CN109192345A - 一种核电站反应堆停堆信号响应时间测量方法 - Google Patents
一种核电站反应堆停堆信号响应时间测量方法 Download PDFInfo
- Publication number
- CN109192345A CN109192345A CN201811044589.XA CN201811044589A CN109192345A CN 109192345 A CN109192345 A CN 109192345A CN 201811044589 A CN201811044589 A CN 201811044589A CN 109192345 A CN109192345 A CN 109192345A
- Authority
- CN
- China
- Prior art keywords
- signal
- shutdown
- insurance
- time
- initial
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G21—NUCLEAR PHYSICS; NUCLEAR ENGINEERING
- G21C—NUCLEAR REACTORS
- G21C17/00—Monitoring; Testing ; Maintaining
- G21C17/10—Structural combination of fuel element, control rod, reactor core, or moderator structure with sensitive instruments, e.g. for measuring radioactivity, strain
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Abstract
本发明属于反应堆停堆系统技术领域,具体涉及一种较为便捷的核电站反应堆停堆信号响应时间测量方法;包括以下步骤:步骤一、检查初始停堆信号;步骤二、初始停堆信号中的信号一和信号二作为初始停堆信号;步骤三、拆除保险信号中保险一及保险二的信号保险;步骤四、连接多通道记录仪,在记录仪上选取两条信号,一条记录初始停堆信号一产生24V电压时间,另一条记录停堆断路器下游失去380V电压时间;步骤五、依次外接24V电源二和24V电源一,此时真正的停堆信号便会触发,停堆断路器也随即断开;步骤六、在多通道记录仪上自动比对初始停堆信号一产生24V时间与停堆断路器下游失去380V电压时间之间的时间差。
Description
技术领域
本发明属于反应堆停堆系统技术领域,具体涉及一种核电站反应堆停堆信号响应时间测量方法。
背景技术
核电站反应堆停堆信号响应时间测量的是初始停堆信号的生成到下游停堆断路器断开的时间。当四个初始停堆信号中有两个及以上由于核电站停堆相关的工艺参数发生变化后会产生24V电压,经过处理器处理后便会触发真正的停堆信号,再传递到停堆断路器,促使停堆断路器断开,下游控制棒失去380V电压,落入堆芯底部,实现反应堆停堆。为了保证核电站反应堆在紧急情况下可以实现及时安全可靠停堆,需要定期对停堆响应时间进行测量,以确保线路上各个环节处理器、传输线路等设备的性能满足要求,同时电站规格书中也明确规定停堆响应时间必须少于150毫秒。
发明内容
本发明的目的是,针对现有技术不足,提供一种较为便捷的核电站反应堆停堆信号响应时间测量方法。
本发明的技术方案是:
包括以下步骤:
步骤一、检查初始停堆信号(1),检查确认停堆断路器处于吸合状态,检查确认控制棒处于对心底部;
步骤二、初始停堆信号(1)中的信号一和信号二作为初始停堆信号;
步骤三、拆除保险信号(2)中保险一及保险二的信号保险;
步骤四、连接多通道记录仪,两端分别与信号一的保险一的下游端口及停堆断路器的下游端口相连,在记录仪上选取两条信号,一条记录初始停堆信号一产生24V电压时间,另一条记录停堆断路器下游失去380V电压时间;
步骤五、依次外接24V电源二和24V电源一,此时真正的停堆信号便会触发,停堆断路器也随即断开;
步骤六、在多通道记录仪上自动比对初始停堆信号一产生24V时间与停堆断路器下游失去380V电压时间之间的时间差;
步骤七、响应时间满足要求后,依次拆除多通道记录仪,移除24V电源一及电源二,恢复保险一及保险二的信号保险。
本发明的有益效果是:
该方法可以简单快捷的对反应堆停堆响应时间进行测量,以检查该时间是否满足要求,同时也能验证处理器、连接线路等设备的性能是否满足要求,且不会造成核电站其他系统或设备误动作,确保了核电站在紧急情况下可以及时安全可靠的停堆。
附图说明
图1:反应堆停堆信号响应流程图
图2:反应堆停堆信号响应时间测量示意图
图中:1、初始停堆信号;2、信号保险;3、处理器;4、停堆断路器;5、控制棒;6、外界24V电源;7、多通道记录仪。
具体实施方式
下面结合实施例对本发明进行进一步的介绍:
一种核电站反应堆停堆信号响应时间测量方法,包括以下步骤:
步骤一、检查初始停堆信号(1),检查确认停堆断路器处于吸合状态,检查确认控制棒处于对心底部;
步骤二、初始停堆信号(1)中的信号一和信号二作为初始停堆信号;
步骤三、拆除保险信号(2)中保险一及保险二的信号保险;
步骤四、连接多通道记录仪,两端分别与信号一的保险一的下游端口及停堆断路器的下游端口相连,在记录仪上选取两条信号,一条记录初始停堆信号一产生24V电压时间,另一条记录停堆断路器下游失去380V电压时间;
步骤五、依次外接24V电源二和24V电源一,此时真正的停堆信号便会触发,停堆断路器也随即断开;
步骤六、在多通道记录仪上自动比对初始停堆信号一产生24V时间与停堆断路器下游失去380V电压时间之间的时间差;
步骤七、响应时间满足要求后,依次拆除多通道记录仪,移除24V电源一及电源二,恢复保险一及保险二的信号保险。
实施例
初始停堆信号,从左至右依次为信号一、信号二、信号三、信号四;
信号保险,从左至右依次为保险一、保险二、保险三、保险四;
外接24V电源,从左至右依次为外接24V电源一、外接24V电源二;
具体实施步骤按照图2所示进行,步骤如下:
1检查信号一、信号二、信号三、信号四无24V初始停堆信号,检查停堆断路器处于吸合状态,检查确认控制棒处于堆芯底部;
2选取信号一跟信号二作为初始停堆信号;
3拆除保险一及保险二的信号保险;
4连接多通道记录仪,两端分别与信号一的保险一的下游端口及停堆断路器的下游端口相连,在记录仪上选取两条信号,一条记录初始停堆信号一产生24V电压时间,另一条记录停堆断路器下游失去380V电压时间;
5依次外接24V电源二和24V电源一,此时真正的停堆信号便会触发,停堆断路器也随即断开;
6在多通道记录仪上自动比对初始停堆信号一产生24V时间与停堆断路器下游失去380V电压时间之间的时间差;
7响应时间满足要求后,依次拆除多通道记录仪,移除24V电源一及电源二,恢复保险一及保险二的信号保险。
该测量方法同样可以选取信号二和信号三作为初始停堆信号,用来进行测量和检查,并以此类推。
Claims (1)
1.一种核电站反应堆停堆信号响应时间测量方法,其特征在于:包括以下步骤:
步骤一、检查初始停堆信号(1),检查确认停堆断路器处于吸合状态,检查确认控制棒处于对心底部;
步骤二、初始停堆信号(1)中的信号一和信号二作为初始停堆信号;
步骤三、拆除保险信号(2)中保险一及保险二的信号保险;
步骤四、连接多通道记录仪,两端分别与信号一的保险一的下游端口及停堆断路器的下游端口相连,在记录仪上选取两条信号,一条记录初始停堆信号一产生24V电压时间,另一条记录停堆断路器下游失去380V电压时间;
步骤五、依次外接24V电源二和24V电源一,此时真正的停堆信号便会触发,停堆断路器也随即断开;
步骤六、在多通道记录仪上自动比对初始停堆信号一产生24V时间与停堆断路器下游失去380V电压时间之间的时间差;
步骤七、响应时间满足要求后,依次拆除多通道记录仪,移除24V电源一及电源二,恢复保险一及保险二的信号保险。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811044589.XA CN109192345A (zh) | 2018-09-07 | 2018-09-07 | 一种核电站反应堆停堆信号响应时间测量方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811044589.XA CN109192345A (zh) | 2018-09-07 | 2018-09-07 | 一种核电站反应堆停堆信号响应时间测量方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109192345A true CN109192345A (zh) | 2019-01-11 |
Family
ID=64915392
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811044589.XA Pending CN109192345A (zh) | 2018-09-07 | 2018-09-07 | 一种核电站反应堆停堆信号响应时间测量方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109192345A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112562878A (zh) * | 2020-11-25 | 2021-03-26 | 三门核电有限公司 | 核电厂反应堆保护和监测系统响应时间测量装置及方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201655343U (zh) * | 2010-04-29 | 2010-11-24 | 华北电力大学 | 一种温度触发的非能动停堆系统的控制棒驱动装置 |
CN103854711A (zh) * | 2012-12-07 | 2014-06-11 | 中国核动力研究设计院 | 一种分析反应堆停堆断路器断开时间性能的方法 |
CN105161143A (zh) * | 2014-05-29 | 2015-12-16 | 江苏核电有限公司 | 一种反应堆物理启动期间增效节能的综合方法 |
-
2018
- 2018-09-07 CN CN201811044589.XA patent/CN109192345A/zh active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201655343U (zh) * | 2010-04-29 | 2010-11-24 | 华北电力大学 | 一种温度触发的非能动停堆系统的控制棒驱动装置 |
CN103854711A (zh) * | 2012-12-07 | 2014-06-11 | 中国核动力研究设计院 | 一种分析反应堆停堆断路器断开时间性能的方法 |
CN105161143A (zh) * | 2014-05-29 | 2015-12-16 | 江苏核电有限公司 | 一种反应堆物理启动期间增效节能的综合方法 |
Non-Patent Citations (1)
Title |
---|
秦山核电联营有限公司: "《秦山核电二期工程,建设经验汇编 9调试卷II》", 30 June 2004 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112562878A (zh) * | 2020-11-25 | 2021-03-26 | 三门核电有限公司 | 核电厂反应堆保护和监测系统响应时间测量装置及方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102571435B (zh) | 海底观测网络节点故障诊断系统 | |
CN103499382B (zh) | 一种基于振动数据融合和图像识别的变压器故障诊断方法 | |
Hajian-Hoseinabadi | Impacts of automated control systems on substation reliability | |
CN104020761A (zh) | 一种无须联网的馈线自动化测试系统 | |
US20120123603A1 (en) | Substation automation system with protection functions | |
CN104332951A (zh) | 电流互感器二次侧开路保护系统 | |
CN105974245B (zh) | 一种全冗余的合并单元装置 | |
CN103616660A (zh) | 智能电能表干扰环境下掉电处理可靠性的测试装置及方法 | |
CN109192345A (zh) | 一种核电站反应堆停堆信号响应时间测量方法 | |
CN204965697U (zh) | 压板状态监视及防误管理系统 | |
CN202034827U (zh) | 110kV~330kV变电站断路器综合在线监测系统 | |
Vaughan et al. | Idaho power RAS: A dynamic remedial action case study | |
CN107782954B (zh) | 一种基于大量过电压次数数据的变压器过电压预警方法 | |
US4200864A (en) | Process control plant comprising processing of signals | |
EP2977838B1 (en) | Process of monitoring intelligent electronic devices installed in an electrical power system | |
CN104795804A (zh) | 一种继电保护辅助监控处理系统及其处理方法 | |
US9681539B2 (en) | System and apparatus for plant monitoring and control | |
WO2009010084A1 (de) | Datenkonzentrator, redundantes schutzsystem und verfahren zum überwachen eines schutzobjektes in einem elektrischen energieversorgungsnetz | |
Miller et al. | PacifiCorp’s Jim Bridger RAS: A dual triple modular redundant case study | |
CN103854711B (zh) | 一种分析反应堆停堆断路器断开时间性能的方法 | |
CN105071337A (zh) | 自反馈智能漏电保护控制装置及其控制方法 | |
CN103997126A (zh) | 一种基于开关量状态的故障诊断分级方法及系统 | |
CN211202068U (zh) | 一种汽轮机ets系统 | |
CN204855685U (zh) | 一种智能变电站二次设备故障录波系统 | |
Naik et al. | Smart grid communication protocol test automation along with protection test automation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190111 |