CN109208929A - A kind of device for the simultaneous maintenance of depositing dust in floor - Google Patents
A kind of device for the simultaneous maintenance of depositing dust in floor Download PDFInfo
- Publication number
- CN109208929A CN109208929A CN201811337059.4A CN201811337059A CN109208929A CN 109208929 A CN109208929 A CN 109208929A CN 201811337059 A CN201811337059 A CN 201811337059A CN 109208929 A CN109208929 A CN 109208929A
- Authority
- CN
- China
- Prior art keywords
- floor
- main pipeline
- spray
- depositing dust
- connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000000428 dust Substances 0.000 title claims abstract description 23
- 238000012423 maintenance Methods 0.000 title claims abstract description 14
- 238000000151 deposition Methods 0.000 title claims abstract description 12
- 239000007921 spray Substances 0.000 claims abstract description 40
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 39
- 238000010276 construction Methods 0.000 claims abstract description 17
- 238000005507 spraying Methods 0.000 claims abstract description 13
- 238000009408 flooring Methods 0.000 claims abstract description 12
- 230000000694 effects Effects 0.000 abstract description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000005553 drilling Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000003344 environmental pollutant Substances 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000013618 particulate matter Substances 0.000 description 1
- 239000008188 pellet Substances 0.000 description 1
- 231100000719 pollutant Toxicity 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/24—Safety or protective measures preventing damage to building parts or finishing work during construction
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B01—PHYSICAL OR CHEMICAL PROCESSES OR APPARATUS IN GENERAL
- B01D—SEPARATION
- B01D47/00—Separating dispersed particles from gases, air or vapours by liquid as separating agent
- B01D47/06—Spray cleaning
Abstract
The invention discloses a kind of devices for the simultaneous maintenance of depositing dust in floor, including water tank, main pipeline and the water pump for being connected to main pipeline lower end, the water pump is placed in water tank, the main pipeline is vertically-mounted along standpipe or construction water pipe, it is located at the position in every floor on main pipeline to be respectively set there are two connector is responsible for, two supervisor's connectors are separately connected spray equipment and flooring spraying device in floor.The present invention can carry out spray maintenance to main structure, wherein spray equipment mainly carries out moist curing to main body wall column in floor, and flooring spraying device can carry out moist curing to beam slab, and carry out real-time control by solenoid valve or Hand-operated butterfly valve, avoid the miscellaneous works such as artificial fortune water watering;Meanwhile the present invention can also reduce the dust in floor, clean the effect of floor air.
Description
Technical field
The present invention relates to a kind of devices for the simultaneous maintenance of depositing dust in floor, belong to construction dust control technology field.
Background technique
As building trade develops, new technology is widely applied in construction projects, and the mankind are being constantly changing environment, and a little
Meanwhile we are pursuing harmony between man and nature development, under the premise of guaranteeing construction quality, need to reduce the influence to environment,
An important factor for wherein fugitive dust prevention and treatment is mostly important, and the fugitive dust that all kinds of construction activities generate is atmosphere pollution.
In the realm of building construction, the main problem of atmosphere pollution is that particulate matter severely exceeds, pellet conduct
Ratio shared by primary pollutant is very high.The fugitive dust that all kinds of construction activities generate can cause serious dirt to atmospheric environment
Dye, construction fugitive dust become one of the main source of Particulate Pollution.Construction fugitive dust etc. influences greatly, to hinder caused by surrounding enviroment
The construction in conservation culture city, also increases the security civilization management difficulty of construction site, this is just to our construction sites
More stringent requirements are proposed for security civilization management.
In order to solve
Summary of the invention
Can not only it shorten the purpose of the present invention is to provide a kind of for depositing dust in floor and the device of maintenance, the drill bit
Interlocking pile drilling time saves construction cost, and can satisfy the requirement of pile body verticality in construction.
To achieve the above object, the invention provides the following technical scheme: it is a kind of for depositing dust in floor and maintenance device,
Including water tank, main pipeline and the water pump for being connected to main pipeline lower end, the water pump is placed in water tank, the main pipeline along
Standpipe or construction water pipe it is vertically-mounted, on main pipeline be located at every floor in position be respectively set there are two supervisor connect
Head, two supervisor's connectors are separately connected spray equipment and flooring spraying device in floor.
Further, spray equipment includes the spray main pipeline being connect by being responsible for connector with main pipeline, institute in the floor
The spray main pipeline stated is arranged in a ring along floor periphery, and spray main pipeline is bundled in the foot of floor surrounding by band
In hand cradle, certain spacing is provided with one group of branch pipe connection on spray main pipeline, is connected with court on each branch pipe connection
Spray branch pipe(tube) into floor is equipped with spray head in the outlet end of spray branch pipe(tube).
Further, the flooring spraying device includes the flexible water conduit being connect by being responsible for connector with main pipeline, described
Flexible water conduit is arranged on the floor in floor, is connected with rotary sprayer by certain spacing on flexible water conduit.Described
Rotary sprayer uses the trident sprayer of model RY101602.
Further, solenoid valve or hand adjustment are connected between the spray main pipeline or flexible water conduit and supervisor's connector
Valve.
Compared with prior art, the beneficial effects of the present invention are: the present invention can carry out spray maintenance to main structure,
Spray equipment mainly carries out moist curing to main body wall column in middle floor, and flooring spraying device can carry out wet support to beam slab
Shield, and real-time control is carried out by solenoid valve or Hand-operated butterfly valve, avoid the miscellaneous works such as artificial fortune water watering;Meanwhile this hair
The bright dust that can also reduce in floor cleans the effect of floor air.Therefore, the present invention, which has, conserves efficient, real-time control, peace
Tear open it is convenient, can flexibly move and it is easy to operate, can effectively inhibit the advantages of fugitive dust.
Detailed description of the invention
Fig. 1 is overall structure diagram of the invention;
Fig. 2 is the structural schematic diagram of spray equipment in floor.
Description of symbols: 1- water tank;2- main pipeline;Spray equipment in 3- floor;4- flooring spraying device;5- flexibility water
Pipe;6- rotary sprayer;7- water pump;8- sprays main pipeline;9- sprays branch pipe(tube);10- branch pipe connection;11- spray head;12- electricity
Magnet valve or Hand-operated butterfly valve;13- is responsible for connector.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, with reference to the accompanying drawings and examples to this hair
It is bright to be described in further detail.
The embodiment of the present invention: for the structural schematic diagram of depositing dust in floor and the device of maintenance as shown in Figure 1, including water
Case 1, main pipeline 2 and the water pump 7 for being connected to 2 lower end of main pipeline, the water pump 7 are placed in water tank 1,2 edge of main pipeline
Standpipe or construction water pipe it is vertically-mounted, the position in every floor is located on main pipeline 2 and is respectively set that there are two main
Pipe fitting 13, two supervisor's connectors 13 are separately connected spray equipment 3 and flooring spraying device 4 in floor.Referring to fig. 2, the building
Spray equipment 3 includes the spray main pipeline 8 being connect by being responsible for connector 13 with main pipeline 2,8 edge of spray main pipeline in layer
Floor periphery be arranged in a ring, and by band by spray main pipeline 8 be bundled on the scaffold 17 of floor surrounding, spraying
One group of branch pipe connection 10 is set by 1 meter of spacing on main pipeline 8, is connected on each branch pipe connection 10 towards the spray in floor
Branch pipe(tube) 9 is equipped with spray head 11 in the outlet end of spray branch pipe(tube) 9.Referring to Fig. 1, the flooring spraying device 4 includes passing through
The flexible water conduit 5 that supervisor's connector 13 is connect with main pipeline 2, the flexible water conduit 5 is arranged on the floor in floor, in flexibility
Rotary sprayer 6 is connected with by 3 meters of spacing on water pipe 5;The rotary sprayer 6 uses the trident of model RY101602
Sprayer, the sprayer can directly be bought by market and be obtained.The spray main pipeline 8 or flexible water conduit 5 and supervisor's connector
Solenoid valve or Hand-operated butterfly valve 12 are connected between 13.
In use, opening water pump 7, water transport is served floor by main pipeline 2.When maintenance, after main body concrete final set, open
Solenoid valve or Hand-operated butterfly valve 12 carry out moisture-keeping maintaining to wall column by spray equipment 3 in floor, and can pass through flooring spraying device
4 pairs of beam slabs carry out moisture-keeping maintaining.When depositing dust, when the various construction operations of floor produce dust, while opens solenoid valve or manual
Butterfly valve 12 can effectively prevent dust pollution by spray equipment 3 in floor and flooring spraying device 4.
Claims (4)
1. it is a kind of for depositing dust in floor and the device of maintenance, including water tank (1), main pipeline (2) and be connected to main pipeline (2)
The water pump (7) of lower end, the water pump (7) are placed in water tank (1), it is characterised in that: the main pipeline (2) is along standpipe
Or construction water pipe it is vertically-mounted, on main pipeline (2) be located at every floor in position be respectively set there are two be responsible for connector
(13), two supervisor's connectors (13) are separately connected spray equipment in floor (3) and flooring spraying device (4).
2. the device according to claim 1 for the simultaneous maintenance of depositing dust in floor, it is characterised in that: spray in the floor
Device (3) includes the spray main pipeline (8) being connect by being responsible for connector (13) with main pipeline (2), the spray main pipeline (8)
It is arranged in a ring along floor periphery, and main pipeline (8) will be sprayed by band and be bundled on the scaffold (17) of floor surrounding,
Certain spacing is provided with one group of branch pipe connection (10) on spray main pipeline (8), is connected on each branch pipe connection (10)
Have towards the spray branch pipe(tube) (9) in floor, spray head (11) are installed in the outlet end of spray branch pipe(tube) (9).
3. the device according to claim 1 for the simultaneous maintenance of depositing dust in floor, it is characterised in that: the flooring fills by spraying
Setting (4) includes the flexible water conduit (5) being connect by being responsible for connector (13) with main pipeline (2), and the flexible water conduit (5) is arranged in
On floor in floor, rotary sprayer (6) are connected with by certain spacing on flexible water conduit (5).
4. the device according to claim 2 or 3 for the simultaneous maintenance of depositing dust in floor, it is characterised in that: the spray master
Solenoid valve or Hand-operated butterfly valve (12) are connected between pipeline (8) or flexible water conduit (5) and supervisor connector (13).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811337059.4A CN109208929A (en) | 2018-11-12 | 2018-11-12 | A kind of device for the simultaneous maintenance of depositing dust in floor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811337059.4A CN109208929A (en) | 2018-11-12 | 2018-11-12 | A kind of device for the simultaneous maintenance of depositing dust in floor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109208929A true CN109208929A (en) | 2019-01-15 |
Family
ID=64995867
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811337059.4A Pending CN109208929A (en) | 2018-11-12 | 2018-11-12 | A kind of device for the simultaneous maintenance of depositing dust in floor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109208929A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113898154A (en) * | 2021-08-24 | 2022-01-07 | 上海宝冶集团有限公司 | Adjustable wall body moisturizing device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104264995A (en) * | 2014-10-20 | 2015-01-07 | 青岛一建集团有限公司 | Automatic spraying conservation system for high-rise building shear wall structure |
EP2834066A1 (en) * | 2012-04-03 | 2015-02-11 | Farah, Nizzar | Floor surface protective sheet |
CN106431494A (en) * | 2016-08-31 | 2017-02-22 | 中国冶集团有限公司 | Automatic spraying system and method for shear wall curing |
CN206801065U (en) * | 2017-06-01 | 2017-12-26 | 中铁二局集团有限公司 | A kind of side wall concrete automatic maintenance device |
CN108331341A (en) * | 2018-05-08 | 2018-07-27 | 中建四局第四建筑工程有限公司 | A kind of formwork support method and device of large size conversion beam |
-
2018
- 2018-11-12 CN CN201811337059.4A patent/CN109208929A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2834066A1 (en) * | 2012-04-03 | 2015-02-11 | Farah, Nizzar | Floor surface protective sheet |
CN104264995A (en) * | 2014-10-20 | 2015-01-07 | 青岛一建集团有限公司 | Automatic spraying conservation system for high-rise building shear wall structure |
CN106431494A (en) * | 2016-08-31 | 2017-02-22 | 中国冶集团有限公司 | Automatic spraying system and method for shear wall curing |
CN206801065U (en) * | 2017-06-01 | 2017-12-26 | 中铁二局集团有限公司 | A kind of side wall concrete automatic maintenance device |
CN108331341A (en) * | 2018-05-08 | 2018-07-27 | 中建四局第四建筑工程有限公司 | A kind of formwork support method and device of large size conversion beam |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113898154A (en) * | 2021-08-24 | 2022-01-07 | 上海宝冶集团有限公司 | Adjustable wall body moisturizing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203919328U (en) | The circulating automatic spray curing system in bridge prefabrication field | |
CN206366278U (en) | Construction tower crane and scope adjustable spraying dust pelletizing system | |
CN104264995A (en) | Automatic spraying conservation system for high-rise building shear wall structure | |
CN108276024A (en) | A kind of climbing form system adhesion type intelligence spray maintenance device and its maintenance process | |
CN211762386U (en) | Automatic spraying health preserving system of prefabricated box girder | |
CN109208929A (en) | A kind of device for the simultaneous maintenance of depositing dust in floor | |
CN210969332U (en) | Bridge construction is with spraying maintenance system | |
CN209620643U (en) | A kind of equipment for the simultaneous maintenance of depositing dust in floor | |
CN206551186U (en) | A kind of section box girder automatic sprinkler fire-extinguishing system | |
CN206045664U (en) | Tower crane spray dust system | |
CN206693132U (en) | A kind of automatic sprinkler fire-extinguishing system for job site depositing dust | |
CN206154492U (en) | Bury shower nozzle intelligence maintenance system | |
CN212146920U (en) | Prefabricated T roof beam atmospheric control spraying system | |
CN205357898U (en) | Install special plant protection machinery who spouts medicine device | |
CN104314311B (en) | For the liftable level of tower machine of constructing 360 ° of spray equipments | |
CN211035722U (en) | Energy-saving concrete curing means | |
CN208340976U (en) | A kind of adjustable spray watering device of hand-held for water receiving pipe | |
CN206366276U (en) | Construction tower crane and fixed point spraying and dust-removing system | |
CN207854705U (en) | A kind of water sprayer for pouring ornamental trees and shrubs | |
CN110604984A (en) | Unitized spraying dust-settling system | |
CN208151237U (en) | A kind of climbing form system adhesion type intelligence spray maintenance device | |
CN204357130U (en) | For the liftable level of tower machine of constructing 360 ° of spray equipments | |
CN205475034U (en) | Movable type sprays dust device | |
CN201778300U (en) | Automatic spraying dust keeper for roads under construction | |
CN209971070U (en) | Concrete member sprays curing means |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190115 |
|
RJ01 | Rejection of invention patent application after publication |