CN109249183A - Production method of titanium steel composite steel plate - Google Patents

Production method of titanium steel composite steel plate Download PDF

Info

Publication number
CN109249183A
CN109249183A CN201710569455.9A CN201710569455A CN109249183A CN 109249183 A CN109249183 A CN 109249183A CN 201710569455 A CN201710569455 A CN 201710569455A CN 109249183 A CN109249183 A CN 109249183A
Authority
CN
China
Prior art keywords
plate
titanium
steel
substrate
isolation board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710569455.9A
Other languages
Chinese (zh)
Other versions
CN109249183B (en
Inventor
张坤
韩旭
王若钢
李新玲
于金洲
林亚桥
于峰
杨军
李黎明
刘立强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Angang Steel Co Ltd
Original Assignee
Angang Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Angang Steel Co Ltd filed Critical Angang Steel Co Ltd
Priority to CN201710569455.9A priority Critical patent/CN109249183B/en
Publication of CN109249183A publication Critical patent/CN109249183A/en
Application granted granted Critical
Publication of CN109249183B publication Critical patent/CN109249183B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P15/00Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B32LAYERED PRODUCTS
    • B32BLAYERED PRODUCTS, i.e. PRODUCTS BUILT-UP OF STRATA OF FLAT OR NON-FLAT, e.g. CELLULAR OR HONEYCOMB, FORM
    • B32B15/00Layered products comprising a layer of metal
    • B32B15/01Layered products comprising a layer of metal all layers being exclusively metallic
    • B32B15/013Layered products comprising a layer of metal all layers being exclusively metallic one layer being formed of an iron alloy or steel, another layer being formed of a metal other than iron or aluminium

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Pressure Welding/Diffusion-Bonding (AREA)

Abstract

The invention relates to a production method of a titanium steel composite steel plate, which comprises a base plate, an intermediate plate and a titanium plate, wherein the intermediate plate, the titanium plate and an isolation plate are sequentially placed in a groove of the base plate, and one surface of the titanium plate coated with an isolating agent faces the isolation plate; and spot welding the periphery of the isolation plate and the substrate, symmetrically stacking two spot-welded plate blanks, and conveying the combined blank to a vacuum electron beam welding box for welding. And preheating, heating, rolling, trimming and separating the welded plate blank to obtain a finished product. The intermediate plate IF steel plate is arranged on the rolled titanium steel composite steel plate, the binding force between the titanium plate and the IF steel is superior to Q235, and the titanium steel composite steel plate has a good binding effect and meets the use requirements of users.

Description

A kind of titanium steel clad steel plate production method
Technical field
The present invention relates to clad steel plate production field, in particular to a kind of titanium steel clad steel plate production method.
Background technique
Titanium is widely used as various chemical reaction containers, heat exchanger material due to its excellent corrosion resistance, but disadvantage It is higher cost.This problem is especially prominent when using especially as structure member, and effective solution method is exactly to use titanium Steel clad steel plate.The composite wood of titanium and ordinary steel is referred to as titanium steel composite wood, the corrosion resistance of existing titanium, and has general steel plate conduct The intensity of works, it is important that cost also sharp fall.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of titanium steel clad steel plate production method, steel plate combination effects It is good.
To achieve the above object, the present invention is implemented with the following technical solutions:
A kind of titanium steel clad steel plate, the titanium steel clad steel plate include substrate, intermediate plate, titanium plate, substrate material Q235, Intermediate plate material is IF steel.
Substrate thickness is 125-135mm, intermediate plate thickness 0.5-1mm, titanium plate thickness 15-25mm.
A kind of titanium steel clad steel plate production method, the production method the following steps are included:
Step 1: raw material preparation
A. it is stand-by to be processed into identical size for titanium plate, intermediate plate, isolation board;
B. one groove of processing is hit exactly in substrate slab, groove size is matched with the size of titanium plate, intermediate plate and isolation board, recessed The depth of slot than titanium plate, intermediate plate and isolation board total thickness more than 1.5-2.0mm;
C. steel slab surface degreasing processing after processing is completed;
D. in titanium plate one side, uniformly one layer of interleaving agent of coating, standing are dried;
Step 2: group material and welding
A. be sequentially placed intermediate plate, titanium plate, isolation board in the groove of substrate, titanium plate be coated with the one of interleaving agent facing towards every From plate;
B. after the completion of placing, isolation board surrounding and substrate are subjected to spot welding, solder joint does not allow prominent plane;
C. the slab after the completion of two pieces of spot welding is symmetrically stacked, formed from top to bottom be respectively substrate, intermediate plate, titanium plate, Isolation board, isolation board, titanium plate, intermediate plate, substrate blank;
D. the blank combined is sent to electron-bombardment welding case and is welded, vacuum degree < 10-2Pa;
Step 3: preheating
A. cell-type stove heating is used, batch-type furnace need to shift to an earlier date baker 12-16h, oven drying temperature >=800 DEG C;
B. start shove charge when furnace temperature is down to 500-600 DEG C;
C. burner is closed after blank shove charge, come out of the stove when furnace temperature is down to 80-100 DEG C;
D. it is transferred quickly to rolling line roller-way after blank is come out of the stove, does not allow to stop in roller-way;
Step 4: hot-leveling
1 or 2 passage hot-levelings are carried out using roughing mill, absolute deformation amount 5-6mm, offline slow cooling is to room after smooth Temperature;
Step 5: heating and rolling
A. stepped heating stove heating is used;Blank enters furnace by soaking zone, and whole process is located in the middle part of soaking zone, and soaking zone is not Other blanks must be put into;
B. bringing-up section furnace temperature≤900 DEG C, 900 ± 5 DEG C of soaking zone furnace temperature, in furnace total time 300-330min;
C. it is rolled using big pressure, continuous three pass deformation >=15%, 800 ± 10 DEG C of finishing temperature;
D. ACC on-line cooling is carried out after rolling, and enters 780 ± 10 DEG C of coolant-temperature gage, 5-7 DEG C of cooling rate/s, final cooling temperature 650 ± 20 ℃;
Step 6: trimming
A. it detects a flaw and determines titanium steel clad steel plate boundary position;
B. the baseplate part on titanium steel clad steel plate boundary is cut to the greatest extent on trimming unit, only retains titanium steel clad steel plate portion Point;
C. titanium steel clad steel plate is separated with isolation board;
The isolation board material is Q235.
Compared with prior art, the beneficial effects of the present invention are:
Titanium steel clad steel plate after present invention rolling, is arranged intermediate plate IF steel plate, titanium plate and the binding force of IF steel are better than Q235, titanium steel clad steel plate combination effect of the invention is good, meets user usage requirements.
Specific embodiment
Below with reference to embodiment, the present invention is further described:
The present invention will be described in detail for following embodiment.These embodiments be only to preferred embodiment of the invention into Row description, does not limit the scope of the present invention.
Embodiment
Titanium steel clad steel plate production method, comprising the following steps:
Step 1: raw material preparation
1. compound plate: material TA2, cut deal finished product, size 20*1150*1150mm, 2.Processing request: single side milling is deep Degree >=2mm;Surfacing zero defect does not allow wedge shape, camber occur, unevenness≤3mm/m, 5.5 μm of roughness Ra <.
2. substrate: material Q235, intermediate base, size 132*2000*3000mm, 2 pieces.Processing request: blank is machined to Above-mentioned specification, single side milling depth >=2mm;It is hit exactly in slab, processes size groove identical with titanium plate specification with milling machine, Depth of groove is (IF steel+titanium plate+Q235 plate+1.5mm) practical overall thickness.Groove surrounding and bottom zero defect, surface roughness 5.5 μm of Ra <.
3. middle layer: material IF steel, cold rolling finished product, size 0.5*1150*1150mm, 2.Processing request: surfacing, The defects of no rusty stain, crackle, scuffing.
4. isolation board: Q235, cut deal finished product, size 10*1150*1150mm, 2.Processing request: surfacing, nothing The defects of rusty stain, crackle, scuffing.
5. titanium plate after processing is completed and Q235 slab, IF steel cold-reduced sheet, Q235 hot rolled plate surface cleaned and (make with acetone Wiped with non-woven fabrics), do not allow greasy residues.
6. in titanium plate one side, uniformly one layer of interleaving agent of coating, standing are dried.
Step 2: group material and welding
1. being sequentially placed IF steel, titanium plate (being coated with interleaving agent one side upward), Q235 plate in every piece of Q235 slab groove.
2. after the completion of placing, Q235 hot rolled plate and Q235 slab surrounding are carried out spot welding, weld is not allow for prominent flat The presence in face, if so, sanding and polishing is needed to remove.
3. the Q235 plate after the completion of two pieces of spot welding is symmetrically stacked, from top to bottom respectively Q235, IF steel, TA2, Q235 The sequence completion blank combination of (10mm), Q235 (10mm), TA2, IF steel, Q235.
4. all blanks need protection blank surface in handling, moving process, avoid generating scuffing and secondary pollution, if having The generations such as greasy dirt will be cleaned with acetone immediately.
It is welded 5. sending the blank combined to electron-bombardment welding case, does not allow that blank occurs in moving process wrong It is dynamic, vacuum degree < 10-2Pa。
Step 3: preheating
1. using cell-type stove heating, batch-type furnace need to shift to an earlier date baker 12h, oven drying temperature >=800 DEG C.
2. closing batch-type furnace burner, start shove charge when furnace temperature is down to 600 DEG C.
3. closing burner after blank shove charge, come out of the stove when furnace temperature is down to 100 DEG C.
4. blank is hoisted to rolling line roller-way with crane rapidly after coming out of the stove, do not allow to stop in roller-way.
Step 4: hot-leveling
1 or 2 passage hot-levelings, absolute deformation amount 5mm are carried out using roughing mill.Offline slow cooling is to room temperature after smooth.
Step 5: heating and rolling
1. using stepped heating stove heating.Blank enters furnace by soaking zone, and whole process is located in the middle part of soaking zone, and soaking zone is not Other blanks must be put into.
2. bringing-up section furnace temperature≤900 DEG C, 900 ± 5 DEG C of soaking zone furnace temperature, in furnace total time 300min.
3. using big pressure rolling, continuous three pass deformation >=15%, 800 ± 10 DEG C of finishing temperature.
4. carrying out ACC on-line cooling after rolling, enter 780 ± 10 DEG C of coolant-temperature gage, 650 ± 20 DEG C of final cooling temperature of 5 DEG C/s of cooling rate
Step 6: trimming
Titanium-steel composite board boundary position is determined 1. detecting a flaw.
2. cutting the baseplate part on titanium steel clad steel plate boundary to the greatest extent on trimming unit, only retain titanium steel clad steel plate portion Point;
3. titanium steel clad steel plate is separated with isolation board.

Claims (4)

1. a kind of titanium steel clad steel plate, which is characterized in that the titanium steel clad steel plate includes substrate, intermediate plate, titanium plate, substrate material Matter is Q235, and intermediate plate material is IF steel.
2. with according to a kind of titanium steel clad steel plate described in claim 1, which is characterized in that substrate thickness 125-135mm, it is intermediate Plate thickness is 0.5-1mm, titanium plate thickness 15-25mm.
3. a kind of titanium steel clad steel plate production method, which is characterized in that the production method the following steps are included:
Step 1: raw material preparation
A. it is stand-by to be processed into identical size for titanium plate, intermediate plate, isolation board;
B. one groove of processing is hit exactly in substrate slab, groove size is matched with the size of titanium plate, intermediate plate and isolation board, groove Depth than titanium plate, intermediate plate and isolation board total thickness more than 1.5-2.0mm;
C. steel slab surface degreasing processing after processing is completed;
D. in titanium plate one side, uniformly one layer of interleaving agent of coating, standing are dried;
Step 2: group material and welding
A. intermediate plate, titanium plate, isolation board are sequentially placed in the groove of substrate, titanium plate is coated with the one of interleaving agent facing towards isolation Plate;
B. after the completion of placing, isolation board surrounding and substrate are subjected to spot welding, solder joint does not allow prominent plane;
C. the slab after the completion of two pieces of spot welding is symmetrically stacked, being formed from top to bottom is respectively substrate, intermediate plate, titanium plate, isolation Plate, isolation board, titanium plate, intermediate plate, substrate blank;
D. the blank combined is sent to electron-bombardment welding case and is welded, vacuum degree < 10-2Pa;
Step 3: preheating
A. cell-type stove heating is used, batch-type furnace need to shift to an earlier date baker 12-16h, oven drying temperature >=800 DEG C;
B. start shove charge when furnace temperature is down to 500-600 DEG C;
C. burner is closed after blank shove charge, come out of the stove when furnace temperature is down to 80-100 DEG C or less;
D. it is transferred quickly to rolling line roller-way after blank is come out of the stove, does not allow to stop in roller-way;
Step 4: hot-leveling
1 or 2 passage hot-levelings are carried out using roughing mill, absolute deformation amount 5-6mm, offline slow cooling is to room temperature after smooth;
Step 5: heating and rolling
A. stepped heating stove heating is used;Blank enters furnace by soaking zone, and whole process is located in the middle part of soaking zone, and soaking zone must not be put Enter other blanks;
B. bringing-up section furnace temperature≤900 DEG C, 900 ± 5 DEG C of soaking zone furnace temperature, in furnace total time 300-330min;
C. it is rolled using big pressure, continuous three pass deformation >=15%, 800 ± 10 DEG C of finishing temperature;
D. ACC on-line cooling is carried out after rolling, and enters 780 ± 10 DEG C of coolant-temperature gage, 5-7 DEG C of cooling rate/s, 650 ± 20 DEG C of final cooling temperature;
Step 6: trimming
A. it detects a flaw and determines titanium steel clad steel plate boundary position;
B. the baseplate part on titanium steel clad steel plate boundary is cut to the greatest extent on trimming unit, only retains titanium steel clad steel plate part;
C. titanium steel clad steel plate is separated with isolation board.
4. titanium steel clad steel plate production method according to claim 2, which is characterized in that the isolation board material is Q235。
CN201710569455.9A 2017-07-13 2017-07-13 Production method of titanium steel composite steel plate Active CN109249183B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710569455.9A CN109249183B (en) 2017-07-13 2017-07-13 Production method of titanium steel composite steel plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710569455.9A CN109249183B (en) 2017-07-13 2017-07-13 Production method of titanium steel composite steel plate

Publications (2)

Publication Number Publication Date
CN109249183A true CN109249183A (en) 2019-01-22
CN109249183B CN109249183B (en) 2020-09-29

Family

ID=65051135

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710569455.9A Active CN109249183B (en) 2017-07-13 2017-07-13 Production method of titanium steel composite steel plate

Country Status (1)

Country Link
CN (1) CN109249183B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110497160A (en) * 2019-09-06 2019-11-26 鞍钢股份有限公司 Vacuum electron beam grooving assembly sealing welding method for titanium steel composite plate
CN110539066A (en) * 2019-09-06 2019-12-06 鞍钢股份有限公司 Vacuum electron beam assembly seal welding method for high-alloy steel titanium composite plate
CN111774748A (en) * 2020-07-08 2020-10-16 鞍钢股份有限公司 High-quality assembly and welding method of heterogeneous composite blank
CN113145664A (en) * 2021-05-10 2021-07-23 成都先进金属材料产业技术研究院股份有限公司 Chamber furnace high-temperature heating method for TA titanium and Q235 steel composite board/coiled raw material blank
CN113145665A (en) * 2021-05-10 2021-07-23 成都先进金属材料产业技术研究院股份有限公司 Chamber furnace isothermal heating method of TA titanium and Q235 steel composite board/coiled raw material blank
CN113523731A (en) * 2021-08-12 2021-10-22 东台耀强机械制造有限公司 High-quality patterned steel plate pipe coiling process
CN113977059A (en) * 2021-11-17 2022-01-28 山东钢铁集团日照有限公司 Method for sealing and welding composite plate vacuum electron beam assembly

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01317688A (en) * 1988-06-15 1989-12-22 Kawasaki Steel Corp Manufacture of composite coated steel plate
CN103231216A (en) * 2013-05-10 2013-08-07 山东亚盛重工股份有限公司 Manufacturing technique and device for composite board
CN104259742A (en) * 2014-07-23 2015-01-07 南京润邦金属复合材料有限公司 Embedded vacuum rolling method of titanium/steel laminated metal
CN104259772A (en) * 2014-09-03 2015-01-07 钢铁研究总院 Method for manufacturing titanium-steel composite plate
CN106424136A (en) * 2016-09-29 2017-02-22 攀钢集团攀枝花钢铁研究院有限公司 Titanium-steel composite plate with IF steel as middle layer and manufacturing method thereof

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01317688A (en) * 1988-06-15 1989-12-22 Kawasaki Steel Corp Manufacture of composite coated steel plate
CN103231216A (en) * 2013-05-10 2013-08-07 山东亚盛重工股份有限公司 Manufacturing technique and device for composite board
CN104259742A (en) * 2014-07-23 2015-01-07 南京润邦金属复合材料有限公司 Embedded vacuum rolling method of titanium/steel laminated metal
CN104259772A (en) * 2014-09-03 2015-01-07 钢铁研究总院 Method for manufacturing titanium-steel composite plate
CN106424136A (en) * 2016-09-29 2017-02-22 攀钢集团攀枝花钢铁研究院有限公司 Titanium-steel composite plate with IF steel as middle layer and manufacturing method thereof

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110497160A (en) * 2019-09-06 2019-11-26 鞍钢股份有限公司 Vacuum electron beam grooving assembly sealing welding method for titanium steel composite plate
CN110539066A (en) * 2019-09-06 2019-12-06 鞍钢股份有限公司 Vacuum electron beam assembly seal welding method for high-alloy steel titanium composite plate
CN110539066B (en) * 2019-09-06 2021-12-24 鞍钢股份有限公司 Vacuum electron beam assembly seal welding method for high-alloy steel titanium composite plate
CN111774748A (en) * 2020-07-08 2020-10-16 鞍钢股份有限公司 High-quality assembly and welding method of heterogeneous composite blank
CN113145664A (en) * 2021-05-10 2021-07-23 成都先进金属材料产业技术研究院股份有限公司 Chamber furnace high-temperature heating method for TA titanium and Q235 steel composite board/coiled raw material blank
CN113145665A (en) * 2021-05-10 2021-07-23 成都先进金属材料产业技术研究院股份有限公司 Chamber furnace isothermal heating method of TA titanium and Q235 steel composite board/coiled raw material blank
CN113523731A (en) * 2021-08-12 2021-10-22 东台耀强机械制造有限公司 High-quality patterned steel plate pipe coiling process
CN113977059A (en) * 2021-11-17 2022-01-28 山东钢铁集团日照有限公司 Method for sealing and welding composite plate vacuum electron beam assembly

Also Published As

Publication number Publication date
CN109249183B (en) 2020-09-29

Similar Documents

Publication Publication Date Title
CN109249183A (en) Production method of titanium steel composite steel plate
CN108188178B (en) Production process of pack-rolled wide thin plate
CN104786581B (en) A kind of multilayer stainless compound steel plate and its manufacture method
CN103418611B (en) A kind of method of Rolling Production stainless steel-aluminium-stainless steel three-layer composite board
CN105107841B (en) The preparation method of titanium steel composite board
WO2015109425A1 (en) Method for rolling metal compound plate strip
CN104492810A (en) Preparation method of wide and thin hot-rolled steel plates with width-to-thickness ratio being greater than or equal to 500
CN105880946A (en) Twice-compounding and twice-rolling composite board process
CN108746204A (en) A kind of continuous ply rolling method of corrugated interfaces ply-metal
CN1253257C (en) Hot roller rolling method for stainless steel/aluminium composite plate
CN101003104A (en) Built up welding technique of restoring roller for shape bar
CN104138920B (en) Method for manufacturing rolled metal composite plate with pipeline steel as base material
CN102873091A (en) Preparation method for wear-resistant steel and carbon structural steel composite plates
CN106607668A (en) Manufacturing method for stainless steel clad plates allowing coating sides to be easily welded
CN104525562A (en) Production method of stainless-steel, carbon steel and stainless steel three-layer combined plate coil
CN104138903A (en) Manufacturing method for rolling titanium-steel composite plate
CN111266815A (en) Manufacturing method of double-layer metal composite steel plate
CN106269961A (en) A kind of container stainless steel double-sided composite plate and manufacture method thereof
CN108213873A (en) Production method of stainless steel composite steel plate for bridge
CN108356088A (en) A kind of production and processing method of pure titanium large-sized plates material
CN110539066B (en) Vacuum electron beam assembly seal welding method for high-alloy steel titanium composite plate
CN111085547A (en) Manufacturing method of asymmetric dissimilar material hot-rolled composite coil
CN102784853B (en) Manufacturing method of composite board seal head made from high-strength austenite nickel-iron-chromium alloy and austenite stainless steel
CN106807752B (en) A kind of preparation of composite metal plate and rolling integrated-type production system and preparation method
CN105921674A (en) Rolling/forging method for producing bimetallic composite turnout sliding bed bedplate

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant