CN101559549A - Process method for rewelding of high strength steel - Google Patents

Process method for rewelding of high strength steel Download PDF

Info

Publication number
CN101559549A
CN101559549A CNA2009103025739A CN200910302573A CN101559549A CN 101559549 A CN101559549 A CN 101559549A CN A2009103025739 A CNA2009103025739 A CN A2009103025739A CN 200910302573 A CN200910302573 A CN 200910302573A CN 101559549 A CN101559549 A CN 101559549A
Authority
CN
China
Prior art keywords
welding
rewelding
weld
strength steel
heating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA2009103025739A
Other languages
Chinese (zh)
Inventor
张华�
舒先庆
叶君龙
邹莉莎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuchuan Heavy Engineering Co.,Ltd.
Original Assignee
WUCHANG SHIPBUILDING INDUSTRY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUCHANG SHIPBUILDING INDUSTRY Co Ltd filed Critical WUCHANG SHIPBUILDING INDUSTRY Co Ltd
Priority to CNA2009103025739A priority Critical patent/CN101559549A/en
Publication of CN101559549A publication Critical patent/CN101559549A/en
Pending legal-status Critical Current

Links

Images

Abstract

The invention relates to the field of rewelding technology of high strength steel and provides a process method for rewelding of high strength steels. The process method comprises the following working steps of firstly heating to a lower pre-heating temperature within a larger range at a welding groove, suitably reducing the temperature gradients and additive stress of the component, subsequently when in welding, heating centrally and continuously within a small range at the positions corresponding to the back surface of the welding positions simultaneously, and maintaining local high pre-heating temperature before welding. The process method can effectively improve the heat utilization ratio of weld pre-heating of the large thickness plate steel components, save the energy resource and improve the rewelding quality and production efficiency.

Description

A kind of process of high-strength steel rewelding
Technical field
The present invention relates to the high-strength steel welding technology field, particularly high-strength steel reprocesses welding technique.
Background technology
High-strength steel welding needs weld preheating usually, to improve the Thermal Cycle condition, prevents the generation of weld crack, and required preheat temperature depends on factors such as the chemical composition, joint constraint (restraint) degree, welding manner, environment temperature of mother metal.Particularly in the rewelding of high-strength steel, because the suffered three-dimensional stress effect of weld seam, constraint (restraint) degree is big, needs than the higher preheat temperature of normal product welding.
According to related specifications, high-strength steel rewelding preheat temperature is required to be about 200 ℃, make big slab high-strength steel structural member reprocess weld metal zone long period stable maintenance about 200 ℃, just need be to fully be heated to required preheat temperature in the enough big zone of weldering member comprehensively, could effectively check heat conduction fast, can bring inefficiency like this, problems such as poor working environment, especially at outdoor construction, when environment temperature was low, cooling velocity was very fast, and pre-heat effect is poor, flame heat point transient temperature can reach the preheat temperature requirement, and after withdrawing thermal source and counting the branch kind, this regional temperature is promptly reduced to and is required below the preheat temperature, and weld preheating work is more difficult.
Summary of the invention
Technical problem to be solved by this invention provides a kind of high-strength steel welding process, improves the capacity usage ratio of big slab high-strength steel member weld preheating effectively, improves rewelding quality and production efficiency.
For solving the problems of the technologies described above, the present invention proposes a kind of process of high-strength steel rewelding, its operation principle is: at first, be heated to low preheat temperature in a big way at the distance bevel for welding, suitably reduce the thermograde and the additional stress of member.Then, in the time of welding, in welding place back side correspondence position continues among a small circle, concentrate heating, keep local higher weld preheating temperature.At last, utilizing thermal source more than needed that welding line is carried out the suitable after heat hydrogen that disappears handles.
Specifically may further comprise the steps:
The first step, for the big slab high-strength steel member weld seam to be reprocessed of removing weld defect, in that fully to be heated to temperature in each side 500mm scope of weld seam be 80~90 ℃ apart from waiting to reprocess,
In second step, concentrate heating at welding place back side correspondence position, and to keep with welding place be that the weld preheating temperature of the 20-50mm regional area at center is 200 ± 20 ℃.
In the 3rd step, begin welding; In the time of welding, continuing heating and keeping local weld preheating temperature is 200 ± 20 ℃, and heating location remains on the zone of welding pool the place ahead 20-50mm, moves along with moving of welding pool.
Further, also comprise step: in the 4th step, utilize thermal source more than needed that welding line is carried out the suitable after heat hydrogen that disappears and handle.
For the welding to be reprocessed of the large-sized steel member of big thickness, fully be heated to 80~90 ℃ waiting to reprocess in each side 500mm scope of weld seam, fully being heated to about 200 ℃ compared to existing technology shortened heat time heating time more than 2/3.Therefore, the present invention can improve the heat utilization ratio of big thick plate steel member weld preheating effectively, and energy savings improves and reprocesses welding quality and production efficiency.
Description of drawings
Below in conjunction with the drawings and specific embodiments technical scheme of the present invention is further described in detail.
Fig. 1 reprocesses the weld job schematic diagram for high-strength steel member corner joint.
Fig. 2 is that the A of Fig. 1 is to schematic diagram.
Fig. 3 reprocesses the weld job schematic diagram for high-strength steel member banjo fixing butt jointing.
Fig. 4 is that the B of Fig. 3 is to schematic diagram.
The specific embodiment
Certain large-scale trussed bridge steel construction has local weld seam to reprocess, technology preheating routinely earlier, owing to be big slab, large-size components, environment temperature is lower, fails abundant preheating, reprocesses success.Used the inventive method afterwards, made and reprocess successfully that effect was remarkable.
Specific embodiment 1
As shown in Figure 1 and Figure 2, corner connection is welded between high strength steel plate 3 and the high strength steel plate 4, specifically reprocesses technology and is:
Exclude all weld defects, be extended down to 10~15mm outside the crackle two ends, what form suitable weldering reprocesses weld groove 1,2, reprocesses weld groove 1,2 and near zone reveals metallic luster with the abrasive machine polishing;
Reprocessing in weld groove 1,2 each side 500mm scope of suitable weldering fully heated, and temperature is 80~90 ℃;
To reprocessing before weld groove 1 welding of suitable weldering, at high strength steel plate 4 back sides be on the weld seam 2 on the corresponding weld groove 1 position of welding point 11 continue to concentrate heating, making the local weld preheating temperature of welding point on the corresponding weld groove 1 is 200 ± 20 ℃;
Adopt CO 2Gas is protected weldering and is carried out rewelding, and in the time of welding, it is the position of welding pool 11 the place ahead 20-50mm that hot spot 12 remains on the welding point, moves along with moving of welding pool 11, and keeping local weld preheating temperature is 200 ± 20 ℃; Moderate welding parameter is selected in welding for use, adopts a short section multilayer to weld more, and use is received arc current and filled up arc crater, strict cleaning welding slag between welding bead, and butt welded seam 1 carries out suitable hammering processing;
Postwelding carries out after heat insulation processing to reprocessing weld seam 1 immediately.
Rewelding is finished after 48 hours and is carried out 100% magnetic powder inspection and ultrasonic examination, has all reached code requirement, reprocesses successfully.
Specific embodiment 2
As shown in Figure 3, Figure 4, dock welding between high strength steel plate 7 and the high strength steel plate 8, specifically reprocess technology and be:
Exclude all weld defects, be extended down to 10~15mm outside the crackle two ends, what form suitable weldering reprocesses weld groove 5,6, reprocesses weld groove 5,6 and near zone reveals metallic luster with the abrasive machine polishing;
Fully heat reprocessing in weld groove 5,6 each side 500mm scope, temperature is 80~90 ℃;
To reprocessing before weld groove 5 weldings of suitable weldering, at high strength steel plate 7,8 back sides be on the weld seam 6 on the corresponding weld groove 5 position of welding point 15 continue to concentrate heating, making the local weld preheating temperature of welding point 15 on the corresponding weld groove 5 is 200 ± 20 ℃;
Adopt CO 2Gas is protected weldering and is carried out rewelding, and in the time of welding, it is the position of welding pool 15 the place ahead 2050mm that hot spot 16 remains on the welding point, moves along with moving of welding pool 15, and keeping local weld preheating temperature is 200 ± 20 ℃; Moderate welding parameter is selected in welding for use, adopts a short section multilayer to weld more, and use is received arc current and filled up arc crater, strict cleaning welding slag between welding bead, and butt welded seam groove 5 carries out suitable hammering processing;
Postwelding carries out after heat insulation processing to reprocessing weld seam 5 immediately.
Rewelding is finished after 48 hours and is carried out 100% magnetic powder inspection and ultrasonic examination, has all reached code requirement, reprocesses successfully.
It should be noted last that, the above specific embodiment is only unrestricted in order to technical scheme of the present invention to be described, although the present invention is had been described in detail with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, can make amendment or be equal to replacement technical scheme of the present invention, and not breaking away from the spirit and scope of technical solution of the present invention, it all should be encompassed in the middle of the claim scope of the present invention.

Claims (2)

1. the process of a high-strength steel rewelding is characterized in that, may further comprise the steps:
The first step, for the big slab high-strength steel member weld seam to be reprocessed of removing weld defect, in that fully to be heated to temperature in each side 500mm scope of weld seam be 80~90 ℃ apart from waiting to reprocess,
In second step, concentrate heating at welding place back side correspondence position, and to keep with welding place be that the weld preheating temperature of the 20-50mm regional area at center is 200 ± 20 ℃.
In the 3rd step, begin welding; In the time of welding, continuing heating and keeping local weld preheating temperature is 200 ± 20 ℃, and heating location remains on the zone of welding pool the place ahead 20-50mm, moves along with moving of welding pool.
2. the process of high-strength steel rewelding according to claim 1 is characterized in that, also comprises:
In the 4th step, utilize thermal source more than needed that welding line is carried out the suitable after heat hydrogen that disappears and handle.
CNA2009103025739A 2009-05-25 2009-05-25 Process method for rewelding of high strength steel Pending CN101559549A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA2009103025739A CN101559549A (en) 2009-05-25 2009-05-25 Process method for rewelding of high strength steel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA2009103025739A CN101559549A (en) 2009-05-25 2009-05-25 Process method for rewelding of high strength steel

Publications (1)

Publication Number Publication Date
CN101559549A true CN101559549A (en) 2009-10-21

Family

ID=41218615

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA2009103025739A Pending CN101559549A (en) 2009-05-25 2009-05-25 Process method for rewelding of high strength steel

Country Status (1)

Country Link
CN (1) CN101559549A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102267000A (en) * 2010-06-02 2011-12-07 哈尔滨建成集团有限公司 Metal active gas (MAG) welding method for butting quenched low-alloy super-high-strength steel and high-quality carbon structural steel
CN103308353A (en) * 2012-03-08 2013-09-18 上海振华重工(集团)股份有限公司 Prefabrication method for rewelding transverse crack of high-strength steel
CN103659017A (en) * 2013-11-05 2014-03-26 领新(南通)重工有限公司 Rework welding process for T-shaped connector full penetration weld of pivot steel structure of ocean engineering crane
CN103769725A (en) * 2014-01-24 2014-05-07 中国核工业二三建设有限公司 Method for reworking surface defect on back surface of weld joint of small container
CN104002030A (en) * 2014-06-10 2014-08-27 中铁宝桥(扬州)有限公司 Butt joint method for super-thick steel plates
CN104139228A (en) * 2013-05-08 2014-11-12 中国核工业二四建设有限公司 Thick steel plate welding process
CN107584194A (en) * 2017-11-01 2018-01-16 上海沪东三造船舶配套有限公司 The welding method of high intensity crack arrest steel
CN113042853A (en) * 2021-03-03 2021-06-29 中国船舶重工集团公司第七二五研究所 Method for repairing non-composite area of pure copper T2-steel composite board

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102267000A (en) * 2010-06-02 2011-12-07 哈尔滨建成集团有限公司 Metal active gas (MAG) welding method for butting quenched low-alloy super-high-strength steel and high-quality carbon structural steel
CN102267000B (en) * 2010-06-02 2012-12-12 哈尔滨建成集团有限公司 Metal active gas (MAG) welding method for butting quenched low-alloy super-high-strength steel and high-quality carbon structural steel
CN103308353A (en) * 2012-03-08 2013-09-18 上海振华重工(集团)股份有限公司 Prefabrication method for rewelding transverse crack of high-strength steel
CN104139228A (en) * 2013-05-08 2014-11-12 中国核工业二四建设有限公司 Thick steel plate welding process
CN103659017A (en) * 2013-11-05 2014-03-26 领新(南通)重工有限公司 Rework welding process for T-shaped connector full penetration weld of pivot steel structure of ocean engineering crane
CN103659017B (en) * 2013-11-05 2016-03-16 领新(南通)重工有限公司 Ocean engineering loop wheel machine maincenter steel construction T connector full penetration weld reprocesses welding procedure
CN103769725A (en) * 2014-01-24 2014-05-07 中国核工业二三建设有限公司 Method for reworking surface defect on back surface of weld joint of small container
CN103769725B (en) * 2014-01-24 2015-09-30 中国核工业二三建设有限公司 A kind of method of reprocessing the blemish of the back of weld of small containers
CN104002030A (en) * 2014-06-10 2014-08-27 中铁宝桥(扬州)有限公司 Butt joint method for super-thick steel plates
CN107584194A (en) * 2017-11-01 2018-01-16 上海沪东三造船舶配套有限公司 The welding method of high intensity crack arrest steel
CN113042853A (en) * 2021-03-03 2021-06-29 中国船舶重工集团公司第七二五研究所 Method for repairing non-composite area of pure copper T2-steel composite board

Similar Documents

Publication Publication Date Title
CN101559549A (en) Process method for rewelding of high strength steel
CN102240841B (en) Submerged-arc welding process for T-type joint for extra thick steel plate
CN105127562B (en) Method for welding welded joint between stainless steel composite plate and austenitic stainless steel
CN101543926B (en) Overlaying welding technology of ductile cast iron roller
CN102962543B (en) Welding process for red copper and stainless steel dissimilar materials
CN105108341A (en) Laser-MAG welding method for steel plate of medium thickness and superhigh strength
CN103801808B (en) Narrow clearance melting electrode metal active gas arc welding technique
CN105127566B (en) The complete penetraction and fusion in welding welding method of big thickness carbon steel stainless steel clad plate
CN102861972B (en) Welding method for vertically spliced super-thick steel plate
CN103084703A (en) Method for patching, overlay welding and reproducing large-scale hollow steel casting
CN102248297B (en) Single-surface traceless welding method for stainless steel composite panel of elevator
CN107598340B (en) Method for welding T-shaped joint of large thick plate
CN104259634A (en) Full penetration fillet weld back-gouging-free welding technology
CN107999916A (en) A kind of double light beam laser-TIG compound silk filling melt-brazing methods of dissimilar material
CN104625322B (en) Large non-standard device thick-plate all-position welding method
CN103008898A (en) Tack welding method, welding method and welding method for welding box beams
CN103624398B (en) A kind of high-strength aluminum alloy slab low_input_power friction stir welding method
CN102500906A (en) Method for welding heterogeneous austenitic stainless steel plates
CN105397319A (en) Welding process for steel bridge structure
CN103659184A (en) Method for welding heat dissipation base plates
CN102909479B (en) Square long girder steel welding method
CN108115247A (en) A kind of welding procedure of last furnace shell cross weld
CN105195858B (en) A kind of steel for ship structure straight angle connects welding method
CN105195873B (en) A kind of steel for ship structure founds corner connection welding method
CN105364430B (en) The method for laser welding that a kind of thin plate edge joint synchronously rolls

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: WUHAN SHIP HEAVY ENGINEERING CO., LTD.

Free format text: FORMER OWNER: WUCHANG SHIP HEAVY INDUSTRY CO., LTD.

Effective date: 20091120

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20091120

Address after: Hubei province Wuhan city Xinzhou District Yangluo town Pan Long Lu No. 117 post encoding: 430415

Applicant after: Wuchuan Heavy Engineering Co.,Ltd.

Address before: Hubei city of Wuhan province Wuchang Ziyang Road No. 2 post encoding: 430060

Applicant before: Wuchang Shipbuilding Industry Co., Ltd.

C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Open date: 20091021