CN109252667B - Fine construction method of frameless glass railing - Google Patents

Fine construction method of frameless glass railing Download PDF

Info

Publication number
CN109252667B
CN109252667B CN201811129822.4A CN201811129822A CN109252667B CN 109252667 B CN109252667 B CN 109252667B CN 201811129822 A CN201811129822 A CN 201811129822A CN 109252667 B CN109252667 B CN 109252667B
Authority
CN
China
Prior art keywords
layer
construction
mounting groove
cushion block
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811129822.4A
Other languages
Chinese (zh)
Other versions
CN109252667A (en
Inventor
张炳生
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Shanghai Architectural Decoration Engineering Co ltd
Original Assignee
Shanghai Jutong Decoration Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Jutong Decoration Group Co ltd filed Critical Shanghai Jutong Decoration Group Co ltd
Priority to CN201811129822.4A priority Critical patent/CN109252667B/en
Publication of CN109252667A publication Critical patent/CN109252667A/en
Application granted granted Critical
Publication of CN109252667B publication Critical patent/CN109252667B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Abstract

The invention discloses a fine construction method of a frameless glass railing, which relates to the technical field of building construction and comprises the following steps: step one, construction positioning: positioning and lofting the ground and a mortar layer on the ground in parallel along the width direction, and selecting a positioning point of the stabilizing base; step two, construction limiting ruler: a limit ruler with the same width as the handrail is arranged at the handrail, a decorative closing-up mounting groove is arranged, and height limiting and fixing are carried out on the decorative closing-up mounting groove according to the field finishing surface; step three, construction flow; the silica gel layer is filled between the toughened glass and the telescopic concave pad, and the edge is finely folded. After the stabilizing base is fixed, the horizontal cushion block is used for adjusting the left and right flatness, after the decorative closing-up mounting groove is fixed by the core-through screw, the limiting cushion block is used for supporting, and the telescopic concave cushion and the silica gel layer are connected and mounted with toughened glass; therefore, the invention has the advantages of firmness, stability, convenient installation, breakage prevention of glass, and hidden and flexible at multiple positions, and has good practical effect.

Description

Fine construction method of frameless glass railing
Technical Field
The invention relates to the technical field of building construction, in particular to a fine construction method of a frameless glass railing.
Background
At present, the ground where people live is often of a concrete, marble tile or wood floor structure, and it is not easy to install frameless glass railings on the ground, so that the structure of the whole floor is not damaged, and professional personnel are required to perform slotting.
The traditional method for constructing frameless glass balustrades comprises the following steps: 1. temporarily fixing battens with nails, 2, pulling out the battens after paving or decorating two sides, 3, using small wood block substrates, 4, inserting glass into the grooves, and embedding and fixing the small wood blocks; therefore, the traditional method for finely constructing the frameless glass balustrade has the following disadvantages: 1. the mortar base layer has weak density and is loosened by shaking; 2. the width of the notch is not straight, and the installation is not correct; 3. the small wood chips are easy to break when not embedded in the position.
Disclosure of Invention
The invention aims to provide a fine construction method of a frameless glass handrail, which aims to solve the problems in the background technology.
In order to achieve the purpose, the invention provides the following technical scheme:
a fine construction method of a frameless glass balustrade comprises the following steps:
step one, construction positioning: positioning and lofting the ground and a mortar layer on the ground in parallel along the width direction, and selecting a positioning point of the stabilizing base;
step two, construction limiting ruler: a limit ruler with the same width as the handrail is arranged at the handrail, a decorative closing-up mounting groove is arranged, and height limiting and fixing are carried out on the decorative closing-up mounting groove according to the field finishing surface;
step three, construction flow:
1. stabilizing the footing of the stabilizing base at the positioning point and vertically fixing;
2. after the height of the horizontal cushion block is measured, the horizontal cushion block is stuck in the groove on the stable base;
3. installing the decorative closing-up installation groove at the top end of the stabilizing base;
4. the core penetrating screw is arranged in the middle of the stable base, and the limiting cushion block is arranged on the core penetrating screw in a suspended mode and is uniformly supported by the core penetrating screw;
5. the telescopic concave pad positioned in the groove is coated and connected with the outside of the toughened glass;
6. the top flanging of the telescopic concave pad is embedded and arranged in the decorative closing-up mounting groove;
7. the silica gel layer is filled between the toughened glass and the telescopic concave pad, and the edge is finely folded.
As a still further scheme of the invention: the stable base is installed on the ground through the beauty nail.
As a still further scheme of the invention: the telescopic concave pad is made of rubber.
As a still further scheme of the invention: an inner layer is laid outside the mortar layer and is an adhesive layer or a wood base layer.
As a still further scheme of the invention: the outer layer is laid outside the inner layer and is a wall brick layer.
Compared with the prior art, the invention has the beneficial effects that: after the stabilizing base is fixed, the horizontal cushion block is used for adjusting the left and right flatness, after the decorative closing-up mounting groove is fixed by the core-through screw, the limiting cushion block is used for supporting, and the telescopic concave cushion and the silica gel layer are connected and mounted with toughened glass; therefore, the invention has the advantages of firmness, stability, convenient installation, breakage prevention of glass, and hidden and flexible at multiple positions, and has good practical effect.
Drawings
Fig. 1 is a schematic view of the completion of the installation of a fine construction method for a frameless glass balustrade.
In the figure: 1-a stable base, 2-a horizontal cushion block, 3-a decorative closing-in mounting groove, 4-a limiting cushion block, 5-a telescopic concave cushion, 6-toughened glass, 7-a silica gel layer, 8-an outer layer, 9-an inner layer, 10-a ground, 11-a beautiful fixing nail, 12-a core penetrating screw and 13-a mortar layer.
Detailed Description
The technical solutions in the embodiments of the present invention are clearly and completely described below with reference to specific embodiments, and it is obvious that the described embodiments are only a part of the embodiments of the present invention, and not all embodiments. All other embodiments, which can be derived by a person skilled in the art from the embodiments given herein without making any creative effort, shall fall within the protection scope of the present invention.
Example 1:
a method for finely constructing a frameless glass balustrade, as shown in fig. 1, comprising the steps of:
step one, construction positioning: positioning and lofting the ground 10 and a mortar layer 13 on the ground 10 in parallel along the width direction, and selecting a positioning point of the stabilizing base 1;
step two, construction limiting ruler: a limit ruler with the same width as the handrail is arranged at the handrail, a decorative closing-up mounting groove 3 is arranged, and height limitation and fixation are carried out on the decorative closing-up mounting groove according to the field finishing surface;
step three, construction flow:
1. stabilizing the footing of the stabilizing base 1 at the positioning point and vertically fixing;
2. after the height of the horizontal cushion block 2 is measured, the horizontal cushion block is stuck in the groove on the stable base 1;
3. installing a decorative closing-up installation groove 3 at the top end of the stable base 1;
4. the core penetrating screw 12 is arranged in the middle of the stable base 1, and the limiting cushion block 4 is arranged on the core penetrating screw 12 in a suspended mode and is uniformly supported by the core penetrating screw 12;
5. the telescopic concave pad 5 positioned in the groove is coated and connected with the outside of the toughened glass 6;
6. the top flanging of the telescopic concave pad 5 is embedded and arranged in the decorative closing-up mounting groove 3;
7. the silica gel layer 7 is filled between the toughened glass 6 and the telescopic concave pad 5 for fine edge folding.
After a stable base 1 is fixed, the horizontal cushion block 2 is used for adjusting the left and right flatness, after a decoration closing-up installation groove 3 is fixed by a core penetrating screw 12, a limit cushion block 4 (a suspended core penetrating screw) is used for supporting, and a telescopic concave cushion 5 and a silica gel layer 7 are connected with and installed on toughened glass 6; therefore, the invention has the advantages of firmness, stability, convenient installation, breakage prevention of glass, and hidden and flexible at multiple positions, and has good practical effect.
Example 2:
on the basis of the embodiment 1, the stable base 1 is installed on the ground 10 through the beauty nail 11, the telescopic concave cushion 5 is made of rubber, the inner layer 9 is paved outside the mortar layer 13, the inner layer 9 is an adhesive layer or a wood base layer, the outer layer 8 is paved outside the inner layer 9, and the outer layer 8 is a wall brick layer; the stable base 1 is installed on the ground 10 through the beauty nail 11, so that the stable base has good installation effect and low manufacturing cost.
It will be evident to those skilled in the art that the invention is not limited to the details of the foregoing illustrative embodiments, and that the present invention may be embodied in other specific forms without departing from the spirit or essential attributes thereof. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein.
Furthermore, it should be understood that although the present description refers to embodiments, not every embodiment may contain only a single embodiment, and such description is for clarity only, and those skilled in the art should integrate the description, and the embodiments may be combined as appropriate to form other embodiments understood by those skilled in the art.

Claims (5)

1. A fine construction method of a frameless glass railing is characterized by comprising the following steps:
step one, construction positioning: parallelly positioning and lofting the ground (10) and a mortar layer (13) on the ground (10) along the width direction, and selecting a positioning point of the stabilizing base (1);
step two, construction limiting ruler: a limit ruler with the same width size as the handrail is arranged at the handrail, a decorative closing-up mounting groove (3) is arranged, and height limitation and fixation are carried out on the decorative closing-up mounting groove according to the field completion surface;
step three, construction flow:
stabilizing the base degree of the stabilizing base (1) at the positioning point and vertically fixing;
after the height of the horizontal cushion block (2) is measured, the horizontal cushion block is stuck in a groove on the stable base (1);
installing the decorative closing-up installation groove (3) at the top end of the stable base (1);
the core penetrating screw (12) is arranged in the middle of the stable base (1), and the limiting cushion block (4) is arranged on the core penetrating screw (12) in a suspended mode and is uniformly supported by the core penetrating screw (12);
the telescopic concave pad (5) positioned in the groove is coated and connected with the outside of the toughened glass (6);
the top flanging of the telescopic concave pad (5) is embedded in the decorative closing-up mounting groove (3);
the silica gel layer (7) is filled between the toughened glass (6) and the telescopic concave pad (5) for fine edge folding.
2. The elaborate construction method of frameless glass balustrade according to claim 1, characterized in that the stabilization base (1) is mounted on the ground (10) by means of beauty nails (11).
3. The fine construction method of frameless glass balustrade of claim 1, wherein the telescopic concave pad (5) is made of rubber.
4. A method of fine construction of frameless glass balustrades according to any of claims 1-3, characterized in that the mortar layer (13) is externally laid with an inner layer (9), the inner layer (9) being an adhesive layer or a wood-based layer.
5. The fine construction method of frameless glass balustrade according to claim 4, characterized in that the outer layer (8) is laid on the outside of the inner layer (9), the outer layer (8) being a wall brick layer.
CN201811129822.4A 2018-09-27 2018-09-27 Fine construction method of frameless glass railing Active CN109252667B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811129822.4A CN109252667B (en) 2018-09-27 2018-09-27 Fine construction method of frameless glass railing

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811129822.4A CN109252667B (en) 2018-09-27 2018-09-27 Fine construction method of frameless glass railing

Publications (2)

Publication Number Publication Date
CN109252667A CN109252667A (en) 2019-01-22
CN109252667B true CN109252667B (en) 2021-04-02

Family

ID=65047525

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811129822.4A Active CN109252667B (en) 2018-09-27 2018-09-27 Fine construction method of frameless glass railing

Country Status (1)

Country Link
CN (1) CN109252667B (en)

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4067548A (en) * 1976-07-12 1978-01-10 Murphy John J Railing
US6419209B1 (en) * 2000-03-30 2002-07-16 John D. Shepherd Railing assembly
EP1277894A2 (en) * 2001-07-18 2003-01-22 Arnold AG Clamped handrail
CN201809915U (en) * 2010-08-18 2011-04-27 深圳市燕加隆实业发展有限公司 Aluminum-alloy frame-free glass guardrail and plate fixing system thereof
CN202627361U (en) * 2012-04-05 2012-12-26 华润建筑有限公司 Adjustable glass river fender fixing device
CN205116591U (en) * 2015-10-29 2016-03-30 深圳广田装饰集团股份有限公司 Glass of limit portion goes into fixing device and fixed structure in groove
CN205531090U (en) * 2016-01-25 2016-08-31 深圳瑞和建筑装饰股份有限公司 Convenient installation device of glass spare
CN205604615U (en) * 2016-05-10 2016-09-28 北京承达创建装饰工程有限公司 Indoor glass breast board fixed knot of no column constructs
CN205894535U (en) * 2016-06-28 2017-01-18 南京三惠建设工程股份有限公司 No framework glass railing

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4067548A (en) * 1976-07-12 1978-01-10 Murphy John J Railing
US6419209B1 (en) * 2000-03-30 2002-07-16 John D. Shepherd Railing assembly
EP1277894A2 (en) * 2001-07-18 2003-01-22 Arnold AG Clamped handrail
CN201809915U (en) * 2010-08-18 2011-04-27 深圳市燕加隆实业发展有限公司 Aluminum-alloy frame-free glass guardrail and plate fixing system thereof
CN202627361U (en) * 2012-04-05 2012-12-26 华润建筑有限公司 Adjustable glass river fender fixing device
CN205116591U (en) * 2015-10-29 2016-03-30 深圳广田装饰集团股份有限公司 Glass of limit portion goes into fixing device and fixed structure in groove
CN205531090U (en) * 2016-01-25 2016-08-31 深圳瑞和建筑装饰股份有限公司 Convenient installation device of glass spare
CN205604615U (en) * 2016-05-10 2016-09-28 北京承达创建装饰工程有限公司 Indoor glass breast board fixed knot of no column constructs
CN205894535U (en) * 2016-06-28 2017-01-18 南京三惠建设工程股份有限公司 No framework glass railing

Also Published As

Publication number Publication date
CN109252667A (en) 2019-01-22

Similar Documents

Publication Publication Date Title
CN1240920C (en) Panel, and connecting strip and connecting element for a panel
CN108457442B (en) Interior decoration system and decoration method
CN102140836B (en) Construction method of large-size floor tile
US20060254169A1 (en) Apparatus, system, and method for extending an exterior wall surface below a debridge of a weep screed
CN109252667B (en) Fine construction method of frameless glass railing
CN110552470A (en) Stair assembly and method of assembling same
CN216740535U (en) Groove strip insertion type wood floor structure
US11753833B2 (en) Modular floating tile, coping and skirting systems for decks and stairs
CN105239751B (en) A kind of combined type floor tile of easily draining
US20060053741A1 (en) Floor tile structure and method therefor
CN209179240U (en) The integrated mounting structure of wall thermal insulating
CN114396147A (en) Groove strip insertion type wood floor structure and installation method
CN209353597U (en) A kind of pre-buried composite structure of frame-free glass railing
CN203113646U (en) Stairs provided with decorative sheets with skidproof function
CN108978851A (en) A kind of improvement room finishing system and decoration method
CN206448501U (en) A kind of floor covering layers locating rack
CN211229237U (en) Leveling device and stair assembly
CN214941964U (en) Splicing structure of wall assembled ceramic tiles
CN204781759U (en) House outer wall stand decorative aluminum buckle
CN217326283U (en) Skirting line embedded part and skirting line decorative structure
CN214461284U (en) Waterproof structure of toilet
KR101492429B1 (en) The construction method and stucture for rafters of traditional wooden building
CN207739427U (en) A kind of walling system
US11866945B2 (en) Methods of constructing floating tile-based flooring and staircase systems and components thereof
ITRE20080080A1 (en) FITTING DEVICE FOR ANCHORAGE SYSTEMS FOR SLABS AND ANCHORAGE SYSTEM INCLUDING THE DEVICE.

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230508

Address after: Room 318, Building 8, No. 68 Dongheyan, Chengqiao Town, Chongming District, Shanghai, 202150 (Shanghai Chengqiao Economic Development Zone)

Patentee after: Shanghai Shanghai Architectural Decoration Engineering Co.,Ltd.

Address before: No.15, Lane 300, Dezhou Road, Pudong New Area, Shanghai, 200126

Patentee before: SHANGHAI JUTONG DECORATION GROUP Co.,Ltd.