CN109245085A - DC energy storage backup power supply and control method with peak load shifting function - Google Patents

DC energy storage backup power supply and control method with peak load shifting function Download PDF

Info

Publication number
CN109245085A
CN109245085A CN201811184193.5A CN201811184193A CN109245085A CN 109245085 A CN109245085 A CN 109245085A CN 201811184193 A CN201811184193 A CN 201811184193A CN 109245085 A CN109245085 A CN 109245085A
Authority
CN
China
Prior art keywords
battery
converter
control mainboard
power supply
energy storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811184193.5A
Other languages
Chinese (zh)
Inventor
李有财
刘震
汤平
陈木泉
熊刚
饶火美
陈见超
张涌才
高辉辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Nebula Electronics Co Ltd
Original Assignee
Fujian Nebula Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Nebula Electronics Co Ltd filed Critical Fujian Nebula Electronics Co Ltd
Priority to CN201811184193.5A priority Critical patent/CN109245085A/en
Publication of CN109245085A publication Critical patent/CN109245085A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J1/00Circuit arrangements for dc mains or dc distribution networks
    • H02J1/14Balancing the load in a network
    • H02J13/0003
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J15/00Systems for storing electric energy
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/40Display of information, e.g. of data or controls
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages

Landscapes

  • Engineering & Computer Science (AREA)
  • Power Engineering (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The present invention provides a kind of DC energy storage backup power supply with peak load shifting function, including control mainboard, CAN communication circuit, voltage and current Acquisition Circuit, battery, DC-DC converter, DTU communication module and Cloud Server;The control mainboard is connected by the DTU communication module with the Cloud Server;The voltage and current Acquisition Circuit, battery and DC-DC converter are connected by the CAN communication circuit with the control mainboard;The battery is connected with the DC-DC converter, and the DC-DC converter is connected with load of base station.The DC energy storage backup power supply control method with peak load shifting function that the present invention also provides a kind of.The present invention can mitigate load of the power grid in crest segment rate period when specifically used significantly, and create huge economic value using electricity using at the peak time price difference.

Description

DC energy storage backup power supply and control method with peak load shifting function
Technical field
The present invention relates to the communications fields, in particular to the DC energy storage backup power supply and controlling party of peak load shifting function Method.
Background technique
In current all base stations, in order to ensure that communication is uninterrupted, in addition to needing to supply base station by power grid Other than electricity, it is also necessary to be powered using backup power supply;Wherein, power grid needs first to connect an AC-DC converter, will hand over Stream becomes direct current, and AC-DC converter connects load of base station by DC bus again, to realize the power supply to base station;And standby Power supply is then directly connected to load of base station, carries out auxiliary power supply to base station to realize;Currently, base station backup power supply mainly uses lead Sour battery or lithium battery.Meanwhile existing base station power is nominal all bigger, substantially all in tens kilowatt hours;Using electricity When net is powered base station, since power grid has point of peak and low ebb, when being in peak times of power consumption, the power generation in power plant Scale has to be larger than electricity consumption scale, otherwise will will cause the situation of electric energy deficiency, in this case, if base station can pass through Backup power supply is powered, it will can be greatly reduced shortage of electric power situation;When being in the low power consumption phase, exhaustless electric energy It can waste again, in this case, if it is possible to extra electric energy be stored, electric energy will can be greatly reduced Waste.
But there are following defects for existing base station backup power supply:
1, existing base station backup power supply only has the function of backup power supply, and distribution-free formula energy-storage function, therefore, it is impossible to match It closes power grid and carries out peak load shifting control;
2, existing base station backup power supply does not have communication remote control, telemetry function, so that when specifically used, it is inconvenient In O&M and maintenance;
3, currently, the retired battery of automobile is more and more, existing base station backup power supply is all only capable of using normal cell, and nothing Method is unfavorable for improving the secondary use to the retired battery of automobile using nonstandard batteries such as the retired batteries of automobile.
Summary of the invention
One of the technical problem to be solved in the present invention is to provide a kind of DC energy storage standby with peak load shifting function Power supply can effectively solve distribution-free formula energy-storage function existing in the prior art by the DC energy storage backup power supply, be not easy to O&M and maintenance can not utilize the problem of nonstandard batteries such as automobile retired battery.
The present invention is realized in one of technical problem: the DC energy storage backup power supply with peak load shifting function, institute Stating DC energy storage backup power supply includes a control mainboard, a CAN communication circuit, a voltage and current Acquisition Circuit, a battery, one DC-DC converter, a DTU communication module and a Cloud Server;The control mainboard by the DTU communication module with it is described Cloud Server is connected;The voltage and current Acquisition Circuit, battery and DC-DC converter pass through the CAN communication circuit It is connected with the control mainboard;The battery is connected with the DC-DC converter, and the DC-DC converter and base station are negative Load is connected.
Further, the DC energy storage backup power supply further includes a display screen and a keyboard or touch screen;It is described aobvious Display screen and keyboard or touch screen are connected with the control mainboard.
Further, the control mainboard is ARM control panel.
Further, the battery is the retired battery of automobile with CAN interface.
The second technical problem to be solved by the present invention is to provide a kind of DC energy storage standby with peak load shifting function Power control method can effectively solve distribution-free formula energy-storage function existing in the prior art by this method, be not easy to O&M The problem of with overhauling, can not be using nonstandard batteries such as the retired batteries of automobile.
The present invention is realized in the twos' of technical problem: the DC energy storage backup power supply with peak load shifting function controls Method, the method need to use above-mentioned DC energy storage backup power supply;The described method includes:
Control mainboard is communicated by CAN communication circuit with voltage and current Acquisition Circuit, and is acquired by voltage and current Circuit acquires the data on DC bus in real time, and when detecting DC bus to load of base station normal power supply, control mainboard It is charged the battery according to the operating parameter control DC-DC converter of setting;When detecting DC bus power down, control master Plate discharges to battery according to the operating parameter control DC-DC converter of setting;
Cooperate power grid to carry out peak load shifting control to DC energy storage backup power supply, specifically include:
When being in flat section rate period, control mainboard control DC-DC converter stopping is charged the battery and is put Electricity;
When in paddy section rate period, control mainboard control DC-DC converter is charged the battery, until battery When capacity is greater than the first parameter SOC1 of setting, control mainboard controls charging of the DC-DC converter stopping to battery;
When being in crest segment rate period, control mainboard control DC-DC converter discharges to battery, until battery When capacity is less than the second parameter SOC2 of setting, control mainboard controls electric discharge of the DC-DC converter stopping to battery.
Further, when battery battery retired for automobile, the method also includes:
After the retired battery of automobile is linked into DC energy storage backup power supply, control mainboard is obtained by CAN communication circuit Take the battery parameter of the retired battery of automobile;The battery parameter includes charging voltage, charging current, discharge voltage, discharge current And Protection parameters;
Operating parameter needed for the battery parameter that control mainboard will acquire automatically updates generation;Operating parameter packet needed for described Include charging voltage, charging current, discharge voltage, discharge current and Protection parameters;
Control mainboard is controlled DC-DC converter and is charged to the retired battery of automobile by the required operating parameter generated And electric discharge.
Further, the control mainboard is charged the battery according to the operating parameter control DC-DC converter of setting Include:
Charging coordinated control is carried out to the AC-DC converter in DC energy storage backup power supply and power grid, is specifically included:
Using the maximum output current of AC-DC converter in power grid as an operating parameter IADCMAXIt is arranged to control mainboard In;
When battery is charged, control mainboard acquires load of base station electric current by voltage and current Acquisition Circuit in real time Iload
Control mainboard is according to IADCMAXAnd IloadCalculate maximum chargeable electric current Imaxcharge, Imaxcharge=IADCMAX* Proportionality coefficient-Iload
Control mainboard is according to the calculated chargeable electric current of maximum, charging electricity of the real time modifying DC-DC converter to battery Stream.
Further, the method also includes: joint debugging control is carried out to DC energy storage backup power supply and power grid, it is specific to wrap It includes:
When power grid in crest segment rate period heavy loads occurs or in the case where the stabilization of power grids, to the second parameter SOC2 It carries out turning down processing;
In the case where power grid is unstable, height-regulating processing is carried out to the second parameter SOC2.
Further, the method also includes: Cloud Server is communicated by DTU communication module with control mainboard, and The operating parameter of DC energy storage backup power supply is set by Cloud Server or obtains the operation data of DC energy storage backup power supply; Meanwhile when DC energy storage backup power supply occurs abnormal, exception information is actively reported to Cloud Server by control mainboard.
Further, the method also includes:
Control mainboard is communicated by CAN communication circuit with battery, and obtains the relevant information of battery in real time, including fill Discharge voltage information, battery capacity information and charging and discharging currents information;
Control mainboard is communicated by CAN communication circuit with DC-DC converter, and obtains DC-DC converter in real time Relevant information, including running state information, charging/discharging voltage information and charging and discharging currents information;
The charging/discharging voltage information of the charging/discharging voltage information of the battery that control mainboard will acquire and DC-DC converter into Row compares, and if the difference of the two is greater than the tolerance value of setting, determines that the wiring of DC-DC converter and battery is different Often, control mainboard shows exception on a display screen at this time.
The present invention has the advantage that
1, power grid can be cooperated to carry out peak load shifting control, in crest segment rate period, it is negative to base station to can control battery It is loaded into capable electric discharge, to reduce load of base station to the electricity consumption of power grid;Paddy section rate period in, can control power grid to battery into Row charging can form huge distributed energy storage by each DC energy storage backup power supply simultaneously as base station is again relatively more Power station;Therefore, the present invention can mitigate load of the power grid in crest segment rate period when specifically used significantly, and available Electricity using at the peak time price difference creates huge economic value;
It 2, can also be into using the communication of control mainboard and Cloud Server, it can be achieved that remotely check operation data, operating status The setting of row operating parameter, therefore, can very convenient progress O&M and maintenance;
3, the retired battery of automobile can perfectly be used in DC energy storage backup power supply, realizes the two of the retired battery of automobile Secondary utilization.
Detailed description of the invention
The present invention is further illustrated in conjunction with the embodiments with reference to the accompanying drawings.
Fig. 1 is the functional block diagram for the DC energy storage backup power supply that the present invention has peak load shifting function.
Description of symbols:
100- DC energy storage backup power supply, 200- load of base station, 300-AC-DC converter, 400- power grid, 500- direct current are female Line, 1- control mainboard, 2-CAN telecommunication circuit, 3- voltage and current Acquisition Circuit, 4- battery, 5-DC-DC converter, 6-DTU communication Module, 7- Cloud Server, 8- display screen, 9- keyboard or touch screen.
Specific embodiment
It please refers to shown in Fig. 1, the present invention has the preferable implementation of the DC energy storage backup power supply 100 of peak load shifting function Example, the DC energy storage backup power supply 100 include a control mainboard 1, a CAN communication circuit 2, a voltage and current Acquisition Circuit 3, One battery 4, a DC-DC converter 5, a DTU communication module 6 and a Cloud Server 7;The control mainboard 1 passes through the DTU Communication module 6 is connected with the Cloud Server 7;The voltage and current Acquisition Circuit 3, battery 4 and DC-DC converter 5 are equal It is connected by the CAN communication circuit 2 with the control mainboard 1;The battery 4 is connected with the DC-DC converter 5, The DC-DC converter 5 is connected with load of base station 200.In the specific implementation, power grid 400 can first and AC-DC converter 300 It is connected, AC-DC converter 300 is connected by DC bus 500 with load of base station 200 again, to realize power grid 400 to base Stand load 200 power supply.
Wherein, the control mainboard 1 is core control panel, and operation logic, relay protective scheme, communication control of system etc. are all logical The control mainboard 1 is crossed to realize;The CAN communication circuit 2 be mainly used for realizing between control mainboard 1 and DC-DC converter 5 with And the communication between control mainboard 1 and battery 4, the CAN communication circuit 2 can using CTM1051 ADuM3201 chip come It realizes;The voltage and current Acquisition Circuit 3 is mainly used for acquiring load of base station electric current and bus voltage, so as to according to acquisition Load of base station electric current come after calculating charging current and judging whether DC energy storage backup power supply 100 enters according to bus voltage Standby mode, the voltage and current Acquisition Circuit 3 are common in the art for acquiring a kind of circuit of electric current and voltage, are being had When body is implemented, only need arbitrarily to select a kind of circuit that can be realized electric current and voltage data acquisition function from the prior art i.e. Can, the acquisition sensor which is related to can be CSM1000S sensor or VSM500D sensor; The battery 4 is stored for realizing the margin of energy and is powered when power grid 400 is powered off to load of base station 200;The DC-DC Converter 5 is bilateral power devices, it can be achieved that charging to battery 4, the energy discharge of battery 4 can also be fed back to power grid In 400;Communication interface of the DTU communication module 6 between control mainboard 1 and Cloud Server 7, it is a kind of dedicated for general Serial data is converted to IP data or by IP data are converted to serial data and network is transmitted by wireless communication nothing Line terminal equipment, in specific implementation, the DTU communication module 6 can be that GPRS DTU wireless communication module, 3G DTU is wireless The various wireless communication modules such as communication module, 4G DTU wireless communication module;The Cloud Server 7 is straight for realizing remotely checking Operation data, the operating status for flowing energy-storage standby power supply 100, can also be achieved remotely located operating parameter.
The DC energy storage backup power supply 100 further includes a display screen 8 and a keyboard or touch screen 9;The display screen 8 And keyboard or touch screen 9 are connected with the control mainboard 1.Wherein, the display screen 8 is for showing operation data, setting Set parameter etc.;The keyboard or touch screen 9 are for realizing human-computer interaction.
The control mainboard 1 is ARM control panel, since ARM control panel is common control panel in single-chip microcontroller, specific real Shi Shi only need to arbitrarily select one kind from existing ARM control panel, for example, TM4C1294, STM32F107 can be used Or ARM control panel made of the ARM chip manufacturing such as STM32F425.
The battery 4 is that the retired battery of automobile with CAN interface in the specific implementation can be by the retired battery of automobile It is directly connected in DC energy storage backup power supply 100 by CAN interface.
Please emphasis referring to Fig.1 shown in, the present invention has the DC energy storage backup power supply control method of peak load shifting function Preferably implement, the method need to use above-mentioned DC energy storage backup power supply;The described method includes:
Control mainboard is communicated by CAN communication circuit with voltage and current Acquisition Circuit, and is acquired by voltage and current Circuit acquires the data (including load of base station electric current and bus voltage) on DC bus in real time, and is detecting DC bus pair When load of base station normal power supply, control mainboard is charged the battery according to the operating parameter control DC-DC converter of setting;? When detecting DC bus power down, control mainboard discharges to battery according to the operating parameter control DC-DC converter of setting, Even if DC energy storage backup power supply enters standby power mode, to support base station to work normally;
Cooperate power grid to carry out peak load shifting control to DC energy storage backup power supply, specifically include:
When being in flat section rate period, control mainboard control DC-DC converter stopping is charged the battery and is put Electricity, DC energy storage backup power supply at this time are the equal of the backup power supply under a stationary state;
When in paddy section rate period, control mainboard control DC-DC converter is charged the battery, until battery Capacity be greater than setting the first parameter SOC1 (first parameter SOC1 is the parameter that can be set, typically larger than 90%) when, control Mainboard control DC-DC converter processed stops the charging to battery;
When being in crest segment rate period, control mainboard control DC-DC converter discharges to battery, to reduce base station The electricity consumption of power grid, until the capacity of battery is less than the second parameter SOC2 set, (the second parameter SOC2 is standby The capacity that power supply needs, typically larger than 50%) when, control mainboard controls DC-DC converter and stops electric discharge to battery.
When battery battery retired for automobile, the method also includes:
After the retired battery of automobile is linked into DC energy storage backup power supply, control mainboard is obtained by CAN communication circuit Take the battery parameter of the retired battery of automobile;The battery parameter includes charging voltage, charging current, discharge voltage, discharge current And Protection parameters;Before the retired battery of automobile is accessed DC energy storage backup power supply of the invention, need retired to automobile Battery first carries out safety detection, only can just be linked into DC energy storage backup power supply after through safety detection;
Operating parameter needed for the battery parameter that control mainboard will acquire automatically updates generation;Operating parameter packet needed for described Include charging voltage, charging current, discharge voltage, discharge current and Protection parameters;
Control mainboard is controlled DC-DC converter and is charged to the retired battery of automobile by the required operating parameter generated And electric discharge.
The control mainboard is charged the battery according to the operating parameter control DC-DC converter of setting
Charging coordinated control is carried out to the AC-DC converter in DC energy storage backup power supply and power grid, is specifically included:
By the maximum output current of AC-DC converter in power grid, (maximum output current of AC-DC converter is that have in power grid Limitation) it is used as an operating parameter IADCMAXIt is arranged into control mainboard;
When battery is charged, control mainboard acquires load of base station electric current by voltage and current Acquisition Circuit in real time Iload
Control mainboard is according to IADCMAXAnd IloadCalculate maximum chargeable electric current Imaxcharge, Imaxcharge=IADCMAX* Proportionality coefficient-IloadIt (i.e. by the maximum output current of AC-DC converter in power grid first multiplied by proportionality coefficient, then subtracts and adopts in real time The load of base station electric current of collection);Wherein, proportionality coefficient generally takes 90%, to reserve a part of power headroom, is being embodied certainly When, also it can modify proportionality coefficient according to actual needs;
Control mainboard is according to the calculated chargeable electric current of maximum, charging electricity of the real time modifying DC-DC converter to battery Stream.
The method also includes: joint debugging control is carried out to DC energy storage backup power supply and power grid, is specifically included:
When power grid in crest segment rate period heavy loads occurs or in the case where the stabilization of power grids, to the second parameter SOC2 It carries out turning down processing, in this manner it is possible to which more some electric energy of feedback are to load of base station in crest segment rate period, so as to effective Network load is reduced, and increases the economic benefits of base station;
In the case where power grid is unstable, height-regulating processing is carried out to the second parameter SOC2, in this way, DC energy storage backup power supply More energy can be laid in, to cope with worse power grid environment, such as prevent from having a power failure for a long time.
The method also includes: Cloud Server is communicated by DTU communication module with control mainboard, and passes through cloud service The operating parameter of DC energy storage backup power supply is arranged (for example, the first parameter SOC1 of setting, is arranged the second parameter SOC2, modification in device Crest segment, paddy section, flat section time etc.), or the operation data of DC energy storage backup power supply is obtained, Cloud Server is getting operation After data, operation data can be shown in WEB terminal or mobile phone terminal, to facilitate carry out O&M;Meanwhile in DC energy storage standby electricity When source occurs abnormal, exception information is actively reported to Cloud Server by control mainboard, and quick sound can be made to failure to facilitate It answers.
The method also includes:
Control mainboard is communicated by CAN communication circuit with battery, and obtains the relevant information of battery in real time, including fill Discharge voltage information, battery capacity information and charging and discharging currents information;It, can be real after relevant information by obtaining battery in real time Now it is conveyed on Cloud Server by the relevant information real-time display of battery to display screen or remotely, it can be with to maintain easily personnel The operating condition of electrolytic cell in real time;
Control mainboard is communicated by CAN communication circuit with DC-DC converter, and obtains DC-DC converter in real time Relevant information, including running state information, charging/discharging voltage information and charging and discharging currents information;By obtaining DC-DC in real time After the relevant information of converter, it can be achieved that by the relevant information real-time display of DC-DC converter to display screen or long-range conveying To on Cloud Server, with maintain easily personnel can be real-time the operating condition of electrolytic cell;
The charging/discharging voltage information of the charging/discharging voltage information of the battery that control mainboard will acquire and DC-DC converter into Row compares, and if the difference of the two is greater than the tolerance value of setting, determines that the wiring of DC-DC converter and battery is different Often, control mainboard shows exception on a display screen at this time;For example, when the information of voltage got from battery is 48V, and from The information of voltage that DC-DC converter is read be 0V, at this time it is determined that between DC-DC converter and battery wiring it is different Often, and exception information can be shown on display screen.
In conclusion the present invention has the advantage that
1, power grid can be cooperated to carry out peak load shifting control, in crest segment rate period, it is negative to base station to can control battery It is loaded into capable electric discharge, to reduce load of base station to the electricity consumption of power grid;Paddy section rate period in, can control power grid to battery into Row charging can form huge distributed energy storage by each DC energy storage backup power supply simultaneously as base station is again relatively more Power station;Therefore, the present invention can mitigate load of the power grid in crest segment rate period when specifically used significantly, and available Electricity using at the peak time price difference creates huge economic value;
It 2, can also be into using the communication of control mainboard and Cloud Server, it can be achieved that remotely check operation data, operating status The setting of row operating parameter, therefore, can very convenient progress O&M and maintenance;
3, the retired battery of automobile can perfectly be used in DC energy storage backup power supply, realizes the two of the retired battery of automobile Secondary utilization.
Although specific embodiments of the present invention have been described above, those familiar with the art should be managed Solution, we are merely exemplary described specific embodiment, rather than for the restriction to the scope of the present invention, it is familiar with this The technical staff in field should be covered of the invention according to modification and variation equivalent made by spirit of the invention In scope of the claimed protection.

Claims (10)

1. a kind of DC energy storage backup power supply with peak load shifting function, it is characterised in that: including a control mainboard, a CAN Telecommunication circuit, a voltage and current Acquisition Circuit, a battery, a DC-DC converter, a DTU communication module and a Cloud Server; The control mainboard is connected by the DTU communication module with the Cloud Server;The voltage and current Acquisition Circuit, battery And DC-DC converter is connected by the CAN communication circuit with the control mainboard;The battery and the DC-DC Converter is connected, and the DC-DC converter is connected with load of base station.
2. as described in claim 1 with the DC energy storage backup power supply of peak load shifting function, it is characterised in that: further include one Display screen and a keyboard or touch screen;The display screen and keyboard or touch screen are connected with the control mainboard.
3. as described in claim 1 with the DC energy storage backup power supply of peak load shifting function, it is characterised in that: the control Mainboard is ARM control panel.
4. as described in claim 1 with the DC energy storage backup power supply of peak load shifting function, it is characterised in that: the battery For the retired battery of automobile with CAN interface.
5. a kind of DC energy storage backup power supply control method with peak load shifting function, it is characterised in that: the method need to make With the DC energy storage backup power supply as described in claim 1-4 is any;The described method includes:
Control mainboard is communicated by CAN communication circuit with voltage and current Acquisition Circuit, and passes through voltage and current Acquisition Circuit Data on acquisition DC bus in real time, and when detecting DC bus to load of base station normal power supply, control mainboard according to The operating parameter control DC-DC converter of setting charges the battery;When detecting DC bus power down, control mainboard is pressed It discharges according to the operating parameter control DC-DC converter of setting battery;
Cooperate power grid to carry out peak load shifting control to DC energy storage backup power supply, specifically include:
When being in flat section rate period, control mainboard control DC-DC converter stopping is charged the battery and is discharged;
When in paddy section rate period, control mainboard control DC-DC converter is charged the battery, until the capacity of battery Greater than setting the first parameter SOC1 when, control mainboard controls DC-DC converter and stops charging to battery;
When being in crest segment rate period, control mainboard control DC-DC converter discharges to battery, until the capacity of battery Less than setting the second parameter SOC2 when, control mainboard controls DC-DC converter and stops electric discharge to battery.
6. as claimed in claim 5 with the DC energy storage backup power supply control method of peak load shifting function, it is characterised in that: When battery battery retired for automobile, the method also includes:
After the retired battery of automobile is linked into DC energy storage backup power supply, control mainboard obtains vapour by CAN communication circuit The battery parameter of the retired battery of vehicle;The battery parameter include charging voltage, charging current, discharge voltage, discharge current and Protection parameters;
Operating parameter needed for the battery parameter that control mainboard will acquire automatically updates generation;Operating parameter needed for described includes filling Piezoelectric voltage, charging current, discharge voltage, discharge current and Protection parameters;
Control mainboard by generate required operating parameter, control DC-DC converter to the retired battery of automobile carry out charging and Electric discharge.
7. as claimed in claim 5 with the DC energy storage backup power supply control method of peak load shifting function, it is characterised in that: The control mainboard is charged the battery according to the operating parameter control DC-DC converter of setting
Charging coordinated control is carried out to the AC-DC converter in DC energy storage backup power supply and power grid, is specifically included:
Using the maximum output current of AC-DC converter in power grid as an operating parameter IADCMAXIt is arranged into control mainboard;
When battery is charged, control mainboard acquires load of base station electric current I by voltage and current Acquisition Circuit in real timeload
Control mainboard is according to IADCMAXAnd IloadCalculate maximum chargeable electric current Imaxcharge, Imaxcharge=IADCMAX* ratio system Number-Iload
Control mainboard is according to the calculated chargeable electric current of maximum, charging current of the real time modifying DC-DC converter to battery.
8. as claimed in claim 5 with the DC energy storage backup power supply control method of peak load shifting function, it is characterised in that: The method also includes: joint debugging control is carried out to DC energy storage backup power supply and power grid, is specifically included:
When power grid heavy loads occurs in crest segment rate period or in the case where the stabilization of power grids, carries out to the second parameter SOC2 Turn down processing;
In the case where power grid is unstable, height-regulating processing is carried out to the second parameter SOC2.
9. as claimed in claim 5 with the DC energy storage backup power supply control method of peak load shifting function, it is characterised in that: The method also includes: Cloud Server is communicated by DTU communication module with control mainboard, and is arranged directly by Cloud Server It flows the operating parameter of energy-storage standby power supply or obtains the operation data of DC energy storage backup power supply;Meanwhile after DC energy storage When stand-by power source occurs abnormal, exception information is actively reported to Cloud Server by control mainboard.
10. having the DC energy storage backup power supply control method of peak load shifting function as claimed in claim 5, feature exists In: the method also includes:
Control mainboard is communicated by CAN communication circuit with battery, and obtains the relevant information of battery, including charge and discharge in real time Information of voltage, battery capacity information and charging and discharging currents information;
Control mainboard is communicated by CAN communication circuit with DC-DC converter, and obtains the correlation of DC-DC converter in real time Information, including running state information, charging/discharging voltage information and charging and discharging currents information;
The charging/discharging voltage information for the battery that control mainboard will acquire and the charging/discharging voltage information of DC-DC converter are compared It is right, and if the difference of the two is greater than the tolerance value of setting, determine that the wiring of DC-DC converter and battery is abnormal, this When control mainboard show exception on a display screen.
CN201811184193.5A 2018-10-11 2018-10-11 DC energy storage backup power supply and control method with peak load shifting function Pending CN109245085A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811184193.5A CN109245085A (en) 2018-10-11 2018-10-11 DC energy storage backup power supply and control method with peak load shifting function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811184193.5A CN109245085A (en) 2018-10-11 2018-10-11 DC energy storage backup power supply and control method with peak load shifting function

Publications (1)

Publication Number Publication Date
CN109245085A true CN109245085A (en) 2019-01-18

Family

ID=65052693

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811184193.5A Pending CN109245085A (en) 2018-10-11 2018-10-11 DC energy storage backup power supply and control method with peak load shifting function

Country Status (1)

Country Link
CN (1) CN109245085A (en)

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109755952A (en) * 2019-03-25 2019-05-14 深圳市安和威电力科技股份有限公司 A kind of old and useless battery system peak load shifting real-time control method
CN110247411A (en) * 2019-05-17 2019-09-17 福建星云电子股份有限公司 A kind of user side instrumentation intelligence light storage plant capacity dynamic allocation method
CN110308781A (en) * 2019-03-26 2019-10-08 深圳大锄科技有限公司 One kind can tolerance high power density series-fed devices and methods therefor
WO2019228226A1 (en) * 2018-05-28 2019-12-05 中国移动通信集团设计院有限公司 Control method and device for distributed direct current power supply system
CN110739741A (en) * 2019-10-28 2020-01-31 上海煦达新能源科技有限公司 Low-voltage direct-current coupling management system of high-voltage power battery in communication base station
CN111756105A (en) * 2019-03-29 2020-10-09 深圳市瑞能实业股份有限公司 Communication base station power supply system for gradient utilization of retired power battery
CN112202161A (en) * 2019-07-08 2021-01-08 北京德意新能科技有限公司 Control method for low-voltage direct-current power supply
CN112202160A (en) * 2020-10-20 2021-01-08 国网四川省电力公司电力科学研究院 Direct-hanging bus type energy storage control system and control method
CN112968456A (en) * 2021-03-01 2021-06-15 华北电力大学 5G base station energy storage regulation and control method considering base station communication load state
WO2021114537A1 (en) * 2019-12-12 2021-06-17 中车株洲电力机车有限公司 Charging control method and system for energy storage element, and locomotive
CN113725879A (en) * 2021-08-11 2021-11-30 重庆瑞盾科技发展有限公司 Peak clipping and valley filling energy storage power supply system and method for stock base station
CN113991718A (en) * 2021-11-19 2022-01-28 上海沪臻智能科技有限公司 Lead-acid battery peak clipping and valley filling self-adaptive system and method
CN114552698A (en) * 2022-01-18 2022-05-27 利天万世新能源有限公司 Communication base station is with battery intelligence accuse box that has peak clipping and fills in millet and be equipped with electric function

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102025182A (en) * 2010-11-30 2011-04-20 梁一桥 Modular charging/discharging system of power battery pack of multifunctional electromobile
CN202121355U (en) * 2011-06-30 2012-01-18 宁波拜特测控技术有限公司 Backup power source of mobile base station
CN105322578A (en) * 2014-06-17 2016-02-10 深圳市沃特玛电池有限公司 Electric vehicle charging system
CN106787227A (en) * 2017-01-05 2017-05-31 深圳市沃特玛电池有限公司 Energy-accumulating power station
CN206498236U (en) * 2017-01-23 2017-09-15 刘杰 A kind of interactive communication base station power back-up system of civil power peak load shifting
CN209119812U (en) * 2018-10-11 2019-07-16 福建星云电子股份有限公司 DC energy storage backup power supply with peak load shifting function

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102025182A (en) * 2010-11-30 2011-04-20 梁一桥 Modular charging/discharging system of power battery pack of multifunctional electromobile
CN202121355U (en) * 2011-06-30 2012-01-18 宁波拜特测控技术有限公司 Backup power source of mobile base station
CN105322578A (en) * 2014-06-17 2016-02-10 深圳市沃特玛电池有限公司 Electric vehicle charging system
CN106787227A (en) * 2017-01-05 2017-05-31 深圳市沃特玛电池有限公司 Energy-accumulating power station
CN206498236U (en) * 2017-01-23 2017-09-15 刘杰 A kind of interactive communication base station power back-up system of civil power peak load shifting
CN209119812U (en) * 2018-10-11 2019-07-16 福建星云电子股份有限公司 DC energy storage backup power supply with peak load shifting function

Cited By (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2019228226A1 (en) * 2018-05-28 2019-12-05 中国移动通信集团设计院有限公司 Control method and device for distributed direct current power supply system
US11437812B2 (en) 2018-05-28 2022-09-06 China Mobile Group Design Institute Co., Ltd. Method and device for controlling distributed direct current power supply system
CN109755952A (en) * 2019-03-25 2019-05-14 深圳市安和威电力科技股份有限公司 A kind of old and useless battery system peak load shifting real-time control method
CN110308781A (en) * 2019-03-26 2019-10-08 深圳大锄科技有限公司 One kind can tolerance high power density series-fed devices and methods therefor
CN111756105A (en) * 2019-03-29 2020-10-09 深圳市瑞能实业股份有限公司 Communication base station power supply system for gradient utilization of retired power battery
CN110247411A (en) * 2019-05-17 2019-09-17 福建星云电子股份有限公司 A kind of user side instrumentation intelligence light storage plant capacity dynamic allocation method
CN110247411B (en) * 2019-05-17 2023-06-27 福建星云电子股份有限公司 Dynamic energy distribution method for user-side Internet of things intelligent optical storage equipment
CN112202161A (en) * 2019-07-08 2021-01-08 北京德意新能科技有限公司 Control method for low-voltage direct-current power supply
CN110739741B (en) * 2019-10-28 2023-03-31 上海煦达新能源科技有限公司 Low-voltage direct-current coupling management system of high-voltage power battery in communication base station
CN110739741A (en) * 2019-10-28 2020-01-31 上海煦达新能源科技有限公司 Low-voltage direct-current coupling management system of high-voltage power battery in communication base station
WO2021114537A1 (en) * 2019-12-12 2021-06-17 中车株洲电力机车有限公司 Charging control method and system for energy storage element, and locomotive
CN112202160A (en) * 2020-10-20 2021-01-08 国网四川省电力公司电力科学研究院 Direct-hanging bus type energy storage control system and control method
CN112202160B (en) * 2020-10-20 2022-06-03 国网四川省电力公司电力科学研究院 Direct-hanging bus type energy storage control system and control method
CN112968456A (en) * 2021-03-01 2021-06-15 华北电力大学 5G base station energy storage regulation and control method considering base station communication load state
CN113725879A (en) * 2021-08-11 2021-11-30 重庆瑞盾科技发展有限公司 Peak clipping and valley filling energy storage power supply system and method for stock base station
CN113725879B (en) * 2021-08-11 2023-06-30 重庆瑞盾科技发展有限公司 Peak clipping and valley filling energy storage power supply system and method for stock base station
CN113991718A (en) * 2021-11-19 2022-01-28 上海沪臻智能科技有限公司 Lead-acid battery peak clipping and valley filling self-adaptive system and method
CN114552698A (en) * 2022-01-18 2022-05-27 利天万世新能源有限公司 Communication base station is with battery intelligence accuse box that has peak clipping and fills in millet and be equipped with electric function

Similar Documents

Publication Publication Date Title
CN109245085A (en) DC energy storage backup power supply and control method with peak load shifting function
CN113794216B (en) Parameter configuration method and terminal of optical storage and charging system
KR20220115623A (en) Charging systems for swapping stations or for energy storage stations
CN103887834B (en) A kind of accumulator battery flexibility balance charge/discharge management rectification module, Apparatus and system
CN111251930B (en) DC charging pile equipment
CN211018374U (en) Automatic energy storage charging system based on common power supply of commercial power and hydrogen fuel cell
CN109193723B (en) Combined base station backup energy storage power supply and control method
CN109274138B (en) Control method of mobile energy storage charging system of multifunctional electric automobile based on combination of multiple energy storage modules
CN113507162A (en) Automatic capacity checking device and capacity checking method for direct current power supply system of transformer substation
CN110323810A (en) A kind of accumulation power supply system and its charge/discharge control method
CN110011408A (en) A kind of moving emergency power-supply system and its working method
CN106208114A (en) A kind of based on the many scenes application controls method on the basis of the most standing electricity of energy storage
CN105280990B (en) Multikilowatt fuel cell/lithium ion battery hybrid power device and its energy management method
CN207234517U (en) A kind of storage battery parallel power supply system based on straight-flow system
CN209119812U (en) DC energy storage backup power supply with peak load shifting function
CN104600810A (en) Novel mode electric vehicle charging system
CN106602681A (en) Charging system and control method thereof
CN201359640Y (en) Intelligent power supply surface observation and report machine
CN201656535U (en) Full on-line accumulator battery charge and discharge test equipment
CN202906507U (en) Distributed cell power supply device and method thereof
CN207859973U (en) Energy-storage battery charge-discharge system
CN206237192U (en) A kind of power communication power-supply system
CN206790184U (en) Charging system
KR20200079606A (en) Control system of DC Uninterruptible Power Supply for load distribution
CN109245286A (en) A kind of transformerless emergency power supply

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20210125

Address after: 350000 building 1-4, 6 Shishi Road, Kuai'an Majiang Avenue, Mawei District, Fuzhou City, Fujian Province

Applicant after: FUJIAN NEBULA ELECTRONICS Co.,Ltd.

Applicant after: Fujian times Nebula Technology Co.,Ltd.

Address before: 350000 building 1-4, 6 Shishi Road, Kuai'an Majiang Avenue, Mawei District, Fuzhou City, Fujian Province

Applicant before: FUJIAN NEBULA ELECTRONICS Co.,Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20230713

Address after: 350000 building 1-4, 6 Shishi Road, Kuai'an Majiang Avenue, Mawei District, Fuzhou City, Fujian Province

Applicant after: FUJIAN NEBULA ELECTRONICS Co.,Ltd.

Address before: 350000 building 1-4, 6 Shishi Road, Kuai'an Majiang Avenue, Mawei District, Fuzhou City, Fujian Province

Applicant before: FUJIAN NEBULA ELECTRONICS Co.,Ltd.

Applicant before: Fujian times Nebula Technology Co.,Ltd.

TA01 Transfer of patent application right