CN109186034A - A kind of chemical experiment chamber system - Google Patents
A kind of chemical experiment chamber system Download PDFInfo
- Publication number
- CN109186034A CN109186034A CN201811113701.0A CN201811113701A CN109186034A CN 109186034 A CN109186034 A CN 109186034A CN 201811113701 A CN201811113701 A CN 201811113701A CN 109186034 A CN109186034 A CN 109186034A
- Authority
- CN
- China
- Prior art keywords
- concubine
- gas
- chemical experiment
- pipeline
- chamber system
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F7/00—Ventilation
- F24F7/04—Ventilation with ducting systems, e.g. by double walls; with natural circulation
- F24F7/06—Ventilation with ducting systems, e.g. by double walls; with natural circulation with forced air circulation, e.g. by fan positioning of a ventilator in or against a conduit
- F24F7/08—Ventilation with ducting systems, e.g. by double walls; with natural circulation with forced air circulation, e.g. by fan positioning of a ventilator in or against a conduit with separate ducts for supplied and exhausted air with provisions for reversal of the input and output systems
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H1/00—Buildings or groups of buildings for dwelling or office purposes; General layout, e.g. modular co-ordination or staggered storeys
- E04H1/12—Small buildings or other erections for limited occupation, erected in the open air or arranged in buildings, e.g. kiosks, waiting shelters for bus stops or for filling stations, roofs for railway platforms, watchmen's huts or dressing cubicles
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Ventilation (AREA)
Abstract
The present invention relates to a kind of chemical experiment chamber systems, chemical experiment chamber system includes the building structure body to form space, ceiling board of the tabula in the middle part of building structure body in above-below direction, installation space positioned at ceiling board top, it is used to carry out the laboratory of experimental implementation positioned at ceiling board lower part, laboratory includes main chamber and concubine, chemical experiment chamber system further includes air cleaning system, the gas extracting device for quickly extracting secondary indoor gas out being connected to concubine, chemical test chamber system further includes gas supplementary device, gas supplementary device includes supplementing pipeline and the first blower on supplement pipeline;The chemical experiment chamber system can be avoided air cleaning system (air-conditioning) and supplement a large amount of gas into main chamber, avoid air cleaning system highly energy-consuming, it substantially reduces laboratory electric energy and uses burden, it avoids high-power more air-conditioning equipments while using, to alleviate the expense expenditure of the setting of air-conditioning equipment.
Description
Technical field
The present invention relates to laboratory overall construction design fields, and in particular to a kind of chemical experiment chamber system.
Background technique
Chemical laboratory is to provide chemical experiment condition and its carries out the important place of scientific exploration.There is a large amount of instrument in it
Device: the experimental tools such as iron stand, asbestos gauge, chemicals cabinet, alcolhol burner.In chemical laboratory, experimental implementation can produce often
Raw foul smell, moisture and the toxic and harmful gas such as inflammable, explosive, perishable prevent in experiment to protect the safety of user
Toxic and harmful gas spread in experiment, it will usually laboratory is separated into the multiple regions including main chamber and concubine, it is main
Room be detained for a long time with personnel and operate it is some without chemical test that is poisonous and harmful, thering is gas with foreign flavor to generate, it is then special in concubine
It operates and places for be also easy to produce chemical test that is poisonous and harmful, having gas with foreign flavor and some be also easy to produce poisonous and harmful substance
Experiment drug, tool, therefore concubine need to be provided with the extractor fan of the toxic and harmful gas quickly extracted, in order to
Generate it is poisonous and harmful quickly draw it out (extraction amount need to reach 2000m3/h), and then avoid harm to the human body, existing skill
It need to be supplemented from main chamber in art from the gas that concubine extracts, can also remain that the pressure of concubine is lower than the pressure of main chamber in this way
Power, so that the toxic and harmful gas of concubine is avoided to flow in main chamber, however entire laboratory is closed space, is tested indoor
Air is then entirely the purification that purification air-conditioning (and using high-power, more air-conditionings are just able to satisfy gas supplement demand) provides
Air, a large amount of extract then need a large amount of gas supplement of air-conditioning, and whole system runs unusual power consumption, and energy waste is very tight
Weight.The power load in city is especially even more seriously increased in summer.
Summary of the invention
The technical problem to be solved by the present invention is to overcome the deficiencies of the prior art and provide a kind of chemical experiment chamber system.
In order to solve the above technical problems, the technical solution adopted by the present invention is as follows:
A kind of chemical experiment chamber system, chemical experiment chamber system include the building structure body to form space, in above-below direction tabula
Ceiling board in the middle part of building structure body, positioned at the installation space on ceiling board top, positioned at ceiling board lower part for being tested
The laboratory of operation, laboratory include main chamber and concubine, and chemical experiment chamber system further includes empty for providing purification into main chamber
The air cleaning system of gas, the gas extracting device for quickly extracting secondary indoor gas out being connected to concubine, chemical test
Chamber system further includes the gas supplementary device for the make-up gas into concubine being connected to concubine, and gas supplementary device includes will
The supplement pipeline and the first blower on supplement pipeline that outside air is connected to concubine.
Preferably, gas supplementary device further includes inside concubine for incuding the air pressure of concubine internal gas pressure
Sensor, control the first blower driving motor revolving speed controller, baroceptor connect with controller signals, controller root
The driving motor revolving speed of the first blower is controlled according to the induction information of baroceptor.
Preferably, the parameter value for the relative pressure being arranged in controller is -5pa, and the driving motor of the first blower is electrodeless
Variable speed electric motors, particularly, when baroceptor senses secondary indoor relative pressure lower than -5pa, controller controls the drive of the first blower
Dynamic motor accelerates rotation, and when baroceptor senses that secondary indoor relative pressure is equal to -5pa, controller controls the first wind
The driving motor constant revolution of machine, when baroceptor senses that secondary indoor relative pressure is higher than -5pa, controller control
The driving motor underdrive of first blower.By the intelligence cooperation between sensor and controller, when so that system starting, begin
Keeping concubine eventually is in the state of tiny structure, so that secondary indoor toxic and harmful gas be avoided to flow backward in main chamber, avoids safe thing
Part occurs.
Preferably, there are two concubine settings, two concubines are located at the two sides of main chamber.Convenient for carrying out a variety of generations simultaneously
The experimental implementation of poisonous and harmful substance discharge, applicability are stronger.
Preferably, supplement pipeline includes the first main pipeline, is respectively communicated between the first main pipeline and the concubine of two sides
First subtube and the second subtube;First main pipeline is located in installation space, and the entrance of the first main pipeline is provided with house
In the one side wall of structural body, the first blower is set on the first main pipeline, the first subtube and the second subtube from installation space to
Under extend across ceiling board respectively to two sides concubine top.(the first main pipeline and the first subtube and the second subtube
Junction connected by triple valve threeway, and synchronized in gas through the first main pipeline and be passed through the first subtube and the second subtube
When middle, triple valve can guarantee that the gas flow being passed through in the first subtube and the second subtube is equal.
Preferably, gas extracting device includes extracting pipeline and the second blower on extraction pipeline out, extracts pipeline packet out
The third subtube and the 4th subtube for including the second main pipeline, being respectively communicated between the second main pipeline and the concubine of two sides;The
Two main pipelines are located in installation space, and the outlet of the second main pipeline is provided on another side wall of building structure body, the second wind
Machine is set on the second main pipeline, and third subtube and the 4th subtube extend downward and through ceiling board respectively extremely by installation space
The top of the concubine of two sides.Supplement pipeline and each pipeline extracted out in pipeline are reasonably spaced apart mounting hole is interior.
Preferably, ceiling board hangs the inside for being located at building structure body by the more full thread sunpenders vertically extended
In the middle part of space, supplement pipeline and extraction pipeline, which pass through full thread sunpender and hang, to be located in installation space.Full thread sunpender is not only right
Ceiling board is lifted, and can also hang set each main pipeline and subtube in above-below direction.So that structure design is more reasonable, take
It is more convenient to build work.
Preferably, air cleaning system includes being set to the airhandling equipment outside building structure body, being set on ceiling board
Ventilation opening, the purge pipe that is connected between airhandling equipment and ventilation opening, purge pipe penetrates installation space by outside
It is connected to afterwards with ventilation opening.
Preferably, air cleaning system include VRV air-conditioner outdoor unit outside the building structure body and with the air conditioning chamber VRV
It is that outer machine is connected to by connecting pipe and be located at main indoor VRV air conditioner indoor unit.
Preferably, ceiling board hangs the inside for being located at building structure body by the more full thread sunpenders vertically extended
In the middle part of space, purge pipe, connecting pipe pass through full thread sunpender and are lifted in installation space.
Due to the implementation of above technical scheme, the invention has the following advantages over the prior art:
Chemical experiment chamber system of the invention carries out having poisonous and harmful generation in concubine by the way that gas supplementary device is arranged
When test operation, when gas collection apparatus extracts toxic and harmful gas out, which can be quickly from the external world by gas
Body fills into concubine, to avoid concubine extraction gas by leading indoor gas come the case where supplement;To avoid air
Purification system (air-conditioning) supplements a large amount of gas into main chamber, avoids air cleaning system highly energy-consuming, substantially reduces experiment
Room electric energy is also avoided high-power more air-conditioning equipments while being used using burden, thus alleviate the setting of air-conditioning equipment
Expense expenditure.
Detailed description of the invention
Fig. 1 is the main view of chemical laboratory overall system architecture of the invention;
Wherein: 100, building structure body;10, the first blower;11, the first main pipeline;12, the first subtube;13, second is in charge of
Road;20, the second blower;21, the second main pipeline;22, third subtube;23, the 4th subtube;30, airhandling equipment;31,
Purge pipe;32, ventilation opening;33, VRV air-conditioner outdoor unit;34, connecting pipe;35, VRV air conditioner indoor unit;S1, installation space;
S2, main chamber;S3, concubine;A1, ceiling board;A2, full thread sunpender;A3, fixed link;A4, pendant.
Specific embodiment
The present invention will be further described in detail with specific embodiment with reference to the accompanying drawing.
As shown in Figure 1, a kind of chemical experiment chamber system, chemical experiment chamber system includes the building structure body to form space
100, in above-below direction ceiling board a1 of the tabula at the middle part of building structure body 100, the installation space s1 positioned at the top ceiling board a1,
It is used to carry out the laboratory of experimental implementation positioned at the lower part ceiling board a1, laboratory includes main chamber s2 and concubine s3, chemical laboratory
System further include for providing the air cleaning system of purification air into main chamber s2, being used for concubine s3 of being connected to concubine s3
The gas extracting device that interior gas is quickly extracted out, chemical test chamber system further include being connected to concubine s3 for into concubine s3
The gas supplementary device of make-up gas, gas supplementary device include by supplement pipeline that outside air is connected to concubine s3 and being set to
Supplement the first blower 10 on pipeline.
In this example, air cleaning system includes the airhandling equipment 30 being set to outside building structure body 100, is set to furred ceiling
Ventilation opening 32 on plate a1, the purge pipe 31 being connected between airhandling equipment 30 and ventilation opening 32, purge pipe 31 by
Outside is connected to after penetrating installation space s1 with ventilation opening 32.Air cleaning system includes the VRV outside building structure body 100
Air-conditioner outdoor unit 33 and the air conditioning chamber VRV that is being connected to VRV air-conditioner outdoor unit 33 by connecting pipe 34 and being located in main chamber s2
Interior machine 35.
Further, gas supplementary device further includes inside concubine s3 for incuding concubine s3 internal gas pressure
Baroceptor, control the first blower 10 driving motor revolving speed controller, baroceptor connect with controller signals,
Controller controls the driving motor revolving speed of the first blower 10 according to the induction information of baroceptor.In this example, set in controller
The parameter value for the relative pressure set is -5pa, and the driving motor of the first blower 10 is electrodeless variable-speed motor, when baroceptor sense
When should arrive relative pressure in concubine s3 lower than -5pa, the driving motor that controller controls the first blower 10 accelerates to rotate so that the
One blower 10 accelerates make-up gas, when baroceptor senses that the relative pressure in concubine s3 is equal to -5pa, controller control
The driving motor constant revolution for making the first blower 10, when baroceptor senses that the relative pressure in concubine s3 is higher than -5pa
When, controller controls the driving motor underdrive of the first blower 10 so that 10 deceleration make-up gas of the first blower.Pass through sensing
Intelligence cooperation between device and controller when so that system starting, remains that concubine s3 is in the state of tiny structure, to avoid
Toxic and harmful gas in concubine s3 flows backward in main chamber s2, avoids security incident.In addition, by air cleaning system to
Be passed through clean gas in main chamber s2, and the relative pressure in main chamber s2 be maintained at 5pa, that is, remain in main chamber s2 in it is micro- just
Pressure condition can also be flow backwards even if there is of short duration micro-positive pressure in concubine s3 in this way to avoid toxic and harmful gas in concubine s3
To main chamber s2, so that the toxic and harmful gas further effectivelying prevent in concubine s3 flows backward in main chamber s2.
In this example, there are two concubine s3 settings, two concubine s3 are located at the two sides of main chamber s2.Convenient for carrying out simultaneously
A variety of experimental implementations for generating poisonous and harmful substance discharge, applicability are stronger.Supplement pipeline in this example includes the first main pipeline
11, the first subtube and the second subtube being respectively communicated between the first main pipeline 11 and the concubine s3 of two sides;First supervisor
Road 11 is located in installation space s1, and the entrance of the first main pipeline 11 is provided in the one side wall of building structure body 100, the first wind
Machine 10 is set on the first main pipeline 11, and the first subtube and the second subtube extend downward and through ceiling board by installation space s1
A1 respectively to two sides concubine s3 top.The junction of first main pipeline 11 and the first subtube and the second subtube passes through three
Port valve threeway connection, and when gas is synchronized through the first main pipeline 11 and is passed through in the first subtube and the second subtube, triple valve
It can guarantee that the gas flow being passed through in the first subtube and the second subtube is equal.
In addition, gas extracting device includes extracting pipeline and the second blower 20 on extraction pipeline out, pipeline packet is extracted out
Include the second main pipeline 21, the third subtube 22 that is respectively communicated between the second main pipeline 21 and the concubine s3 of two sides and the 4th point
Pipeline 23;Second main pipeline 21 is located in installation space s1, and the outlet of the second main pipeline 21 is provided with building structure body 100
(it is corresponding that the outlet of the entrance of the first main pipeline 11 and the second main pipeline 21 is opened in building structure body 100 respectively on another side wall
Two sidewalls on), the second blower 20 be set to the second main pipeline 21 on, third subtube 22 and the 4th subtube 23 are by installation space
S1 extend downward and through ceiling board a1 respectively to two sides concubine s3 top.It supplements pipeline and extracts each pipeline in pipeline out
It is reasonably spaced apart mounting hole is interior.
Further, ceiling board a1 is that the full thread sunpender a2 vertically extended by more hangs and is located at building structure
(bottom of full thread sunpender a2, which is hung, sets fixed link a3, and fixed link a3 passes through pendant a4 and ceiling board in the middle part of the inner space of body 100
A1 connection, so realize ceiling board a1 hanging), the first main pipeline 11, the first subtube, the second subtube, the second main pipeline 21,
Third subtube 22, the 4th subtube 23, purge pipe 31, connecting pipe 34 etc. are lifted on installation by full thread sunpender a2
In the s1 of space.Full thread sunpender a2 not only lifts ceiling board a1, but also can also hang set each pipeline in above-below direction.So that
Structure design is more reasonable, and building is more convenient.
In conclusion chemical experiment chamber system of the invention is carried out by the way that gas supplementary device is arranged in concubine
When malicious harmful test operation generated, when gas collection apparatus extracts toxic and harmful gas out, which can be fast
Speed fills into gas in concubine from the external world, to avoid concubine extraction gas by leading indoor gas come the case where supplement;
To avoid air cleaning system (air-conditioning) from supplementing a large amount of gas into main chamber, air cleaning system highly energy-consuming is avoided,
Laboratory electric energy is substantially reduced using burden, high-power more air-conditioning equipments is also avoided while using, to alleviate air-conditioning
The expense of the setting of equipment is paid.
The present invention is described in detail above, its object is to allow the personage for being familiar with this field technology that can understand this
The content of invention is simultaneously implemented, and it is not intended to limit the scope of the present invention, all Spirit Essence institutes according to the present invention
The equivalent change or modification of work, should be covered by the scope of protection of the present invention.
Claims (10)
1. a kind of chemical experiment chamber system, the chemical experiment chamber system includes the building structure body to form space, in upper and lower
To ceiling board of the tabula in the middle part of the building structure body, positioned at the ceiling board top installation space, be located under ceiling board
Portion is used to carry out the laboratory of experimental implementation, and the laboratory includes main chamber and concubine, and the chemical experiment chamber system further includes
For the air cleaning system of purification air is provided into the main chamber, be connected to the concubine be used for secondary indoor gas is fast
The gas extracting device of speed extraction, it is characterised in that: the chemical test chamber system further includes being used for what the concubine was connected to
The gas supplementary device of make-up gas into the concubine, the gas supplementary device include connecting outside air and the concubine
Logical supplement pipeline and the first blower on the supplement pipeline.
2. chemical experiment chamber system according to claim 1, it is characterised in that: the gas supplementary device further includes being set to
The driving of the baroceptor for incuding the concubine internal gas pressure, control first blower inside the concubine
The controller of motor speed, the baroceptor are connected with the controller in a signal way., and the controller is according to the air pressure transmission
The induction information of sensor controls the driving motor revolving speed of first blower.
3. chemical experiment chamber system according to claim 2, it is characterised in that: the relative pressure being arranged in the controller
Parameter value be -5pa, the driving motor of first blower is electrodeless variable-speed motor, when the baroceptor senses institute
When stating secondary indoor relative pressure lower than -5pa, the driving motor that the controller controls first blower accelerates rotation, when
When the baroceptor senses that the indoor relative pressure of pair is equal to -5pa, the controller controls first blower
Driving motor constant revolution, when the baroceptor sense the indoor relative pressure of pair be higher than -5pa when, it is described
Controller controls the driving motor underdrive of first blower.
4. chemical experiment chamber system according to claim 1, it is characterised in that: there are two the concubine settings, two institutes
State the two sides that concubine is located at the main chamber.
5. chemical experiment chamber system according to claim 4, it is characterised in that: the supplement pipeline includes the first supervisor
Road, the first subtube and the second subtube being respectively communicated between first main pipeline and the concubine of two sides;It is described
First main pipeline is located in installation space, and the entrance of first main pipeline is provided with the one side wall of the building structure body
On, first blower is set on first main pipeline, and first subtube and the second subtube are by the installation space
Extend downward and through the ceiling board respectively to two sides the concubine top.
6. chemical experiment chamber system according to claim 5, it is characterised in that: the gas extracting device includes extraction pipe
Road and the second blower on the extraction pipeline, the extraction pipeline including the second main pipeline, be respectively communicated with described the
Third subtube and the 4th subtube between two main pipelines and the concubine of two sides;Second main pipeline is located at the peace
It fills in space, and the outlet of second main pipeline is provided on another side wall of the building structure body, second blower
On second main pipeline, the third subtube and the 4th subtube extend downward and through institute by the installation space
State ceiling board respectively to two sides the concubine top.
7. chemical experiment chamber system according to claim 6, it is characterised in that: the ceiling board is vertically square by more
It hangs and is located in the middle part of the inner space of the building structure body to the full thread sunpender of extension, the supplement pipeline and extraction pipe
Road, which passes through the full thread sunpender and hangs, to be located in the installation space.
8. chemical experiment chamber system according to claim 1, it is characterised in that: the air cleaning system includes being set to institute
It states the airhandling equipment outside building structure body, the ventilation oral area on the ceiling board, be connected to the air-treatment
Purge pipe between equipment and the ventilation opening, the purge pipe by outside penetrate after the installation space with the ventilation
Oral area connection.
9. chemical experiment chamber system according to claim 8, it is characterised in that: the air cleaning system includes being set to institute
State the VRV air-conditioner outdoor unit outside building structure body and be connected to the VRV air-conditioner outdoor unit by connecting pipe and be located at
The indoor VRV air conditioner indoor unit of master.
10. chemical experiment chamber system according to claim 9, it is characterised in that: the ceiling board passes through more vertically
The full thread sunpender that direction extends, which is hung, to be located in the middle part of the inner space of the building structure body, the purge pipe, the connection
Pipeline passes through the full thread sunpender and is lifted in the installation space.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811113701.0A CN109186034A (en) | 2018-09-25 | 2018-09-25 | A kind of chemical experiment chamber system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811113701.0A CN109186034A (en) | 2018-09-25 | 2018-09-25 | A kind of chemical experiment chamber system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109186034A true CN109186034A (en) | 2019-01-11 |
Family
ID=64909592
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811113701.0A Pending CN109186034A (en) | 2018-09-25 | 2018-09-25 | A kind of chemical experiment chamber system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109186034A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113125653A (en) * | 2021-04-21 | 2021-07-16 | 林国伟 | Indoor air detection device |
WO2021207995A1 (en) * | 2020-04-16 | 2021-10-21 | 上海易托邦建筑科技有限公司 | Virus detection laboratory with inflatable membrane structure, biosafety laboratory, and virus detection laboratory with earth-sheltered structure |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07260222A (en) * | 1994-03-25 | 1995-10-13 | Kajima Corp | Combined air-conditioning and ventilating system for laboratory and fume hood |
CN203972435U (en) * | 2014-03-06 | 2014-12-03 | 中石化上海工程有限公司 | A kind of air-replenishing type ventilating cabinet |
JP3205519U (en) * | 2016-03-17 | 2016-07-28 | 台灣尖端先進生技醫藥股▲分▼有限公司Taiwan Advance Bio−Pharm Inc | Laboratory environment control system |
CN207350692U (en) * | 2017-04-19 | 2018-05-11 | 重庆哥尔摩科技有限公司 | Based on the intelligent ventilating system in scientific experiment room |
CN207372010U (en) * | 2017-08-15 | 2018-05-18 | 江西金域医学检验所有限公司 | Draught cupboard and draught cupboard ventilating system |
CN208936419U (en) * | 2018-09-25 | 2019-06-04 | 苏州珠峰实验室系统工程有限公司 | A kind of chemical experiment chamber system |
-
2018
- 2018-09-25 CN CN201811113701.0A patent/CN109186034A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07260222A (en) * | 1994-03-25 | 1995-10-13 | Kajima Corp | Combined air-conditioning and ventilating system for laboratory and fume hood |
CN203972435U (en) * | 2014-03-06 | 2014-12-03 | 中石化上海工程有限公司 | A kind of air-replenishing type ventilating cabinet |
JP3205519U (en) * | 2016-03-17 | 2016-07-28 | 台灣尖端先進生技醫藥股▲分▼有限公司Taiwan Advance Bio−Pharm Inc | Laboratory environment control system |
CN207350692U (en) * | 2017-04-19 | 2018-05-11 | 重庆哥尔摩科技有限公司 | Based on the intelligent ventilating system in scientific experiment room |
CN207372010U (en) * | 2017-08-15 | 2018-05-18 | 江西金域医学检验所有限公司 | Draught cupboard and draught cupboard ventilating system |
CN208936419U (en) * | 2018-09-25 | 2019-06-04 | 苏州珠峰实验室系统工程有限公司 | A kind of chemical experiment chamber system |
Non-Patent Citations (1)
Title |
---|
王建群: "洁净负压实验室彩钢夹心板围护结构安装技术", 建筑技术, no. 09, pages 674 - 676 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2021207995A1 (en) * | 2020-04-16 | 2021-10-21 | 上海易托邦建筑科技有限公司 | Virus detection laboratory with inflatable membrane structure, biosafety laboratory, and virus detection laboratory with earth-sheltered structure |
CN113125653A (en) * | 2021-04-21 | 2021-07-16 | 林国伟 | Indoor air detection device |
CN113125653B (en) * | 2021-04-21 | 2023-08-15 | 林国伟 | Indoor air detection device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202419845U (en) | Window type indoor fresh air supply device | |
CN109186034A (en) | A kind of chemical experiment chamber system | |
CN208936419U (en) | A kind of chemical experiment chamber system | |
CN219693510U (en) | Exhaust system of refrigerator room | |
CN110107980A (en) | A kind of anti-exhaust ventilation device in kitchen | |
CN209197075U (en) | A kind of fire engineering automatic smoke exhausting system | |
CN105990796B (en) | A kind of damp-proof moisture removing apparatus of switch cabinet of converting station | |
CN202094499U (en) | Intelligent adjusting device for fresh air and cold air | |
CN208238170U (en) | Insect-and mouse-preventing device and air conditioner indoor unit with it | |
CN203201826U (en) | Intelligent inducing fan | |
CN206361852U (en) | A kind of Classroom air purifier | |
CN205248668U (en) | A remove condensation device for cubical switchboard | |
CN204214093U (en) | Transformer station's indoor environment intelligent controlling device | |
CN107218690A (en) | A kind of solar energy VMC | |
CN207872190U (en) | Mobile Laboratory Module | |
CN205897439U (en) | Laboratory inverter type ventilation control system | |
CN207455838U (en) | A kind of door socket forced draft device | |
CN203501395U (en) | Air inlet and outlet pipeline of fresh air machine | |
CN104089340A (en) | Air purifier with fresh air exhausting function | |
CN107741067B (en) | Integrated high-energy active oxygen ion air purification device | |
CN211503049U (en) | Ceiling type fresh air dehumidifier | |
CN103162371A (en) | Intelligent fresh air ventilator for dust-haze prevention | |
CN207939003U (en) | A kind of industrial automatic control electric control cabinet | |
CN207050174U (en) | A kind of fresh air dehumidification autonomous control system | |
CN102526914A (en) | Fire fighting device and fire fighting method for electrical control room |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |