Built up welding technique of restoring roller for shape bar Download PDF

Info

Publication number
CN101003104A
CN101003104A CN 200610021925 CN200610021925A CN101003104A CN 101003104 A CN101003104 A CN 101003104A CN 200610021925 CN200610021925 CN 200610021925 CN 200610021925 A CN200610021925 A CN 200610021925A CN 101003104 A CN101003104 A CN 101003104A
Authority
CN
China
Prior art keywords
welding
built
roll
repair process
flux
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN 200610021925
Other languages
Chinese (zh)
Inventor
邹宏军
杨建明
杨胜东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
XIELI CO GANGCHENG ENTERPRISES CORP PANZHIHUA STEELS GROUP
Original Assignee
XIELI CO GANGCHENG ENTERPRISES CORP PANZHIHUA STEELS GROUP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XIELI CO GANGCHENG ENTERPRISES CORP PANZHIHUA STEELS GROUP filed Critical XIELI CO GANGCHENG ENTERPRISES CORP PANZHIHUA STEELS GROUP
Priority to CN 200610021925 priority Critical patent/CN101003104A/en
Publication of CN101003104A publication Critical patent/CN101003104A/en
Pending legal-status Critical Current

Links

Landscapes

  • Reduction Rolling/Reduction Stand/Operation Of Reduction Machine (AREA)

Abstract

A build-up welding technology for repairing the rolling roller of section includes such steps as pre-turning, defect inspection, pre-heating, welding transition layer with flux-cored wire SN-YD1031 and flux SSF, welding working layer with flux-cored wire SN-YD285 and flux HJ107, heat treating, turning, and inspection.

Description

A kind of section roll build-up welding repair process
Technical field
The invention belongs to the technique for overlaying field, relate to the omnipotent production line second rolling mill roll overlaying reparation of a kind of Metallurgical Enterprise, particularly a kind of section roll build-up welding repair process.
Background technology
Roll is the crucial spare part that Metallurgical Enterprise is produced, climbing the omnipotent production line second rolling mill roll of steel (being commonly called as the BD2 roll) material is 60CrNiMo, barrel diameter has φ 1090 according to steel rolling product type difference, φ 1320, φ 1340, specifications such as φ 1350, can rolling 75Kg/m, 60Kg/m, 50Kg/m, 43Kg/m heavy rail and 300*175H, 200*200H, 250*250H, section bars such as 300*200H shaped steel, the body of roll bears huge high speed alternation draught pressure during work, square steel is through being shaped substantially behind this milling train, drafts is big when rolling, the pass wearing and tearing are big, require at high temperature to have certain red hardness, wearability, fatigue resistance.The production of BD2 roll need be through manufacturing procedures such as steel-making, forging and pressing, normalizings, and the production cycle is long, and disposable occupied fund volume is big, the manufacturing cost costliness, a pair of this roll is worth about 1,500,000 yuan, if do not do repair process after the normal abandonment, will cause enormous economic loss to smelter.As the normal abandonment roll is carried out the built-up welding reparation, solved long, problems such as lack service life, wear no resistance, production cost height of this roll production cycle well, realized the utilization again of the residual body of useless roller simultaneously.
Summary of the invention
The technical problem to be solved in the present invention is to provide the build-up welding repair process of a kind of Metallurgical Enterprise second roll of omnipotent production line (BD2).
Its technical scheme is, described build-up welding repair process steps in sequence is rough turn before the roll weldering, carrying out flaw detection, and preheating, the built-up welding transition zone, the built-up welding working lining, post weld heat treatment, surperficial turning processing, carrying out flaw detection is carried out intermediate heat-treatment in built-up welding working lining process.Adopt this technology can be, reduce the Metallurgical Enterprise production cost the BD2 roll repairing and reusing of normal abandonment, adopt BD2 roll after the reparation of this technology be service life former new roller 1-2 doubly.
The specific embodiment
Processing step sequencing of the present invention is rough turn before the roll weldering, carrying out flaw detection, preheating, built-up welding transition zone, built-up welding working lining, post weld heat treatment, roll finished product turning processing, carrying out flaw detection.
In built-up welding working lining process, carry out intermediate heat-treatment respectively.
1, rough turn before the roll weldering
Rough turn purpose is to remove roller surface fatigue layer and blemish before the weldering, the minimum 3mm that is not less than of the turning degree of depth, concrete visual fatigue layer thickness and decide requires fatigue layer is thoroughly removed totally, the respective surface defective can be carried out local turning or polishing, and purpose is that defective is removed totally.
2, carrying out flaw detection
Must carry out flaw detection after roll is rough turn, adopt magnetic powder inspection and ultrasonic examination to check that roll barrel surface or inside have or not the crack defect that exceeds standard, exist the roll of crack defect not do reparation to body of roll inside, carry out local turning or polishing to what there was defective in body surface, but reparation is not done less than what roll used the diameter lower limit in the roller footpath after the turning.
3, preheating
The BD2 roll that flaw detection is qualified is packed into and is carried out weld preheating in the special-purpose thermal insulation cover and handle, and programming rate is 20-40 ℃/h, and preheat temperature is 350 ℃ ± 10 ℃, and constant temperature cools the temperature to 280-320 ℃ of beginning built-up welding transition zone after 16 hours.
4, built-up welding transition zone
Transition zone built-up welding one deck all adopts the built-up welding of transition zone technology smooth to body of roll local defect position.Transition zone bead-welding technology parameter is as follows:
Resurfacing welding material: SN-YD1031 (Ф 4.0mm) flux-cored wire+SSF solder flux;
Electric power polarity: dc reverse connection;
Welding current: 380-420A;
Weldingvoltage: 29-32V;
Speed of welding: 400-420mm/min;
Stem elongation: 25-30mm; Eccentric throw: 30-40mm;
Amount of lap: 50-60%; Interlayer temperature: 280-320 ℃;
5, built-up welding working lining
Promptly begin the built-up welding working lining after the transition zone built-up welding finishes, bead-welding technology is as follows:
Resurfacing welding material: SN-YD285 (Ф 4.0mm) flux-cored wire+HJ107 solder flux
Electric power polarity: dc reverse connection;
Welding current: 380-420A;
Weldingvoltage: 30-34V;
Speed of welding: 400-420mm/min;
Stem elongation: 25-30mm;
Eccentric throw: 30-40mm;
Amount of lap: 50-60%;
Interlayer temperature: 300-330 ℃;
Intermediate heat-treatment: must do one time intermediate heat-treatment when monolateral every built-up welding 25-30mm is thick in the working lining weld deposit process, technological parameter is: programming rate is 20-40 ℃/h, be warming up to 500-520 ℃ of insulation 12 hours, continue built-up welding after being cooled to 300-330 ℃ with the cooling velocity of 20-40 ℃/h then.
6, post weld heat treatment
After finishing, the BD2 roll overlaying need carry out post weld heat treatment immediately, technological parameter is: at first heat-treatment furnace is preheated to 330 ℃ of constant temperature and roll was advanced stove in 1 hour, roll is warming up to 560 ± 10 ℃ with 20-40 ℃/h speed after advancing stove, constant temperature 18h is cooled to below 100 ℃ with the cooling velocity of 20-40 ℃/h then and comes out of the stove.
7, roll finished surface turning processing
After the BD2 roll was cooled to room temperature, last lathe carried out turning processing by the figure paper size.
8, carrying out flaw detection
BD2 roll after the turning need carry out blemish check and hardness detects, and through defectives such as magnetic powder detection flawless, slag inclusion, lack of penetration, incomplete fusions, the hardness detection is qualified in the HRC35-42 scope.
The invention has the advantages that weld deposit process is easy to grasp, and easy to operate, overlay cladding thickness is big, Body of roll kerve overlay cladding thickness can reach 80mm, and body of roll sidewall built-up welding thickness can reach 150mm, built-up welding Need adopt sheet iron to make the pushing off the slag circle during sidewall, point is welded on the sidewall, and every built-up welding 25mm is thick for sidewall Pushing off the slag circle of weldering during the left and right sides prevents that overlap, incomplete fusion, lack of penetration or folder from appearring in sidewall edge The defectives such as slag, adopt this technology in weld deposit process and heat treatment after overlay cladding do not produce any splitting Line and other weld defect, surfacing hardness are in the HRC35-42 scope, and deposited metal is strong Good toughness, the antifatigue damage capability is strong.

Claims (6)

1, a kind of section roll build-up welding repair process is characterized in that, it is preceding rough turn that the order of described processing step is followed successively by the roll weldering, carrying out flaw detection, preheating, built-up welding transition zone, built-up welding working lining, post weld heat treatment, roll finished product turning processing, carrying out flaw detection.
2, a kind of section roll build-up welding repair process according to claim 1, it is characterized in that, the roll that flaw detection is qualified is packed into and is carried out weld preheating in the special-purpose thermal insulation cover and handle, programming rate is 20-40 ℃/h, preheat temperature is 350 ℃ ± 10 ℃, and constant temperature cools the temperature to 280-320 ℃ of beginning built-up welding transition zone after 16 hours.
3, a kind of section roll build-up welding repair process according to claim 2 is characterized in that transition zone bead-welding technology parameter is as follows:
Resurfacing welding material: SN-YD1031 (φ 4.0mm) flux-cored wire+SSF solder flux;
Electric power polarity: dc reverse connection; Welding current: 380-420A;
Weldingvoltage: 29-32V; Speed of welding: 400-420mm/min;
Stem elongation: 25-30mm; Eccentric throw: 30-40mm;
Amount of lap: 50-60%; Interlayer temperature: 280-320 ℃.
4, according to the described any a kind of section roll build-up welding repair process of claim 1-3, it is characterized in that the technological parameter of built-up welding working lining is as follows:
Resurfacing welding material: SN-YD285 (Φ 4.0mm) flux-cored wire+HJ107 solder flux
Electric power polarity: dc reverse connection; Welding current: 380-420A;
Weldingvoltage: 30-34V; Speed of welding: 400-420mm/min;
Stem elongation: 25-30mm; Eccentric throw: 30-40mm;
Amount of lap: 50-60%; Interlayer temperature: 300-330 ℃.
5, a kind of section roll build-up welding repair process according to claim 4, it is characterized in that, must do one time intermediate heat-treatment when monolateral every built-up welding 25-30mm is thick in the working lining weld deposit process, programming rate is 20-40 ℃/h, be warming up to 500-520 ℃ of insulation 12 hours, continue built-up welding after being cooled to 300-330 ℃ with the cooling velocity of 20-40 ℃/h then.
6, according to claim 1 or 2 or 3 or 5 described a kind of section roll build-up welding repair process, it is characterized in that, after finishing, built-up welding need carry out post weld heat treatment immediately, at first heat-treatment furnace is preheated to 330 ℃ of constant temperature during heat treatment and roll was advanced stove in 1 hour, roll is warming up to 560 ± 10 ℃ with 20-40 ℃/h speed after advancing stove, constant temperature 18h is cooled to below 100 ℃ with the cooling velocity of 20-40 ℃/h then and comes out of the stove.
CN 200610021925 2006-09-22 2006-09-22 Built up welding technique of restoring roller for shape bar Pending CN101003104A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200610021925 CN101003104A (en) 2006-09-22 2006-09-22 Built up welding technique of restoring roller for shape bar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200610021925 CN101003104A (en) 2006-09-22 2006-09-22 Built up welding technique of restoring roller for shape bar

Publications (1)

Publication Number Publication Date
CN101003104A true CN101003104A (en) 2007-07-25

Family

ID=38702607

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200610021925 Pending CN101003104A (en) 2006-09-22 2006-09-22 Built up welding technique of restoring roller for shape bar

Country Status (1)

Country Link
CN (1) CN101003104A (en)

Cited By (39)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100537116C (en) * 2007-12-12 2009-09-09 湖南珠华机械有限公司 Build-up welding process for low-alloy cast iron valve body sealing surface
CN101829879A (en) * 2010-04-15 2010-09-15 张子益 Method for restoring roll body of steel casting roll of twin-roll strip casting
CN101612695B (en) * 2008-06-23 2011-07-13 宝山钢铁股份有限公司 Surface overlaying welding material for fixed-width side press module and overlaying welding process
CN102152058A (en) * 2011-05-11 2011-08-17 天津冶金集团重型机械制造有限公司 Surfacing repair method for large cold-rolled supporting roll
CN101596635B (en) * 2009-07-10 2011-08-24 攀钢集团钢铁钒钛股份有限公司 Composite resurfacing welding method for sink roller and stabilizing roller used for hot dipping
CN102189316A (en) * 2010-03-11 2011-09-21 上海一钢机电有限公司 Submerged-arc welding overlaying repairing method for stainless steel hot rolled delivery roll
CN102430839A (en) * 2011-09-28 2012-05-02 常州宝菱重工机械有限公司 Method for manufacturing composite straightening roll by overlaying
CN102441760A (en) * 2011-11-07 2012-05-09 山西鼎荣冷弯型钢有限公司 Cold-bending roller welding repair method
CN102717225A (en) * 2012-06-05 2012-10-10 新疆众和股份有限公司 Method for repairing damage of non-work surface of roller
CN103192224A (en) * 2013-04-20 2013-07-10 韶关市龙润工业技术有限公司 Metallurgical continuous casting machine roller repairing method
CN103350315A (en) * 2013-07-05 2013-10-16 莱芜钢铁集团有限公司 Method for reproducing ineffective H-type rolling mill sliding plate
CN103350316A (en) * 2013-07-15 2013-10-16 莱芜钢铁集团有限公司 Method for roll skin bead weld repair of 4PG 900*700 four-roll crusher
CN103418923A (en) * 2013-08-30 2013-12-04 北京工业大学 Overlaying repair method for worn roller
CN103658928A (en) * 2012-09-22 2014-03-26 宝山钢铁股份有限公司 Surface overlaying method for rack roller for wide and thick plates
CN104416293A (en) * 2013-08-23 2015-03-18 中冶东方工程技术有限公司秦皇岛研究设计院 Composite overlaying manufacturing method of casting roller
CN104785895A (en) * 2015-05-05 2015-07-22 合肥东方节能科技股份有限公司 Submerged arc surfacing manufacturing technology of looper roll for rolling mill
CN104801922A (en) * 2014-01-26 2015-07-29 宝山钢铁股份有限公司 Method for repairing fractured roller way spindle nose
CN105436665A (en) * 2015-12-16 2016-03-30 秦皇岛鸿翔焊业有限公司 Surfacing reconstructed layer of large hot-rolled supporting roll Cr4 and method for repairing roll
CN105478962A (en) * 2015-12-16 2016-04-13 秦皇岛鸿翔焊业有限公司 Overlaying rebuilt layer for large cold-rolled supporting roll 70 Cr3Mo and method for repairing roll
CN105499751A (en) * 2015-12-28 2016-04-20 湖北万安通复合再制造科技有限公司 Hardfacing repair process used for hot continuous rolling pinch roll
CN105798424A (en) * 2016-05-31 2016-07-27 沙洲职业工学院 Roll surfacing repair device and repair method
CN106891131A (en) * 2016-12-29 2017-06-27 常熟市常轴轴承有限公司 The surface repairing technique of high abrasion seal
CN107052701A (en) * 2017-03-31 2017-08-18 安徽再制造工程设计中心有限公司 A kind of roll overlaying technique
CN107414405A (en) * 2017-08-28 2017-12-01 上海外高桥造船有限公司 The repair technology of the bearing block weld crack of self-elevating drilling platform
CN107414326A (en) * 2017-07-06 2017-12-01 承德新新机械制造有限公司 A kind of crystallizer foot roll surface overlaying technique and clamping workpiece frock
CN107755966A (en) * 2016-08-18 2018-03-06 合肥东方节能科技股份有限公司 A kind of renovation technique of milling train loop back roll
CN108000049A (en) * 2017-11-01 2018-05-08 中车长江铜陵车辆有限公司 A kind of build-up welding repair method of axle forging swage block
CN108326462A (en) * 2018-03-16 2018-07-27 王伟 A kind of overlaying method of BDM roughing rollcogging-roll
CN108704940A (en) * 2018-05-30 2018-10-26 攀钢集团攀枝花钢钒有限公司 Big mill roll method for repairing and mending
CN108817602A (en) * 2018-07-21 2018-11-16 马鞍山晨鑫机械制造有限公司 The automatic surfacing restorative procedure of the Centrifugal rolling of supercentrifuge
CN108857263A (en) * 2018-07-21 2018-11-23 马鞍山晨鑫机械制造有限公司 A kind of Centrifugal rolling of the supercentrifuge of automatic surfacing reparation
CN108890075A (en) * 2018-07-16 2018-11-27 中冶建筑研究总院有限公司 A kind of new process of compound (again) the manufacture Continuous Casting Rolls of built-up welding
CN109227040A (en) * 2018-09-19 2019-01-18 张化机(苏州)重装有限公司 The manufacture craft of reinforced tube on pressure vessel
CN109570901A (en) * 2019-01-23 2019-04-05 耿立朋 A kind of mixer sealing ring repair technology
CN111872633A (en) * 2020-07-14 2020-11-03 苏州市鑫渭阀门有限公司 Valve and shaft surface regeneration strengthening process
CN111940997A (en) * 2019-05-15 2020-11-17 宝山钢铁股份有限公司 Modification method for hole pattern of forged semi-steel roller
CN113001117A (en) * 2021-03-05 2021-06-22 海南立磨焊接工程有限公司 Surfacing repair method for worn roller
CN114669840A (en) * 2022-05-09 2022-06-28 苏州威奥得焊材科技有限公司 Method for repairing nodular cast iron roller
CN115415737A (en) * 2022-06-29 2022-12-02 江苏华之益机械有限公司 Large-area corrosion-resistant surfacing process for pipeline

Cited By (57)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100537116C (en) * 2007-12-12 2009-09-09 湖南珠华机械有限公司 Build-up welding process for low-alloy cast iron valve body sealing surface
CN101612695B (en) * 2008-06-23 2011-07-13 宝山钢铁股份有限公司 Surface overlaying welding material for fixed-width side press module and overlaying welding process
CN101596635B (en) * 2009-07-10 2011-08-24 攀钢集团钢铁钒钛股份有限公司 Composite resurfacing welding method for sink roller and stabilizing roller used for hot dipping
CN102189316B (en) * 2010-03-11 2013-08-14 上海一钢机电有限公司 Submerged-arc welding overlaying repairing method for stainless steel hot rolled delivery roll
CN102189316A (en) * 2010-03-11 2011-09-21 上海一钢机电有限公司 Submerged-arc welding overlaying repairing method for stainless steel hot rolled delivery roll
CN101829879B (en) * 2010-04-15 2012-05-09 张子益 Method for restoring roll body of steel casting roll of twin-roll strip casting
CN101829879A (en) * 2010-04-15 2010-09-15 张子益 Method for restoring roll body of steel casting roll of twin-roll strip casting
CN102152058B (en) * 2011-05-11 2012-08-08 天津冶金集团重型机械制造有限公司 Surfacing repair method for large cold-rolled supporting roll
CN102152058A (en) * 2011-05-11 2011-08-17 天津冶金集团重型机械制造有限公司 Surfacing repair method for large cold-rolled supporting roll
CN102430839A (en) * 2011-09-28 2012-05-02 常州宝菱重工机械有限公司 Method for manufacturing composite straightening roll by overlaying
CN102430839B (en) * 2011-09-28 2014-04-09 常州宝菱重工机械有限公司 Method for manufacturing composite straightening roll by overlaying
CN102441760A (en) * 2011-11-07 2012-05-09 山西鼎荣冷弯型钢有限公司 Cold-bending roller welding repair method
CN102441760B (en) * 2011-11-07 2015-01-28 山西鼎荣冷弯型钢有限公司 Cold-bending roller welding repair method
CN102717225A (en) * 2012-06-05 2012-10-10 新疆众和股份有限公司 Method for repairing damage of non-work surface of roller
CN102717225B (en) * 2012-06-05 2015-05-20 新疆众和股份有限公司 Method for repairing damage of non-work surface of roller
CN103658928B (en) * 2012-09-22 2016-01-27 宝山钢铁股份有限公司 A kind of Wide and Thick Slab breast roll surface overlaying method
CN103658928A (en) * 2012-09-22 2014-03-26 宝山钢铁股份有限公司 Surface overlaying method for rack roller for wide and thick plates
CN103192224A (en) * 2013-04-20 2013-07-10 韶关市龙润工业技术有限公司 Metallurgical continuous casting machine roller repairing method
CN103350315A (en) * 2013-07-05 2013-10-16 莱芜钢铁集团有限公司 Method for reproducing ineffective H-type rolling mill sliding plate
CN103350315B (en) * 2013-07-05 2016-01-20 莱芜钢铁集团有限公司 A kind of inefficacy H profile steel rolling mill sliding plate reproducing method
CN103350316A (en) * 2013-07-15 2013-10-16 莱芜钢铁集团有限公司 Method for roll skin bead weld repair of 4PG 900*700 four-roll crusher
CN104416293A (en) * 2013-08-23 2015-03-18 中冶东方工程技术有限公司秦皇岛研究设计院 Composite overlaying manufacturing method of casting roller
CN103418923B (en) * 2013-08-30 2015-06-17 北京工业大学 Overlaying repair method for worn roller
CN103418923A (en) * 2013-08-30 2013-12-04 北京工业大学 Overlaying repair method for worn roller
CN104801922A (en) * 2014-01-26 2015-07-29 宝山钢铁股份有限公司 Method for repairing fractured roller way spindle nose
CN104785895A (en) * 2015-05-05 2015-07-22 合肥东方节能科技股份有限公司 Submerged arc surfacing manufacturing technology of looper roll for rolling mill
CN104785895B (en) * 2015-05-05 2017-03-01 合肥东方节能科技股份有限公司 A kind of submerged arc overlay welding manufacturing process of milling train loop back roll
CN105436665A (en) * 2015-12-16 2016-03-30 秦皇岛鸿翔焊业有限公司 Surfacing reconstructed layer of large hot-rolled supporting roll Cr4 and method for repairing roll
CN105478962A (en) * 2015-12-16 2016-04-13 秦皇岛鸿翔焊业有限公司 Overlaying rebuilt layer for large cold-rolled supporting roll 70 Cr3Mo and method for repairing roll
CN105478962B (en) * 2015-12-16 2017-10-31 秦皇岛鸿翔焊业有限公司 The method of large-scale cold rolling backing roll 70Cr3Mo built-up welding reconstruction layer and repaired roller
CN105499751A (en) * 2015-12-28 2016-04-20 湖北万安通复合再制造科技有限公司 Hardfacing repair process used for hot continuous rolling pinch roll
CN105499751B (en) * 2015-12-28 2018-02-13 湖北万安通复合再制造科技有限公司 Hard-face overlaying welding renovation technique for hot continuous rolling pinch roll
CN105798424A (en) * 2016-05-31 2016-07-27 沙洲职业工学院 Roll surfacing repair device and repair method
CN107755966A (en) * 2016-08-18 2018-03-06 合肥东方节能科技股份有限公司 A kind of renovation technique of milling train loop back roll
CN106891131A (en) * 2016-12-29 2017-06-27 常熟市常轴轴承有限公司 The surface repairing technique of high abrasion seal
CN107052701A (en) * 2017-03-31 2017-08-18 安徽再制造工程设计中心有限公司 A kind of roll overlaying technique
CN107414326A (en) * 2017-07-06 2017-12-01 承德新新机械制造有限公司 A kind of crystallizer foot roll surface overlaying technique and clamping workpiece frock
CN107414326B (en) * 2017-07-06 2019-08-23 承德新新机械制造有限公司 A kind of crystallizer foot roll surface overlaying technique and clamping workpiece tooling
CN107414405A (en) * 2017-08-28 2017-12-01 上海外高桥造船有限公司 The repair technology of the bearing block weld crack of self-elevating drilling platform
CN107414405B (en) * 2017-08-28 2019-03-05 上海外高桥造船有限公司 The repair technology of the bearing block weld crack of self-elevating drilling platform
CN108000049A (en) * 2017-11-01 2018-05-08 中车长江铜陵车辆有限公司 A kind of build-up welding repair method of axle forging swage block
CN108326462A (en) * 2018-03-16 2018-07-27 王伟 A kind of overlaying method of BDM roughing rollcogging-roll
CN108704940A (en) * 2018-05-30 2018-10-26 攀钢集团攀枝花钢钒有限公司 Big mill roll method for repairing and mending
CN108890075A (en) * 2018-07-16 2018-11-27 中冶建筑研究总院有限公司 A kind of new process of compound (again) the manufacture Continuous Casting Rolls of built-up welding
CN108890075B (en) * 2018-07-16 2021-11-19 中冶建筑研究总院有限公司 Technology for overlaying composite (re) manufacturing continuous casting roller
CN108857263A (en) * 2018-07-21 2018-11-23 马鞍山晨鑫机械制造有限公司 A kind of Centrifugal rolling of the supercentrifuge of automatic surfacing reparation
CN108817602A (en) * 2018-07-21 2018-11-16 马鞍山晨鑫机械制造有限公司 The automatic surfacing restorative procedure of the Centrifugal rolling of supercentrifuge
CN109227040A (en) * 2018-09-19 2019-01-18 张化机(苏州)重装有限公司 The manufacture craft of reinforced tube on pressure vessel
CN109227040B (en) * 2018-09-19 2020-07-10 张化机(苏州)重装有限公司 Manufacturing process of reinforcing pipe on pressure container
CN109570901A (en) * 2019-01-23 2019-04-05 耿立朋 A kind of mixer sealing ring repair technology
CN111940997A (en) * 2019-05-15 2020-11-17 宝山钢铁股份有限公司 Modification method for hole pattern of forged semi-steel roller
CN111940997B (en) * 2019-05-15 2022-07-19 宝山钢铁股份有限公司 Modification method for hole pattern of forged semi-steel roller
CN111872633A (en) * 2020-07-14 2020-11-03 苏州市鑫渭阀门有限公司 Valve and shaft surface regeneration strengthening process
CN113001117A (en) * 2021-03-05 2021-06-22 海南立磨焊接工程有限公司 Surfacing repair method for worn roller
CN114669840A (en) * 2022-05-09 2022-06-28 苏州威奥得焊材科技有限公司 Method for repairing nodular cast iron roller
CN114669840B (en) * 2022-05-09 2023-11-17 苏州威奥得焊材科技有限公司 Method for repairing ductile cast iron roller
CN115415737A (en) * 2022-06-29 2022-12-02 江苏华之益机械有限公司 Large-area corrosion-resistant surfacing process for pipeline

Similar Documents

Publication Publication Date Title
CN101003104A (en) Built up welding technique of restoring roller for shape bar
CN105290703B (en) A kind of method that hot roll is worn with submerged arc overlay welding and laser melting coating reparation
CN103706921B (en) Hot-rolling finishing mill backing roll build-up welding repair method
CN103046044B (en) Laser deposition composite powder and method for remanufacturing waste roller table roller surface
CN105436665B (en) The method of large-scale hot-rolling supporting roll Cr4 built-up welding reconstruction layer and repaired roller
CN100479940C (en) Technology for repairing semi-steel roller with flux-core welding wire built-up welding
CN101358344B (en) Repair method of backup roll surface of steckel mill and special repair powder used thereon
CN107335939B (en) The build-up welding repair process of large-scale 70Cr3Mo backing roll
CN103255412B (en) High hardness material laser cladding process method for roller work surface
CN103658925B (en) Heavy-gauge sheeting and steel-casting welding procedure
CN101138819A (en) High-hardness high carbon alloy hammered steel roll set composite manufacturing technology
CN103451650A (en) Laser quick repair process method for large rotary machine bearing bush
CN101293300B (en) Renovation technique for phi2100x3400mm wrought steel support roll
CN105499751A (en) Hardfacing repair process used for hot continuous rolling pinch roll
CN109722662A (en) A kind of laser melting coating restorative procedure of breast roll
CN101804709A (en) Wearing resistant structure of wear resistant piece and repair machining process thereof
CN106269961A (en) A kind of container stainless steel double-sided composite plate and manufacture method thereof
WO2016110159A1 (en) Method for welding and repairing rack crack of four-roll plate bending machine
CN102764960A (en) Method for manufacturing composite steel plate for hydrogenation reaction kettle barrel
CN110747458A (en) Method for repairing crankshaft of hot-rolling fixed-width press
CN101559549A (en) Process method for rewelding of high strength steel
CN103990889A (en) Welding technology for surfaced abrasion-resistant bronze layer in cross head pin hole
CN100463768C (en) Welding technology for broken and waste core rod
CN102950363A (en) Overlaying repair process for winch drum
CN114310148A (en) Method for repairing surface quality of working roller

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication