CN109235289A - A kind of continuous T beam bridge is without bracket maintenance and reinforcement operation platform and installation method - Google Patents
A kind of continuous T beam bridge is without bracket maintenance and reinforcement operation platform and installation method Download PDFInfo
- Publication number
- CN109235289A CN109235289A CN201811041894.3A CN201811041894A CN109235289A CN 109235289 A CN109235289 A CN 109235289A CN 201811041894 A CN201811041894 A CN 201811041894A CN 109235289 A CN109235289 A CN 109235289A
- Authority
- CN
- China
- Prior art keywords
- deck
- anchoring
- hanger
- operation platform
- continuous
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000002787 reinforcement Effects 0.000 title claims abstract description 21
- 238000012423 maintenance Methods 0.000 title claims abstract description 19
- 238000000034 method Methods 0.000 title claims abstract description 12
- 238000009434 installation Methods 0.000 title claims abstract description 11
- 238000009826 distribution Methods 0.000 claims abstract description 43
- 238000004873 anchoring Methods 0.000 claims abstract description 30
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 claims abstract description 24
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 239000000853 adhesive Substances 0.000 claims description 3
- 230000001070 adhesive effect Effects 0.000 claims description 3
- 238000004519 manufacturing process Methods 0.000 claims description 2
- 210000000003 hoof Anatomy 0.000 claims 1
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 239000003292 glue Substances 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 238000002513 implantation Methods 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
Abstract
A kind of continuous T beam bridge is without bracket maintenance and reinforcement operation platform and installation method, including anchoring pedestal, hanger, longitudinal distribution beam, transverse distribution beam and pedal.Hanger is welded on symmetrical anchoring pedestal on the inside of the adjacent T web;Longitudinal distribution beam is set up between the through beam of adjacent hanger, sets up transverse distribution beam between longitudinal distribution beam of neighbouring T web lower part;It is laid with pedal respectively at the top of longitudinal distribution beam, transverse distribution beam, deck beam.The present invention does not influence traffic on bridge compared with bridge-checking vehicle, and maintenance and reinforcement is convenient, and cost is relatively low;The present invention is not influenced compared with conventional stent by landform and under-clearance, does not influence traffic under bridge, and convenient for disassembly and assembly, cost is relatively low.
Description
Technical field
The invention belongs to Bridge repair and reinforcement technical fields, and in particular to a kind of continuous T beam bridge without bracket maintenance and reinforcement
Operation platform and installation method.
Background technique
As Bridges in Our Country development is increasingly turned to maintenance and reinforcement field, at present for the maintenance and reinforcement side of continuous T type bridge
Method mainly has using bridge-checking vehicle and sets up two methods of conventional stent, but bridge-checking vehicle cost of use is higher, and influences bridge and submit
It is logical;And conventional stent is limited by landform, especially across river, cross a river or cross-line when set up bracket seriously affect under bridge normally navigation and
It is current to require;When under-clearance is higher simultaneously, bracket security risk and economic cost are also larger.
Therefore, in conjunction with the structure type of continuous T beam bridge itself, it is at low cost how to design a kind of maintenance and reinforcement, not by space
Constraint based on sites, and easy to operate erection without scaffolding platform are that those skilled in the art need solve the problems, such as.
Summary of the invention
To solve the above problems, the present invention provides a kind of simple, economical, not by landform, the volume of traffic and under-clearance
The continuous T beam bridge of influence is without bracket maintenance and reinforcement operation platform and installation method.
To achieve the above object, the present invention provides the following technical solutions.
A kind of continuous T beam bridge is without bracket maintenance and reinforcement operation platform, which is characterized in that including anchoring pedestal, hanger, longitudinal direction
Distribution beam, transverse distribution beam and pedal.Hanger is welded on symmetrical anchoring pedestal on the inside of the adjacent T web;Adjacent
Longitudinal distribution beam is set up between the through beam of hanger, sets up transverse distribution beam between longitudinal distribution beam of neighbouring T web lower part;
It is laid with pedal respectively at the top of longitudinal distribution beam, transverse distribution beam, deck beam.
As a further solution of the present invention: the operation platform, at the horseshoe inclined-plane in adjacent T beam on coxostermum
Longitudinally asymmetric several anchoring pedestals of installation, anchoring pedestal are made of anchor plate and support.
As a further solution of the present invention: the operation platform, every hanger include deck beam, sunpender, through beam,
Short hanging rod.Deck beam is supported between adjacent T beam on two anchoring pedestals of longitudinally asymmetric arrangement;Deck beam with sunpender intersection
Short hanging rod is set;Sunpender upper and lower part is connect with deck beam and through beam both ends respectively.
As a further solution of the present invention: the operation platform, comprising: deck beam is by the identical parallel interval of two panels
The channel steel of certain distance forms;Short hanging rod, sunpender and through beam are made of angle steel;Longitudinal distribution beam and transverse distribution beam are adopted
It is made of i shaped steel.
A kind of installation method of the continuous T beam bridge without bracket maintenance and reinforcement operation platform of the present invention, which is characterized in that
The hole of several same diameters and depth is drilled with according to anchoring pedestal force request at the horseshoe inclined-plane of T web lower part;Cleaning
Screw rod is implanted into using anchoring adhesive after hole.
Identical hole is drilled in the anchor plate two sides corresponding position of anchoring pedestal;Anchor plate is penetrated and has bonded fastening
Horseshoe inclined-plane screw rod;Anchoring pedestal, which is bolted, to be fastened on T web horseshoe inclined-plane.
Short hanging rod is weldingly fixed at the top position that deck beam is connect with sunpender;Sunpender upper end passes through deck beam middle ware
Fixation is bolted in gap and short hanging rod;Downrod lower end is all made of with through beam both ends is bolted fixation respectively.
The deck beam both ends of every hanger are respectively welded at anchoring pedestal top surface.
Fixed several longitudinal distribution beams are installed between the through beam of adjacent hanger;In the longitudinal direction of neighbouring T web lower part
Fixed several transverse distribution beams are installed between distribution beam.It is laid with and steps on respectively at the top of longitudinal distribution beam, transverse distribution beam and deck beam
Plate.
Compared with prior art, the beneficial effects of the present invention are: the present invention does not influence traffic on bridge compared with bridge-checking vehicle, dimension
Repair reinforce it is convenient, cost is relatively low;The present invention is not influenced compared with conventional stent by landform and under-clearance, does not influence to hand under bridge
Logical and convenient for disassembly and assembly, cost is relatively low.
Detailed description of the invention
Fig. 1 is that the present invention can be used for continuous T beam bridge without bracket maintenance and reinforcement operation platform structure chart.
Fig. 2 is the operation platform layout drawing being laid with after pedal of the invention.
Fig. 3 is anchoring pedestal structure figure of the invention.
Fig. 4 is hanger structure figure of the invention.
Wherein: 1 being deck beam, 2 be support, 3 be short hanging rod, 4 be sunpender, 5 be through beam, 6 be hanger, 7 be pedal, 8
Longitudinal distribution beam, 9 be transverse distribution beam, 10 be anchor plate, 11 be anchoring pedestal.
Specific embodiment
Technical solution of the present invention is described in further detail with reference to the accompanying drawing.
It is shown in Figure 1, one kind for continuous T beam bridge without bracket maintenance and reinforcement operation platform and installation method, it is described to apply
Work stage+module method be included at the horseshoe inclined-plane of T web lower part be drilled with according to anchoring 11 force request of pedestal it is several identical straight
The hole of diameter and depth, punch position should avoid the reinforcing bar inside horseshoe;Surface dust in hole is cleaned up with hairbrush, then uses inflator
It blows off;Anchoring adhesive is injected since bottom hole with colloid-injecting gun, until glue is full of the 2/3 of hole inner volume;It is implanted into screw rod, and straight
To bottom hole, glue is just full of entire cavity at this time;Mustn't shake within 1 hour screw rod after the completion, and according to standard carry out scene with
Machine self-test;Anchoring pedestal 11 is fastened on horseshoe inclined-plane screw rod by nut again.
Every hanger 6 is fixed on T web lower part horseshoe inclined-plane by anchoring pedestal 11;In the through beam 5 of adjacent hanger 6
Between several longitudinal distribution beams 8 are installed;Fixed several transverse distributions are longitudinally mounted equidistant between the neighbouring longitudinal distribution beam 8 of T web
Beam 9.
It is shown in Figure 2, for one be installed on longitudinal distribution beam 8, transverse distribution beam 9 and deck beam 1 facing for fixed pedestal 7
When without bracket maintenance and reinforcement operation platform.
Shown in Figure 3, anchoring pedestal 11 is anchored at the side of the T web horseshoe after implantation screw rod by nut;Institute
Anchoring pedestal 11 is stated to be welded by support 2 and anchor plate 10.
Shown in Figure 4,6 structure of hanger includes deck beam 1, and the deck beam 1 is by the identical parallel interval of two panels
The channel steel of certain distance forms, and intersects between channel steel with sunpender 4
The short hanging rod 3 of place's welding angle steel production, deck beam 1 are connect with sunpender 4 by bolt 7, and sunpender 4 and short hanging rod 3 pass through spiral shell
Bolt 7 connects, and sunpender 4, which is extended downwardly, to be connect with through beam 5 by bolt 7, forms hanger 6.
When operation, pedal 7 is laid on longitudinal distribution beam 8, transverse distribution beam 9 and the deck beam 1 arranged;Pedal 7 is worn
Hole, and be fixed on respective beam with iron wire;7 both ends of pedal arrange reinforcing bar protective net, to weld and the place of being bolted carry out
Antirust treatment.
Compared with prior art, the interim hanger device installation of the present invention for continuous T type Bridge repair and reinforcement,
Disassembly is simple, cost is relatively low, is not influenced by landform, the volume of traffic and under-clearance.
Claims (5)
1. a kind of continuous T beam bridge is without bracket maintenance and reinforcement operation platform, which is characterized in that including anchoring pedestal, hanger, Zong Xiangfen
With beam, transverse distribution beam and pedal;Hanger is welded on symmetrical anchoring pedestal on the inside of the adjacent T web;It is hung adjacent
Longitudinal distribution beam is set up between the through beam of frame, sets up transverse distribution beam between longitudinal distribution beam of neighbouring T web lower part;?
Longitudinal distribution beam, transverse distribution beam, deck beam top are laid with pedal respectively.
2. continuous T beam bridge according to claim 1 is without bracket maintenance and reinforcement operation platform, which is characterized in that in adjacent T beam
Longitudinally asymmetric several anchoring pedestals of installation, anchoring pedestal are made of anchor plate and support at horseshoe inclined-plane on interior coxostermum.
3. continuous T beam bridge according to claim 1 is without bracket maintenance and reinforcement operation platform, which is characterized in that every hanger
Including deck beam, sunpender, through beam, short hanging rod;Deck beam is supported on two anchoring pedestals of longitudinally asymmetric arrangement between adjacent T beam
On;Short hanging rod is being arranged with sunpender intersection in deck beam;Sunpender upper and lower part is connect with deck beam and through beam both ends respectively.
4. continuous T beam bridge according to claim 1 is without bracket maintenance and reinforcement operation platform, which is characterized in that deck beam by
The channel steel of the identical parallel interval certain distance of two panels forms;Short hanging rod, sunpender and through beam are made of angle steel;Longitudinal distribution
Beam and transverse distribution beam are all made of i shaped steel production.
5. installation method of the continuous T beam bridge without bracket maintenance and reinforcement operation platform described in claim 1, which is characterized in that in T
The hole of several same diameters and depth is drilled at the horseshoe inclined-plane of web lower part according to anchoring pedestal force request;Clear up hole
Screw rod is implanted into using anchoring adhesive afterwards;
Identical hole is drilled in the anchor plate two sides corresponding position of anchoring pedestal;Anchor plate is penetrated to the horse for having bonded fastening
Hoof inclined-plane screw rod;Anchoring pedestal, which is bolted, to be fastened on T web horseshoe inclined-plane;
Short hanging rod is weldingly fixed at the top position that deck beam is connect with sunpender;Sunpender upper end pass through deck beam intermediate space with
Fixation is bolted in short hanging rod;Downrod lower end is all made of with through beam both ends is bolted fixation respectively;
The deck beam both ends of every hanger are respectively welded at anchoring pedestal top surface;
Fixed several longitudinal distribution beams are installed between the through beam of adjacent hanger;Longitudinal distribution in neighbouring T web lower part
Fixed several transverse distribution beams are installed between beam;It is laid with pedal respectively at the top of longitudinal distribution beam, transverse distribution beam and deck beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811041894.3A CN109235289A (en) | 2018-09-07 | 2018-09-07 | A kind of continuous T beam bridge is without bracket maintenance and reinforcement operation platform and installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811041894.3A CN109235289A (en) | 2018-09-07 | 2018-09-07 | A kind of continuous T beam bridge is without bracket maintenance and reinforcement operation platform and installation method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109235289A true CN109235289A (en) | 2019-01-18 |
Family
ID=65060048
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811041894.3A Pending CN109235289A (en) | 2018-09-07 | 2018-09-07 | A kind of continuous T beam bridge is without bracket maintenance and reinforcement operation platform and installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109235289A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924319A (en) * | 2019-12-31 | 2020-03-27 | 中铁大桥局武汉桥梁特种技术有限公司 | Isolation protection shed frame and construction method |
CN114382019A (en) * | 2021-12-30 | 2022-04-22 | 浙江正方交通建设有限公司 | Active service T-beam bridge comprehensive reinforcement structure and construction method |
CN114457684A (en) * | 2022-01-24 | 2022-05-10 | 中建五局土木工程有限公司 | Auxiliary bearing formwork supporting structure and construction method for box girder full framing of inclined leg rigid frame bridge |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6817444B1 (en) * | 2002-09-10 | 2004-11-16 | George Shinas | Suspended work platform |
CN202705932U (en) * | 2012-08-29 | 2013-01-30 | 重庆亲禾预制品有限公司 | T-beam reinforced hanger frame structure |
CN105298099A (en) * | 2015-11-17 | 2016-02-03 | 中国建筑第八工程局有限公司 | Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof |
CN108149913A (en) * | 2018-01-29 | 2018-06-12 | 中交二公局第三工程有限公司 | A kind of wet seam builder's staging of Precast T-Beam |
CN209162662U (en) * | 2018-09-07 | 2019-07-26 | 南昌大学 | A kind of continuous T beam bridge is without bracket maintenance and reinforcement operation platform |
-
2018
- 2018-09-07 CN CN201811041894.3A patent/CN109235289A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6817444B1 (en) * | 2002-09-10 | 2004-11-16 | George Shinas | Suspended work platform |
CN202705932U (en) * | 2012-08-29 | 2013-01-30 | 重庆亲禾预制品有限公司 | T-beam reinforced hanger frame structure |
CN105298099A (en) * | 2015-11-17 | 2016-02-03 | 中国建筑第八工程局有限公司 | Modular suspension type steel tube fastener scaffold operating platform and erecting method thereof |
CN108149913A (en) * | 2018-01-29 | 2018-06-12 | 中交二公局第三工程有限公司 | A kind of wet seam builder's staging of Precast T-Beam |
CN209162662U (en) * | 2018-09-07 | 2019-07-26 | 南昌大学 | A kind of continuous T beam bridge is without bracket maintenance and reinforcement operation platform |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110924319A (en) * | 2019-12-31 | 2020-03-27 | 中铁大桥局武汉桥梁特种技术有限公司 | Isolation protection shed frame and construction method |
CN114382019A (en) * | 2021-12-30 | 2022-04-22 | 浙江正方交通建设有限公司 | Active service T-beam bridge comprehensive reinforcement structure and construction method |
CN114457684A (en) * | 2022-01-24 | 2022-05-10 | 中建五局土木工程有限公司 | Auxiliary bearing formwork supporting structure and construction method for box girder full framing of inclined leg rigid frame bridge |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109235289A (en) | A kind of continuous T beam bridge is without bracket maintenance and reinforcement operation platform and installation method | |
CN103243651B (en) | Method for fixedly installing and leveling base of metal upright column of bridge guardrail | |
CN201762663U (en) | Reinforced concrete superposed beam wing board support | |
CN105178163A (en) | Novel continuous beam type rail | |
CN104005338A (en) | Three-directional temporary tower and girder consolidation structure of large-span cable-stayed bridge | |
CN107905083A (en) | A kind of the inversion type clod wash U-shaped steel combination beam bridge and construction method of lacing connection | |
CN103243818A (en) | Connection joint of concrete column and steel beam | |
CN105178194B (en) | Continuous beam type rail construction method | |
CN113235438A (en) | Pouring construction tool and construction method for steel-concrete composite beam bridge deck | |
CN210134353U (en) | Bracket type hoop bracket for bent cap construction | |
CN209162662U (en) | A kind of continuous T beam bridge is without bracket maintenance and reinforcement operation platform | |
CN202914107U (en) | Roadway support truss | |
CN209194353U (en) | It is a kind of to ride integral type bracket suitable for the construction of Bridge High-pier 0# block | |
CN104328747A (en) | Reinforcement method for single beam bearing of bridge and construction method thereof | |
CN112976297A (en) | Remanufacturing method of T-beam prefabricated pedestal | |
CN102953344B (en) | Climbing cone type triangular cantilever bracket | |
CN105113781A (en) | Cantilever frame beam side all-embedded mounting and erecting device | |
CN205349372U (en) | For a short time, construct to fold friendship tunnel controllable gate shaped steel frame apart from shield only | |
CN104746434A (en) | Closure segment formwork system without dismantling outer formwork | |
CN205839606U (en) | The ruggedized construction of Long span Hollow Slab Beam Bridge | |
CN103938877B (en) | The installation method of crab-bolt stock | |
CN209079700U (en) | One kind is firmly across mounting structure | |
CN207749400U (en) | A kind of inversion type clod wash U-shaped steel combination beam bridge of lacing connection | |
CN208857960U (en) | A kind of Large-Span Continuous domes and its top plate supporting system | |
CN208533380U (en) | A kind of template and support system of the cast-in-place pier top beam of pin-connected panel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |