CN106679950B - A kind of converter valve is water-cooled equipment test device and its test method - Google Patents

A kind of converter valve is water-cooled equipment test device and its test method Download PDF

Info

Publication number
CN106679950B
CN106679950B CN201611201120.3A CN201611201120A CN106679950B CN 106679950 B CN106679950 B CN 106679950B CN 201611201120 A CN201611201120 A CN 201611201120A CN 106679950 B CN106679950 B CN 106679950B
Authority
CN
China
Prior art keywords
water
test
valve
test product
experimental rig
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201611201120.3A
Other languages
Chinese (zh)
Other versions
CN106679950A (en
Inventor
徐子萌
胡治龙
黄熹东
王奔
张腾
同聪维
许钒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an High Voltage Electrical Apparatus Research Institute Co.,Ltd.
Original Assignee
China XD Electric Co Ltd
Xian High Voltage Apparatus Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China XD Electric Co Ltd, Xian High Voltage Apparatus Research Institute Co Ltd filed Critical China XD Electric Co Ltd
Priority to CN201611201120.3A priority Critical patent/CN106679950B/en
Publication of CN106679950A publication Critical patent/CN106679950A/en
Application granted granted Critical
Publication of CN106679950B publication Critical patent/CN106679950B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01MTESTING STATIC OR DYNAMIC BALANCE OF MACHINES OR STRUCTURES; TESTING OF STRUCTURES OR APPARATUS, NOT OTHERWISE PROVIDED FOR
    • G01M13/00Testing of machine parts

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)
  • Testing Resistance To Weather, Investigating Materials By Mechanical Methods (AREA)

Abstract

The present invention provides a kind of converter valve and is water-cooled equipment test device and its test method, and experimental rig is made of interior recirculated water measuring table, outer circulation water gaging platform, pressure testing platform, power termination device and measurement monitoring system, master system.Interior recirculated water measuring table and outer circulation water gaging platform are connected in the inside/outside water loop of test product water cooling equipment, and power termination device is parallel to water resistance control valve and is connected to interior recirculated water measuring table.Pressure testing platform is connected to interior recirculated water measuring table by spare interface.Simulation valve group by water resistance control valve and power termination unit simulation converter valve as test product water cooling equipment adjusts test product to test operation condition, carries out comprehensive monitoring to the operating parameter of test product by a variety of high-performance measuring instrumentss of experimental rig.Experimental rig is equipped with comprehensive early warning and defencive function simultaneously, and when operating parameter exception can issue warning signal in time, and protection act can be generated when serious.

Description

A kind of converter valve is water-cooled equipment test device and its test method
[technical field]
The invention belongs to technical field of direct current power transmission, it is related to a kind of converter valve and is water-cooled equipment test device and its test Method.
[background technique]
Direct current transportation field achieves significant progress in recent years, have every year a plurality of direct current transportation circuit put into production and It uses.In addition to Traditional DC engineering persistently puts into construction, flexible direct current engineering has also obtained swift and violent development.Converter valve water cooling But equipment is the important ancillary equipment of DC transmission engineering core equipment converter valve.No matter Traditional DC engineering and flexible direct current work Journey, in the DC transmission engineering of any voltage class, converter valve is water-cooled the unfailing performance of equipment and stable operation is all An important factor for DC transmission engineering even running.
Standard never unified before the experiment certification of converter valve water cooling equipment, each manufacturing enterprise is also mostly in enterprise Inside is to look forward to being designated as standard, until China in 2013 is just proposed relevant national standard -- " GB/T30425-2013 high voltage direct current Current transmission valve water cooling equipment ", but do not occur the water cooling equipment experimental rig of perfect in shape and function and test system in market so far System.Presently relevant detection is mainly temporarily built test pipeline by manufacturing enterprise and carried out.There are many deficiencies in this scheme, Mainly there is DATA REASONING in test there are borrow itself measuring instruments of test product water cooling equipment to carry out more, causes testing accuracy by test product Itself accuracy of instrument restricts, and checking function is not perfect, examine equipment safety facility incomplete etc..
[summary of the invention]
The object of the present invention is to provide a kind of converter valves to be water-cooled equipment test device and its test method, solves existing There is DATA REASONING in technology to borrow the progress of itself measuring instruments of test product water cooling equipment, causes testing accuracy by test product itself instrument Precision restricts;The problem that checking function is not perfect and inspection equipment safety facility is incomplete.
To achieve the above object, the invention adopts the following technical scheme:
A kind of converter valve is water-cooled the experimental rig of equipment, including interior recirculated water measuring table, outer circulation water gaging are put down Platform, pressure testing platform, power termination device, measurement monitoring system and master system;
The import and export of the interior recirculated water measuring table is connected to the confession of cold part in test product, on water return outlet, interior Water resistance control valve is provided on the pipeline of recirculated water measuring table;It is provided on the pipeline of interior recirculated water measuring table and water resistance The pH value transmitter of control valve parallel connection;
The outer circulation water gaging platform is connected to the outer water loop in test product outside cold part and test product between cold part In;
The power termination device is connected in interior recirculated water measuring table, and in parallel with water resistance control valve;
The pressure testing platform both ends are connected on interior recirculated water measuring table by spare interface;For being carried out to test product It moisturizing and suppresses;
The measurement monitoring system controls recirculated water measuring table, outer circulation water gaging platform, pressure in connection respectively Test platform, power termination device, data monitoring and early warning to all measurement points of experimental rig;
The master system connection measurement monitoring system, to the remote operation and monitoring of test platform.
As a further improvement of the present invention, the interior recirculated water measuring table main body measures pipeline structure by interior recirculated water At;It is circulating water intake pressure transmitter in being installed on interior recirculated water measurement entrance, interior circulating water intake temperature transmitter, interior Circulating water flow transmitter and interior recirculated water conductivity transmitter;On pipe outlet install in circulating water outlet temperature transmitter and Interior circulating water outlet pressure transmitter.
As a further improvement of the present invention, the water resistance control valve is in series by multiple valves.
As a further improvement of the present invention, the outer circulation water gaging main platform body is by outer circulation water gaging pipeline structure At installation outer circulation water flow transmitter, outer circulation water inlet temperature transmitter and outer circulation water inlet on outer circulation water gaging Temperature transmitter.
As a further improvement of the present invention, threeway is installed on the export pipeline of the outer circulation water flow transmitter Valve, triple valve are connected to outer circulation water gaging import all the way.
As a further improvement of the present invention, the power termination device be multiple groups can independent control water-cooled resistance; The import and export of power termination device is connected to interior recirculated water measuring table by spare interface, simultaneously with valve body water resistance control valve Join, is respectively mounted control valve on the import and export of power termination device;Outlet is equipped with temperature sensor, and import is equipped with flow Sensor.
As a further improvement of the present invention, the pressure testing platform is by force (forcing) pump and small pump and water tank structure At the entery and delivery port of pressure testing platform is provided with valve.
As a further improvement of the present invention, the measurement monitoring system is by PLC host, touch screen and corresponding survey Measure the measurement monitoring system of module composition.
A kind of test method for the experimental rig being water-cooled equipment based on the converter valve, comprising the following steps:
Simulation valve group by water resistance control valve and power termination unit simulation converter valve as test product water cooling equipment is adjusted Test product water cooling equipment is saved to test operation condition, by experimental rig multiple measuring points measuring instrumentss to test product water cooling equipment Operating parameter carry out comprehensive monitoring, while experimental rig is provided with early warning and defencive function, in the fortune of test product and experimental rig It is issued warning signal in time when row abnormal parameters, protection act can be generated when serious.
Specifically includes the following steps:
When carrying out pressure testing, pressure testing platform is connected to interior recirculated water measuring table by spare interface;PH value is closed to become The valve before and after device is sent, moisturizing is carried out to test product and experimental rig by the small pump of pressure testing platform, after the completion of moisturizing, is closed Small pump, and close moisturizing pipeline valve;Test pressure is set on measurement monitoring host computer and starts adding for pressure testing platform Press pump;After test product reaches test objective pressure, force (forcing) pump can be automatically closed, be then shut off capstan valve, and keep to examination The time required to testing;
When heat exchange property is tested, set by water resistance control valve and power termination unit simulation converter valve as the cooling of test product water Standby simulation valve group: cooling water water dispenser in starting test product, and it is adjusted to nominal operating conditions;Startup power load device, wait try When cooling water temperature is risen to higher than outer cooling water temperature certain temperature in product, outer cooling water is made to start to flow and adjust flow and reach To specified value;Monitoring system is measured to carry out full the operating parameter of test product water cooling equipment by the measuring instrumentss of multiple measurement points Face monitoring and early warning and defencive function;The temperature for observing temperature point everywhere records temperature value everywhere after it is stablized;Meter Calculation obtains the heat transfer coefficient of test product, completes heat exchange property test.
When hydraulic performance test, the valve before and after power termination device and pH value transmitter is closed, by water resistance control valve It simulates valve group water resistance: recycling water dispenser in starting test product, it is made to work in specified water supply flow and pressure of supply water, adjust main pump outlet The valve at place adjusts test product water supply flow and pressure, record measuring point into valve flow and pressure, judge whether it meets the requirements, Complete hydraulic performance test;
When water quality measurement is tested, the valve before and after power termination device and pH value transmitter is closed, by water resistance control valve It simulates valve group water resistance: recycling water dispenser in starting test product, it is made to work in declared working condition, open the valve before and after pH value transmitter, After test product stable conditions, start test product deionization branch, when its flow reaches specified, starts timing and monitor interior cooling water Conductivity and pH value, when as in interior cooling water stable conductivity to prescribed limit, record cooling water conductivity in test product, pH value and Time completes test water quality measurement test;
When continuous service test, set by water resistance control valve and power termination unit simulation converter valve as the cooling of test product water Standby simulation valve group: starting test product water cooling equipment makes its inside and outside water reach declared working condition, by measurement monitoring system to test product Operating parameter carry out comprehensive monitoring and early warning and defencive function, while observing test product motor, pump, blower and heat exchanger fortune Whether row is normal, keeps test product continuous operation to the time of test requirements document, completes continuous service test;
It carries out defencive function test and communication and interface test constantly, closes power termination device and pH value transmitter two Side valve door simulates valve group water resistance by water resistance control valve: starting test product water dispenser passes through examination after making its operation to declared working condition Product water cooling equipment host simulated failure situation, judges whether its defencive function meets design requirement, carries out defencive function test; Whether the uplink and downlink information communication between detection test product water cooling plant host and its Protection control system are normal, are communicated It is tested with interface.
Compared with the existing technology, the invention has the following advantages:
The present invention is filled by interior recirculated water measuring table, outer circulation water gaging platform, pressure testing platform, power termination It sets, measure monitoring system and six part of master system composition, incorporate a variety of converter valve water cooling equipment type approval test functions To an aggregation type test platform, all type approval test demands of the water cooling equipment in addition to EMC test can be met.The present invention is using integration The aggregation type test platforms of a variety of test functions, test function multiplicity, cooperation earth resistance tester, noise-measuring instrument and Insulate pressure tester then all pattern pilot projects of the achievable water cooling equipment in addition to EMC test.
Further, the present invention is provided with perfect early warning and defencive function, including abnormal parameters early warning and error protection function Can, test product and testing equipment can be comprehensively protected, the security risk during test is excluded.
Further, the present invention is monitored using the measurement that third-party measuring instrument carries out test product parameter, it can be achieved that right completely The standardized management of test measurement instrument, and test parameters and measurement accuracy are not influenced by test product water cooling equipment self-condition.
Further, the power of external cooler investment can be adjusted flexibly to cooperate different examinations by adjusting the aperture of triple valve Proved recipe formula.
Test method of the invention is cooling as test product water by water resistance control valve and power termination unit simulation converter valve The simulation valve group of equipment adjusts test product to test operation condition, by a variety of high-performance measuring instrumentss of experimental rig to test product Operating parameter carries out comprehensive monitoring.Experimental rig is equipped with comprehensive early warning and defencive function simultaneously, when operating parameter exception can and When issue warning signal, protection act can be generated when serious.And pressure testing, heat exchange property test, water can be carried out simultaneously Power performance test, water quality measurement test, continuous service test, defencive function test and a variety of examinations such as communication and interface test It tests.Solve in the prior art DATA REASONING borrow itself measuring instruments of test product water cooling equipment carry out, cause testing accuracy by Test product itself accuracy of instrument restricts;The problem that checking function is not perfect and inspection equipment safety facility is incomplete.
[Detailed description of the invention]
Fig. 1 is overall structure diagram of the invention.
Wherein, 1, cold part outside test product;2, outer circulation water gaging platform;21, triple valve;22, outer circulation water flow pick-up Device;23, outer circulation water inlet temperature transmitter;24, outer circulation water outlet temperature transmitter;3, cold part in test product;4, interior to follow Ring water gaging platform;41, interior circulating water outlet pressure transmitter;42, interior circulating water outlet temperature transmitter;43, water resistance is adjusted Valve;44, pH value transmitter;45, interior recirculated water conductivity transmitter;46, interior circulating water intake pressure transmitter;47, interior to follow Ring water inlet temperature transmitter;48, interior circulating water flow transmitter;5, power termination device;51, power termination outlet temperature becomes Send device;52, power termination flow transmitter;6, pressure testing platform;7, monitoring system is measured;8, master system.
[specific embodiment]
Below in conjunction with attached drawing of the invention, technical solution of the present invention is clearly and completely described.Based on this hair Embodiment in bright, every other implementation obtained by those of ordinary skill in the art without making creative efforts Example belongs to the range of this reality invention protection.
As shown in Figure 1, being experimental rig overall structure of the invention, experimental rig is followed by interior recirculated water measuring table 4, outside Ring water gaging platform 2, pressure testing platform 6, power termination device 5 and measurement monitoring system 7,8 six part group of master system At.In test, the import/export of interior recirculated water measuring table 4 is connected to confession/water return outlet of cold part in test product, outer circulation Water gaging platform 2 is connected to outside the test product of test product water cooling plant in cold part 1, and power termination device 5 is parallel to water resistance regulating valve Door 43 is connected to interior recirculated water measuring table 4.
Wherein, the main body of interior recirculated water measuring table 4 is made of interior recirculated water measurement pipeline.Circulating water flow in Pipe installing Transmitter 48, interior recirculated water import/export temperature transmitter 47/42, interior recirculated water import/export pressure transmitter 46/41 and interior Recirculated water conductivity transmitter 45, and the water resistance control valve 43 being made of multiple valves is installed for simulating valve body water in testing Resistance and progress water resistance adjusting.Further include the pH value transmitter 44 in parallel with water resistance control valve 43 on pipeline, uses import/export Parallel branch with valve carries out the real-time measurement of pH value, can be adjusted under extreme test situation the pressure of pH value measuring instrument with Flow, and valve can be closed when system is run if necessary, pH value measuring instrument is cut out with protection instrument and test product.
The main body of outer circulation water gaging platform 2 is made of outer circulation water gaging pipeline.Pipe installing outer circulation water flow quantitative change Device 22, outer circulation water import/export temperature transmitter 23/24 are sent, and the triple valve 21 that adjustable outer water flow shunts is installed.
The water route outlet of power termination device 5 is equipped with temperature sensor 51, and import is equipped with flow sensor 52.It uses When interior recirculated water measuring table 4 is connected to by spare interface, it is in parallel with water resistance control valve 43.
6 main body of pressure testing platform is made of force (forcing) pump and small pump and water tank, and moisturizing can be carried out to test product and is suppressed. And the setting of pressure testing goal pressure, force (forcing) pump meeting when being pressurized to goal pressure to test product can be carried out by measurement monitoring system Pressurization is automatically stopped to prevent hypertonia caused by maloperation.
Measurement monitoring system can realize the data monitoring to all measurement points of experimental rig, and form data sheet.Simultaneously It measures monitoring system and is equipped with perfect early warning and defencive function.It is made of PLC host, touch screen and corresponding measurement software and hardware Measure monitoring system.The data monitoring to all measurement points of experimental rig can be achieved, and form data sheet.Monitoring is measured simultaneously System is equipped with perfect early warning and defencive function, and early warning can be carried out to the abnormality of test product and test platform, serious in failure When can generate protection act.
Master system is made of host computer computer and corresponding software system, passes through Ethernet and measurement monitoring system host Be connected, it can be achieved that test platform remote operation and monitoring.
A kind of test method for the experimental rig being water-cooled equipment based on converter valve, comprising the following steps:
By water resistance control valve and power termination unit simulation converter valve as test product water cooling equipment when test carries out Valve group is simulated, adjusts test product water cooling equipment to test operation condition, by a variety of high-performance measuring instrumentss of experimental rig to examination The operating parameter of product water cooling equipment carries out comprehensive monitoring.Experimental rig is provided with comprehensive early warning and defencive function simultaneously, can It is issued warning signal in time in the operating parameter exception of test product and experimental rig, protection act can be generated when serious.
When being tested using this experimental rig, specific step is as follows for main experimental project:
Pressure testing step:
1, test platform is correctly connect with test product, pressurized pump system is connected to interior follow by pre-reservation pressure test interface Ring water gaging platform closes valve before and after pH meter measuring device;
2, pressure testing goal pressure is arranged by measurement monitoring system, and starts pressurized pump system, test product is increased Pressure, after pressure reaches test pressure, booster pump is automatically stopped pressurization;
3, pressure testing interface valve is closed, test product pressure is monitored, completes pressure testing.
Water quality measurement test procedure:
1, test platform is correctly connect with test product, starts water replanishing device, made in pipeline full of supplementing water as defined in meeting, Record amount of makeup water and initial conductivity;
2, after ensuring that pH value measurement circuit both ends valve is in the open state, start test product water dispenser, and adjust water resistance adjusting Valve makes test product pressure of supply water and water supply flow reach rated value;
3, start test product deionization branch, when its flow reaches specified, start timing, and monitor interior cooling water conductivity And pH value, when as in interior cooling water stable conductivity to prescribed limit, cooling water conductivity, pH value and time in test product are recorded, Complete test water quality measurement test.
Hydraulic performance test step:
1, test platform is correctly connect with test product, starts water replanishing device, made in pipeline full of supplementing water as defined in meeting;
2, start test product main pump, and adjust water resistance control valve, test product is made to work in declared working condition;
3, water resistance control valve is adjusted, and is recorded into valve flow and pressure (measurement point is no less than 5), hydraulic performance is completed Test.
Heat exchange property test procedure:
1, test platform is correctly connect with test product, starts water replanishing device, made in pipeline full of supplementing water as defined in meeting;
2, start main circulation pump, adjust interior cooling water flow to specified value;
3, startup power load device makes outer cold when interior cooling water temperature rises to higher than 10 DEG C of outer cooling water temperature But water, which starts to flow and adjust flow, reaches specified value;
4, the temperature for observing thermometer everywhere records temperature value everywhere after it is stablized.Then, it is observed continuously 10min chooses the wherein temperature value of 3~5 time point records everywhere.According to calculating, the heat transfer coefficient of test product can be obtained, complete Heat exchange property test.
Continuous service test step:
1, test platform is correctly connect with test product, starts water replanishing device, made in pipeline full of supplementing water as defined in meeting;
2, start test product, and adjust water resistance control valve, make its work in rated condition, monitor test product flow everywhere, Pressure, temperature, conductivity and pH value;
3, whether normal the operation of the main components such as test product motor, pump, blower and heat exchanger is observed.
4, it keeps test product continuous operation to the time of test requirements document, completes continuous service test.
Specific experimental method is as follows:
When carrying out pressure testing, pressure testing platform 6 is connected to interior recirculated water measuring table 4 by spare interface.Close pH value The valve of 44 front and back of transmitter.Moisturizing is carried out to test product and experimental rig by small pump, after the completion of moisturizing, closes small pump, and Close moisturizing pipeline valve.Test pressure is set on measurement monitoring host computer and starts force (forcing) pump.Test product reaches test objective pressure After power, force (forcing) pump can be automatically closed.Then capstan valve is turned off manually, and keeps to test required time.
It is cooling as test product water by water resistance control valve 43 and power termination unit simulation converter valve when heat exchange property is tested The simulation valve group of equipment.Start cooling water water dispenser in test product, and is adjusted to nominal operating conditions.Startup power load 5, to test product When interior cooling water temperature is risen to higher than 10 DEG C of outer cooling water temperature, outer cooling water is made to start to flow and adjust flow and reach regulation Value.Comprehensive monitoring is carried out to the operating parameter of test product water cooling equipment by a variety of high-performance measuring instrumentss of experimental rig.Simultaneously Experimental rig is provided with comprehensive early warning and defencive function, can issue in time in the operating parameter exception of test product and experimental rig Pre-warning signal can generate protection act when serious.The temperature for observing thermometer everywhere records temperature everywhere after it is stablized Value.Then, 10min is observed continuously, chooses the wherein temperature value of 3~5 time point records everywhere.According to calculating, can be tried The heat transfer coefficient of product completes heat exchange property test.
When hydraulic performance test, power termination device and pH value transmitter import/export valve are closed, by water resistance control valve Simulate valve group water resistance.Start and recycle water dispenser in test product, it is made to work in specified water supply flow and pressure of supply water.Adjust main pump outlet The valve at place adjusts test product water supply flow and pressure.It records into valve flow and pressure (measurement point is no less than 5), judges that it is It is no to meet design requirement, complete hydraulic performance test.
When water quality measurement is tested, power termination device 5 and pH value transmitter import/export valve are closed, by water resistance regulating valve Door simulation valve group water resistance.Start and recycle water dispenser in test product, it is made to work in declared working condition.Open pH value transmitter disengaging/mouth valve Door.After test product stable conditions, start test product deionization branch, when its flow reaches specified, starts timing and monitor interior cold But water conductivity and pH value.When as in interior cooling water stable conductivity to prescribed limit, cooling water conductivity, pH in test product are recorded Value and time complete test water quality measurement test.
When continuous service test, converter valve is simulated as test product water cooling by water resistance control valve 43 and power termination device 5 But the simulation valve group of equipment.Start test product water cooling equipment, its inside and outside water is made to reach declared working condition.By experimental rig to test product Operating parameter carry out comprehensive monitoring.Simultaneously by the comprehensive early warning of experiment device and defencive function, to test product and experimental rig into Row early warning protection.It is whether normal that the operation of the main components such as test product motor, pump, blower and heat exchanger is observed simultaneously.Keep examination Product continuous operation completes continuous service test to the time of test requirements document.
When carrying out defencive function test and communication and interface test, power termination device and pH value transmitter two sides valve It closes, valve group water resistance is simulated by water resistance control valve.Start test product water dispenser, after making its operation to declared working condition, passes through test product Water cooling equipment host simulated failure situation, judges whether its defencive function meets design requirement, carries out defencive function test.Inspection Whether uplink between test article water cooling plant host and its Protection control system and downlink information communication normal, carry out communication and Interface test.
It as shown in table 1, is water cooling equipment LWA750-109F continuous service test data record.
Table 1
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any Those familiar with the art in the technical scope disclosed by the present invention, can easily think of the change or the replacement, and should all contain Lid is within protection scope of the present invention.Therefore, protection scope of the present invention should be based on the protection scope of the described claims.

Claims (10)

1. the experimental rig that a kind of converter valve is water-cooled equipment, which is characterized in that including interior recirculated water measuring table (4), outside Recirculated water measuring table (2), pressure testing platform (6), power termination device (5), measurement monitoring system (7) and master system (8);
The import and export of the interior recirculated water measuring table (4) is connected to the confession of cold part (3) in test product, on water return outlet, Water resistance control valve (43) are provided on the pipeline of interior recirculated water measuring table (4);On the pipeline of interior recirculated water measuring table (4) It is provided with the pH value transmitter (44) in parallel with water resistance control valve (43);
The outer circulation water gaging platform (2) is connected to the outer water in test product outside cold part (3) and test product between cold part (1) In circuit;
The power termination device (5) is connected in interior recirculated water measuring table (4), and simultaneously with water resistance control valve (43) Connection;
Pressure testing platform (6) both ends are connected on interior recirculated water measuring table (4) by spare interface;For to test product into It row moisturizing and suppresses;
The measurement monitoring system (7) control respectively connection in recirculated water measuring table (4), outer circulation water gaging platform (2), Pressure testing platform (6), power termination device (5), data monitoring and early warning to all measurement points of experimental rig;
Master system (8) connection measurement monitoring system (7), remotely operates test platform and is monitored.
2. a kind of converter valve is water-cooled the experimental rig of equipment according to claim 1, which is characterized in that followed in described Ring water gaging platform (4) main body is made of interior recirculated water measurement pipeline;Recirculated water in being installed on interior recirculated water measurement entrance Inlet pressure transmitter (46), interior circulating water intake temperature transmitter (47), interior circulating water flow transmitter (48) and interior circulation Water conductivity transmitter (45);Circulating water outlet temperature transmitter (42) and interior circulating water outlet pressure in being installed on pipe outlet Transmitter (41).
3. a kind of converter valve is water-cooled the experimental rig of equipment according to claim 1, which is characterized in that the water resistance Control valve (43) is in series by multiple valves.
4. a kind of converter valve is water-cooled the experimental rig of equipment according to claim 1, which is characterized in that described outer to follow Ring water gaging platform (2) main body is made of outer circulation water gaging pipeline, and outer circulation water flow pick-up is installed on outer circulation water gaging Device (22), outer circulation water inlet temperature transmitter (24) and outer circulation water inlet temperature transmitter (23).
5. a kind of converter valve is water-cooled the experimental rig of equipment according to claim 4, which is characterized in that described outer to follow It is equipped on the export pipeline of ring water flow transmitter (22) triple valve (21), triple valve (21) is connected to outer circulation water gaging all the way Import.
6. a kind of converter valve is water-cooled the experimental rig of equipment according to claim 1, which is characterized in that the power Load device (5) be multiple groups can independent control water-cooled resistance;The import and export of power termination device (5) is connected by spare interface It is connected to interior recirculated water measuring table (4), it is in parallel with valve body water resistance control valve (43), on the import and export of power termination device (5) It is respectively mounted control valve;Outlet is equipped with temperature sensor (51), and import is equipped with flow sensor (52).
7. a kind of converter valve is water-cooled the experimental rig of equipment according to claim 1, which is characterized in that the pressure Test platform (6) is made of force (forcing) pump and small pump and water tank, and the entery and delivery port of pressure testing platform (6) is provided with valve Door.
8. a kind of converter valve is water-cooled the experimental rig of equipment according to claim 1, which is characterized in that the measurement The measurement monitoring system that monitoring system (7) is made of PLC host, touch screen and corresponding measurement module.
9. a kind of test method for the experimental rig for being water-cooled equipment based on converter valve described in claim 1, which is characterized in that The following steps are included:
Analog valve by water resistance control valve (43) and power termination device (5) simulation converter valve as test product water cooling equipment Group, adjusts test product water cooling equipment to test operation condition, by experimental rig multiple measuring points measuring instrumentss to test product water cooling But the operating parameter of equipment carries out comprehensive monitoring, while experimental rig is provided with early warning and defencive function, in test product and test dress It is issued warning signal in time when the operating parameter exception set, protection act can be generated when serious.
10. the test method that converter valve according to claim 8 is water-cooled the experimental rig of equipment, which is characterized in that Specifically includes the following steps:
When carrying out pressure testing, pressure testing platform (6) is connected to interior recirculated water measuring table (4) by spare interface;Close pH value Valve before and after transmitter (44) carries out moisturizing to test product and experimental rig by the small pump of pressure testing platform (6), and moisturizing is complete Cheng Hou closes small pump, and closes moisturizing pipeline valve;Test pressure is set on measurement monitoring host computer and starts pressure testing The force (forcing) pump of platform (6);After test product reaches test objective pressure, force (forcing) pump can be automatically closed, be then shut off capstan valve, And the time required to keeping to test;
When heat exchange property is tested, by water resistance control valve (43) and power termination device (5) simulation converter valve as test product water cooling But the simulation valve group of equipment: cooling water water dispenser in starting test product, and it is adjusted to nominal operating conditions;Startup power load device (5), when cooling water temperature in test product rises to higher than outer cooling water temperature certain temperature, make outer cooling water start to flow and adjust Amount of restriction reaches specified value;Measure the fortune of monitoring system (7) by the measuring instrumentss of multiple measurement points to test product water cooling equipment Row parameter carries out comprehensive monitoring and early warning and defencive function;The temperature for observing temperature point everywhere, after it is stablized, record is everywhere Temperature value;The heat transfer coefficient of test product is calculated, completes heat exchange property test;
When hydraulic performance test, the valve before and after power termination device (5) and pH value transmitter (44) is closed, by water resistance regulating valve Door (43) simulates valve group water resistance: recycling water dispenser in starting test product, it is made to work in specified water supply flow and pressure of supply water, adjust master Valve at pump discharge adjusts test product water supply flow and pressure, record measuring point into valve flow and pressure, judge whether it meets It is required that completing hydraulic performance test;
When water quality measurement is tested, the valve before and after power termination device (5) and pH value transmitter (44) is closed, by water resistance regulating valve Door (43) simulates valve group water resistance: recycling water dispenser in starting test product, it is made to work in declared working condition, before opening pH value transmitter (44) Valve afterwards starts test product deionization branch after test product stable conditions, when its flow reaches specified, starts timing and supervises Cooling water conductivity and pH value in surveying when as in interior cooling water stable conductivity to prescribed limit, record cooling water power in test product Conductance, pH value and time complete test water quality measurement test;
When continuous service test, by water resistance control valve (43) and power termination device (5) simulation converter valve as test product water cooling But the simulation valve group of equipment: starting test product water cooling equipment makes its inside and outside water reach declared working condition, by measurement monitoring system (7) comprehensive monitoring and early warning and defencive function are carried out to the operating parameter of test product, at the same observe test product motor, pump, blower and Whether heat exchanger operation is normal, keeps test product continuous operation to the time of test requirements document, completes continuous service test;
When carrying out defencive function test and communication and interface test, power termination device (5) and pH value transmitter (44) are closed Two sides valve simulates valve group water resistance by water resistance control valve (43): starting test product water dispenser, after making its operation to declared working condition, By test product water cooling equipment host simulated failure situation, judges whether its defencive function meets design requirement, carry out protection function It can test;Whether the uplink and downlink information communication between detection test product water cooling plant host and its Protection control system are normal, Carry out communication and interface test.
CN201611201120.3A 2016-12-22 2016-12-22 A kind of converter valve is water-cooled equipment test device and its test method Active CN106679950B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201611201120.3A CN106679950B (en) 2016-12-22 2016-12-22 A kind of converter valve is water-cooled equipment test device and its test method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201611201120.3A CN106679950B (en) 2016-12-22 2016-12-22 A kind of converter valve is water-cooled equipment test device and its test method

Publications (2)

Publication Number Publication Date
CN106679950A CN106679950A (en) 2017-05-17
CN106679950B true CN106679950B (en) 2019-01-25

Family

ID=58871411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201611201120.3A Active CN106679950B (en) 2016-12-22 2016-12-22 A kind of converter valve is water-cooled equipment test device and its test method

Country Status (1)

Country Link
CN (1) CN106679950B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107091754A (en) * 2017-05-26 2017-08-25 中国南方电网有限责任公司超高压输电公司天生桥局 A kind of simulation experiment system of HVDC-valve inner cold system
CN107702904B (en) * 2017-09-20 2019-12-31 北京国电富通科技发展有限责任公司 Converter valve cooling system cold and hot alternation testing device and method
CN109211601A (en) * 2018-07-03 2019-01-15 中国南方电网有限责任公司超高压输电公司天生桥局 A kind of converter valve external cooling device fouling differentiation pilot system
CN110646194B (en) * 2019-08-29 2020-09-01 中国南方电网有限责任公司超高压输电公司广州局 Converter valve cooling capacity multidimensional analysis early warning method and system
CN113359897B (en) * 2021-06-02 2022-05-27 常州博瑞电力自动化设备有限公司 Method and system for controlling outlet water temperature of circulating water in converter valve water cooling system
CN114485778B (en) * 2021-12-27 2023-07-14 广州高澜节能技术股份有限公司 Automatic checking device and method for FACTS cooling equipment
CN115498853B (en) * 2022-10-12 2024-05-24 南方电网科学研究院有限责任公司 Detection method for inlet valve flow protection function of flexible straight valve cold control protection system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6804996B2 (en) * 2003-03-18 2004-10-19 Edp Technical Services, Inc. Head gasket testing apparatus and method
CN101937057A (en) * 2010-08-30 2011-01-05 中国西电电气股份有限公司 Synthesis loop for running test of converter valve for direct current power transmission project
CN202260981U (en) * 2011-09-30 2012-05-30 广州高澜节能技术股份有限公司 Direct-current power transmission and current conversion valve cooling system
CN102879738A (en) * 2012-09-24 2013-01-16 唐山轨道客车有限责任公司 Water resistance testing system
KR101224192B1 (en) * 2012-04-06 2013-01-21 유종훈 High temperature high pressure valve test device
CN203024989U (en) * 2012-12-05 2013-06-26 广州高澜节能技术股份有限公司 Cooling experiment system of converter valve device
CN105717266A (en) * 2014-12-04 2016-06-29 国家电网公司 Direct-current transmission converter valve cooling water quality online monitoring system and method

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6804996B2 (en) * 2003-03-18 2004-10-19 Edp Technical Services, Inc. Head gasket testing apparatus and method
CN101937057A (en) * 2010-08-30 2011-01-05 中国西电电气股份有限公司 Synthesis loop for running test of converter valve for direct current power transmission project
CN202260981U (en) * 2011-09-30 2012-05-30 广州高澜节能技术股份有限公司 Direct-current power transmission and current conversion valve cooling system
KR101224192B1 (en) * 2012-04-06 2013-01-21 유종훈 High temperature high pressure valve test device
CN102879738A (en) * 2012-09-24 2013-01-16 唐山轨道客车有限责任公司 Water resistance testing system
CN203024989U (en) * 2012-12-05 2013-06-26 广州高澜节能技术股份有限公司 Cooling experiment system of converter valve device
CN105717266A (en) * 2014-12-04 2016-06-29 国家电网公司 Direct-current transmission converter valve cooling water quality online monitoring system and method

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
不同环境下超低能耗运行的换流阀冷却系统设计;景兆杰 等;《自动化应用》;20131231(第7期);第99-102页
循环蓄冷式换流阀冷却系统设计;蔡常群 等;《信息技术》;20141231(第5期);第178-182页

Also Published As

Publication number Publication date
CN106679950A (en) 2017-05-17

Similar Documents

Publication Publication Date Title
CN106679950B (en) A kind of converter valve is water-cooled equipment test device and its test method
CN108398611A (en) Function test system based on minimum battery management system and its test method
CN204758596U (en) Dissolved gas content dynamic calibration system among transformer oil
CN208156105U (en) Function test system based on minimum battery management system
CN107941851A (en) The performance testing device and its test method of a kind of heat radiator of internal-combustion engine
CN103278312B (en) Method and device for verifying pressure relief valve of transformer
CN106153161B (en) Instrument detection device
CN207991747U (en) A kind of full-automatic pressure sensor batch detection calibration console
CN112611586B (en) Method and system for testing and verifying liquid cooling system of data machine room
CN103364197A (en) An engine low-pressure simulation testing platform
CN203688420U (en) Internal corrosion test bed for engine coolant radiating water tank
CN209607849U (en) Auxiliary pile simulator for fuel cell generation test
CN102507229B (en) Warmer box-type experimental device
CN105807000B (en) A kind of on-line chemical monitoring instrument standard calibration device and method
CN108169678A (en) A kind of electronic development test system of analog fuel battery
CN106774190A (en) Wet cooling gas turbine group condenser vacuum exception auto-check system and method
CN203551273U (en) Device for measuring performance parameters of thermoregulator
CN112687920A (en) Device for simulating circulating pump capacity in fuel cell system
CN205876303U (en) Well head warm -pressing becomes integration installation device
CN205826780U (en) Stray current drainage device testboard
CN115274148A (en) Nuclear power plant containment tightness simulation test system
CN213239324U (en) A verifying attachment for detecting pressure sensor
CN113432680A (en) Nuclear power plant reactor coolant system flow calibration method
CN209590663U (en) The measurement of high-precision fuel consumption and oil temperature oil pressure control system
CN114689812A (en) Automatic checking and calibrating system and method for online chemical instrument

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210811

Address after: 710077 No. 18 West Second Ring Road, Shaanxi, Xi'an

Patentee after: XI'AN HIGH VOLTAGE APPARATUS RESEARCH INSTITUTE Co.,Ltd.

Address before: 710075 Shaanxi city of Xi'an province high tech Zone No. 7 Tang Xing Lu

Patentee before: CHINA XD ELECTRIC Co.,Ltd.

Patentee before: XI'AN HIGH VOLTAGE APPARATUS RESEARCH INSTITUTE Co.,Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 710077 No. 18 West Second Ring Road, Shaanxi, Xi'an

Patentee after: Xi'an High Voltage Electrical Apparatus Research Institute Co.,Ltd.

Address before: 710077 No. 18 West Second Ring Road, Shaanxi, Xi'an

Patentee before: XI'AN HIGH VOLTAGE APPARATUS RESEARCH INSTITUTE Co.,Ltd.