise barrier 3 is fast moved can with guide cam 301 and pulley 2 305, saves manpower.
Conduit 2 is equipped on leading portion car body 8 and back segment car body 15, the tail portion of the leading portion car body 8 is laid with connecting column 1201, the mechanical gripper 1202 for holding connecting column 1201 is installed on the back segment car body 15;The present invention can pass through scene Condition of construction adjusts the length of traction platform 10, it is only necessary to which unclamping connecting column 1201 by mechanical gripper 1202 makes leading portion car body 8 It is separated with back segment car body 15, site operation is met to increase the length of traction platform 10 by rotation connection steel structure 1 splicing It is required that rotation connection steel structure 1 is symmetrically mounted on back segment car body 15 and leading portion car body 8.
Rotation connection steel structure 1 includes the pedestal 106 being mounted on conduit 2, and rotation connection steel structure 1 can come on conduit 2 The docking requirement for meeting back segment car body 15 and leading portion car body 8 is moved in return, is hinged with steel structure 2 105, steel structure 2 105 on pedestal 106 Hinged steel structure 1 is also hinged on the steel structure 2 105 and stretches hydraulic cylinder 2 107, in which: steel structure 2 105 and steel structure one 103 hinged places center are hollow structure 108, and stretching hydraulic cylinder 1 in this way can be through in steel structure 2 105 and steel structure 1 Splicing (asking emphasis refering to Fig. 8) is straightened in the two;Stretch the hinged steel structure 2 105 in one 102 one end of hydraulic cylinder, the hinged steel structure of the other end One 103;The steel structure 1 is equipped with connecting hole 109, and steel structure connecting plate 13 penetrates connecting hole 109 by pin will be adjacent The rotation connection locking connection of steel structure 1.The inside of steel structure 1 is also hinged with hydraulic cylinder temporary support foot 104.
Based on above-mentioned apparatus, the invention also provides a kind of construction method of road safety job execution barrier structure, It is characterized in that, includes the following steps:
A, specified construction site is drawn to for platform 10 is drawn by tractor, is adjusted to suitable position;
B, unclamping connecting column 1201 by control mechanical gripper 1202 separates leading portion car body 8 and back segment car body 15;
C, ipsilateral by the way that symmetrically arranged rotation connection steel structure 1 to be moved to, hydraulic cylinder 1 is stretched by control later It is straight line that elongation, which makes steel structure 1 and steel structure 2 105 be articulated and connected, then is shunk by stretching hydraulic cylinder 2 107 by steel structure 2 105 forget about it and are horizontally placed at steel structure 1 and steel structure 2 105 on leading portion car body 8 and back segment car body 15;
D, steel structure connecting plate 13 is penetrated in connecting hole 109 by pin by the rotation connection locking connection of steel structure 1;It will be hydraulic Supporting leg 9 and hydraulic cylinder temporary support foot 104 open support on ground;
E, wirerope 14 is mounted between the reel 7 of same level height and is tensed;
F, the item 51 that de-orbits is moved by the way that noise barrier 3 is manually forced through track strip 51, at this time wirerope abaculus 304 are directly embedded on wirerope 14;
G, noise barrier 3 moves back and forth neat arranged in parallel formation construction barrier on wirerope 14, and construction terminates.
Embodiment 2
As shown, road safety job execution barrier structure, including traction platform 10, the lower section of the traction platform 10 Hydraulic leg 9 is installed, the traction platform 10 divides for leading portion car body 8 and back segment car body 15, four drawn on platform 10 Angle is equipped with spud pile 6, is equipped with reel 7 on the spud pile 6, in which: 2 reels 7 are mounted on each spud pile 6, 7 level height of reel above each spud pile 6 is identical, and is located at the reel 7 of same level height above two ipsilateral spud piles 6 Between be connected with wirerope 14.
Top plate 5 is installed, the top plate 5 is uniformly equipped with track strip 51 above, and noise barrier 3 passes through on traction platform 10 Guide cam 301 is embedded in track strip 51 and is uniformly lifted below top plate 5;The two sides of the noise barrier 3 are symmetrically arranged with steel wire Rope abaculus 304, the inside of the wirerope abaculus 304 is also equipped with pulley 1.It is equipped on noise barrier 3 and spud pile 6 Working light placing frame 302, working light placing frame 302 provide warning for placing traffic flash lamp for vehicle at night.Noise barrier Bottom is also equipped with pulley 2 305, and construction personnel is in moving process, it is only necessary to noise barrier 3 is gently pushed, by adopting Noise barrier 3 is fast moved can with guide cam 301 and pulley 2 305, saves manpower.
Conduit 2 is equipped on leading portion car body 8 and back segment car body 15, the tail portion of the leading portion car body 8 is laid with connecting column 1201, the mechanical gripper 1202 for holding connecting column 1201 is installed on the back segment car body 15;The present invention can pass through scene Condition of construction adjusts the length of traction platform 10, it is only necessary to which unclamping connecting column 1201 by mechanical gripper 1202 makes leading portion car body 8 It is separated with back segment car body 15, site operation is met to increase the length of traction platform 10 by rotation connection steel structure 1 splicing It is required that rotation connection steel structure 1 is mounted on back segment car body 15, slidingtype connection steel structure 11 is installed on leading portion car body 8.
Rotation connection steel structure 1 includes the pedestal 106 being mounted on conduit 2, and rotation connection steel structure 1 can come on conduit 2 The docking requirement for meeting back segment car body 15 and leading portion car body 8 is moved in return, is hinged with steel structure 2 105, steel structure 2 105 on pedestal 106 Hinged steel structure 1 is also hinged on the steel structure 2 105 and stretches hydraulic cylinder 2 107, in which: steel structure 2 105 and steel structure one 103 hinged places center are hollow structure 108, and stretching hydraulic cylinder 1 in this way can be through in steel structure 2 105 and steel structure 1 Splicing (asking emphasis refering to Fig. 8) is straightened in the two;Stretch the hinged steel structure 2 105 in one 102 one end of hydraulic cylinder, the hinged steel structure of the other end One 103;The steel structure 1 is equipped with connecting hole 109, and steel structure connecting plate 13 penetrates connecting hole 109 by pin will be adjacent The rotation connection locking connection of steel structure 1.The inside of steel structure 1 is also hinged with hydraulic cylinder temporary support foot 104.
Slidingtype connection steel structure 11 includes the railroad shoe 1105 being mounted on the conduit 2 of leading portion car body 8;The railroad shoe One section in 1105 is equipped with lower part steel structure 1104, and upper steel structure 1103 is mounted on lower part steel structure 1104, upper steel structure 1103 Bottom is equipped with pulley and is embedded in on 1104 track of lower part steel structure, is connected between the lower part steel structure 1104 and upper steel structure 1103 Connecting rod 1102 is equipped in the lower part steel structure 1104 and is made rotating motion steel wire cable 1101 by motor drive, connecting rod 1102 (ask emphasis refering to Fig. 6) on stuck steel wire cable 1101, such upper steel structure 1103 pulls connecting rod by steel wire cable 1101 1102 movements and fall to and be in the same horizontal position with lower part steel structure 1104 and spliced, the upper steel structure 1103 and lower part It also is provided with penetrating connecting hole 109 by pin for steel structure connecting plate 13 on steel structure 1104.
In addition, further including the loop wheel machine 4 being mounted on 1104 track of lower part steel structure, loop wheel machine 4 can be in 1104 rail of lower part steel structure Move back and forth on road, when preparing recycling after the completion of the slidingtype connection construction of steel structure 11, upper steel structure is sling by loop wheel machine 4 1103, by manually docking, make upper steel structure 1103 on the track for returning to lower part steel structure 1104.
Based on above-mentioned apparatus, the invention also provides a kind of construction method of road safety job execution barrier structure, It is characterized in that, includes the following steps:
A, specified construction site is drawn to for platform 10 is drawn by tractor, is adjusted to suitable position;
B, unclamping connecting column 1201 by control mechanical gripper 1202 separates leading portion car body 8 and back segment car body 15, By will rotate connection steel structure 1 connect with slidingtype steel structure 11 be moved to it is ipsilateral;
C, stretching the elongation of hydraulic cylinder 1 steel structure 1 and steel structure 2 105 is made to be articulated and connected through control is one straight Line, then so that steel structure 1 and steel structure 2 105 is horizontally placed at back segment by stretching hydraulic cylinder 2 107 and shrinking to forget about it steel structure 2 105 On car body 15, steel structure connecting plate 13 is respectively penetrated by pin will in the connecting hole 109 of lower part steel structure 1104 and steel structure 1 Rotation connection steel structure 1 connects the locking connection of both steel structures 11 with slidingtype;Or
Stretching the elongation of hydraulic cylinder 1 steel structure 1 and steel structure 2 105 is made to be articulated and connected through control is straight line, Steel structure 1 and steel structure 2 105 is set to be horizontally placed at back segment vehicle by stretching hydraulic cylinder 2 107 and shrinking to forget about it steel structure 2 105 again On body 15, drives steel wire cable 1101 to move by the motor in lower part steel structure 1104, pushed so that drive link 1102 is advanced Upper steel structure 1103 advances, and finally falls on down and is in the same horizontal position with lower part steel structure 1104 and is spliced, later by steel structure Connecting plate 13 is respectively penetrated in the connecting hole 109 of upper steel structure 1103 and steel structure 1 by pin rotation connecting 1 He of steel structure Slidingtype connects the locking connection of both steel structures 11;
E, hydraulic leg 9 and hydraulic cylinder temporary support foot 104 are opened into support on ground, wirerope 14 is mounted on same level It is tensed between the reel 7 of height;
F, the item 51 that de-orbits is moved by the way that noise barrier 3 is manually forced through track strip 51, at this time wirerope abaculus 304 are directly embedded on wirerope 14;
G, noise barrier 3 moves back and forth neat arranged in parallel formation construction barrier on wirerope 14, and construction terminates.

Claims (4)

1. road safety job execution barrier structure, including platform (10) are drawn, it is equipped with below the traction platform (10) Hydraulic leg (9), the traction platform (10) are divided into leading portion car body (8) and back segment car body (15), which is characterized in that the traction Quadrangle on platform (10) is equipped with spud pile (6), is equipped with reel (7) on the spud pile (6), in which: each spud pile (6) 2 reels (7) are mounted on, reel (7) level height of each spud pile (6) above is identical, and is located at ipsilateral two Spud pile (6) is connected with wirerope (14) between the reel (7) of same level height above;It is equipped on the traction platform (10) Top plate (5), the top plate (5) are uniformly equipped with track strip (51) above, and noise barrier (3) is embedded in by guide cam (301) Top plate (5) is uniformly lifted in track strip (51) below;The two sides of the noise barrier (3) are symmetrically arranged with wirerope abaculus (304), pulley one (303) is also equipped on the inside of the wirerope abaculus (304);
Described is to be equipped with conduit (2) on leading portion car body (8) and back segment car body (15), and the tail portion of the leading portion car body (8) is uniformly distributed Equipped with connecting column (1201), the mechanical gripper (1202) for holding connecting column (1201) is installed on the back segment car body (15);Rotation Turn connection steel structure (1) to be symmetrically mounted on back segment car body (15) and leading portion car body (8);
Rotation connection steel structure (1) includes the pedestal (106) being mounted on conduit (2), and pedestal is hinged with steel structure two on (106) (105), steel structure two (105) hinged steel structure one (103) is also hinged on the steel structure two (105) and stretches hydraulic cylinder two (107), Wherein: steel structure two (105) is hollow structure (108) with steel structure one (103) hinged place center, stretches hydraulic cylinder one (102) one end Hinged steel structure two (105), the hinged steel structure one (103) of the other end;The steel structure one (103) is equipped with connecting hole (109), and steel structure connects Fishplate bar (13) penetrates connecting hole (109) for adjacent rotation connection steel structure (1) locking connection by pin.
2. road safety job execution barrier structure according to claim 1, which is characterized in that the noise barrier (3) With working light placing frame (302) are equipped on spud pile (6), noise barrier (3) bottom is also equipped with pulley two (305).
3. road safety job execution barrier structure according to claim 1, which is characterized in that the steel structure one (103) Inside be also hinged with hydraulic cylinder temporary support foot (104).
4. the construction method of road safety job execution barrier structure according to claim 1, which is characterized in that including such as Lower step:
A, platform (10) will be drawn by tractor and is drawn to specified construction site, and be adjusted to suitable position;
B, unclamping connecting column (1201) by control mechanical gripper (1202) divides leading portion car body (8) and back segment car body (15) From;
C, ipsilateral by the way that symmetrically arranged rotation connection steel structure (1) to be moved to, hydraulic cylinder one (102) are stretched by control later It is straight line that elongation, which makes steel structure one (103) and steel structure two (105) be articulated and connected, then is shunk by stretching hydraulic cylinder two (107) Steel structure two (105), which is forgotten about it, makes steel structure one (103) and steel structure two (105) be horizontally placed at leading portion car body (8) and back segment car body (15) On;
D, steel structure connecting plate (13) is penetrated in connecting hole (109) by pin by rotation connection steel structure (1) locking connection;By liquid Supporting leg (9) and hydraulic cylinder temporary support foot (104) are pressed to open support on ground;
E, wirerope (14) is mounted between the reel (7) of same level height and is tensed;
F, it is de-orbited item (51) by the way that noise barrier (3) is manually forced through track strip (51) movement, wirerope is embedding at this time Block (304) is directly embedded on wirerope (14);
G, noise barrier (3) moves back and forth neat arranged in parallel formation construction barrier on wirerope (14), and construction terminates.
CN201710551009.5A 2017-07-07 2017-07-07 Road safety job execution barrier structure and its construction method Expired - Fee Related CN107269114B (en)

Priority Applications (3)

Application Number Priority Date Filing Date Title
CN201811355181.4A CN109252736B (en) 2017-07-07 2017-07-07 Road safety operation construction barrier structure
CN201811355183.3A CN109252737B (en) 2017-07-07 2017-07-07 Road safety operation construction barrier structure and construction method thereof
CN201710551009.5A CN107269114B (en) 2017-07-07 2017-07-07 Road safety job execution barrier structure and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710551009.5A CN107269114B (en) 2017-07-07 2017-07-07 Road safety job execution barrier structure and its construction method

Related Child Applications (2)

Application Number Title Priority Date Filing Date
CN201811355183.3A Division CN109252737B (en) 2017-07-07 2017-07-07 Road safety operation construction barrier structure and construction method thereof
CN201811355181.4A Division CN109252736B (en) 2017-07-07 2017-07-07 Road safety operation construction barrier structure

Publications (2)

Publication Number Publication Date
CN107269114A CN107269114A (en) 2017-10-20
CN107269114B true CN107269114B (en) 2019-05-24

Family

ID=60072699

Family Applications (3)

Application Number Title Priority Date Filing Date
CN201811355183.3A Active CN109252737B (en) 2017-07-07 2017-07-07 Road safety operation construction barrier structure and construction method thereof
CN201710551009.5A Expired - Fee Related CN107269114B (en) 2017-07-07 2017-07-07 Road safety job execution barrier structure and its construction method
CN201811355181.4A Expired - Fee Related CN109252736B (en) 2017-07-07 2017-07-07 Road safety operation construction barrier structure

Family Applications Before (1)

Application Number Title Priority Date Filing Date
CN201811355183.3A Active CN109252737B (en) 2017-07-07 2017-07-07 Road safety operation construction barrier structure and construction method thereof

Family Applications After (1)

Application Number Title Priority Date Filing Date
CN201811355181.4A Expired - Fee Related CN109252736B (en) 2017-07-07 2017-07-07 Road safety operation construction barrier structure

Country Status (1)

Country Link
CN (3) CN109252737B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109252735B (en) * 2018-11-08 2019-08-06 四川大学 A kind of municipal administration overhead construction protective fence and its installation apparatus
CN110093840B (en) * 2019-05-27 2021-04-16 淮阴工学院 Novel pavement laying auxiliary plate erecting device, erecting method and disassembling method
CN110130230B (en) * 2019-06-24 2021-05-18 中铁二局集团有限公司 Construction method for installing sound barrier by automatic traveling lifting lane-changing type trolley
CN110748235B (en) * 2019-09-23 2020-12-01 江西省连城建筑工程有限公司 Building workpiece installation construction method
CN111140074B (en) * 2019-11-01 2022-06-03 吴瑞祺 Anti-riot guardrail

Family Cites Families (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE102004018385A1 (en) * 2004-04-16 2005-11-03 Rationelle Technik Im Maschinenbau Rtm Gmbh Component e.g. post, setting device for making e.g. guard rail, is designed as steerable vehicle which carries post setting and loading devices, where setting and loading devices have control units that are coupled with drive units
CN100408758C (en) * 2006-07-14 2008-08-06 常熟华东汽车有限公司 Road barricade vehicle
KR101157917B1 (en) * 2010-01-11 2012-06-22 노용규 System support mold installation lift
CN201901854U (en) * 2010-12-25 2011-07-20 常熟华东汽车有限公司 Vehicle and barrier separating mechanism for combined type net barrier
CN202064293U (en) * 2011-05-12 2011-12-07 中铁二十局集团第一工程有限公司 Traction system used for steel trussed beam cantilever hauling construction
CN202990563U (en) * 2013-01-16 2013-06-12 明光市浩淼消防科技发展有限公司 Net casting and recovery device of knife stabbing net
CN103470097B (en) * 2013-09-25 2015-11-18 北京安龙特种车辆有限公司 A kind of transport vehicle of isolating mesh sheet and loading isolation mesh sheet
GB2534295A (en) * 2015-01-18 2016-07-20 Mowatt Bryce John Improved post driver
CN205330278U (en) * 2016-01-26 2016-06-22 国网安徽省电力公司检修公司 Electronic car of arranging of primary equipment safety measure

Also Published As

Publication number Publication date
CN109252737A (en) 2019-01-22
CN109252736A (en) 2019-01-22
CN109252737B (en) 2020-02-28
CN109252736B (en) 2020-06-12
CN107269114A (en) 2017-10-20

Similar Documents

Publication Publication Date Title
CN107269114B (en) Road safety job execution barrier structure and its construction method
CN211314243U (en) Integrated construction trolley for hanging cloth in tunnel
CN101891121B (en) Crane backstay spreader
CN103996992B (en) Mobile quick crossing frame
CN107514264A (en) A kind of new Multifunctional performing machine for constructing tunnel
CN103863955B (en) A kind of from introduction system and have this tower machine from introduction system
CN207348868U (en) A kind of new Multifunctional performing machine for constructing tunnel
CN109812129B (en) Municipal road construction baffle mounting structure and construction method thereof
US4846445A (en) Hydraulic fence post puller
CN115596463A (en) Arch frame installation device for repairing operated tunnel defects
CN204940111U (en) A kind of bridge detecting device
CN109458045A (en) Construction of the highway coaming plate auto-erecting structure and its construction method
CN111733872B (en) Pipe gallery construction method
CN2755282Y (en) Apparatus for restoring machines from comprehensive coal face
CN209704586U (en) Coal mine roadway prefabricated section is laid with apparatus for work
CN205036389U (en) Novel tunnel water proofing board is spread and is hung platform truck
CN107476556A (en) A kind of packaged type automatic lifting operating platform
CN110065888A (en) A kind of cable crane main rope Demolition Construction method
CN208122420U (en) A kind of antihunting stereo parking facility
CN2830157Y (en) Movable stage vehicle
CN208416564U (en) Two grommets with mobile arc track are to reinforcing steel bar laying trolley
CN108708746B (en) Reinforcing steel bar installation equipment
CN112429677A (en) Steel formwork installation device and method suitable for cover plate
CN2742140Y (en) Mounting composite workings urface machinery device
CN209211189U (en) Dodgem folds earth mat

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190422

Address after: Room 1122, Building 17, Huashan Road, Gaochun Economic Development Zone, Nanjing City, Jiangsu Province

Applicant after: Nanjing Rongli Real Estate Investment Co., Ltd.

Address before: 277524 No. 174, Bashangcun, Guanqiao Town, Tengzhou City, Zaozhuang City, Shandong Province

Applicant before: Qu Chengming

GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190524

Termination date: 20210707