CN109211370A - A kind of multipurpose pVTt method gas flow standard detection system - Google Patents

A kind of multipurpose pVTt method gas flow standard detection system Download PDF

Info

Publication number
CN109211370A
CN109211370A CN201811142964.4A CN201811142964A CN109211370A CN 109211370 A CN109211370 A CN 109211370A CN 201811142964 A CN201811142964 A CN 201811142964A CN 109211370 A CN109211370 A CN 109211370A
Authority
CN
China
Prior art keywords
standard
valve
flow
volumetric standard
control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811142964.4A
Other languages
Chinese (zh)
Inventor
孙彩虹
石建荣
肖晖
周轶
赵作广
董芳
徐焰栋
李志�
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHENJIANG METROLOGICAL VERIFICATION TESTING CENTER
Original Assignee
ZHENJIANG METROLOGICAL VERIFICATION TESTING CENTER
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHENJIANG METROLOGICAL VERIFICATION TESTING CENTER filed Critical ZHENJIANG METROLOGICAL VERIFICATION TESTING CENTER
Priority to CN201811142964.4A priority Critical patent/CN109211370A/en
Publication of CN109211370A publication Critical patent/CN109211370A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F25/00Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume
    • G01F25/10Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume of flowmeters
    • G01F25/15Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume of flowmeters specially adapted for gas meters
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01FMEASURING VOLUME, VOLUME FLOW, MASS FLOW OR LIQUID LEVEL; METERING BY VOLUME
    • G01F25/00Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume
    • G01F25/10Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume of flowmeters
    • G01F25/17Testing or calibration of apparatus for measuring volume, volume flow or liquid level or for metering by volume of flowmeters using calibrated reservoirs

Abstract

The invention discloses a kind of multipurpose pVTt method gas flow standard detection systems, including volumetric standard group comprising the volumetric standard of various criterion volume, the volumetric standard group divide into 0.1m3、3m3And 34m3The volumetric standard of normal volume specification, overall skid-mounted structure setting is all made of on verification table position, and configure the constant guarantee component pipeline system of temperature, for connecting each pipeline composition of the flow path between the volumetric standard group, the tong-test ammeter system and the air supply system, the volumetric standard group and the tong-test ammeter system of various criterion volume share a set of air supply system.Beneficial effects of the present invention: it is big with detection range, accuracy is high, have two kinds of detecting states of positive pressure and negative pressure, improve efficiency, and can be to velocity of sound mouth and the high-grade standard scale amount of progress biography.

Description

A kind of multipurpose pVTt method gas flow standard detection system
Technical field
Flow standard technical field of the present invention more particularly to a kind of inspection of multipurpose pVTt method gas flow standard Examining system.
Background technique
For the detection work for effectively carrying out Gas Energy Source instrument, the construction of China's gas flow standard device enters height Fast period of expansion, but due to the otherness of manufacturing enterprise's technical level, cause standard set-up quality very different, while standard Inspection problem also become increasingly conspicuous.In conjunction with China's gas flow instrument magnitude tracing status and it can satisfy multiple industries pair Gas flow standard device effectively quickly carry out tracing to the source demand situation under, develop that range of flow is wide, accuracy is high, have just Pressure and two kinds of detection operating conditions of negative pressure, and can be to the pVTt method gas flow mark of sonic nozzle and the high-grade standard scale amount of progress biography Standard apparatus is necessary.
China possesses the unit of multipurpose pVTt method gas flow standard detection system its device in normal pressure and micro- at present Direct draught work, calibrating maximum flow only reach 1300m3/ h, has been unable to meet actual demand.And 0.2 grade of High-precision standard gas Flowmeter body is widely used in during gas standard sets, but lacks science legal standard set-up offer is effectively traced to the source.
Summary of the invention
The purpose of this section is to summarize some aspects of the embodiment of the present invention and briefly introduce some preferable implementations Example.It may do a little simplified or be omitted to avoid this is made in this section and the description of the application and the title of the invention Partially, the purpose of abstract of description and denomination of invention is fuzzy, and this simplification or omission cannot be used for limiting model of the invention It encloses.
In view of above-mentioned existing problem, the present invention is proposed.
Therefore, it is an object of the present invention to provide a kind of multipurpose pVTt method gas flow standard detection system, accuracy is better than 0.1% positive pressure multipurpose pVTt method gas flow standard detection system, and can be achieved at the same time calibration sound under positive pressure and normal pressure Fast nozzle, and 0.2 grade of calibrating gas flowmeter can be demarcated.
In order to solve the above technical problems, the invention provides the following technical scheme: a kind of multipurpose pVTt method gas flow mark Quasi- detection system, including volumetric standard group comprising the volumetric standard of various criterion volume, the volumetric standard group are divided into 0.1m3、3m3And 34m3The volumetric standard of normal volume specification is all made of overall skid-mounted structure setting on verification table position, and Configure the constant guarantee component of temperature;Tong-test ammeter system is set on mobile microscope carrier and connects with each volumetric standard group It connects, each tong-test ammeter system can carry out detection work independently or simultaneously;Air supply system, be the volumetric standard group and The tong-test ammeter system provides individual gas sources, further includes positive pressure gas source and negative pressure gas source, the work for being respectively used to positive pressure and vacuumizing Industry;Pipe-line system, it is each for connecting the flow path between the volumetric standard group, the tong-test ammeter system and the air supply system Pipeline composition, wherein the positive pressure gas source and the negative pressure gas source share a set of pipe-line system;And various criterion volume The volumetric standard group and the tong-test ammeter system share a set of air supply system;And control system, the control system It further include power control cabinet ontology and electrical component, generally frame structure including power control cabinet, the electrical component is set to Running on the power control cabinet ontology, for control system.
A kind of preferred embodiment as multipurpose pVTt method gas flow standard detection system of the present invention, in which: The verification table position is for placing 34m3Volumetric standard group platform position, corresponding carrying installation 34m3The volumetric standard group, and 34m3The constant guarantee component of temperature of volumetric standard group configuration is set in constant temperature using water-jacket.
A kind of preferred embodiment as multipurpose pVTt method gas flow standard detection system of the present invention, in which: The tong-test ammeter system further includes tested nozzle and standard scale, using the installation side of pipeline connection between the two and the pipe-line system Formula, each pipeline are respectively provided with measuring instrumentss;According to the principle of mass conservation, pass through the mass flow of standard scale and showing for checklist Value compares, and completes the detection of checklist.
A kind of preferred embodiment as multipurpose pVTt method gas flow standard detection system of the present invention, in which: The pipe-line system includes main line and manifold trunk branch;The main line is used for the tong-test ammeter system, volumetric standard group, gas The triangular connection of source system;The manifold trunk branch is several branch lines on the main line, by the air supply system Air pressure flow path branch.
A kind of preferred embodiment as multipurpose pVTt method gas flow standard detection system of the present invention, in which: When the negative pressure gas source is the gas source of the volumetric standard group, device detection of negative pressure state comprising water ring vacuum pump and blade Vacuum pump;When the positive pressure gas source is the gas source of the volumetric standard group, device is positive pressure detecting state, and the positive pressure gas Source includes the high pressure tank of air compressor, cooler, drying machine and different pressures.
A kind of preferred embodiment as multipurpose pVTt method gas flow standard detection system of the present invention, in which: It further include flow control system and control system;The flow control system is opposite by pipeline with the volumetric standard group It should connect, and the flow control system includes the continuously adjustable critical flow generating apparatus of flow, using continuous control critical flow The technology of nozzle flow;The control system uses two-stage separate test and control system, and the progress for capableing of complete paired systems is controlled automatically System, data acquisition, data processing, report management and record printing.
A kind of preferred embodiment as multipurpose pVTt method gas flow standard detection system of the present invention, in which: The flow control system further includes valve control assembly, under automatic Verification state, can be selected by the control system The corresponding valve of switch is selected, and in place by the switch of limit switch guarantee valve, and valve control mode is pneumatic, electricity It moves or surges.
A kind of preferred embodiment as multipurpose pVTt method gas flow standard detection system of the present invention, in which: The control system includes host computer, slave computer, data acquisition and actuator;The host computer can be in human-computer interaction interface Under set temperature value, flow value, control device run and stop, and the host computer is realized by Ethernet protocol and is described The reception, transmission of data between the machine of position, can generate the probation redport to tested flowmeter according to institute's measured data;The bottom Machine includes programmable controller PLC, A/D module and D/A module, and the A/D module is by temperature sensor, humidity sensor, pressure The analog signal that sensor, flowmeter export is converted into digital data transmission to programmable controller PLC, realizes adopting for data Collection;Digital signal is converted analog control signal output by the D/A module, realizes the control to the actuator.
A kind of preferred embodiment as multipurpose pVTt method gas flow standard detection system of the present invention, in which: The data acquisition includes temperature sensor, humidity sensor, pressure sensor, proving flowmeter and tested flowmeter, above-mentioned Output signal is analog signal;And the temperature sensor use Pt100A grade platinum resistance, 0~50 DEG C, MPEV≤0.1 DEG C, Scale division value is not more than 0.01 DEG C;The pressure sensor uses 0.025 stage pressure transmitter;The humidity sensor uses number Aobvious thermometer, measurement range: 10%~99% RH, allowable error ± 2%RH.
A kind of preferred embodiment as multipurpose pVTt method gas flow standard detection system of the present invention, in which: The actuator is corresponding with the valve control assembly, further include pneumatic control valve door, frequency converter, power controller and Thermo hydrograph regulator;The signal that the frequency converter is exported by receiving PLC, controls the revolving speed of blower, the pneumatic control valve Door adjusts aperture by receiving current analog signal, and the two collective effect realizes control to flow, the power controller with The thermo hydrograph regulator controls the gas temperature and environment temperature of outflow heat exchanger by receiving standard analog signal respectively Degree controls indoor temperature.
Beneficial effects of the present invention: the range of nozzle can be examined by expanding, big with detection range, accuracy is high, with positive pressure It with two kinds of detecting states of negative pressure, improves efficiency, and can both examine and determine (school to velocity of sound mouth and the high-grade standard scale amount of progress biography It is quasi-) critical flow venturi nozzle standard, it can also examine and determine (calibration) high-precision gas flowmeter (such as gas roots flowmeter, section Li Aoli mass flowmenter, gas turbine meter etc.).
Detailed description of the invention
In order to illustrate the technical solution of the embodiments of the present invention more clearly, making required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, right For those of ordinary skill in the art, without any creative labor, it can also be obtained according to these attached drawings Other attached drawings.Wherein:
Fig. 1 is 34m shown in the first embodiment of the invention3The theory structure schematic diagram of volumetric standard;
Fig. 2 is 34m shown in the first embodiment of the invention3The air supply system theory structure schematic diagram of volumetric standard;
Fig. 3 is 34m shown in the first embodiment of the invention3The whole principle knot applied to air supply system of volumetric standard Structure schematic diagram;
Fig. 4 is the enlarged diagram of A module in Fig. 3;
Fig. 5 is the enlarged diagram of B module in Fig. 3;
Fig. 6 is the enlarged diagram of C module in Fig. 3;
Fig. 7 is the enlarged diagram of D-module in Fig. 3;
Fig. 8 is 34m shown in second of embodiment of the invention3、3m3And 0.1m3It constitutes volumetric standard group and is applied to gas source system The whole theory structure schematic diagram of system;
Fig. 9 is the enlarged diagram of E module in Fig. 8;
Figure 10 is the enlarged diagram of F module in Fig. 8;
Figure 11 is control system architecture schematic diagram in second of embodiment of the invention;
Figure 12 is the flowage structure schematic diagram that control system is realized in second of embodiment of the invention;
Figure 13 is the overall structure diagram of adjustable opening pneumatic operated valve described in the third embodiment of the invention;
Figure 14 is the overall structure diagram of the 4th kind of safty shield of the invention;
Figure 15 is the 4th kind of safty shield perspective view overall structure diagram of the invention;
Figure 16 is the visual angle overall structure diagram of the 4th kind of safty shield isometric bottom side of the invention;
Figure 17 is the 4th kind of safty shield schematic cross-sectional view of the invention;
Figure 18 is the overall structure diagram of power control cabinet described in the 5th kind of embodiment of the invention;
Figure 19 is the structural schematic diagram of wire-arranging mechanism described in the 5th kind of embodiment of the invention;
Figure 20 is the structural schematic diagram of element mounting assembly described in the 5th kind of embodiment of the invention;
Figure 21 is the overall structure diagram of breaker described in the 5th kind of embodiment of the invention;
Figure 22 is the overall structure diagram under another visual angle of breaker described in the 5th kind of embodiment of the invention.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, right with reference to the accompanying drawings of the specification A specific embodiment of the invention is described in detail, it is clear that and described embodiment is a part of the embodiments of the present invention, and It is not all of embodiment.Based on the embodiments of the present invention, ordinary people in the field is without making creative work Every other embodiment obtained, all should belong to the range of protection of the invention.
In the following description, numerous specific details are set forth in order to facilitate a full understanding of the present invention, but the present invention may be used also To be implemented using other than the one described here other way, those skilled in the art can be without prejudice in the present invention Similar popularization is done in the case where culvert, therefore the present invention is not limited by the specific embodiments disclosed below.
Secondly, " one embodiment " or " embodiment " referred to herein, which refers to, may be included at least one realization of the present invention A particular feature, structure, or characteristic in mode." in one embodiment " that different places occur in the present specification is not equal Refer to the same embodiment, nor the individual or selective embodiment mutually exclusive with other embodiments.
Thirdly, combination schematic diagram of the present invention is described in detail, when describing the embodiments of the present invention, for purposes of illustration only, Indicate that the sectional view of device architecture can disobey general proportion and make partial enlargement, and the schematic diagram is example, herein not The scope of protection of the invention should be limited.In addition, the three-dimensional space of length, width and depth should be included in actual fabrication.
Simultaneously in the description of the present invention, it should be noted that the orientation of the instructions such as " upper and lower, inner and outer " in term Or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description of the present invention and simplification of the description, and It is not that the device of indication or suggestion meaning or element must have a particular orientation, be constructed and operated in a specific orientation, therefore It is not considered as limiting the invention.In addition, term " first, second or third " is used for description purposes only, and cannot understand For indication or suggestion relative importance.
In the present invention unless otherwise clearly defined and limited, term " installation is connected, connection " shall be understood in a broad sense, example Such as: may be a fixed connection, be detachably connected or integral type connection;It equally can be mechanical connection, electrical connection or directly connect It connects, can also indirectly connected through an intermediary, the connection being also possible to inside two elements.For the common skill of this field For art personnel, the concrete meaning of above-mentioned term in the present invention can be understood with concrete condition.
Embodiment 1
A kind of multipurpose pVTt method gas flow standard detection system provided in the present embodiment, can be in positive pressure, negative pressure It is used under two kinds of operating conditions, shares a set of pipeline, data acquisition, transmission, processing and control systems, can carry out independently or simultaneously Detect work, and can to high-precision gas flowmeter (such as 0.2 grade of gas roots flowmeter, coriolis mass flowmeters, Gas turbine meter etc.) calibrating (calibration).The device includes volumetric standard group 100, tong-test ammeter system 200, flow adjusting system System, air supply system 300, control system and pipe-line system 400.Specifically, above-mentioned each component is carried out by pipe-line system 400 Open loop or closed loop connection, form pipe path, and wherein volumetric standard group 100 uses existing overall skid-mounted structure, sledge dress Formula structure, which refers to, is integrated in functional unit on one unsplit bedplate, can be with a kind of integration mode of integral installation, movement;Institute Meaning skid is just to be convenient to carry out by the movement of equipment, in place using crowbar, including corresponding with volumetric standard group 100 install Verification table position and volumetric standard group 100 configure constant the guarantees component 101 of temperature, using the water of the prior art in the present embodiment Jacketed constant-temp setting, the temperature for 100 surrounding of volumetric standard group control.
As shown in Figures 1 to 3,34m involved in the present embodiment3Illustrate the gas flow mark for volumetric standard pVTt-101 The principle and process of standard apparatus.Specifically, the device further includes being set to 34m in the present embodiment3On volumetric standard pVTt-101 The tong-test ammeter system 200 of trip, by pipe-line system 400 respectively with 34m3Volumetric standard pVTt-101, tong-test ammeter system 200 connect Air supply system 400, and the control system integrally controlled for device.Further, in referring to Fig.1,34m3Volumetric standard PVTt-101 on verification table position, and is configured with the constant guarantee component 101 of temperature, the temperature using overall skid-mounted structure setting Constant guarantee component 101 uses existing water-jacket thermostat, including is set to above volumetric standard pVTt-101 Water recycle hopper, collet is in 34m3The water circulation stream and frequency converter SV- of volumetric standard pVTt-101 wall surface 101, and for the pump PU-101 in Water circulation hydrodynamics source.Tong-test ammeter system 200 is set on mobile pallet, the movable type frame Platform be it is existing present in packaged type microscope carrier, in the present embodiment tong-test ammeter system 200 include checklist, telescoping tube TPS1, with And adjustable flow nozzle FCN-101.Pipe-line system 400 includes main line 401 and manifold trunk branch 402, and main line 401 is used for Tong-test ammeter system 200, volumetric standard group 100, the triangular connection of air supply system 300;Manifold trunk branch 402 is on main line 401 Several branch lines, by the air pressure flow path branch of air supply system 300, for the pipeline pressure of each branch path, in order to more preferable Go understand the present invention,
To be illustrated as in main line 401 with the part of gas source piping connection in figure first branch b1, second branch b2 and Third branch a, by the most upstream of first branch b1 be disposed with muffler, starting pneumatic operated valve AV-101, telescoping tube TPS1, Nozzle, triple valve 3WV-101,34m3Volumetric standard pVTt-101, adjustable opening valve LDV-101 and pipe end pneumatic operated valve LCV- 101, and corresponding measuring device is set in the present embodiment, including the temperature sensor being arranged between telescoping tube TPS1 and nozzle TT101, pressure sensor PT101 and temperature value display instrument TY101, pressure value display instrument PY101, by above-mentioned sensing The numerical value of corresponding detection is shown after device acquisition measurement data in temperature value, pressure value display instrument.Wherein pressure sensor PT101 is the sensor of existing PTX5072 model;The present embodiment further includes for measuring 34m3Volumetric standard pVTt-101 Temperature sensor TT102, the pressure sensor PT102 of temperature and pressure and be used for temperature controlled water circulation pipe SV101, And the temperature sensor TT102 being located at herein is connect with data-interface EIU102A, data-interface EIU102A can take with serial ports The data of acquisition are shared and are analyzed by business device connection;It further include the temperature sensing for measuring water circulation hopper temperature Device TT601, temperature value display instrument TY601.After the completion of the connection of above-mentioned positional relationship, first branch b1, second branch b2 Connect respectively with negative pressure gas source 302 in air supply system, third branch a be located at starting pneumatic operated valve AV-101, telescoping tube TPS1 it Between, it is connect with positive pressure gas source 301.Working principle in the present embodiment: opening triple valve 3WV-101 and first branch b1 first It closes and opens, closed with 200 end of tong-test ammeter system, by air supply system 300 to 34m3Volumetric standard pVTt-101 carries out level-one and takes out very 34m is worked as in do-nothing operation3It is right using air supply system 300 again after temperature, pressure value display are stablized in volumetric standard pVTt-101 Volumetric standard group 100 is formally vacuumized operation, and after postponing a period of time, system carries out temperature, the pressure data of acquisition It judges whether to test, after temperature is stablized in volumetric standard group 100, carefully be taken out by first branch b2, create sound The critical state of fast nozzle.Each valve is the operated pneumatic valve that positive pressure gas source 301 connects during this, be not excluded for certainly using The possibility of electrically-controlled valve or the valve that surges.
It is air supply system theory structure schematic diagram provided in this embodiment, specifically, the air supply system 300 referring to Fig. 2 Including positive pressure gas source 301 and negative pressure gas source 302, positive pressure gas source 301 can not only as the gas source under positive pressure calibrating state, and It is also provided for pneumatic operated valve involved in the present embodiment and opens or closes power.Positive pressure gas source 301 includes being set to basement first Interior sequentially connected air compressor, cooler, drying machine and hand-operated valve MV501;It is set to basement upper layer and hand-operated valve The sequentially connected 5m of MV5013High pressure air storing duct VT-601,36m3High pressure air storing duct VT-602,26m3High pressure air storing duct VT-603 And heat exchanger, the wet temp instrument HT600 for being set to heat exchanger end, and each high pressure air storing duct all configure temperature, Pressure sensor, it is identical as the detection instrument of above-mentioned standard container setting, in the present embodiment on the pipeline of positive pressure gas source 301 also Manifold trunk HD is set, the manifold trunk HD paid by different pressures section pipeline, pneumatic operated valve is connect by pipeline with manifold trunk HD, Realize the opening and closing of pneumatic operated valve, wherein the pipeline of positive pressure gas source 301 is located at 26m3The upstream end high pressure air storing duct VT-603 is set It sets by having flow control valve CV-101, CV-102, flow is adjusted by the aperture of regulating valve, and adjusted with flow Controller PIC501, PIC502 of valve CV-101, CV-102 and corresponding line temperature, pressure sensor connection, for controlling Temperature and pressure parameter in pipeline.Further, negative pressure gas source 302 includes connecting with above-mentioned first branch b1, second branch b2 Liquid-ring type vacuum pumping pump VP-101, dry-type vacuum pumping pump VP-102, and between pipeline equally using pneumatic operated valve, hand-operated valve carry out It controls, pressure sensor PT504 is also provided on pipeline and carries out loine pressure detection.It vacuumizes operation and is divided into two-stage, use first The progress of liquid-ring type vacuum pumping pump slightly vacuumizes operation, then carries out second level using dry-type vacuum pumping pump and vacuumizes operation.It completes Afterwards, start the preparation tested.
It is 34m in reference Fig. 33Volumetric standard platform position is applied to tong-test ammeter system 200, air supply system 300 and passes through pipeline The whole theory structure schematic diagram that system 400 connects, 34m3One is shared under volumetric standard either positive pressure, negative pressure calibrating state Circuits system 400 and air supply system 300, and the switching power of pneumatic operated valve in pipeline is provided by positive pressure gas source 301, in order to more It clearly indicates and understands convenient for those skilled in the art, be classified as tetra- parts A, B, C, D, and referring to shown in Fig. 4~6 Respectively this tetrameric enlarged diagram.
Embodiment 2
In order to improve the efficiency of detection and adapt to the detection of different size in the present embodiment, in the present embodiment with the In one embodiment the difference is that: further include verification table position specification be respectively specifically 0.1m3Volumetric standard platform position, 3m3Mark Quasi- container platform position and 34m3Volumetric standard platform position;Respectively correspond 0.1m3、3m3And 34m3Volumetric standard, the mark of different size Quasi- container group 100 constitutes volumetric standard group, wherein 3m3、 34m3Volumetric standard uses water-jacket thermostat, 0.1m3Standard Container uses water-bath type thermostat, and three can simultaneously or independently carry out detection operation.Referring in Fig. 8~10, wherein Fig. 9,10 For the enlarged diagram of E, F module in Fig. 8, wherein E is 3m3Volumetric standard, F 0.1m3Volumetric standard and 34m3Volumetric standard Platform position, which is set side by side, shares a set of tested instrument testing equipment.Specifically, volumetric standard group 100 uses existing difference The volumetric standard of volume specification, to meet in the short time stabilization of temperature and uniformly, wherein 34m3And 3m3Volumetric standard uses water Jacket type designs, and the sink and water circulation pipe of volume are computed for its mating setting, preferably, will in the present embodiment 34m3And 3m3The water leg of volumetric standard is divided into six and four separate chambers, each separate chamber according to calculated result respectively The water inlet line of room configures the assembled unit of vortex-shedding meter and valve, monitors and adjust the feed water flow of each chamber in real time Amount utmostly improves water quantity of circulating water homogenization in collet, it is ensured that temperature collaborative in stabilization process in volumetric standard, And finally ensuring the homogenization that temperature is stable in volumetric standard, by being specifically designed, target is the water flow of each waters collet The stabilization time of gas temperature in volumetric standard is controlled into the 0.1m within 90min3Volumetric standard is designed using water-bath type, peace It is put in specially designed water bath.
It further, further include being set to the tong-test ammeter system 200 of volumetric standard group upstream in the present embodiment, and each folder Table system 200 is correspondingly connected with the volumetric standard of a specification, so that each tong-test ammeter system 200 can carry out independently or simultaneously Work is detected, and tong-test ammeter system 200 further includes tested nozzle and standard scale, is pacified between the two and pipe-line system 400 using duct type Dress mode, and measuring instrumentss are respectively provided at each pipeline and the volumetric standard of each specification, middle measuring instrumentss include in this implementation Temperature sensor, humidity sensor, pressure sensor, temperature sensor use Pt100A grade platinum resistance, 0~50 DEG C, MPEV≤ 0.1 DEG C, scale division value is not more than 0.01 DEG C;The pressure sensor uses 0.025 stage pressure transmitter;Humidity sensor uses Digital display thermometer, measurement range: 10%~99%RH, allowable error ± 2%RH.Pressure measurement in volumetric standard is selected not Degree of certainty is the transmitter of 0.01% (0~700) kPa abs, and it is 0.04%, (- 30 that uncertainty is selected in pipeline pressure measurement ~700) transmitter of kPaG;The pick-up that atmospheric pressure measurement need to be 0.02%, (75~125) kPa abs with uncertainty Device.The accuracy of temperature measurement is most important in same each volumetric standard group 100, and existing middle benchmark container (is equivalent to this Embodiment Plays container) clinical practice is uniformly distributed temperature measuring point, recommends to select OKAZAKI high-precision four-wire system platinum resistance, both ends Two conducting wires are respectively drawn, wherein two are used as constant current input signal cable, to provide constant 1mA reference current, in addition two Signal wire is used to measure its voltage value, and measurement circuit independently separates, due to being isolated using input, output, power supply three, greatly The big error for reducing lead resistance and measuring resistance value to it, accuracy is 0.05 DEG C, range is 0~50 DEG C, meanwhile, thermometric is visited Head diameter is less than 3.5mm, can effectively reduce thermal resistance, the variation of the rapid reaction temperature of energy.
Due to answering multiple spot science to be distributed temperature measuring point, 34m in volumetric standard group 1003Volumetric standard, every cubic metre is not Less than 1 temperature measuring point, sum are no less than 40 temperature measuring points, 3m3When volumetric standard, temperature measuring point is no less than 8,0.1m3Standard is held Device, temperature measuring point are no less than 4, with reduce due in volumetric standard gas temperature it is uneven caused by uncertainty of measurement, It is the transmitter of 0.01% (0~700) kPa abs, pipeline pressure that uncertainty is selected in pressure measurement in volumetric standard group 100 It is the transmitter of 0.04%, (- 30~700) kPaG that uncertainty is selected in power measurement;Atmospheric pressure measurement need to be with uncertainty 0.02%, the transmitter of (75~125) kPa abs.
Itd is proposed in the present embodiment the volumetric standard groups 100 of above-mentioned 3 different sizes by after pipe-line system connection side by side A set of tested instrument test pipeline is shared under two kinds of operating conditions of positive pressure and negative pressure, is shared the shared sets of data of sets of data acquisition and is adopted Collection, transmission, processing and control systems, there is independent gas source to pass through standard set-up mass flow according to the principle of mass conservation Compared with the indicating value of checklist, the detection of checklist is completed, detection work can be carried out independently or simultaneously.Certain the present embodiment In should further include control system, and for piping flow control flow control system.Specific flow control system is real Border is each valve control assembly (i.e. pneumatic operated valve) in above-mentioned one embodiment, corresponding between each volumetric standard and pipeline Connection, and flow control system further includes the critical flow generating apparatus for having flow continuously adjustable, is sprayed using continuous control critical flow The technology of mouth flow.Valve control assembly can select switch respective valves under automatic Verification state, through control system, And in place by the switch of limit switch guarantee valve, and valve control mode is pneumatic, electronic or surges, it is clear that, The control mode of pipeline valve is that the valve that Pneumatic opening & closing mode is connected with volumetric standard group 100 uses pneumatically in the present embodiment The double valve combination of cut-off and Pneumatic opening & closing ball valve, it is ensured that the gas under high vacuum trystate and high-potting state Body zero leakage be connected with volumetric standard group 100 triple valve be package unit uncertainty level principal element, which adopts With Japanese import and patented product, triple valve commutating period meet Δ t≤1 × 10-4, reach requirement of ignoring; Design measures record to triple valve commutating period using high-precision laser sensor, according to triple valve commutating period Actual observation record, triple valve Theoretical Design commutating period error are less than 1ms.Pipeline control is realized with this.It is not difficult in the present embodiment It was found that certainly should also include time measuring unit, the prior art be used, the timing of time measuring unit should be accurate and reliable, There are two types of the factors for causing time uncertainty of measurement: first is that the stability of crystal oscillation frequency;Second is that A when timer Class uncertainty, using existing crystal oscillator sensor, resolving power is less than 0.1ms, and the stability of crystal oscillator 8h is better than 1 × 10-6, when Between measurement Composite Seismogram be Urel=0.001% (k=2).Matched by the design of above each modular unit, device instantaneously flows The uncertainty calculation formula of amount is u1=(u2 v+u2 t+u2 p+u2 T+u2 Z+u2 Δt+u2 Δm)1/2, in formula: the phase of volumetric standard volume To standard uncertainty uv=0.025%;The relative standard uncertainty u of time measurementt=0.001%;The phase of pressure measurement To standard uncertainty up=0.01%;The relative standard uncertainty u of temperature measurementT=0.017%;Gas compressibility factor Relative standard uncertainty uZ=0.005%;And the time system difference relative standard uncertainty u of triple valveΔt= 0.01%;The relative standard uncertainty u of pressure measurementΔm=0.005%;The instantaneous flow relative uncertainty degree u of synthesis1= 0.0335%, expanded uncertainty Urel=0.067% (k=2).
The checklist range of flow that covering device design can examine and determine under negative pressure method is (0.2~1600) m3/ h, positive pressure method Detectable range of flow is 0.5~400m down3/ h, positive pressure method pressure are 0.6MPa abs.1m3Or more volumetric standard phase It is U to expanded uncertaintyrel=0.07% (k=2), 1m3The opposite expanded uncertainty of following volumetric standard is Urel= 0.1% (k=2);Room temperature control is at 15 DEG C~25 DEG C when device is run, temperature stability are as follows: ± 2 DEG C/for 24 hours, ± 0.5 ℃/1h.The design of the covering device has fully considered the Proper Match of each section, stringent design, the configuration guaranteed mould of accuracy Module unit, it is ensured that the uncertainty of package unit;Calibrating can be achieved in positive and negative platen press, and closes for the method for standard table in later period is reserved Suitable expansion interface and space reaches the standard for fully considering device and using, safety, and rational deployment, meets environmental protection The requirement that noise reduction improves efficiency.
Further, the realization of control system is illustrated, control system uses existing PIC or PLC in the present embodiment Controller (programmable interrupt controller) corresponds to the PIC appended drawing reference in diagram.Further, according in existing control system It should be noted that control system includes host computer, slave computer, data acquisition and actuator;Wherein host computer is to use LabVIEW software programming controls the PC of program, can be in human-computer interaction interface set temperature value, flow value, control device operation And stopping, and host computer by Ethernet protocol realize and slave computer between data reception, send, can be according to institute's measured data Generate the probation redport to tested flowmeter;Slave computer includes programmable controller PLC, A/D module and D/A module, AD module Digital data transmission is converted extremely for the analog signal of temperature sensor, humidity sensor, pressure sensor, flowmeter output Programmable controller PLC realizes the acquisition of data;Digital signal is converted analog control signal output, realization pair by D/A module The control of actuator.Data acquisition includes temperature sensor, humidity sensor, pressure sensor, proving flowmeter and tested stream Meter, output signal are analog signal.Actuator part and above-mentioned valve control assembly adapt to comprising pneumatic control valve door, Frequency converter, power controller and thermo hydrograph regulator, the signal that frequency converter is exported by receiving PLC control turning for blower Speed, pneumatic control valve adjust aperture by receiving current analog signal, and the two collective effect realizes the control to flow, power Controller and thermo hydrograph regulator control the gas temperature and ring of outflow heat exchanger by receiving standard analog signal respectively Temperature in the temperature-controlled chamber of border.
Referring to Fig.1 in 1, the present embodiment control system for example can be using centralized management, decentralised control, data sharing Structure, Industrial Ethernet is for realizing the communication between management level and the controller of shop layer or between controller and PC, generally Data volume is larger, transmission range farther out, transmission rate it is fast, be suitable for bad environments and anti-interference demanding industry spot.This Device is by using 3 existing temperature-detecting devices, respectively to 3 constant volume slots (standard of corresponding 3 different sizes Container group 100) internal temperature is measured in real time, and data are passed to host computer, data sharing thus may be implemented. The present apparatus additionally uses 3 pressure detecting instruments, data acquisition is carried out to the pressure in 3 constant volume slots, to realize data sharing; And in heat exchanger and atmosphere, humidity measurement instrument and temperature and humidity pressure one detector real-time data collection are used respectively and is total to It enjoys;3 T4CU are used simultaneously, data collected are analyzed respectively, to judge whether test is completed.Firstly, trying After the completion of testing by these data transmissions into host computer, every detail parameters of checklist are then provided, are finally uploaded to In specified data library.This 3 T4CU operate 3 triple valves respectively, control entire experiment process, and during the test With 3 PC machine shared datas.Above all of data realize that the agreement used is RS- by one 16 mouthfuls of serial server 485。
Flow chart in 2 referring to Fig.1, together referring to Fig.1~10 in, the control principle based on PLC is accomplished by the first order The process vacuumized is designed essentially according to the control sequence of PLC.It is vacuumized to constant volume slot (i.e. above-mentioned standard container group 100) When, it is first separately turned on water-ring vacuum pump, BV105 and BV102, vacuum pump is made first to open operation;After postponing a period of time, BV102 is closed, then opens BV103, LDV101 and LCV101 respectively, thus starts that constant volume slot is carried out to vacuumize operation.In order to Ensure that pressure inside the tank is stablized, after constant volume slot internal pressure reaches preset requirement, also needs to wait for a period of time.When pressure reaches After certain requirement, LDC101, LCV101 and BV103 are closed, opens BV102, and wait the signal of above-mentioned valve in place; Finally, stopping VP101 and BV102, the first order vacuumizes work and is basically completed at this time, needs to monitor constant volume slot internal pressure;Such as Fruit unit exception, then want termination test;Test terminates must be according to certain process, to prevent equipment damage;It simultaneously will be in host computer Device is in test final state at this time for display;The second level vacuumize vacuumized with the first order it is quite similar, difference be head Dry-type vacuum pumping pump has first been used, so the pipeline used is different, after dry vacuum pump startup, has opened BV104 to constant volume slot It carries out vacuumizing operation.Before carrying out formal flowmeter detection test, it is also necessary to be prepared work, preparing process is pole Its is important, it will directly affect the success or not of flowmeter detection test, mainly by user's selection using negative pressure method or Positive pressure method is tested, as long as can make as long as host computer is selected slave computer PLC to device carry out practical operation.Into one Step, when using negative pressure method, AV101 is opened, pipeline is directly contacted with atmospheric pressure at this time;When selection is using positive pressure method, beat AV102 is opened, constant volume slot is made to be connected with air accumulator, successively carries out flowmeter detection test.The present embodiment further include using LabVIEW designs monitoring system picture, wherein including 3 pipeline pictures, the process for entirely testing.Meanwhile operator's energy It is enough directly to operate whole system from monitoring screen, also it can learn that equipment is abnormal from monitoring system picture, in time make It adjusts out;It is necessary to when, can emergency cut-off whole equipment.
In Fig. 1~10, appended drawing reference involved in figure is as follows: (note: LCV-201 is equal with LCV201, other similarly)
Embodiment 3
It is adjustable in multipurpose pVTt method gas flow standard detection system of the present invention in reference above-described embodiment Aperture pneumatic operated valve is illustrated as CV101 or CV102 in figure, is used for the flow control of positive pressure pipeline, existing middle pneumatic control valve with Compressed gas is power source, using cylinder as actuator, and by means of valve positioner, converter, solenoid valve, guarantor position valve, gas storage The attachmentes such as tank, pneumatic filter remove driving valve, can realize that switching value or proportion expression are adjusted by way of adjusting aperture, To adjust pipeline medium: the various parameters of technique process such as flow, pressure, temperature, liquid level.It should be noted that the present embodiment Middle pneumatic piston actuating mechanism use compressed air source, i.e., using air supply system 300 generate gas source by pipeline with It is connected between pneumatic control valve, and is moved up and down by the movement of valve inner piston band ovable valve stem, reaching makes opening for valve It closes.It will be apparent to a skilled person that in real process, first is that pneumatic control valve installation site, requires away from ground Have certain height, valve it is upper and lower will there are certain spaces, to carry out the dismounting and repairing of valve, for being equipped with operated pneumatic valve The regulating valve of locator and handwheel, must guarantee operation, observation and it is easy to adjust;Second is that regulating valve should be mounted on horizontal pipe, And it is vertical with pipeline up and down, it generally to be supported, be guaranteed solid and reliable under valve;And install when, when regulating valve bore with It when process pipe is not identical, should be connected using reduced pipe, in the installation of small-bore regulating valve, can be threadedly coupled, avoid to tune Section valve brings bigger additional stress, third is that by-pass line is arranged, it is therefore an objective to convenient for switching or manual operation, can not stop Only regulating valve is overhauled in the case where operation.
Therefore the adjustable opening pneumatic operated valve that the present embodiment uses is as shown in figure 13, illustrates the present embodiment adjustable opening The overall structure diagram of pneumatic operated valve comprising valve 500, air rammer 600 and valve deck unit 700, the peace between three Assembling structure can refer in the prior art in such a way that screw thread is embedded in or is fixed using bolt.Specifically, valve 500 is one Kind closure member is the slide-valve of parallel gate plate, and closure member can be single disc or the double disc therebetween with spreading mechanism, Flashboard to the pressing force of valve seat is controlled by acting on the pressure medium of floating flashboard or floating valve seat, if it is double disc Flat gate valve, then the spreading mechanism between two flashboards can supplement this pressing force, and flat gate valve can be divided into hand by driving method Dynamic flat gate valve, Pneumatic flat-plate gate valve and driven plate gate valve.And the present embodiment be single valve plate, and by air rammer 600 come Driving valve 500 is turned on or off, and by this present embodiment using air pressure being the piston of power, therefore can be made With rubber material because the opposite mode of surging will lead to rubber material using after a long time can aging, lead to sealing leak, There are problems that some potential safety problems.Air rammer 600 further includes the chamber with sliding space in further the present embodiment Body 601, piston only 602, valve rod 603 and indicating arm 604, piston only 602 are set in cavity 601 and are integral type Solid construction, 603 upper end of valve rod are connect with piston only 602, and lower end is connected with the valve plate 501 being set in valve 500 It connects.It should be noted that piston only 602 can slide up and down in cavity 601, by infusing into 601 one end of cavity Entering hydraulic or air pressure causes pressure in cavity 601 to increase, thus push piston only 602 mobile to the lesser one end of pressure, Otherwise similarly, and the signal in such as figure of valve deck unit 700, the mode being fixed by bolts are installed on the both ends of valve 500.Into One step, in the present embodiment, valve 500 further includes pipeline 502, valve chamber 503 and valve seat 504;Valve chamber 503 and pipeline 502 Cross connection, understandable to be, corresponding pipeline 502 is multipurpose pVTt method gas flow standard inspection of the present invention Gas source pipe in examining system, operated pneumatic valve are used for the flow control of pipeline.Valve seat 504 is set in valve chamber 503, and valve plate 501 is set It is placed in valve seat 504 and is driven by about 603 valve rod, realize the opening and closing of valve seat 504, valve deck unit 700 further includes It is arranged on the bonnet, 701 and bottom flange 702 of lower end;Mounting portion 701a, mounting portion 701a is arranged in 701 upper end of bonnet, It is inserted into lower installing port by being threadedly engaged installation, and valve rod 603 passes through bonnet, 701 and connect with valve plate 501;Bottom flange 702 Further include the tail-hood 702a being connect with 500 bottom end of valve, the nested hood 702b being set in tail-hood 702a and is set to tail Cover the foot piece 702c in 702a and hood 702b.It is to have the case where pressure in valve chamber 503 that the purpose of foot piece 702c is arranged herein Under, 501 stress balance of valve plate, it is ensured that be in valve wide open or full off state, avoid valve plate from receiving the pressure of medium and to moving up It is dynamic.
It should be noted that mounting means up and down between piston only 602, valve rod 603 and indicating arm 604 can be with Using screw thread mounting means, prior art realization can refer to, while it is not difficult to visualize ability gets over personnel, valve rod 603 and indicating arm 604 can also merge into the telescopic rod with one, that is, the telescopic rod merged entirely runs through the upper and lower ends of piston only 602, and two The part that end is stretched out is the valve rod 603 and indicating arm 604 in the present embodiment, and certainly exists seal assembly in piston and be used for The air rammer is sealed, equally can refer to prior art realization.Further, air rammer 600 further includes being set to outside The enterprising pressure mouth 605 of wall, under into pressure mouth 606 and be set to upper and lower end upper opening and lower installing port;Enterprising pressure mouth 605, Under into pressure mouth 606 be separately connected pressure source, push piston only 602 to be located at by different pressure and moved in cavity 601; 604 one end of indicating arm is connect with piston only 602, and the other end, which is passed through in upper opening and realized by sealing block, seals anti-stopping leak Dew;603 one end of valve rod is connect with piston only 602, the other end pass through lower installing port after connect with valve plate 501, similarly for Valve rod 603 is also that there is sealing structure identical with sealing block to be sealed in lower installing port.It should be noted that installation Portion 701a is inserted into lower installing port by being threadedly engaged installation, equally uses screw thread mounting means, can refer to prior art reality Existing and enterprising pressure mouth 605, under into pressing mouth 606 to connect with external pressure source, and cavity 601 is divided by piston only 602 Epicoele and cavity of resorption, enterprising pressure mouth 605 are connected to epicoele, under into pressure mouth 606 be connected to cavity of resorption, when pressure in upper cavity pressure and cavity of resorption When inconsistent, it is mobile to the lesser one end of pressure that piston only 602 can be driven, therefore realize the movement with ovable valve stem.
Embodiment 4
As the signal of Figure 14~17 is provided with upper opening in the top of air rammer 600 referring in above-described embodiment 607, and 604 one end of indicating arm is connect with piston only 602, the other end passes through upper opening 607 and slides up and down, in piston When carrying out operation, since upper opening 607 is exposed in air, there can be a large amount of dust in the air under adverse circumstances Particle is fallen in upper opening 607, thus the dust fallen in the relative motion gap between indicating arm 604 and upper opening 607 Cause the movement abrasion of the two to increase, there can be certain abrasion of particles lubricating oil is added, seriously affect making for piston With effect and service life.Therefore abrasion caused by dust is fallen by upper opening 607 in order to effectively reduce, the present embodiment with it is above-mentioned Embodiment the difference is that: above upper opening 607 be arranged safty shield 800, the safty shield 800 be used for upper opening 607 it is dust-proof, and indicating arm 604 it is exposed constantly do outside stretching motion to extraneous operator have certain security threat, Therefore safty shield 800 also has the safety protection function for indicating arm 604, herein it should also be noted that, safety is anti- Mounting means between shield 800 and upper opening 607 realizes that those skilled in the art are it is not difficult to find that for example using the prior art Opening is arranged inwardly and slot of the inner surface with box thread in the bottom of safty shield 800, while upper opening 607 raises upward Extension just corresponding insertion and is arranged male thread on 607 lateral wall of upper opening and is equipped with mother in the slot of box thread Cooperated between the slot of screw thread, when safty shield 800 to be transferred in upper opening 607, can be realized between the two Installation;In another example being arranged after directly safty shield 800 is placed in upper opening 607 in 800 bottom surface surrounding of safty shield Bolt will be installed between the bottom surface of safty shield 800 and the upper top surface of air rammer 600 to contact with each other with bolt and be connected, Above-mentioned mounting means those skilled in the art combine the prior art to be fully able to realize, therefore this part of the present embodiment is not being schemed Middle signal.
Further, safty shield 800 further include cover 801, the linkage unit being set in cover 801 802 and The overturning component 803 in 801 outside of cover is connect and is set to linkage unit 802, and linkage unit 802 and indicating arm 604 connect It connecing, indicating arm 604 moves up and down with piston only 602, so that linkage unit 802 is driven to link, linkage unit 802 left-hand end and overturning component 803 are inconsistent, will overturn component 803 along with the movement of piston and contradict overturning, thus also It can be used to indicate that the movement travel of piston.
More specifically, cover 801 is cylindrical shape, opens up on side wall and stretches out slot 801a, positioned at the upper of stretching slot 801a Shutter 801b is arranged in side, and shutter 801b is arranged at the longitudinal rail 801b-1 limit of 801 inner wall of cover, is not difficult to send out Existing longitudinal rail 801b-1 is the baffle of " L " type, can be located in guide rail and longitudinal sliding occurs, and shutter 801b Lateral width be greater than and stretch out slot 801a transverse notch width size, therefore when shutter 801b declines, can will stretch out slot The corresponding partial occlusion of the notch of 801a effectively reduces dust and is entered in cover 801 by stretching slot 801a;And it is located at and stretches out The lower section of slot 801a inwardly along extended support plate 801c, is used to support linkage unit 802, which includes pair Extension bar 802a, lifter plate 802b, the first interlocking bar 802c, the second interlocking bar 802d and conflict idler wheel 802e, should illustrate It is to be installed to extension bar 802a insertion 604 internal screw thread mode of indicating arm, therefore be able to maintain synchronous fortune up and down with indicating arm 604 Dynamic, the mounting means is with reference to the installation between safty shield 800 and upper opening 607, and those skilled in the art combine Fig. 7 Signal it is not difficult to find that when safty shield 800 be embedded in upper opening 607 on be rotatablely installed when, extension bar 802a can be inserted Enter the rotational installation synchronized in indicating arm 604, it, can be with of course, it is possible to the mode different by thread depth ratio setting Be safty shield 800 be embedded in upper opening 607 carry out after rotating certain distance, to extension bar 802a and insertion indicating arm 604 it Between start to be threadedly engaged or synchronize, can be achieved.Further, it is connected to the top of extension bar 802a with lifter plate 802b, To indicating arm 604, synchronous up and down motion is able to maintain to extension bar 802a and lifter plate 802b;First interlocking bar 802c One end is hinged by the first axle bed 802c and lifter plate 802b, and one end of the other end and the second interlocking bar 802d are by contradicting rolling It is hinged to take turns 802e, and the other end of the second interlocking bar 802d pass through it is hinged between the second axle bed 802d-1 and support plate 801c, because This when indicating arm 604, extension bar 802a and lifter plate 802b are synchronized in the motion process being pressed downward, contradict idler wheel 802e by It is stretched out and is contradicted to the inner wall of overturning component 803 by stretching slot 801a to pressure, the process constantly pushed can always outward Contradicting overturning component 803 makes its flip-over, and when similarly moving upwards, contradicting idler wheel 802e can inwardly stretch, and overturns component 803 just not will receive outside conflict power.Further, overturning component 803 includes the torsional spring shaft 803a of bottom setting, is needed Being noted that torsional spring shaft 803a use in the prior art has the shaft of spring torsion, when conflict idler wheel in the present embodiment When 802e is inwardly retracted, generating restoring force by torsional spring shaft 803a makes to overturn component 803 with the trend to turn to the inside.
When under the present embodiment original state, illustrate for when valve is in the open state, when beginning, piston only 602 Above cavity 601, it should be noted that valve opening includes the two states for fully opening or not fully opening, is shown Right, indicating arm 604 is in the distalmost end moved upwards on direction when fully opening, and it is understandable to be, when not fully opening In half way, therefore the present embodiment, when valve fully opens, corresponding overturning component 803 is in a vertical state, and torsional spring turns The spring of axis 803a is in the state that deformation occurs, and in order to which operator learns state at a glance, is located at overturning component 803 Lateral wall be arranged sign, such as this implementations use "ON" word.
Further, it is moved gradually downward in piston only 602 and corresponds to valve 800 and progressively close off, while plug body 602 move downward drive indicating arm 604, move downward to extension bar 802a and lifter plate 802b, contradict idler wheel 802e at this time Be pressed down, due to the hinged setting of each fulcrum of linkage unit 802, contradict idler wheel 802e from the stretching for stretching out slot 801a contradict to On the inner wall for overturning component 803, it is downwardly turned over using torsional spring shaft 803a as fulcrum, overturning component 803 and 801 structure of cover At angle be continuously increased, deformation occurs for the spring in torsional spring shaft 803a, overturning component 803 have revolution trend, and should The space that slot 801a is located above the first interlocking bar 802c is stretched out when the first interlocking bar 802c declines in the process will increase, and Shutter 801b is blocked the part that general who has surrendered stretches out that slot 801a is vacated under by gravity.Conversely, when valve is by closing When unlatching demand, indicating arm 604 is moved upwards, the revolution trend that overturning component 803 has, after fully opening, in perpendicular Straight state.Likewise, shutter 801b is contradicted when the first interlocking bar 802c rises, its is upward, therefore realize and block The rising of plate 801b falls volume dust granule in cover 801 to suitably reduce.According to above-mentioned those skilled in the art it is not difficult to find that The corresponding overturning component 803 of the distance that can rise or decline by indicating arm 604 in the present embodiment and cover 801 are constituted and are pressed from both sides The size at angle, to indicate the degree of 800 valve plate of valve unlatching, for example (,) it is simplest after valve fully opens, overturn component 803 is vertical, and the angle of composition is 0, and indicating arm 604 is in the distalmost end moved upwards, therefore can similarly obtain valve opening one Half feature is vertical and to characteristic value when completely closing, and similarly, the numerical value of the half of half is also the same it is found that with this Analogize, the instruction or substantially of specific value can be calculated and carried out with actual needs of the user to valve opening degree Instruction.
Embodiment 5
Referring to above-mentioned second embodiment and together referring to Fig.1 1~12, above-mentioned control system is also provided in the present embodiment The a kind of of system applies power control cabinet, referring to Fig.1 the signal in 8, is the overall structure diagram of the present embodiment power control cabinet, electrical cabinet Also known as electrical control cabinet, as the term suggests being exactly the electric cabinet as electrical control effect, power control cabinet includes power control cabinet in the present embodiment Ontology 900, electrical component 1000 and element mounting assembly 1100, electrical component 1000 are pacified by element mounting assembly 1100 Dress, which is fixed on the composition electrical cabinet of power control cabinet ontology 900, can be used in the operation of electric wiring.More specifically, power control cabinet ontology 900 generally frame structures, and power control cabinet ontology 900 further includes unit framework 901, bedframe 902 and demarcation plate 903, Unit framework 901 is arranged successively splicing, and bedframe 902 and the bottom end of unit framework 901 are correspondingly arranged, and demarcation plate 903 will Space is divided into cell 904 in unit framework 901, understandable herein to be, several unit frameworks 901 can be according to electricity The actual needs of road scale is spliced, and the corresponding bedframe 902 of each unit framework 901 is fixed, bedframe 902 are seated ground, likewise, identical as unit framework 901 be corresponding in turn to splicing, of course, connecting method can be used it is existing Bolt fastening.Further, referring to the signal in figure, it is not difficult to find that the demarcation plate 903 in the present embodiment further includes It is set in side and the frame of unit framework 901, and the demarcation plate 903 marked in figure is only a kind of signal, it is clear that , there is also the demarcation plate 903 at other different locations in figure, label is not provided in figure, but cannot be limited only in figure Label, should be in conjunction with attached drawing signal and related description;Therefore for the ease of distinguishing, demarcation plate 903 further includes edge in the present embodiment The riser 903a and the transverse slat 903b spread out in the horizontal direction, riser 903a that vertical direction is spread out are set to unit framework 901 For being separated out cell 904, transverse slat 903b horizontal spreading, which is set in cell 904, can carry placement object in outside, and Distance of the riser 903a with transverse slat 903b apart from ground is adjustable according to actual needs, and transverse slat 903b is capable of forming different size of Bearing space is shelved for article.Electrical component 1000 is set in cell 904 by element mounting assembly 1100, is used In the operation of automatically controlled circuit, electrical component 1000 include the power supply 1001 being connected by electrical wiring, bus switch 1002, Breaker 1003, bus cases 1004, contactor 1005 and indicator 1006, herein it should be noted that those skilled in the art not Hardly possible is found, is only to illustrate the substantially common element connected in route in electrical cabinet in the present embodiment, is not represent this Only have above-mentioned element in power control cabinet, certainly its can also include referring to due element in power control cabinet in the prior art and The cable etc. of connection, such as existing electrical control cabinet are divided into traditional relay control cabinet and PLC integrated control cabinet, compare Simple control is controlled with relay, and complicated control generally uses PLC control, and (PLC refers to programmable logic control System), PLC is the brain of whole system, for handling external input signal, export control signal again after sequential operation, For controlling the movement of external field device, as equipment starting, stop, the speed of motor is adjusted etc. and cabinet in element And peripheral cell, wherein element includes contactor, relay, motor starter, Surge Protector, power supply (common electricity in cabinet Source, ups power supply), the elements such as breaker, and peripheral cell includes limit switch, close to switch, shock sensor, yaw counting Device etc., the present embodiment combination prior art are subject to the control for realizing electric circuit.Based on above-mentioned, wherein contactor 1005 is main If reaching the electric appliance of control power control cabinet complexes load, cardinal principle is to flow through electric current using coil to generate certain magnetic , so that contact closure.Contactor is mainly made of electromagnetic system, contact system, arc-control device.If contactor goes out If existing failure, then in general may be that contactor is not attracted, contactor is not released after coil breakpoint after coil pain spot It puts, main noddle on contactor breaks down.Relay, the variation of input quantity reach as defined in when requiring, in electric appliance output circuit So that scheduled Spline smoothing occurs for controlled volume, it is used to control larger current in relay actually city's power control cabinet complexes Automatic switch, the effects of playing automatic adjustment, safeguard protection, conversion circuit, can be alternating voltage, be also possible to direct current Voltage.Motor starter, electric current is up five times of electric current, therefore the impact to power grid if motor directly initiates It is very big.So just need such motor starter, the size of electric current can be adjusted when soft start, be reduced to electricity The impact of net improves power grid quality.Surge Protector is that the Surge Protector device in power control cabinet complexes is primarily adapted for use in The atmospheric over-voltage in power grid, that is, the influence of thunder and lightning are limited, enables to thunder and lightning to cross piezoelectric voltage not using such device The maximum impact force and withstanding voltage being able to bear more than various electrical equipments and power distribution equipment.Power supply 1001 be power control cabinet at It is very important in covering device, it is mainly used for for alternating current being changing into direct current and battery is in parallel, is on the one hand to charge, one Aspect is to inverter power supply again, and when alternating current breaks down, inverter continual can transmit electricity, whether direct current Or alternating current is ok.Breaker 1003, the breaker in power control cabinet complexes is primarily to guarantee electric system Safety, when detecting that breaker just starts when there is excess load on a circuit, on protection circuit, other equipment are being just Often operation, it is ensured that the stabilization of electric system.Bus switch 1002 controls opening or closing for entire electrical wiring road, bus cases 1004 converge route, so that route has, item is orderly, and the operation or halted state of the then indicating equipment of indicator 1006, monitoring Whether whether the power supply for controlling electric appliance normal and normal using red light monitoring trip(ping) circuit, is with green light monitoring closing circuit It is no normal.Further, the element mounting assembly 1100 installed for electrical component 1000, further includes 1101 He of carrier bar Hanging plate 1102, carrier bar 1101 are horizontally placed in cell 904, and its both ends connect structure with the bar of 901 two sides of unit framework At loading end, hanging plate 1102 extends in the vertical direction the fixed composition wall built-up face of side lever by unit framework 901, power supply 1001 It is set on the loading end of the formation of carrier bar 1101, bus switch 1002, breaker 1003, bus cases 1004, contactor 1005 And indicator 1006 hangs and is set on the wall built-up face of the composition of hanging plate 1102;So popular says, i.e. element part can It is set on the horizontal plane of the formation of carrier bar 1101, or is set on the vertical plane of the formation of hanging plate 1102, the two It is realized in a manner of being bolted.
9~20 signal referring to Fig.1, in order to by the more firm docking of unit framework 901 and winding displacement, the present embodiment Wire-arranging mechanism 11000 is also set up in power control cabinet ontology 900.More specifically, wire-arranging mechanism 11000 will be arranged successively setting Unit framework 901 is attached, and wire-arranging mechanism 11000 further includes winding displacement plate 11001 and limit plate 11002, winding displacement plate 11001 Parallel interval setting, reserved space is used for the arrangement of electrical wiring to each other, and winding displacement plate 11001 is fixed and limited by limit plate 11002 Position, and be located at the docking of adjacent cells frame 901, herein it should be noted that wire-arranging mechanism 11000 is installed as between plate Mounting structure can be fixed using bolt mode, and is correspondingly arranged at adjacent 901 docking of unit framework, a side Limit of the face limit plate 11002 for winding displacement plate 11001 is fixed, and is on the other hand integrally used for list with 11001 groups of winding displacement plate What is connected between first frame 901 is firm.Further, in the present embodiment in order to adapt to the big small power supply 1001 of different size or other The installation of element, element mounting assembly 1100 further include clamping plate 1103 and adjusting rod 1104;Clamping plate 1103 is set to carrier bar On 1101, and the two sides for being located at power supply 1001 are clamped, and fluted 1103a, groove is arranged in 1103 medial surface of clamping plate 1103a matches limit with the raised 1001a on 1001 side of power supply;Adjusting rod 1104 is connect with carrier bar 1101.Adjusting rod 1104 are set on the inside of the bar of unit framework 901, and its bottom end is connect with bedframe 902.The bottom end of adjusting rod 1104 is also Lower matching hole 902a is arranged in matching hole 1104a and 902 surface of bedframe in setting, is matched under by upper matching hole 1104a It closes hole 902a and is correspondingly connected with the position for adjusting adjusting rod 1104, so as to adjust the spacing between carrier bar 1101, therefore energy It is enough that installation is adjusted according to the size specification of power supply 1001.
Further, a kind of entirety of the convenient installation of breaker 1003 is illustrated referring to Figure 21~22 in the present embodiment Structural schematic diagram.The mounting structure of the breaker 1003 includes breaker body 1003a, side plate 1003b, end plate 1003c, bottom Composition built-in space is arranged in parallel in plate 1003d and cover board 1003e, two pieces of side plate 1003b, and end plate 1003c is set to interior empty Between front end side, cover board 1003e is set to the top of built-in space, the opposite side of breaker body 1003a and end plate 1003c The corresponding installation of bolt mode can be used in setting, above-mentioned setting.More specifically, " L " type hook is extended in the two sides of side plate 1003b Part 1003b-1, and the setting of the two sides end plate 1003c hooks the locking projections 1003c-1 that part 1003b-1 is matched with " L " type, works as end When plate 1003c is embedded in built-in space by front end, locking projections 1003c-1 slides into the cunning mouth 1003b-2 being arranged on side plate 1003b Cooperation corresponding with " L " type hook part 1003b-1 after interior, and fixed by bolt mode.And the end side plate 1003b extends rising limit Position hooks part 1003b-2, and after breaker body 1003a is embedded in built-in space by end, which hooks part 1003b-2 will be breaking Device ontology 1003a limit, also part extends upwards at the both ends bottom plate 1003d, can slide into installation in built-in space and fix.Into one Step, the indicator light 1003c-2, reset switch 1003c-3 and panel of the state of being used to indicate are additionally provided on end plate 1003c 1003c-4, panel 1003c-4 can show the basic parameter of breaker body 1003a.
It should be noted that the above examples are only used to illustrate the technical scheme of the present invention and are not limiting, although referring to preferable Embodiment describes the invention in detail, those skilled in the art should understand that, it can be to technology of the invention Scheme is modified or replaced equivalently, and without departing from the spirit and scope of the technical solution of the present invention, should all be covered in this hair In bright scope of the claims.

Claims (10)

1. a kind of multipurpose pVTt method gas flow standard detection system, it is characterised in that: including,
Volumetric standard group (100) comprising the volumetric standard of various criterion volume, the volumetric standard group (100) are divided into 0.1m3、3m3And 34m3The volumetric standard of normal volume specification is all made of overall skid-mounted structure setting on verification table position, and Configure the constant guarantee component (101) of temperature;
Tong-test ammeter system (200) is set on mobile microscope carrier and connect with each volumetric standard group (100), Mei Gesuo Detection work can be carried out independently or simultaneously by stating tong-test ammeter system (200);
Air supply system (300) is that the volumetric standard group (100) and the tong-test ammeter system (200) provide individual gas sources, also wraps Positive pressure gas source (301) and negative pressure gas source (302) are included, the operation for being respectively used to positive pressure and vacuumizing;
Pipe-line system (400), for connecting the volumetric standard group (100), the tong-test ammeter system (200) and the gas source system The flow path each pipeline composition united between (300), wherein the positive pressure gas source (301) and the negative pressure gas source (302) share it is a set of The pipe-line system (400);And various criterion volume the volumetric standard group (100) and the tong-test ammeter system (200) altogether With a set of air supply system (300);And
Control system, the control system include power control cabinet, further include power control cabinet ontology (900) and electrical component (1000), Its generally frame structure, the electrical component (1000) is set on the power control cabinet ontology (900), for control system Running.
2. multipurpose pVTt method gas flow standard detection system as described in claim 1, it is characterised in that: the verification table 34m is for being placed in position3Volumetric standard platform position, corresponding carrying installation 34m3The volumetric standard group (100), and 34m3Mark The constant guarantee component (101) of temperature of quasi- container group (100) configuration is set in constant temperature using water-jacket.
3. multipurpose pVTt method gas flow standard detection system as claimed in claim 1 or 2, it is characterised in that: the folder Table system (200) further includes tested nozzle (201) and standard scale (202), and pipeline is used between the two and the pipe-line system (400) The mounting means of connection, each pipeline are respectively provided with measuring instrumentss;According to the principle of mass conservation, by the mass flow of standard scale with The indicating value of checklist compares, and completes the detection of checklist.
4. multipurpose pVTt method gas flow standard detection system as claimed in claim 3, it is characterised in that: the pipeline system System (400) includes main line (401) and manifold trunk branch (402);
The main line (401) is between the tong-test ammeter system (200), volumetric standard group (100), air supply system (300) three Connection;The manifold trunk branch (402) is several branch lines on the main line (401), by the air supply system (300) air pressure flow path branch.
5. claim 1,2 or 4 it is any as described in multipurpose pVTt method gas flow standard detection system, it is characterised in that: When the negative pressure gas source (302) is the gas source of the volumetric standard group (100), device detection of negative pressure state comprising water ring is true Sky pump (302a) and sliding vane rotary vacuum pump (302b);When the positive pressure gas source (301) is the gas source of the volumetric standard group (100), Device is positive pressure detecting state, and the positive pressure gas source (301) includes air compressor, cooler, drying machine and different pressures The high pressure tank of power.
6. multipurpose pVTt method gas flow standard detection system as claimed in claim 5, it is characterised in that: further include flow Regulating system and control system;
The flow control system and the volumetric standard group (100) are by the corresponding connection of pipeline, and the flow adjusts system System includes the critical flow generating apparatus that flow is continuously adjusted, using the technology of continuous control critical flow nozzle flow;The control System uses two-stage separate test and control system, is capable of the carrying out automatically controlling of complete paired systems, data acquisition, data processing, report Management and record printing.
7. multipurpose pVTt method gas flow standard detection system as claimed in claim 6, it is characterised in that: the flow tune Section system further includes valve control assembly, under automatic Verification state, switch can be selected corresponding by the control system Valve, and the switch of valve is guaranteed in place by limit switch, and valve control mode is pneumatic, electronic or surge.
8. multipurpose pVTt method gas flow standard detection system as claimed in claims 6 or 7, it is characterised in that: the control System processed includes host computer, slave computer, data acquisition and actuator;
The host computer control device operation and can stop in human-computer interaction interface set temperature value, flow value, and it is described on Position machine, can be according to the generation pair of institute's measured data by the reception, transmission of data between Ethernet protocol realization and the slave computer The probation redport of tested flowmeter;
The slave computer includes programmable controller PLC, A/D module and D/A module, and the A/D module is by temperature sensor, humidity The analog signal that sensor, pressure sensor, flowmeter export is converted into digital data transmission to programmable controller PLC, reality The acquisition of existing data;Digital signal is converted analog control signal output by the D/A module, realizes the control to the actuator System.
9. multipurpose pVTt method gas flow standard detection system as claimed in claim 8, it is characterised in that: the data are adopted Collection includes temperature sensor, humidity sensor, pressure sensor, proving flowmeter and tested flowmeter, and above-mentioned output signal is equal For analog signal;And the temperature sensor uses Pt100A grade platinum resistance, 0~50 DEG C, MPEV≤0.1 DEG C, scale division value is little In 0.01 DEG C;The pressure sensor uses 0.025 stage pressure transmitter;The humidity sensor uses digital display thermometer, surveys Measure range: 10%~99%RH, allowable error ± 2%RH.
10. multipurpose pVTt method gas flow standard detection system as claimed in claim 9, it is characterised in that: the execution Device is corresponding with the valve control assembly, further includes pneumatic control valve door, frequency converter, power controller and temperature and humidity adjustment Device;
The signal that the frequency converter is exported by receiving PLC, controls the revolving speed of blower, the pneumatic control valve door passes through reception Current analog signal adjusts aperture, and the two collective effect realizes the control to flow, the power controller and the temperature and humidity For adjuster by receiving standard analog signal, gas temperature and the environment temperature control for controlling outflow heat exchanger respectively are indoor Temperature.
CN201811142964.4A 2018-09-28 2018-09-28 A kind of multipurpose pVTt method gas flow standard detection system Pending CN109211370A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811142964.4A CN109211370A (en) 2018-09-28 2018-09-28 A kind of multipurpose pVTt method gas flow standard detection system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811142964.4A CN109211370A (en) 2018-09-28 2018-09-28 A kind of multipurpose pVTt method gas flow standard detection system

Publications (1)

Publication Number Publication Date
CN109211370A true CN109211370A (en) 2019-01-15

Family

ID=64982358

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811142964.4A Pending CN109211370A (en) 2018-09-28 2018-09-28 A kind of multipurpose pVTt method gas flow standard detection system

Country Status (1)

Country Link
CN (1) CN109211370A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111854861A (en) * 2019-04-26 2020-10-30 中国石油天然气股份有限公司 Natural gas flowmeter calibration method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102725573A (en) * 2009-10-21 2012-10-10 韦特柯格雷斯堪的纳维亚有限公司 Subsea valve actuator having visual manual position indicator connected to a manual override shaft
CN103837214A (en) * 2014-03-25 2014-06-04 重庆市计量质量检测研究院 Combined container type gas flow detection device by pVTt method
CN203745051U (en) * 2014-03-25 2014-07-30 重庆市计量质量检测研究院 Two-position one-way reversing valve type pVTt-method gas flow device
CN205066891U (en) * 2015-10-13 2016-03-02 辽宁省计量科学研究院 High accuracy pVTt method gas flow standard device
CN105508715A (en) * 2016-01-08 2016-04-20 江苏方程机械有限公司 Oil-controlled flat valve

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102725573A (en) * 2009-10-21 2012-10-10 韦特柯格雷斯堪的纳维亚有限公司 Subsea valve actuator having visual manual position indicator connected to a manual override shaft
CN103837214A (en) * 2014-03-25 2014-06-04 重庆市计量质量检测研究院 Combined container type gas flow detection device by pVTt method
CN203745051U (en) * 2014-03-25 2014-07-30 重庆市计量质量检测研究院 Two-position one-way reversing valve type pVTt-method gas flow device
CN205066891U (en) * 2015-10-13 2016-03-02 辽宁省计量科学研究院 High accuracy pVTt method gas flow standard device
CN105508715A (en) * 2016-01-08 2016-04-20 江苏方程机械有限公司 Oil-controlled flat valve

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周轶: "多用途pVTt法气体流量标准装置概述", 《中国计量》 *
房福生: "移动式临界流文丘里喷嘴气体流量标准装置", 《油气田地面工程》 *
赵䶮: "基于PLC的混合式pVTt气体流量标准装置测控系统", 《农业装备与车辆工程》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111854861A (en) * 2019-04-26 2020-10-30 中国石油天然气股份有限公司 Natural gas flowmeter calibration method and device

Similar Documents

Publication Publication Date Title
CN109211364A (en) A kind of Multipurpose gas flow standard system with control equipment
CN103471829B (en) A kind of test stand of multi-way valve of hydraulic excavator
CN110487488A (en) The device and method of full-automation detection fuel cell pile air-tightness
CN109211367A (en) A kind of pVTt method gas flow standard device
US9429493B2 (en) Manifold assembly for a portable leak tester
CN106679950B (en) A kind of converter valve is water-cooled equipment test device and its test method
CN109211366A (en) A kind of Multipurpose gas flow standard device based on air supply system
CN109799421A (en) The combined environment test of aerospace optical connector studies system
CN107796570A (en) A kind of product part special-shaped surfaces air tightness detection system and application
CN109211370A (en) A kind of multipurpose pVTt method gas flow standard detection system
CN109211368A (en) A kind of pVTt method gas flow standard system with control equipment
JPWO2017122714A1 (en) Gas supply device capable of measuring flow rate, flow meter, and flow rate measuring method
CN216284157U (en) Helium gas tightness detection device of non-metal sealing gasket
CN109211371A (en) A kind of pVTt method gas flow standard device based on air supply system
CN109211365A (en) A kind of multipurpose pVTt method gas flow standard device
CN109211369A (en) A kind of pVTt method gas flow standard detection system
CN107796571B (en) Portable equipment for detecting air tightness of special-shaped surface of product
JP2006275906A (en) Leakage inspection method and system
CN106248730A (en) Test device for the detection of adiabator performance
CN201269866Y (en) Apparatus used for verifying on-line chromatographic instrument
CN202836631U (en) Single-pipe buchholz relay detecting platform and centring clamping mechanism special for buchholz relay detection
CN106323557B (en) Pressure-bearing parts method for conducting leak test and detection device under low temperature environment
CN105427907A (en) Method and system for measuring volume of microcavity of fuel rod
CN216278774U (en) Hydraulic component comprehensive test bench based on computer-aided system
CN206095538U (en) Pressure -bearing spare part leakproofness detection device under low temperature environment

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190115