CN109235252A - A kind of preparation process of bridge expanssion joint Water stop structure and waterstop - Google Patents

A kind of preparation process of bridge expanssion joint Water stop structure and waterstop Download PDF

Info

Publication number
CN109235252A
CN109235252A CN201810865667.6A CN201810865667A CN109235252A CN 109235252 A CN109235252 A CN 109235252A CN 201810865667 A CN201810865667 A CN 201810865667A CN 109235252 A CN109235252 A CN 109235252A
Authority
CN
China
Prior art keywords
fastening band
fashioned iron
rubber fastening
bridge expanssion
expanssion joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810865667.6A
Other languages
Chinese (zh)
Inventor
张丰庆
陈永梅
王士平
荆蒙蒙
许玮
张聪
李猛
孙雨思
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Yuangen Chemical Technology Research And Development Co Ltd
Original Assignee
Shandong Yuangen Chemical Technology Research And Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Yuangen Chemical Technology Research And Development Co Ltd filed Critical Shandong Yuangen Chemical Technology Research And Development Co Ltd
Priority to CN201810865667.6A priority Critical patent/CN109235252A/en
Publication of CN109235252A publication Critical patent/CN109235252A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/06Arrangement, construction or bridging of expansion joints
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08KUse of inorganic or non-macromolecular organic substances as compounding ingredients
    • C08K3/00Use of inorganic substances as compounding ingredients
    • C08K3/02Elements
    • C08K3/04Carbon
    • CCHEMISTRY; METALLURGY
    • C08ORGANIC MACROMOLECULAR COMPOUNDS; THEIR PREPARATION OR CHEMICAL WORKING-UP; COMPOSITIONS BASED THEREON
    • C08KUse of inorganic or non-macromolecular organic substances as compounding ingredients
    • C08K3/00Use of inorganic substances as compounding ingredients
    • C08K3/34Silicon-containing compounds
    • C08K3/36Silica
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/08Damp-proof or other insulating layers; Drainage arrangements or devices ; Bridge deck surfacings
    • E01D19/083Waterproofing of bridge decks; Other insulations for bridges, e.g. thermal ; Bridge deck surfacings

Landscapes

  • Chemical & Material Sciences (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Medicinal Chemistry (AREA)
  • Polymers & Plastics (AREA)
  • Organic Chemistry (AREA)
  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses the preparation processes of a kind of bridge expanssion joint Water stop structure and waterstop, including being symmetricly set on two fashioned iron of expansion joint two sides and connecting the rubber fastening band of two fashioned iron, the fashioned iron is E font, the rubber fastening band is W-shaped, the bottom of symmetrically arranged two spliced eyes is equipped with equipped with the groove to match with the protrusion on rubber water-proof band, the spliced eye inside top and positioned at fashioned iron the chamfering protrusion being meshed with the chamfering slot of rubber fastening band left and right ends on two fashioned iron;The preparation process of waterstop includes the following steps: the selection of S1, raw material;The preparation of S2, rubber fastening band.Waterstop of the present invention plays the normal waterproof action in the case of the bridge expanssion joint mutation changing of the relative positions, and product material reaches design requirement performance indicator, has good anti-aging property and corrosion resistance, while meeting the requirement of the long-time service of bridge expanssion joint environment.

Description

A kind of preparation process of bridge expanssion joint Water stop structure and waterstop
Technical field
The invention belongs to bridge technology fields, and in particular to the system of a kind of bridge expanssion joint Water stop structure and waterstop Standby technique.
Background technique
It is well known that bridge panel can due to temperature change etc. expansion or shrinkage, the predetermined beam length of every two Each adjacent floorings between an expansion joint is set, the dilatation of bridge in the longitudinal direction is mainly by bridge expanssion joint It undertakes.
Currently, bridge expansion joint installation has multiple types, two types most commonly are symmetrical arranged in expansion joint two sides Then the rubber fastening band of U-shaped or V-arrangement is arranged, between two fashioned iron again to prevent rainwater from flowing into bridge between fashioned iron gap in steel Beam substructure.Currently, fashioned iron section used in bridge expansion joint installation is mostly " F " shape, " C " shape or " E " shape.But When environment temperature changes, telescopic moving can occur for pontic, and the gap between the fashioned iron of expansion joint also can broaden or narrow, above-mentioned Can usually sundries be fallen into gap between structural steel shape and influences the normal flexible of fashioned iron, it is serious that expansion joint deformation can be made broken It is bad, so structurally waterproof is the critical issue in bridge expanssion joint work progress, so rubber fastening band, which becomes, prevents sundries mud Slurry enters the key of the normal waterproof in the case of expansion joint and the bridge expanssion joint mutation changing of the relative positions.
For this purpose, it is proposed that the preparation process of a kind of bridge expanssion joint Water stop structure and waterstop solves above-mentioned ask Topic.
Summary of the invention
The purpose of the present invention is to provide the preparation processes of a kind of bridge expanssion joint Water stop structure and waterstop, with solution Certainly the problems mentioned above in the background art.
To achieve the above object, the invention provides the following technical scheme: a kind of bridge expanssion joint Water stop structure, including It is symmetricly set on two fashioned iron of expansion joint two sides and connects the rubber fastening band of two fashioned iron, the fashioned iron is E font, institute State rubber fastening band be it is W-shaped, on two fashioned iron the bottom of symmetrically arranged two spliced eyes be equipped with on rubber water-proof band The groove that matches of protrusion, the spliced eye inside top and be located at fashioned iron and be equipped with to fall with rubber fastening band left and right ends The chamfering protrusion that chamfered groove is meshed.
Preferably, the protrusion is located at the left and right sides bottom of rubber fastening band, and raised level is spaced substantially equidistant and is equipped with Two.
Preferably, the protrusion is made of hydro-expansive rubber.
A kind of preparation process of bridge expanssion joint waterstop, includes the following steps:
The selection of S1, raw material: including being formed by the raw material of following parts by weight: 5,601 100 parts of EPDM, tasteless DCP 10 Part, 40 parts of N550,20 parts of white carbon black, 60 parts of plasticizer, R-503 parts, 0.8 part of S;
The preparation of S2, rubber fastening band: EPDM 5601 is kneaded on a mill and packet roller, and temperature is controlled in 45-55 DEG C, carbon black, plasticizer, N550 and R-50 is added, vulcanizing agent tasteless DCP and S, thin logical 3- are sequentially added after being cooled to 20 DEG C It 5 times, is uniformly mixed, bottom sheet, molding is rubber fastening band finished product.
Preferably, in the step S2 curing temperature of open mill be 170 DEG C, vulcanization time 15min, pressure 9- 11MPa。
Preferably, in the step S2 open mill model XK-160.
Technical effect and advantage of the invention: the preparation process of the bridge expanssion joint Water stop structure and waterstop, no Enter inside expansion joint simply against mud, and waterstop play it is normal anti-in the case of the bridge expanssion joint mutation changing of the relative positions Water effect, product material reach design requirement performance indicator, have good anti-aging property and corrosion resistance, while meeting bridge The requirement of the long-time service of beam expansion joint environment, rubber strip waterstop are answered using generating enough contacts on waterproof working face Power achievees the purpose that waterproof, and detachable, maintenance or replacement in validity period, ensure that product structure meets engineering and uses need It asks, preparation process is simple.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the structural schematic diagram of fashioned iron of the present invention;
Fig. 3 is the structural schematic diagram of rubber fastening band of the present invention.
In figure: 1 fashioned iron, 2 rubber fastening bands, 3 spliced eyes, 4 protrusions, 5 grooves, 6 chamfering slots, 7 chamferings protrusion.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
The present invention provides a kind of bridge expanssion joint Water stop structures as shown in Figs. 1-3, including are symmetricly set on and stretch Two fashioned iron 1 of contracting seam two sides and the rubber fastening band 2 for connecting two fashioned iron 1, the fashioned iron 1 is E font, and the rubber stops Water band 2 be it is W-shaped, on two fashioned iron 1 bottom of symmetrically arranged two spliced eyes 3 be equipped with it is convex on rubber fastening band 2 Rise 4 grooves 5 to match, 3 inside top of spliced eye and be located at fashioned iron 1 be equipped with and 2 left and right ends of rubber fastening band The chamfering protrusion 7 that chamfering slot 6 is meshed.
Specifically, described raised 4 are located at the left and right sides bottom of rubber fastening band 2, and raised 4 levels are spaced substantially equidistant and set There are two.
Specifically, described raised 4 are made of hydro-expansive rubber, the reliability of waterproof is reinforced.
A kind of preparation process of bridge expanssion joint waterstop, includes the following steps:
The selection of S1, raw material: including being formed by the raw material of following parts by weight: 5,601 100 parts of EPDM, tasteless DCP 10 Part, 40 parts of N550,20 parts of white carbon black, 60 parts of plasticizer, R-503 parts, 0.8 part of S;
The preparation of S2, rubber fastening band: EPDM 5601 is kneaded on a mill and packet roller, and temperature is controlled in 45-55 DEG C, carbon black, plasticizer, N550 and R-50 is added, vulcanizing agent tasteless DCP and S, thin logical 3- are sequentially added after being cooled to 20 DEG C It 5 times, is uniformly mixed, bottom sheet, molding is rubber fastening band finished product.
Specifically, in the step S2 curing temperature of open mill be 170 DEG C, vulcanization time 15min, pressure 9- 11MPa。
Specifically, in the step S2 open mill model XK-160.
The preparation process of the bridge expanssion joint Water stop structure and waterstop, not only prevents mud from entering in expansion joint Portion, and waterstop plays the normal waterproof action in the case of the bridge expanssion joint mutation changing of the relative positions, and product material reaches design It is required that performance indicator, has good anti-aging property and corrosion resistance, while meeting the long-time service of bridge expanssion joint environment Requirement, rubber strip waterstop achievees the purpose that waterproof using generating enough contact stress on waterproof working face, and Detachable in validity period, maintenance or replacement, ensure that product structure meets engineering use demand, preparation process is simple.
Finally, it should be noted that the foregoing is only a preferred embodiment of the present invention, it is not intended to restrict the invention, Although the present invention is described in detail referring to the foregoing embodiments, for those skilled in the art, still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features, All within the spirits and principles of the present invention, any modification, equivalent replacement, improvement and so on should be included in of the invention Within protection scope.

Claims (6)

1. a kind of bridge expanssion joint Water stop structure, including being symmetricly set on two fashioned iron (1) of expansion joint two sides and connecting Connect the rubber fastening band (2) of two fashioned iron (1), it is characterised in that: the fashioned iron (1) is E font, the rubber fastening band (2) To be W-shaped, the bottoms of two upper symmetrically arranged two spliced eyes (3) of fashioned iron (1) be equipped with it is convex on rubber fastening band (2) It plays (4) groove (5) for matching, spliced eye (3) inside top and is located at fashioned iron (1) and is equipped with and rubber fastening band (2) The chamfering that the chamfering slot (6) of left and right ends is meshed is raised (7).
2. the flexible Water stop structure of a kind of bridge according to claim 1, it is characterised in that: the protrusion (4) is located at The left and right sides bottom of rubber fastening band (2), and there are two raised (4) level is spaced substantially equidistant and sets.
3. a kind of bridge expanssion joint Water stop structure according to claim 1, it is characterised in that: it is described protrusion (4) by Hydro-expansive rubber is made.
4. a kind of preparation process of bridge expanssion joint waterstop described in claim 1, which is characterized in that including walking as follows It is rapid:
The selection of S1, raw material: including by following parts by weight raw material form: 5,601 100 parts of EPDM, 10 parts of tasteless DCP, 40 parts of N550,20 parts of white carbon black, 60 parts of plasticizer, 3 parts of R-50,0.8 part of S;
The preparation of S2, rubber fastening band: EPDM 5601 is kneaded on a mill and packet roller, and temperature is controlled at 45-55 DEG C, is added Enter carbon black, plasticizer, N550 and R-50, vulcanizing agent tasteless DCP and S is sequentially added after being cooled to 20 DEG C, it is thin 3-5 times logical, It is uniformly mixed, bottom sheet, molding is rubber fastening band finished product.
5. a kind of preparation process of bridge expanssion joint waterstop according to claim 4, it is characterised in that: the step In S2 the curing temperature of open mill be 170 DEG C, vulcanization time 15min, pressure 9-11MPa.
6. a kind of preparation process of bridge expanssion joint waterstop according to claim 4, it is characterised in that: the step The model XK-160 of open mill in S2.
CN201810865667.6A 2018-08-01 2018-08-01 A kind of preparation process of bridge expanssion joint Water stop structure and waterstop Pending CN109235252A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810865667.6A CN109235252A (en) 2018-08-01 2018-08-01 A kind of preparation process of bridge expanssion joint Water stop structure and waterstop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810865667.6A CN109235252A (en) 2018-08-01 2018-08-01 A kind of preparation process of bridge expanssion joint Water stop structure and waterstop

Publications (1)

Publication Number Publication Date
CN109235252A true CN109235252A (en) 2019-01-18

Family

ID=65072641

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810865667.6A Pending CN109235252A (en) 2018-08-01 2018-08-01 A kind of preparation process of bridge expanssion joint Water stop structure and waterstop

Country Status (1)

Country Link
CN (1) CN109235252A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681123A (en) * 2020-12-18 2021-04-20 江苏领跑梦毛勒智造科技集团有限公司 Environment-friendly telescopic device and mounting method thereof
CN115637006A (en) * 2022-10-25 2023-01-24 联科华技术有限公司 Industrial rubber product prepared from monatomic zinc material with ultralow zinc content

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH666302A5 (en) * 1984-10-15 1988-07-15 Honel Holdings Ag Expansion joint cover for roads - has hook-shaped clamping strips for rubber seal, secured to head flange by bolts
CN203603049U (en) * 2013-12-13 2014-05-21 姚昆 Concealed highway bridge expansion device
CN205636482U (en) * 2016-08-26 2016-10-12 常海明 Bridge rubber expansion joint device
CN206655117U (en) * 2017-04-14 2017-11-21 杨文来 Railroad bridge Fast Installation expansion joint
CN107880406A (en) * 2017-11-02 2018-04-06 衡水滨河工程橡塑有限公司 Modified ethylene propylene diene monomer, waterstop and preparation method thereof, application and manufactory
CN108314849A (en) * 2017-01-13 2018-07-24 杭州星庐科技有限公司 Rubber composition and processing method, and apply its adhesive tape, rubber roller and production method

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH666302A5 (en) * 1984-10-15 1988-07-15 Honel Holdings Ag Expansion joint cover for roads - has hook-shaped clamping strips for rubber seal, secured to head flange by bolts
CN203603049U (en) * 2013-12-13 2014-05-21 姚昆 Concealed highway bridge expansion device
CN205636482U (en) * 2016-08-26 2016-10-12 常海明 Bridge rubber expansion joint device
CN108314849A (en) * 2017-01-13 2018-07-24 杭州星庐科技有限公司 Rubber composition and processing method, and apply its adhesive tape, rubber roller and production method
CN206655117U (en) * 2017-04-14 2017-11-21 杨文来 Railroad bridge Fast Installation expansion joint
CN107880406A (en) * 2017-11-02 2018-04-06 衡水滨河工程橡塑有限公司 Modified ethylene propylene diene monomer, waterstop and preparation method thereof, application and manufactory

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张能武等: "《材料员岗位技能必读》", 30 April 2015, 湖南科学技术出版社 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112681123A (en) * 2020-12-18 2021-04-20 江苏领跑梦毛勒智造科技集团有限公司 Environment-friendly telescopic device and mounting method thereof
CN115637006A (en) * 2022-10-25 2023-01-24 联科华技术有限公司 Industrial rubber product prepared from monatomic zinc material with ultralow zinc content

Similar Documents

Publication Publication Date Title
CN109235252A (en) A kind of preparation process of bridge expanssion joint Water stop structure and waterstop
CN101881059B (en) Folding fan-shaped hyperboloidal unit-type building curtain wall system and a construction method thereof
CN207974258U (en) Waterproofing of movement joints constructs
CN216041832U (en) Expansion joint structure is built in civil engineering room
CN103450568B (en) A kind of REPDM/RIIR elastomerics and preparation method thereof
CN208965825U (en) Novel T-shaped curtain wall construction system
CN103526776A (en) Rubber waterstop rigidity layering method and rubber waterstop for immersed tunnel
KR101381593B1 (en) A circle elastic bearing
CN210597006U (en) Expansion joint dust keeper for bridge maintenance
CN207933885U (en) A kind of novel super-high performance concrete joint construction for expansion joint beam-ends
CN109535502A (en) A kind of high strength solid tire and preparation method thereof
CN110423409A (en) A kind of preparation method of dilatancy composite rubber water stop
CN102561270B (en) Production process of seamless rubber dam bag
CN210684614U (en) Novel water stop cover plate structure
CN206495240U (en) A kind of city integrated piping lane sealing strip of service life length
CN204849576U (en) A bridge expansion joint device for bridge
CN205741896U (en) A kind of bridge comb expansion joint
CN220665843U (en) Waterproof expansion water stop
CN220414694U (en) Integrated waterproof coating for tile roof
CN114293669B (en) Steel structure deformation joint construction structure and method
CN214613571U (en) Expansion joint structure
CN217601352U (en) Inclined plane circular arc strip longitudinal integral adjustable rubber waterstop
CN214459600U (en) Civil engineering is expansion joint waterproof construction for safety construction
CN217783529U (en) Asymmetric waterproof structure of shield tunnel seam
CN221001459U (en) Water seepage prevention structure of overhead pool bottom plate initiation joint

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190118