CN109236018A - The construction equipment of attached tower tube line - Google Patents
The construction equipment of attached tower tube line Download PDFInfo
- Publication number
- CN109236018A CN109236018A CN201811156362.4A CN201811156362A CN109236018A CN 109236018 A CN109236018 A CN 109236018A CN 201811156362 A CN201811156362 A CN 201811156362A CN 109236018 A CN109236018 A CN 109236018A
- Authority
- CN
- China
- Prior art keywords
- tower
- plate
- rotating plate
- cylinder
- bottom plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/34—Arrangements for erecting or lowering towers, masts, poles, chimney stacks, or the like
- E04H12/342—Arrangements for stacking tower sections on top of each other
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Working Measures On Existing Buildindgs (AREA)
Abstract
The invention discloses a kind of construction equipments of attached tower tube line, comprising: support frame;Rotating plate;Telescopic rod, one end and the side of the separate rotating plate of the upper surface of the bottom plate are hinged, and the other end of the telescopic rod is hinged on the upper end of the vertical side of the inside of the rotating plate;Semicircular gear;Rack gear is engaged with the semicircular gear, and the gear drives it to move back and forth in the width direction of the bottom plate by telescoping mechanism, to drive the plate circular gear circumference forward or reverse;Locking half, is removably fixed with the semicircular gear, and the two cooperates, between by the other end locking of tower;A pair of of lifting lug, up and down be oppositely arranged on the tower the other end outer wall on;Boom hoisting can be sling the other end of the tower to vertical state from horizontality by a pair of of lifting lug.The present invention has many advantages, such as that safety coefficient is high and facilitates construction, can be widely applied to the technical field of construction equipment of attached tower tube line.
Description
Technical field
The present invention relates to the technical field of construction equipment of attached tower tube line.It is more particularly related to a kind of attached tower tube
The construction equipment of line.
Background technique
Domestic tower at present is mostly that scene is arrived in segmentation, lower half lift in advance in place, to upper half arrival it is live into
" work of attaching the names of pre-determined candidates of wearing the clothes " being commonly called as is completed in the installation of the work such as row ladder, platform, attached tower tube line, anti-corrosion, heat preservation, electric lighting,
Then it is grouped in the sky, this kind of Construction Mode is needed when carrying out high altitude operation, and the tower upper half docks ratio with lower half
It is more difficult, and the attached tower tube line of overhead welding is also more troublesome, and wind load is very big on welding influence, and bulk heat treatmet is difficult to
It realizes, Hydrostatic test increases substantially foundation bearing capacity, and main is that security risk existing for high altitude operation is not allowed to neglect
Depending on.
Summary of the invention
The object of the present invention is to provide a kind of construction equipments for the attached tower tube line that safety coefficient is high and facilitates construction.
In order to realize these purposes and other advantages according to the present invention, a kind of construction equipment of attached tower tube line is provided,
Include:
Support frame, by being horizontally placed on the bottom plate on ground, the both ends of length direction that is opposite and being vertically set on bottom plate
A pair of side plates be combined into it is U-shaped;
Rotating plate, is vertically arranged in the upper end of any side plate, and the lower end of the vertical side of the inside of the rotating plate passes through
Hinge is hinged on the upper end of the vertical side of the inside of the side plate vertically, so that the rotating plate can be turned to around the pin shaft of hinge
The upper end of plate and the upper end of another side plate are affixed;
Fixed cylinder is detachably fixed by an antithetical phrase half for identical and setting up and down half tubular shape and forms cylinder
Shape, wherein the center of the vertical side in underlying described sub half outside for being secured transverse to the rotating plate, and the son half
Cylinder arc-shaped concave upward, for accommodating the one end for the tower being laterally arranged;Another described sub half be located above is detachable
Be fixed on the son half, one end of the tower can be stuck in the inner ring in fixed cylinder;
Telescopic rod, one end and the side of the separate rotating plate of the upper surface of the bottom plate are hinged, the telescopic rod it is another
End is hinged on the upper end of the vertical side of the inside of the rotating plate;
Semicircular gear, side that is coaxial and being oppositely arranged on the fixed cylinder, half center of the semicircular gear
The arc-shaped concave direction of through-hole, for accommodating the other end of the tower;
Rack gear is engaged with the semicircular gear, and the gear drives it in the width of the bottom plate by telescoping mechanism
Direction moves back and forth, to drive the plate circular gear circumference forward or reverse;
Locking half, is removably fixed with the semicircular gear, and the two cooperates, by the another of tower
End locking is between;
A pair of of lifting lug, up and down be oppositely arranged on the tower the other end outer wall on;
Boom hoisting can be sling the other end of the tower to vertical state from horizontality by a pair of of lifting lug;
Wherein, when the telescopic rod is in longest state, the rotating plate is in a vertical state;When the telescopic rod is in
When most short status, the upper end of the rotating plate turns to the upper end that against the side plate hinged not with it, sets up above it, is formed and used
In the pedestal of load-bearing;
The part that the center of the vertical side in the outside of the rotating plate is lived by the fixed cylinder circle is embedded with rotatable
Ball.
Preferably, the telescopic rod is electric telescopic rod.
Preferably, the telescoping mechanism is cylinder or oil cylinder.
Preferably, the telescopic rod is more.
Preferably, the upper surface of the bottom plate is also vertically arranged with more springs and multiple row support cylinder;
The lower end of the spring is fixed on the bottom plate, and the upper end for being located at a pair of side plate is stretched out in the upper end;
The cylinder body of the support cylinder is fixed on the bottom plate, and the upper surface of the piston rod of the support cylinder is fixed with
One spherical elastic rubber ball;
Support cylinder described in each column is uniformly arranged along the width direction of the bottom plate, and multiple row support cylinder is along the bottom
The length direction of plate is uniformly arranged;
When the piston rod of the support cylinder does not extend out, the upper end is concordant with the upper end of the side plate.
Preferably, the construction equipment of the attached tower tube line, further includes support device comprising:
Support plate is fixed on the ground of the underface of the tower along the axis direction of the tower;
Multiple support cylinders, cylinder body is vertical and is detachably mounted to the upper surface of the support plate, on piston rod
It is provided with the arc rubber of arc shape, arc-shaped concave upward, is used to support the downside of the tower;
Wherein, the arc rubber is embedded with the framework of steel reinforcement of arc.
The present invention is include at least the following beneficial effects:
The construction equipment of attached tower tube line provided by the invention is eliminated existing by the whole Transporting and lifting to tower
Aerial docking and welding in technology, simplify the installation steps of tower and ensure that the safety of tower construction;By setting
Semicircular gear and rack gear are set, telescoping mechanism facilitates and installs attached tower tube line in tower surrounding, so that the outer wall of tower is every
Place can be located at side or top, convenient for construction, moreover, being sling the side of tower by a pair of of lifting lug and boom hoisting
And it is made to turn to vertical state, that is, it may make tower to lift to pre-installed position, therefore the present invention is that a kind of safety coefficient is high, simultaneously
And facilitate the construction equipment of the attached tower tube line of construction.
Further advantage, target and feature of the invention will be partially reflected by the following instructions, and part will also be by this
The research and practice of invention and be understood by the person skilled in the art.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram that rotating plate of the present invention turns to horizontality;
Fig. 3 is the positional diagram of support plate of the present invention and tower;
Fig. 4 is the connection relationship diagram of support cylinder and arc rubber of the present invention;
Fig. 5 is that the tower other end is locked schematic diagram by semicircle rack gear of the present invention and locking half.
Description of symbols: 1, bottom plate, 2, side plate, 3, rotating plate, 4, son half, 5, telescopic rod, 6, semicircular gear, 7, tooth
Item, 8, locking half, 9, lifting lug, 10, hinge, 11, tower, 12, support plate, 13, support cylinder, 14, arc rubber, 15, stretch
Contracting mechanism.
Specific embodiment
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art referring to specification text
Word can be implemented accordingly.
It should be noted that experimental method described in following embodiments is unless otherwise specified conventional method, institute
Reagent and material are stated, unless otherwise specified, is commercially obtained;In the description of the present invention, term " transverse direction ", " vertical
To ", "upper", "lower", "front", "rear", "left", "right", "vertical", "horizontal", "top", "bottom", "inner", the instructions such as "outside" side
Position or positional relationship are to be based on the orientation or positional relationship shown in the drawings, and are merely for convenience of description of the present invention and simplification of the description,
It is not that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, because
This is not considered as limiting the invention.
As shown in Figs. 1-5, the present invention provides a kind of construction equipment of attached tower tube line, comprising:
Support frame, by be horizontally placed on the bottom plate 1 on ground, length direction that is opposite and being vertically set on bottom plate 1 two
The a pair of side plates 2 at end is combined into U-shaped;
Rotating plate 3, is vertically arranged in the upper end of any side plate 2, and the lower end of the vertical side of the inside of the rotating plate 3 is logical
Cross hinge 10 be hinged on vertically the side plate 2 inside vertical side upper end so that the rotating plate 3 can be around the pin shaft of hinge 10
The upper end of the upper end and another side plate 2 that turn to rotating plate 3 is affixed;
Fixed cylinder is detachably fixed for half 4 by an antithetical phrase of identical and setting up and down half tubular shape and forms circle
Tubular, wherein the center of the vertical side in underlying described sub half 4 outside for being secured transverse to the rotating plate 3, and should
Son half 4 arc-shaped concave upward, for accommodating the one end for the tower 11 being laterally arranged;Another described sub half be located above
4 are detachably mounted on the son half 4, and one end of the tower 11 can be stuck in the inner ring in fixed cylinder;
Telescopic rod 5, one end and the side of the separate rotating plate 3 of the upper surface of the bottom plate 1 are hinged, the telescopic rod 5
The other end is hinged on the upper end of the vertical side of the inside of the rotating plate 3;
Semicircular gear 6, side that is coaxial and being oppositely arranged on the fixed cylinder, the semicircular gear 6 half in
The arc-shaped concave direction of heart through-hole, for accommodating the other end of the tower 11;
Rack gear 7 is engaged with the semicircular gear 6, and the gear drives it in the bottom plate 1 by telescoping mechanism 15
Width direction moves back and forth, to drive the plate circular gear circumference forward or reverse;
Locking half 8, it is removably fixed with the semicircular gear 6, and the two cooperates, by tower 11
The other end is locked between;
A pair of of lifting lug 9, up and down be oppositely arranged on the tower 11 the other end outer wall on;
Boom hoisting can be sling the other end of the tower 11 to vertical shape from horizontality by a pair of of lifting lug 9
State;
Wherein, when the telescopic rod 5 is in longest state, the rotating plate 3 is in a vertical state;When the telescopic rod 5
When in most short status, the upper end of the rotating plate 3 turns to the upper end that against the side plate 2 hinged not with it, sets up above it,
Form the pedestal for being used for load-bearing;
The part that the center of the vertical side in the outside of the rotating plate 3 is lived by the fixed cylinder circle, being embedded with can be rotated
Ball.
In this kind of technical solution, when 11 entirety of tower is transported to erecting bed, for Fig. 1, the son being located above is partly
Cylinder 4 and locking are not locked on underlying sub half 4 and semicircular gear 6 for half 8, at this point, underlying son
The arc-shaped concave of half 4 and semicircular gear 6 lift upward, by the both ends horizontal of tower 11 to underlying sub half 4 and
It on semicircular gear 6, places, then will lock half 8 and be fixed on semicircular gear 6, so that the right end of tower 11 be fixed
On the semicircular gear 6, the lateral wall of tower 11 being located above is welded, after the completion of welding, then passes through telescoping mechanism 15
It drives the semicircular gear 6 forward or reverse, so that the underlying lateral wall of tower 11 is gone to side, facilitates progress
The installation of attached tower tube line.
After being installed of attached tower tube line, underlying son half is locked and is fixed on by son half 4 be located above
On cylinder 4, so that the left end of the tower 11 is locked on rotating plate 3, it, can be by welding if the weight of tower 11 is excessive, it will
The left end of tower 11 is welded on an antithetical phrase half 4, in case the left end of tower 11 in hoisting process, takes off from an antithetical phrase half 4
It falls;After completing above-mentioned fixation, by boom hoisting and a pair of of lifting lug 9, the right end of the tower 11 is lifted by crane, in this process,
The length of the telescopic rod 5 is gradually shortened, so that, the tower 11 turns to shown in Fig. 2 from horizontality shown in FIG. 1
Vertical state, 11 left end of tower is welded and fixed at this point, releasing an antithetical phrase half 4, by the way of cutting or its other party
Then formula removes son half 4 positioned at left side, and tightens the wirerope for slinging a pair of of lifting lug 9 slightly, so that the weight of tower 11
Amount, is born by boom hoisting completely, then integrally removes support frame, rotating plate 3 and son half 4 positioned at right side, then transfers
The lower end of the tower 11 is placed on the ground, completes the attached tower tube line of the tower 11 by the wirerope for slinging a pair of of lifting lug 9
Construction and its lifting will find the position of the pre-installation of tower 11, and by the support before tower 11 transports to erecting bed in advance
Frame installs, and guarantees to be located at accurate position after tower 11 lifts.
For Fig. 1, underlying sub half 4, preferably it is integrally formed with the rotating plate 3, and in alternate internal
Reinforcing bar is set, to reach construction intensity.
Wherein, rotating plate 3 are vertically arranged in the upper end of any side plate 2;Fixed cylinder, by identical and upper and lower
One antithetical phrase of the half tubular shape of setting is detachably fixed to form cylindrical shape for half 4, in orientation, describe referring to Fig.1.
In another technical solution, the telescopic rod 5 is electric telescopic rod.
In this kind of technical solution, using the fast convenience of electric telescopic rod.
In another technical solution, the telescoping mechanism 15 is cylinder or oil cylinder.
In this kind of technical solution, the oil cylinder and cylinder are common constructing device, compare and are easy to get.
In another technical solution, the telescopic rod 5 is more.
In this kind of technical solution, telescopic rod 5 is more, the bull stick can be supported more stable, allows the rotating plate 3
When turning to Fig. 2 state from 1 state of soil, rotation process is more stable, it is noted that allowing as far as possible when more telescopic rods 5 stretch
Its synchronization telescope.
In another technical solution, the upper surface of the bottom plate 1 is also vertically arranged with more springs and multiple row support oil
Cylinder;
The lower end of the spring is fixed on the bottom plate 1, and the upper end is stretched out on the upper end for being located at a pair of side plate 2
Side;
The cylinder body of the support cylinder is fixed on the bottom plate 1, and the upper surface of the piston rod of the support cylinder is fixed
There is a spherical elastic rubber ball;
Support cylinder described in each column is uniformly arranged along the width direction of the bottom plate 1, and multiple row support cylinder is along described
The length direction of bottom plate 1 is uniformly arranged;
When the piston rod of the support cylinder does not extend out, the upper end is concordant with the upper end of the side plate 2.
In this kind of technical solution, spring and support cylinder can when rotating plate 3 turns to Fig. 2 state from Fig. 1 state,
To the carry out Auxiliary support of rotating plate 3, to guarantee that rotation process is stablized.
In another technical solution, the construction equipment of the attached tower tube line, further includes support device comprising:
Support plate 12 is fixed on the ground of the underface of the tower 11 along the axis direction of the tower 11;
Multiple support cylinders 13, cylinder body is vertical and is detachably mounted to the upper surface of the support plate 12, piston
The arc rubber 14 of arc shape is provided on bar, arc-shaped concave upward, is used to support the downside of the tower 11;
Wherein, the arc rubber 14 is embedded with the framework of steel reinforcement of arc.
In this kind of technical solution, the support cylinder 13 can be when the tower 11 is such as Fig. 1 state, in attached tower tube
In the welding process of line, to being supported in the middle part of attached tower tube line, as shown in figure 3, when reducing Fig. 1 state, an antithetical phrase half 4
And the stress of semicircular gear 6, delay its service life.Moreover, because not to the installation site of the attached tower tube line of tower 11
It is fixed, even moreover, same tower 11, before and after its rotation, the position that 11 lower end of tower is supported for support cylinder 13 is also not
It is fixed on, so setting support cylinder 13 can be detachably mounted to support plate 12 along the different positions of 11 axis direction of tower
It sets, to meet installation requirements.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed
With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily
Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited
In specific details and legend shown and described herein.
Claims (6)
1. a kind of construction equipment of attached tower tube line characterized by comprising
Support frame, by be horizontally placed on the bottom plate on ground, the both ends of length direction that is opposite and being vertically set on bottom plate one
Board group synthesis in opposite side is U-shaped;
Rotating plate, is vertically arranged in the upper end of any side plate, and the lower end of the vertical side of the inside of the rotating plate passes through hinge
It is hinged on the upper end of the vertical side of the inside of the side plate vertically, so that the rotating plate can turn to rotating plate around the pin shaft of hinge
Upper end and the upper end of another side plate are affixed;
Fixed cylinder is detachably fixed by an antithetical phrase half for identical and setting up and down half tubular shape and forms cylindrical shape,
The wherein center of the vertical side in underlying described sub half outside for being secured transverse to the rotating plate, and the son half
Arc-shaped concave upward, for accommodating the one end for the tower being laterally arranged;Another described sub half be located above is removably solid
It is scheduled on the son half, one end of the tower can be stuck in the inner ring in fixed cylinder;
Telescopic rod, one end and the side of the separate rotating plate of the upper surface of the bottom plate are hinged, the other end hinge of the telescopic rod
Connect the upper end in the vertical side of the inside of the rotating plate;
Semicircular gear, side that is coaxial and being oppositely arranged on the fixed cylinder, half central through hole of the semicircular gear
Arc-shaped concave direction, for accommodating the other end of the tower;
Rack gear is engaged with the semicircular gear, and the gear drives it in the width direction of the bottom plate by telescoping mechanism
Move back and forth, to drive the plate circular gear circumference forward or reverse;
Locking half, is removably fixed with the semicircular gear, and the two cooperates, and the other end of tower is locked
Tightly between;
A pair of of lifting lug, up and down be oppositely arranged on the tower the other end outer wall on;
Boom hoisting can be sling the other end of the tower to vertical state from horizontality by a pair of of lifting lug;
Wherein, when the telescopic rod is in longest state, the rotating plate is in a vertical state;When the telescopic rod is in most short
When state, the upper end of the rotating plate turns to the upper end that against the side plate hinged not with it, sets up above it, is formed for holding
The pedestal of weight;
The part that the center of the vertical side in the outside of the rotating plate is lived by the fixed cylinder circle, is embedded with rotatable rolling
Pearl.
2. the construction equipment of attached tower tube line as described in claim 1, which is characterized in that the telescopic rod is electric telescopic rod.
3. the construction equipment of attached tower tube line as described in claim 1, which is characterized in that the telescoping mechanism is cylinder or oil
Cylinder.
4. the construction equipment of attached tower tube line as described in claim 1, which is characterized in that the telescopic rod is more.
5. the construction equipment of attached tower tube line as described in claim 1, which is characterized in that the upper surface of the bottom plate is also set vertically
It is equipped with more springs and multiple row support cylinder;
The lower end of the spring is fixed on the bottom plate, and the upper end for being located at a pair of side plate is stretched out in the upper end;
The cylinder body of the support cylinder is fixed on the bottom plate, and the upper surface of the piston rod of the support cylinder is fixed with a ball
The elastic rubber ball of shape;
Support cylinder described in each column is uniformly arranged along the width direction of the bottom plate, and multiple row support cylinder is along the bottom plate
Length direction is uniformly arranged;
When the piston rod of the support cylinder does not extend out, the upper end is concordant with the upper end of the side plate.
6. the construction equipment of attached tower tube line as described in claim 1, which is characterized in that further include support device comprising:
Support plate is fixed on the ground of the underface of the tower along the axis direction of the tower;
Multiple support cylinders, cylinder body is vertical and is detachably mounted to the upper surface of the support plate, is all provided on piston rod
It is equipped with the arc rubber of arc shape, arc-shaped concave upward, is used to support the downside of the tower;
Wherein, the arc rubber is embedded with the framework of steel reinforcement of arc.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811156362.4A CN109236018B (en) | 2018-09-28 | 2018-09-28 | Construction equipment with tower pipeline |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811156362.4A CN109236018B (en) | 2018-09-28 | 2018-09-28 | Construction equipment with tower pipeline |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109236018A true CN109236018A (en) | 2019-01-18 |
CN109236018B CN109236018B (en) | 2021-02-19 |
Family
ID=65055474
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811156362.4A Active CN109236018B (en) | 2018-09-28 | 2018-09-28 | Construction equipment with tower pipeline |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109236018B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113250518A (en) * | 2021-03-30 | 2021-08-13 | 国网河北省电力有限公司邢台供电分公司 | Electric power iron tower extension device and use method thereof |
CN113996882A (en) * | 2021-09-30 | 2022-02-01 | 中国化学工程第十四建设有限公司 | Large-scale tower equipment and tower-attached pipeline installation method |
CN115338568B (en) * | 2022-07-27 | 2023-05-26 | 中国港湾工程有限责任公司 | Pipeline construction device |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201685072U (en) * | 2010-06-09 | 2010-12-29 | 天津重钢机械装备股份有限公司 | Circular tube workpiece positioner |
CN203271242U (en) * | 2013-04-28 | 2013-11-06 | 湖北三江航天万峰科技发展有限公司 | Spiral tower body lifting device |
CN203514935U (en) * | 2013-08-23 | 2014-04-02 | 中国石油天然气股份有限公司 | Chimney lifting device of oil-gas field heating device |
CN104439808A (en) * | 2014-11-28 | 2015-03-25 | 江苏沃得植保机械有限公司 | Special welding machine for welding parts on shaft pipes |
CN106245983A (en) * | 2016-08-25 | 2016-12-21 | 无锡市同腾复合材料有限公司 | The hydraulic vertical rod-type installation method of compound polyurethane material electric pole |
US20170107736A1 (en) * | 2015-10-14 | 2017-04-20 | James D. Lockwood | Crane system incorporated into a tower |
CN206458152U (en) * | 2017-01-04 | 2017-09-01 | 国动网络通信集团有限公司 | A kind of emergency communication steel tower being easily installed |
CN207698832U (en) * | 2018-01-02 | 2018-08-07 | 中化二建集团有限公司 | The assembled pairing device of large scale equipment transport |
-
2018
- 2018-09-28 CN CN201811156362.4A patent/CN109236018B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201685072U (en) * | 2010-06-09 | 2010-12-29 | 天津重钢机械装备股份有限公司 | Circular tube workpiece positioner |
CN203271242U (en) * | 2013-04-28 | 2013-11-06 | 湖北三江航天万峰科技发展有限公司 | Spiral tower body lifting device |
CN203514935U (en) * | 2013-08-23 | 2014-04-02 | 中国石油天然气股份有限公司 | Chimney lifting device of oil-gas field heating device |
CN104439808A (en) * | 2014-11-28 | 2015-03-25 | 江苏沃得植保机械有限公司 | Special welding machine for welding parts on shaft pipes |
US20170107736A1 (en) * | 2015-10-14 | 2017-04-20 | James D. Lockwood | Crane system incorporated into a tower |
CN106245983A (en) * | 2016-08-25 | 2016-12-21 | 无锡市同腾复合材料有限公司 | The hydraulic vertical rod-type installation method of compound polyurethane material electric pole |
CN206458152U (en) * | 2017-01-04 | 2017-09-01 | 国动网络通信集团有限公司 | A kind of emergency communication steel tower being easily installed |
CN207698832U (en) * | 2018-01-02 | 2018-08-07 | 中化二建集团有限公司 | The assembled pairing device of large scale equipment transport |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113250518A (en) * | 2021-03-30 | 2021-08-13 | 国网河北省电力有限公司邢台供电分公司 | Electric power iron tower extension device and use method thereof |
CN113996882A (en) * | 2021-09-30 | 2022-02-01 | 中国化学工程第十四建设有限公司 | Large-scale tower equipment and tower-attached pipeline installation method |
CN115338568B (en) * | 2022-07-27 | 2023-05-26 | 中国港湾工程有限责任公司 | Pipeline construction device |
Also Published As
Publication number | Publication date |
---|---|
CN109236018B (en) | 2021-02-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109236018A (en) | The construction equipment of attached tower tube line | |
CN102359303B (en) | Extra-high voltage common circuit iron tower assembling method | |
US10106946B2 (en) | Pile upending system | |
KR102529595B1 (en) | Apparatus for lifting heavy loads | |
RU2020112054A (en) | LIFTING CRANE CONTAINING FIRST MAST EQUIPPED WITH TILTING TOP | |
BR112014028802B1 (en) | METHOD OF OVERBOARDING AND LOWERING A LOAD FROM A VESSEL, CRANE-MOUNTED CONDUCTIVE DEVICE, CRANE, VESSEL AND METHOD OF ADAPTING A VESSEL-MOUNTED CRANE | |
CN107054582B (en) | Ship bow construction platform device | |
CN109231023B (en) | Method for installing jib system of portal crane | |
SK283752B6 (en) | Hoisting device | |
US10752474B2 (en) | Lifting unit, luffing jib crane comprising such a lifting unit and method for assembling such a crane | |
KR20170132851A (en) | Cranes with gantry forces and boom forces that effectively coincide in the upper structure | |
ES2380998T3 (en) | Modular heavy-duty motor vehicle for lifting and transporting in an erect way a foundation of a wind power installation | |
US10875748B2 (en) | Marine crane vessel and method of operation | |
CN106284264B (en) | A kind of detachable truss leg | |
NL2011985C2 (en) | Saddle and hook system. | |
CN217437508U (en) | Heavy solid rocket body overturning lifting appliance | |
CN113023095A (en) | Marine tower section of thick bamboo fixing device of wind power installation and tower section of thick bamboo transportation frock | |
CN104813537B (en) | Hydraulically extensible antenna mast system and its operating method | |
US20060102577A1 (en) | Swivelling hoist with high load capability | |
CN218539096U (en) | Platform loop wheel machine davit rest stand | |
CN209352522U (en) | Telescopic hoistable platform | |
CN207566766U (en) | A kind of collapsible falling-resistant crane boom | |
CN110117956A (en) | A kind of rotary digging pile driving construction device and rotary digging pile construction method | |
TWI609124B (en) | Construction method for cylindrical tank | |
CA2919767C (en) | Luffing cross member |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |