CN109252590A - A kind of huge diagonal brace of overlength superelevation and its seek connections with formula construction method - Google Patents

A kind of huge diagonal brace of overlength superelevation and its seek connections with formula construction method Download PDF

Info

Publication number
CN109252590A
CN109252590A CN201811269214.3A CN201811269214A CN109252590A CN 109252590 A CN109252590 A CN 109252590A CN 201811269214 A CN201811269214 A CN 201811269214A CN 109252590 A CN109252590 A CN 109252590A
Authority
CN
China
Prior art keywords
huge
diagonal
supporting member
diagonal brace
column
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811269214.3A
Other languages
Chinese (zh)
Other versions
CN109252590B (en
Inventor
韩朋
赵龙坡
王香华
徐庚辰
庄会云
李檀
李文波
付小敏
郜可忠
马翠娟
阴泰越
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING MACHINERY CONSTRUCTION Co Ltd
Original Assignee
BEIJING MACHINERY CONSTRUCTION Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING MACHINERY CONSTRUCTION Co Ltd filed Critical BEIJING MACHINERY CONSTRUCTION Co Ltd
Priority to CN201811269214.3A priority Critical patent/CN109252590B/en
Publication of CN109252590A publication Critical patent/CN109252590A/en
Application granted granted Critical
Publication of CN109252590B publication Critical patent/CN109252590B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

The invention discloses a kind of huge diagonal brace of overlength superelevation and its seek connections with formula construction method, diagonal brace is arranged between adjacent huge column in X-shaped, 4 endpoints of X-shaped diagonal brace are welded to each other integral structure between huge column respectively, several end to end X-shaped diagonal braces are equipped between adjacent huge column.The formula construction method of seeking connections with includes carrying out equitable subsection merogenesis to diagonal supporting member, according to segmentation situation, diagonal supporting member is used into support free construction method, utilize Midas's overall calculation, it determines the i.e. reinforcing pull rod or steel strut arrangement in integrated tooling arrangement, makes to form self-stabilization stress system between reinforcing pull rod or steel strut and diagonal brace, huge column;With finite element software modeling analysis, steel rod elements detail treatment is determined;It is simulated according to Midas's overall calculation result, finite element analysis software, establishes construction model and reinforcing pull rod or steel strut and analyzed with set of model, reinforcing pull rod, steel strut, crosshead tooling are designed using model, processed, are made according to detail drawing scene.

Description

A kind of huge diagonal brace of overlength superelevation and its seek connections with formula construction method
Technical field
The present invention relates to super high steel structure outline border incline structures without support mounting technique field, and in particular to a kind of overlength It the huge diagonal brace of superelevation and its seeks connections with formula and seeks connections with formula construction method without support.
Background technique
Recently as the continuous improvement of design level and construction technology, super high steel structure has obtained development at full speed. The huge intercolumniation of outline border adds huge diagonal brace to increase the globality of structure, and the huge diagonal supporting member section of such steel construction is very big. Just start after outer frame system and core cartridge system to several layers in the design phase sufficiently to increase head room in first floor hall There is the connection of floor beam, causes huge diagonal brace jib-length too long, and huge diagonal brace tilt angle is big, brings to installation huge Difficulty.
Summary of the invention
It is an object of the invention to overcome defect existing in the prior art, provide a kind of structure is simple, construction cost is low, Structure is safe and reliable, convenient for constructing operation the huge diagonal brace of overlength superelevation and its seek connections with formula construction method.
To achieve the above object, the technical scheme is to design a kind of huge diagonal brace of overlength superelevation, the diagonal brace is in X Shape is arranged between adjacent huge column, and 4 endpoints of X-shaped diagonal brace are welded to each other integral structure between huge column respectively, adjacent Several end to end X-shaped diagonal braces are equipped between huge column.
Preferred technical solution is that the huge column is in y-type structure, and both the bottom of huge column was single huge column, and top is double joint Huge column is in 20 °~30 ° angles between the huge column of double joint, and one end of the huge column of double joint is mutually passed through with single huge column, and the length of the huge column of double joint is N times of single huge column length, wherein two bottom ends of the nethermost X-shaped diagonal brace of several end to end X-shaped diagonal braces are distinguished It is welded to each other integral structure between single huge column, the 4 of two upper ends of nethermost X-shaped diagonal brace and remaining X-shaped diagonal brace A endpoint is welded to each other integral structure between the huge column of double joint respectively.
Preferred technical solution is in addition, the single huge column, the huge column of double joint and X-shaped diagonal brace are mutually welded by several segments tube body It is connected into overall structure, each of these section is respectively diagonal supporting member or is huge column component.
Further preferred technical solution is installation lifting lug to be equipped on every section of diagonal supporting member and lifting lug of unloading, On every section of diagonal supporting member install lifting lug at least provided with 4, installation lifting lug setting position should meet ensure diagonal supporting member lifting when Inclination angle it is 3~5 ° bigger than theoretical value.
Further preferred technical solution is in addition, be equipped with Core Walls Structure between the single huge column and the huge column branch of double joint, in list Reinforcing pull rod, the steel strut for constructing operation are equipped between the huge column of root, the huge column of double joint, Core Walls Structure and diagonal supporting member, in diagonal brace structure Part has the crosshead and operating platform for constructing operation.
A kind of huge diagonal brace of overlength superelevation seeks connections with formula construction method, and the formula construction method of seeking connections with includes following technique step It is rapid:
The first step carries out equitable subsection merogenesis to diagonal supporting member, according to transport road conditions, site operation and tower crane operating condition, really Determine that first segment diagonal supporting member length is 8m, the second~tetra- section diagonal supporting member length is that 9m, Section of five diagonal supporting member length are 4.5m, Section of six diagonal length are 5.1m, intermediate closing node is emerging font node;
Diagonal supporting member is used support free construction method according to segmentation situation by second step, using Midas's overall calculation, It determines the i.e. reinforcing pull rod arrangement in integrated tooling arrangement, with Abaqus finite element software modeling analysis, determines steel rod elements thin portion Node;
Third step is simulated according to Midas's overall calculation result, Abaqus finite element analysis software, is established with Tekla Construction model and reinforcing pull rod are analyzed with set of model, so that analyze that installation diagonal supporting member at the scene can encounter various asks Topic is predicted in advance and takes counter-measure in time;
Reinforcing pull rod, steel strut, crosshead tooling are designed by the 4th step using Tekla model, according to detail drawing scene into Row processing, production.
Preferred technical solution is the wherein installation of first segment diagonal supporting member, will be positioned using welding on huge column in advance Plate finds out suitable hoisting point position according to the dip member center of gravity of X-shaped diagonal brace, and principle is after first segment diagonal supporting member is sling than it Mounting inclination angle degree is small.
Preferred technical solution will use in addition, the wherein installation of the second~tetra- section diagonal supporting member to first segment diagonal brace structure Part finishes and after qualification of detecting a flaw with the welding of huge column intersecting mouth, then huge column is installed to the huge pillar height degree of setting reinforcing pull rod, suspension centre Principle is 3~5 ° bigger than its mounting inclination angle degree after slinging;
When in the installation of the second~tetra- section diagonal supporting member, since inclination angle is bigger than theoretical value, top contacts first, in off the hook In the process, the movement tendency of upper section diagonal supporting member is using contact point as axis rotation always until inclination angle reaches design value, entire right Interface coincide, and saves connecting plate up and down and is connected firmly, installs reinforcing pull rod later, and reinforcing pull rod both ends weld seam is full penetration weld, to It, can decoupling device after the completion of the welding of reinforcing pull rod both ends weld seam.
Further preferred technical solution is, wherein Section of four huge diagonal brace installation, huge column is installed to setting reinforcing pull rod Huge pillar height degree, when the installation of Section of four diagonal supporting member, steel strut is set between two diagonal supporting members, in advance places reinforcing pull rod just Position, while a diagonal supporting member is respectively lifted with two movable arm towers.After position reaches theoretical coordinate, connecting plate connection will be saved up and down It securely, at this time can decoupling device then by steel rod elements firm welding.
Further preferred technical solution installs huge column to super in addition, when wherein the five~six section diagonal supporting member is installed The height of diagonal supporting member to be installed is crossed, the five, the six section diagonal supporting members are connect with F7, F8 floor beam respectively, in order to guarantee It realizes emerging font node structure, the relative coordinate of emerging font node need to be measured, the five, the six section diagonal supporting members were being installed The relative coordinate sat in journey according to its Theoretical Design, determines its suitable coordinate;Emerging font node installation, by emerging font node installation After in place, the counterpart of two trouser legs and the lower huge support of section is adjusted, after adjustment reaches code requirement, connected floor is installed and is reinforced Welding.
The advantages and beneficial effects of the present invention are: the huge diagonal brace of overlength superelevation and its seek connections with formula construction method have knot Structure is simple, construction cost is low, structure is safe and reliable, is convenient for the features such as constructing operation.It is sought connections with by using more piece multilayer without support Formula construction method, reduce a large amount of backing material and production, installation, remove support needed for personnel, machinery, saved at This, shortens preliminary preparation and ending time in later period, greatly increases construction efficiency, achieve splendid effect, Reference, guidance are provided for the construction of similar engineering.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the huge diagonal brace of overlength superelevation of the present invention;
Fig. 2 is the diagonal supporting member structural schematic diagram in Fig. 1;
Fig. 3 is the constructing structure schematic diagram in the huge diagonal brace of overlength superelevation of the present invention.
In figure: 1, diagonal brace;1.1, diagonal supporting member;1.11, first segment diagonal supporting member;1.12, the second section diagonal supporting member; 1.13, third section diagonal supporting member;1.14, Section of four diagonal supporting member;1.15, Section of five diagonal supporting member;1.16, Section of six diagonal brace structure Part;1.17, emerging font node;2, huge column;2.1, single huge column;2.2, the huge column of double joint;3, lifting lug is installed;4, it unloads lifting lug;5, Core Walls Structure;6, reinforcing pull rod;7, steel strut;8, crosshead;9, operating platform.
Specific embodiment
With reference to the accompanying drawings and examples, further description of the specific embodiments of the present invention.Following embodiment is only For clearly illustrating technical solution of the present invention, and not intended to limit the protection scope of the present invention.
As shown in Figures 1 to 3, the present invention is a kind of huge diagonal brace of overlength superelevation, and the diagonal brace 1 is arranged in X-shaped adjacent huge Between column 1,4 endpoints of X-shaped diagonal brace 1 are welded to each other integral structure between huge column 2 respectively, set between adjacent huge column 2 There are several end to end X-shaped diagonal braces 1.
The preferred embodiment of the invention is that the huge column 2 is in y-type structure, and both the bottom of huge column 2 was single huge column 2.1, Top is the huge column 2.2 of double joint, and the huge column 2.2 of double joint is in 25 ° of angles, and one end of the huge column 2.2 of double joint is passed through with single huge 2.1 phase of column, double The length of root huge 2.2 is N times of single 2.1 length of huge column, wherein the nethermost X-shaped of several end to end X-shaped diagonal braces 1 Two bottom ends of diagonal brace 1 are welded to each other integral structure, two upper ends of nethermost X-shaped diagonal brace 1 with single huge column 2.1 respectively And 4 endpoints of remaining X-shaped diagonal brace 1 are welded to each other integral structure between the huge column 2.2 of double joint respectively.
If the preferred embodiment of the invention in addition, the single huge column 2.1, the huge column 2.2 of double joint and X-shaped diagonal brace 1 by Dry section tube body is welded to each other integral structure, and each of these section is respectively diagonal supporting member 1.1 or is huge column component.
Further preferred embodiment of the present invention is that installation 3 He of lifting lug is equipped on every section of diagonal supporting member 1.1 It unloads lifting lug 4, at least provided with 4, the position that installation lifting lug 3 is arranged should meet and ensure installation lifting lug 3 on every section of diagonal supporting member 1.1 Inclination angle when diagonal supporting member 1.1 lifts is 3~5 ° bigger than theoretical value.
Further preferred embodiment of the present invention between the single huge column 2.1 and 2.2, the huge column of double joint in addition, be equipped with Core Walls Structure 5 is equipped between single huge column 2.1, the huge column 2.2 of double joint, Core Walls Structure 5 and diagonal supporting member 1.1 for constructing operation Reinforcing pull rod 6, steel strut 7 have the crosshead 8 and operating platform 9 for constructing operation in diagonal supporting member 1.1.
A kind of huge diagonal brace of overlength superelevation seeks connections with formula construction method, and the formula construction method of seeking connections with includes following technique step It is rapid:
The first step carries out equitable subsection merogenesis to diagonal supporting member 1.1, according to transport road conditions, site operation and tower crane operating condition, Determine that 1.11 length of first segment diagonal supporting member is 8m, 1.12~1.14 length of the second~tetra- section diagonal supporting member is 9m, Section five 1.15 length of diagonal supporting member is 4.5m, Section of six 1.16 length of diagonal is 5.1m, intermediate closing node is emerging font node 1.17;
Diagonal supporting member 1.1 is used support free construction method, is integrally counted using Midas by second step according to segmentation situation It calculates, determines that the reinforcing pull rod 6 in integrated tooling arrangement is arranged, with Abaqus finite element software modeling analysis, determine that steel rod elements 6 are thin Portion's node;
Third step is simulated according to Midas's overall calculation result, Abaqus finite element analysis software, is established with Tekla Construction model and reinforcing pull rod 6 are analyzed with set of model, thus analyze installation diagonal supporting member 1.1 at the scene can encounter it is various Problem is predicted in advance and takes counter-measure in time;
Reinforcing pull rod 6, steel strut 7,8 tooling of crosshead are designed by the 4th step using Tekla model, existing according to detail drawing Field is processed, is made.
The preferred embodiment of the invention is the wherein installation of first segment diagonal supporting member 1.11, will be using in advance in huge column 2 Upper welding location-plate finds out suitable hoisting point position according to the dip member center of gravity of X-shaped diagonal brace, and principle is first segment diagonal supporting member 1.11 sling after it is smaller than its mounting inclination angle degree.
The preferred embodiment of the invention will adopt in addition, the wherein installation of the second~tetra- section diagonal supporting member 1.12~1.14 With being finished after first segment diagonal supporting member 1.11 with the welding of huge 2 intersecting mouth of column and after qualification of detecting a flaw, then by the installation of huge column 2 to being arranged 2 height of huge column of reinforcing pull rod 6, suspension centre principle are 3~5 ° bigger than its mounting inclination angle degree after slinging;
When in the installation of the second~tetra- section diagonal supporting member 1.12~1.14, since inclination angle is bigger than theoretical value, top is first Contact, during off the hook, it is axis rotation until inclination angle reaches that the movement tendency of upper section diagonal supporting member 1.1, which is using contact point always, Design value, entire tone of docking close, save connecting plate up and down and be connected firmly, install reinforcing pull rod 6 later, 6 both ends weld seam of reinforcing pull rod is equal It can decoupling device after the completion of the welding of 6 both ends weld seam of reinforcing pull rod for full penetration weld.
Further preferred embodiment of the present invention is, wherein Section of four diagonal supporting member installation 1.14, extremely by the installation of huge column 2 Steel strut is arranged when Section of four diagonal supporting member 1.14 is installed in 2 height of huge column that reinforcing pull rod 6 is arranged between two diagonal supporting members 1.1 7, reinforcing pull rod 6 is placed in position in advance, while respectively lifting a diagonal supporting member 1.1 with two movable arm towers.Position reaches theoretical After coordinate, upper and lower section connecting plate is connected firmly, then by 6 firm welding of steel rod elements, it at this time can decoupling device.
Further preferred embodiment of the present invention is in addition, wherein the five~six section diagonal supporting member 1.15~1.16 is installed When, by the installation of huge column 2 to being more than to install the height of diagonal supporting member 1.1, the five, the six section diagonal supporting members 1.15,1.16 respectively with The connection of F7, F8 floor beam, need to be by the opposite of emerging font node 1.17 in order to guarantee to realize emerging 1.17 structure of font node Measurement of coordinates comes out, the opposite seat that the five, the six section diagonal supporting members 1.15,1.16 are sat according to its Theoretical Design during the installation process Mark, determines its suitable coordinate;Emerging font node 1.17 is installed, by emerging font node 1.17 install it is in place after, adjust two trouser legs with The counterpart of the lower huge support of section after adjustment reaches code requirement, installs connected floor and carries out reinforcing welding.
Embodiment 1
As shown in Figure 1, for 94 floor of super high steel structure engineering high building ground, 4 layers of underground, building height 428m.Tower Building plane quadrangle is respectively disposed with huge frame column, mega-frame column section Φ 4200*80.High building integrally resists to improve structure Lateral force arranges huge X-shaped diagonal brace 1 in four facades between huge column 2, and each facade respectively has 7 huge X-shapeds oblique 1, wherein Bottom one layer huge X-shaped diagonal brace 1 (- 7.95m~35.33m) member section maximum Φ 2800*80, outer frame system and core First of floor beam is arranged in cylinder 5 at F7 layers (26.85m).
Construction Difficulties
It is the whole world by the huge column 2 of double inclinations that huge frame column Φ 4200*80 and huge X-shaped diagonal brace 1 are made of Φ 2800*80 Maximum phase passes through docking in super high-rise building, and the two huge column angles of inclination are 25 °.This intersection welding seam welding difficulty is high.
Since huge diagonal brace mutually passes through on huge frame column, on downward projection, center line is not overlapped the two huge columns 2 of inclination. It is irregular when installing positioning to follow, therefore be accurately positioned to measurement and bring huge challenge.
It is closed from passing through with huge 2 phase of column to F9 layers, 1 length of X-shaped diagonal brace reaches 50m, weight about 268.3t.It need to rationally plan to be segmented Merogenesis requires technique preparation high.
It which kind of installation method to be the most important thing of this huge diagonal brace mount scheme using.Not only safe and reliable, but also save the cost.
It needs to select suitable suspension centre, it is ensured that angle is consistent with theoretical value after lifting.
Huge diagonal brace installs performance analysis.
Huge diagonal brace merogenesis and suspension centre analysis.
As shown in Fig. 2, entire huge 1 length of diagonal brace reaches 50m, according to live tower crane arrangement and performance, every section diagonal brace weight No more than 60t.The method installed using more piece multilayer, diagonal supporting member 1.1 is using 4 points of liftings, by designing suspension centre position in advance It sets and rope capacity, it is ensured that inclination angle when diagonal supporting member 1.1 lifts is 3~5 ° bigger than theoretical value, in this way when upper section diagonal brace When component 1.1 is docked with lower section diagonal supporting member 1.1, upper section diagonal supporting member 1.1 only needs off the hook to can be completed in place, improves construction Efficiency.
Huge diagonal brace mount scheme analysis.
Diagonal supporting member 1.1 sets reinforcing pull rod 6 in huge column 2 pull-up using no Construction of Supporting process Installation.Pass through technology point X-shaped diagonal brace is divided into 6 sections after analysis, and diagonal supporting member 1.1 is using installation method construction from bottom to top section by section.
It is compared without support installation with traditional measures
As shown in figure 3, since 1.1 weight of this engineering diagonal supporting member is big, according to on-site actual situations and concrete floor Bearing capacity, therefore using no method for supporting install.Specifically: it is huge with outline border that second and third is saved into huge diagonal supporting member 1.12,1.13 2 drawknot of column, to reduce vertical load;Third and fourth section diagonal supporting member 1.13,1.14 needs and 5 drawknot of core shell, that is, guarantees Planar stability;Section four, steel strut 7 is set between diagonal supporting member, and offset each other horizontal force;Five, the six section diagonal supporting members and building (F7 layers, F8 layers) of beam connection of layer.All reinforcing pull rods 6, steel strut 7 it is unwelded securely before, tower crane can not decoupling device.Diagonal supporting member 1.1 divide into crosshead 8, and crosshead 8 is not subject to huge support load, only personnel's lower channel.
Huge diagonal brace seeks connections with formula construction method
Technical preparation
Equitable subsection merogenesis is carried out to diagonal supporting member 1.1.According to transport road conditions, site operation and tower crane operating condition etc., determine 1.11 length of first segment diagonal supporting member is 8m, 1.12~1.14 length of the second~tetra- section diagonal supporting member is 9m, Section of five diagonal brace 1.15 length of component is 4.5m, Section of six 1.16 length of diagonal supporting member is 5.1m, intermediate closing node is emerging font node 1.17.
According to segmentation actual conditions, diagonal supporting member is relatively high to technical requirements using no Construction of Supporting process.It utilizes Midas's overall calculation determines that integrated tooling arrangement i.e. reinforcing pull rod 6 is arranged.With Abaqus finite element software modeling analysis, really Determine 6 detail treatment of reinforcing pull rod.
According to analysis modes such as Midas, Abaqus finite element softwares.Construction model and reinforcing pull rod 6 are established with Tekla It is analyzed with set of model, the various problems that huge diagonal brace can encounter is installed at the scene to analyze, predicted in advance and timely Take counter-measure.
The toolings such as reinforcing pull rod 6, crosshead 8 are subjected to Deepen Design using Tekla model, are carried out according to in-depth detail drawing scene Processing, production.
Hoisting
First segment diagonal supporting member 1.11 is installed;
Since diagonal supporting member mutually passes through on huge frame column, on downward projection, center line is not overlapped the two huge columns 2 of inclination. The installation positioning of first segment diagonal supporting member 1.11 moves towards problem concerning to entire huge X-shaped diagonal brace 1.It need to shift to an earlier date and be welded on huge column 2 Connect positioning plate, suitable hoisting point position found out according to dip member center of gravity, principle be after first segment diagonal supporting member 1.11 is sling than Its mounting inclination angle degree is small.
The installation of the second~tri- section diagonal supporting member 1.12,1.13;
It is finished and after qualification of detecting a flaw after first segment diagonal supporting member 1.11 and the welding of huge 2 intersecting mouth of column, then extremely by the installation of huge column 2 2 height of huge column of reinforcing pull rod 6 is set.Suspension centre principle is 3~5 ° bigger than its mounting inclination angle degree after slinging.
When installing diagonal supporting member 1.1, since inclination angle is bigger than theoretical value, top contacts first, during off the hook, upper section The movement tendency of diagonal supporting member 1.1 is using contact point as axis rotation until inclination angle reaches design value always, and entire tone of docking is closed. Section connecting plate is connected firmly up and down, installs reinforcing pull rod 6 later, 6 both ends weld seam of reinforcing pull rod is full penetration weld, to reinforcing pull rod two It, can decoupling device after the completion of holding weld seam welding.
Section four, the installation of diagonal supporting member 1.14;
By huge column 2 installation to huge 2 height of column of setting reinforcing pull rod 6, when Section of four diagonal supporting member 1.14 is installed, it is contemplated that intermediate Spacing is smaller, therefore steel strut 7 is arranged between two huge supports.Reinforcing pull rod 6, steel strut 7 are placed in position in advance, while with two movable arm towers Respectively one diagonal supporting member 1.1 of lifting.After position reaches theoretical coordinate, connecting plate is saved up and down and is connected firmly, then reinforcing pull rod 6 is welded It connects securely, it at this time can decoupling device.
The installation of five~six section diagonal supporting member 1.15,1.16;
By the installation of huge column 2 to more than the height that install diagonal supporting member 1.1.Five, the six section diagonal supporting members respectively with F7, F8 Floor beam connection, in order to guarantee to realize the perfect closure of emerging font node 1.17.It need to be by " trouser legs " of emerging font node 6 Relative coordinate is measured.Five, the six section diagonal supporting members 1.15,1.16 are during the installation process according to its Theoretical Design coordinate, " trousers The relative coordinate of leg " determines its suitable coordinate.Other methods principle is the same as above-mentioned.
The installation of emerging font node 1.17;
Emerging font node 1.17 can perfect closure be entire diagonal supporting member 1.1 the most important thing.By emerging font node After 1.17 installations are in place, the counterpart of two " trouser legs " and the lower huge support of section is adjusted.After adjustment reaches code requirement, connected floor is installed And carry out reinforcing welding.
Huge diagonal brace surveillance and control measure
Measurement control
Three-dimensional coordinate at intersecting mouth is found out in BIM model, using total station setting-out, is released and is fixed temporarily on huge column 2 The position of plate, and weld.Wherein 5 pieces of lower section is fixed temporarily the lateral profile that plate is intersecting mouth.
First segment diagonal supporting member 1.11 is lifted, 5 pieces of lower section is fixed temporarily plate and fixes diagonal supporting member bottom, at this time first segment Diagonal supporting member 1.11 is interim in place.
(highest suitable for reading is selected by the three-dimensional coordinate that BIM model finds out diagonal supporting member required 4 control points suitable for reading Point, minimum point and its left and right two o'clock).
Measurement of coordinates and correction are carried out to each control point in periphery with total station cooperation prism, checks and accepts after passing through and starts before welding Welding.
Pilot measurement control point after the completion of welding measures capital three-dimensional coordinate again, provides survey for the installation of upper section diagonal supporting member 1.1 The foundation of correction is measured, is so recycled.Diagonal supporting member is installed to Section four according to above-mentioned steps.
Need to do following preparation before installing the installation of the five, the six section diagonal supporting members: 1, Section of four diagonal supporting member of has been completed Finish.2, the relative dimensional coordinate of the emerging font node 1.17 of measure field.3, emerging font node 1.17 is simulated to interface by BIM Physical location.4, Section of four diagonal supporting member three-dimensional coordinate suitable for reading of repetition measurement simulates big node by BIM and current Section four huge The goodness of fit of support, and find best docking location and its three-dimensional coordinate.
Five, the six section diagonal supporting members measuring control point suitable for reading is installed and is subject to most advantageous three-dimensional coordinate.Complete emerging font node Installation measurement.
By using more piece multilayer without support installation technology, reduces a large amount of backing material and production, installation, removes branch Personnel, machinery needed for support, have saved cost, shorten preliminary preparation and ending time in later period, greatly increase and apply Work efficiency rate achieves splendid effect, also provides reference, guidance for the construction of similar engineering.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvements and modifications can also be made, these improvements and modifications Also it should be regarded as protection scope of the present invention.

Claims (10)

1. a kind of huge diagonal brace of overlength superelevation, which is characterized in that the diagonal brace is arranged between adjacent huge column in X-shaped, X-shaped diagonal brace 4 endpoints integral structure is welded to each other between huge column respectively, between adjacent huge column be equipped with several end to end X Shape diagonal brace.
2. the huge diagonal brace of overlength superelevation according to claim 1, which is characterized in that the huge column is in y-type structure, both huge column Bottom be single huge column, it is in 20 °~30 ° angles, one end of the huge column of double joint and list between the huge column of double joint that top, which is double joint huge column, The huge column of root mutually passes through, and the length of the huge column of double joint is N times of single huge column length, and wherein several end to end X-shaped diagonal braces are most Two bottom ends of following X-shaped diagonal brace are welded to each other integral structure between single huge column respectively, nethermost X-shaped diagonal brace 4 endpoints of two upper ends and remaining X-shaped diagonal brace are welded to each other integral structure between the huge column of double joint respectively.
3. the huge diagonal brace of overlength superelevation according to claim 2, which is characterized in that the single huge column, the huge column of double joint and X Shape diagonal brace is welded to each other integral structure by several segments tube body, and each of these section is respectively diagonal supporting member or is huge column structure Part.
4. the huge diagonal brace of overlength superelevation according to claim 3, which is characterized in that be all provided on every section of diagonal supporting member There is installation lifting lug and lifting lug of unloading, at least provided with 4, the position of installation lifting lug setting should expire installation lifting lug on every section of diagonal supporting member Foot ensures that inclination angle when diagonal supporting member lifts is 3~5 ° bigger than theoretical value.
5. the huge diagonal brace of overlength superelevation according to claim 4, which is characterized in that the single huge column, the huge column of double joint, It is equipped with reinforcing pull rod, the steel strut for constructing operation between Core Walls Structure and diagonal supporting member, has in diagonal supporting member for constructing The crosshead and operating platform of operation.
6. a kind of huge diagonal brace of overlength superelevation as described in any one of Claims 1 to 5 seeks connections with formula construction method, feature It is, the formula construction method of seeking connections with comprises the technical steps that:
The first step carries out equitable subsection merogenesis to diagonal supporting member, according to transport road conditions, site operation and tower crane operating condition, determines the One section diagonal supporting member length is 8m, the second~tetra- section diagonal supporting member length be 9m, Section of five diagonal supporting member length is 4.5m, Six section diagonal length are 5.1m, intermediate closing node is emerging font node;
Second step is integrally counted by diagonal supporting member using formula support free construction method is sought connections with using Midas according to segmentation situation It calculates, determines the i.e. reinforcing pull rod or steel strut arrangement in integrated tooling arrangement, make shape between reinforcing pull rod or steel strut and diagonal brace, huge column At self-stabilization stress system;With Abaqus finite element software modeling analysis, steel rod elements detail treatment is determined;
Third step is simulated according to Midas's overall calculation result, Abaqus finite element analysis software, establishes and construct with Tekla Model and reinforcing pull rod are analyzed with set of model, to analyze the various problems that installation diagonal supporting member can encounter at the scene, are mentioned Preceding precognition simultaneously takes counter-measure in time;
Reinforcing pull rod, steel strut, crosshead tooling are designed using Tekla model, are added according to detail drawing scene by the 4th step Work, production.
7. the huge diagonal brace of overlength superelevation according to claim 6 seeks connections with formula construction method, which is characterized in that wherein first The installation of diagonal supporting member is saved, conjunction will be found out according to the dip member center of gravity of X-shaped diagonal brace using the welding location-plate on huge column in advance Suitable hoisting point position, principle are bigger than its mounting inclination angle degree after first segment diagonal supporting member is sling.
8. the huge diagonal brace of overlength superelevation according to claim 7 seeks connections with formula construction method, which is characterized in that wherein second The installation of~tetra- section diagonal supporting members, will be using finishing to first segment diagonal supporting member with the welding of huge column intersecting mouth and qualification of detecting a flaw Afterwards, then by huge column install to setting reinforcing pull rod huge pillar height degree, suspension centre principle be sling after it is bigger by 3 than its mounting inclination angle degree~ 5°;
When in the installation of the second~tetra- section diagonal supporting member, since inclination angle is bigger than theoretical value, top contacts first, in off the hook process In, it is axis rotation until inclination angle reaches design value, entirely to interface that the movement tendency of upper section diagonal supporting member, which is using contact point always, It coincide, saves connecting plate up and down and be connected firmly, reinforcing pull rod is installed later, reinforcing pull rod both ends weld seam is full penetration weld, is drawn to steel It, can decoupling device after the completion of the welding of bar both ends weld seam.
9. the huge diagonal brace of overlength superelevation according to claim 8 seeks connections with formula construction method, which is characterized in that wherein the 4th Huge diagonal brace installation is saved, huge column is installed to the huge pillar height degree of setting reinforcing pull rod, when Section of four diagonal supporting member is installed, in two diagonal braces Steel strut is set between component, is in advance placed in position steel strut, while respectively lifting a diagonal supporting member with two movable arm towers, After position reaches theoretical coordinate, upper and lower section connecting plate is connected firmly, then by steel strut both ends and diagonal brace firm welding, at this time just It can decoupling device.
10. the huge diagonal brace of overlength superelevation according to claim 9 seeks connections with formula construction method, which is characterized in that wherein When five~six section diagonal supporting members are installed, huge column is installed to more than the height that install diagonal supporting member, the five, the six section diagonal supporting members It connect with F7, F8 floor beam, in order to guarantee to realize emerging font node structure, the opposite of emerging font node need to be sat respectively Mark is measured, the relative coordinate that the five, the six section diagonal supporting members are sat according to its Theoretical Design during the installation process, determines that it is suitable Coordinate;Emerging font node installation, by emerging font node installation it is in place after, adjust two trouser legs and the lower huge support of section counterpart, be adjusted to Up to after code requirement, connected floor beam is installed and carries out reinforcing welding.
CN201811269214.3A 2018-10-29 2018-10-29 Super-long super-high giant diagonal brace and climbing type construction method thereof Active CN109252590B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811269214.3A CN109252590B (en) 2018-10-29 2018-10-29 Super-long super-high giant diagonal brace and climbing type construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811269214.3A CN109252590B (en) 2018-10-29 2018-10-29 Super-long super-high giant diagonal brace and climbing type construction method thereof

Publications (2)

Publication Number Publication Date
CN109252590A true CN109252590A (en) 2019-01-22
CN109252590B CN109252590B (en) 2020-04-03

Family

ID=65044885

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811269214.3A Active CN109252590B (en) 2018-10-29 2018-10-29 Super-long super-high giant diagonal brace and climbing type construction method thereof

Country Status (1)

Country Link
CN (1) CN109252590B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323159A (en) * 2021-07-08 2021-08-31 江苏沪宁钢机股份有限公司 Manufacturing method of anti-deformation Y-shaped bent cone connection box body node
CN113863504A (en) * 2021-09-14 2021-12-31 中国建筑第八工程局有限公司 Super high-rise core tube vertical surface support and construction method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080016793A1 (en) * 2004-04-19 2008-01-24 Majlessi Kamran R Web hole reinforcing for metal wall stubs
CN103321296A (en) * 2013-05-23 2013-09-25 江苏沪宁钢机股份有限公司 Annular double-layer truss and manufacture method thereof
CN103334514A (en) * 2013-06-17 2013-10-02 南京长江都市建筑设计股份有限公司 Full precast frame steel support structure and construction method thereof
CN105369891A (en) * 2015-12-08 2016-03-02 上海市机械施工集团有限公司 Construction control method of corridor consisting of large-span trusses different in length
CN106368322A (en) * 2016-09-27 2017-02-01 北京市机械施工有限公司 Installing method of bidirectional symmetric oblique steel posts used between super high-rise building transfer stories
CN205935200U (en) * 2016-08-20 2017-02-08 黄再清 Steel structural framework XI type supports structure
CN206143950U (en) * 2016-08-29 2017-05-03 山东莱钢建设有限公司 Vertical truss and building steel structure assembly
CN206706801U (en) * 2017-05-03 2017-12-05 中建八局第一建设有限公司 A kind of support system being applied between raft foundation levels reinforcing bar

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20080016793A1 (en) * 2004-04-19 2008-01-24 Majlessi Kamran R Web hole reinforcing for metal wall stubs
CN103321296A (en) * 2013-05-23 2013-09-25 江苏沪宁钢机股份有限公司 Annular double-layer truss and manufacture method thereof
CN103334514A (en) * 2013-06-17 2013-10-02 南京长江都市建筑设计股份有限公司 Full precast frame steel support structure and construction method thereof
CN105369891A (en) * 2015-12-08 2016-03-02 上海市机械施工集团有限公司 Construction control method of corridor consisting of large-span trusses different in length
CN205935200U (en) * 2016-08-20 2017-02-08 黄再清 Steel structural framework XI type supports structure
CN206143950U (en) * 2016-08-29 2017-05-03 山东莱钢建设有限公司 Vertical truss and building steel structure assembly
CN106368322A (en) * 2016-09-27 2017-02-01 北京市机械施工有限公司 Installing method of bidirectional symmetric oblique steel posts used between super high-rise building transfer stories
CN206706801U (en) * 2017-05-03 2017-12-05 中建八局第一建设有限公司 A kind of support system being applied between raft foundation levels reinforcing bar

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
E.AYDIN,M.H.BODUROGLU: "Optimal placement of steel diagonal braces for upgrading the seismic capacity of existing structures and its comparison with optimal dampers", 《JOURNAL OF CONSTRUCTIONAL STEEL RESEARCH》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323159A (en) * 2021-07-08 2021-08-31 江苏沪宁钢机股份有限公司 Manufacturing method of anti-deformation Y-shaped bent cone connection box body node
CN113863504A (en) * 2021-09-14 2021-12-31 中国建筑第八工程局有限公司 Super high-rise core tube vertical surface support and construction method thereof

Also Published As

Publication number Publication date
CN109252590B (en) 2020-04-03

Similar Documents

Publication Publication Date Title
CN111364615B (en) Mounting method of special-shaped and curved surface suspension type steel structure system
CN114086669B (en) Modularized rapid construction method for large-scale space special-shaped curved surface steel net rack
CN104775564B (en) Unsupported installation method for bidirectional tilting great-section box latticed columns
CN102102444B (en) Assembling and positioning construction method of large steel casting members
CN103410322A (en) Large-span parallel truss steel connective corridor construction method
CN101451378A (en) 'Drip shaped' radial monolayer steel pipe reticulated shell block and installation method
CN108678398B (en) Pre-assembly method for steel structure truss of reinforced layer of super high-rise building
CN111691681A (en) Method for mounting outer frame cylinder structure of diagonal steel pipe grid column
CN109252590A (en) A kind of huge diagonal brace of overlength superelevation and its seek connections with formula construction method
CN104074364A (en) Steel casting funnel-shaped structure pre-assembling positioning construction method
CN113802693A (en) Construction method of goblet-shaped support super-long multi-layer U-shaped curved surface space steel structure
CN109267493A (en) A kind of construction method installed across river steel lid beam
CN106121040A (en) Lattice column welding device and welding method
CN106522364B (en) 'garland' steel structure system for stadium periphery and installation process thereof
CN209323691U (en) A kind of huge diagonal brace of overlength superelevation
CN116816103A (en) External expansion type construction method for large-span aluminum alloy single-layer reticulated shell dome structure
CN105464215A (en) Reverse construction method construction method of hanging structure incapable of being provided with vertical temporary support
CN108952002A (en) A kind of super large, the combined I-shaped girder steel of ultra-wide Two bors d's oeuveres and its segmentation divide installation method
CN113802694A (en) Construction method of large-span asymmetric U-shaped multi-layer truss
CN106245531A (en) Steel structural bridge installation method is hung under bilateral derrick type
CN207538193U (en) A kind of steel core concrete column and reinforced concrete column concrete core cylinder mixed structure
CN115045190B (en) Steel anchor box installation mechanism and installation method
CN105201368B (en) A kind of inclination honeycomb texture load bearing channel door and installation method
CN114908979B (en) Construction and installation method of super high-rise building special-shaped component
CN113323361B (en) Construction method of high-altitude supporting operation frame based on bottom steel platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant