CN109184729A - A kind of accurate received control method of realization push-bench - Google Patents

A kind of accurate received control method of realization push-bench Download PDF

Info

Publication number
CN109184729A
CN109184729A CN201811294364.XA CN201811294364A CN109184729A CN 109184729 A CN109184729 A CN 109184729A CN 201811294364 A CN201811294364 A CN 201811294364A CN 109184729 A CN109184729 A CN 109184729A
Authority
CN
China
Prior art keywords
push
bench
head
wall
tube coupling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811294364.XA
Other languages
Chinese (zh)
Inventor
潘建立
刘应亮
李亚风
赵涛
穆军明
郭凤武
蒋峰峰
郭海雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 18th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Original Assignee
China Railway 18th Bureau Group Co Ltd
First Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 18th Bureau Group Co Ltd, First Engineering Co Ltd of China Railway 18th Bureau Group Co Ltd filed Critical China Railway 18th Bureau Group Co Ltd
Priority to CN201811294364.XA priority Critical patent/CN109184729A/en
Publication of CN109184729A publication Critical patent/CN109184729A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/003Arrangement of measuring or indicating devices for use during driving of tunnels, e.g. for guiding machines

Abstract

The invention discloses a kind of accurate received control methods of realization push-bench, first prepare a set of push-bench reception device, the orifice tube of device is embedded in and is received in well opening wall, during orifice tube is installed, the position of orifice tube need to be measured, when push-bench is close to received well, the axis of push-bench is measured and adjusted, ensure that push-bench can break wall within the specified range, including carries out control operation using in tube coupling deceleration line, the broken wall line of tube coupling and the corresponding control node position of tube coupling terminated line.Opportunity is crushed by being precisely controlled plain concrete wall in the present invention; it reduces and can smoothly enter into reception cabin probability because mass concrete influences head; in addition it is precisely controlled push-bench reception; it realizes that push-bench is safe and smooth to enter reception cabin and protect cabin to increase recycling rate of waterused by being precisely controlled push-bench reception, reduces construction cost.

Description

A kind of accurate received control method of realization push-bench
Technical field
The present invention relates to the accurate received control methods of tunneling operation technical field more particularly to a kind of realization push-bench.
Background technique
Push-bench reception device and method of reseptance under a kind of high hydraulic condition are disclosed according to patent CN104455724A, In under high hydraulic condition through the invention push-bench reception device and receive push-bench method applicability it is wide.This method can be with The big, features as poor geologic condition suitable for various stratum, especially receiving end Water And Earth Pressures, and the stratum of end reinforcing can not be carried out.And Receiving cabin can be split and be assembled according to on-site hoisting condition, meet place and transport requires.Method peace of the invention Quan Xinggao receives cabin and uses mud and water balance principle, guarantees that the mud hydraulic pressure in cabin is greater than by the air pressure adjusted in pressure stabilizing cabin Stratum Water And Earth Pressures, during push-bench is appeared, the gas in pressure stabilizing cabin can also prevent steel sleeve from receiving pressure in the cabin of cabin Rise sharply, thus reduce to steel sleeve receive cabin intensity and sealing requirement, substantially increase the safety of construction;Meanwhile Y Type sealing rubber ring has good sealing effect, eliminates jacking construction because of leak spillage problem caused by formation condition, makes Push-bench receive process in the closed space of a steel sleeve reception device, do not generate danger to the external world always, can be fine Ground solve the received security risk of push pipe, make push-bench safely, rapidly enter received well;Method saving of the invention is constructed into This, carries out push-bench reception using the present apparatus, can exempt the reinforcing to the receiving end soil body and dewatering construction, and in this method The device used can recycle, and reduce construction cost.
Currently, slurry-water balance type push pipe is a kind of with the tunneling boring cutting soil body, balancing earth pressure power and ground are come with mud hydraulic pressure Launching stress, and using muddy water as the mechanical automation jacking of conveying spoir medium;Wherein, mud water balance push bench goes out It is one of material risk point in jacking construction that hole, which receives, and especially in rich groundwater, soil property is weak, the big intricately quality of hydraulic pressure Layer.Therefore it is precisely controlled plain concrete wall and is crushed opportunity, and reduce probability existing for mass concrete when plain concrete is crushed, So that the head of mud water balance push bench is safe and smooth to enter reception storehouse, it is the key that pipe curtain jacking construction success or failure.
Summary of the invention
The object of the present invention is to provide a kind of accurate received control methods of realization push-bench, solve mud water balance push bench Being easy when plain concrete is crushed, which has mass concrete and how to realize that safety enters, receives storehouse.
In order to solve the above technical problems, the present invention adopts the following technical scheme:
The present invention discloses a kind of realization push-bench precisely received control method, first prepares a set of push-bench reception device, The orifice tube of device is embedded in and is received in well opening wall, during orifice tube is installed, the position of orifice tube need to be surveyed Amount, when push-bench is close to received well, measures and adjusts to the axis of push-bench, it is ensured that push-bench can be in specified range Interior broken wall, including wall line and the corresponding control node position progress of tube coupling terminated line are broken using in tube coupling deceleration line, tube coupling Following operating procedure:
(a), the tube coupling deceleration line refers to when head cutterhead jacking to the second plain concrete underground of push-bench head connects It is continuous within the walls and when residual thickness is 50cm, it is controlled by the fltting speed of the hydraulic jack in regulation pipe curtain upper pipe working well The head cutterhead move speed of the push-bench head is made, so that the travel speed of the push-bench head is 3-4cm/min, and And the broken speed 1-2cm/ of the second plain concrete diaphram wall of pipe curtain adapter tube active well peripheral side is controlled simultaneously Min, to reduce because the presence of mass concrete enters the influence of reception cabin safety to the push-bench head;
(b), the broken wall line of the tube coupling refers to that the second plain concrete diaphram wall is simultaneously described in the push-bench head bursting When initially entering reception orifice tube, when the first pipe curtain tube coupling arrival in pipe curtain upper pipe working well originates sealing ring, in periproct It is noted for determining the position on broken wall opportunity on steel sleeve.After reaching the broken wall line of the tube coupling, the push-bench head is advanced fast Degree is in 1-2cm/min, head rotating 4-5 circle/min, the slow broken second plain concrete diaphram wall out;
(c), the tube coupling terminated line refers to head completely into the push-bench being arranged in the pipe curtain adapter tube active well The front deck of reception device, changeover portion are in sealed compartment position by aperture pipe flange, abolish second plain concrete underground company After the completion of continuous wall, the push-bench head, which slowly enters, receives cabin speed in 1-2cm/min, after reaching terminated line, the push pipe The head of machine head stops rotating and stops jacking of the hydraulic jack to the push-bench head.
Further, the position of the tube coupling deceleration line be located at push-bench head it is coaxial on periproct steel sleeve on, and And with the push-bench head spacing be the pipe curtain upper pipe working well to pipe curtain adapter tube active well spacing.
Further, the tube coupling break wall line position be located at push-bench head it is coaxial on periproct steel sleeve on, It and is spacing of the pipe curtain upper pipe working well to the pipe curtain adapter tube active well with the push-bench head spacing.
Further, the position of the tube coupling terminated line be located at push-bench head it is coaxial on periproct steel sleeve on, It and is spacing of the pipe curtain upper pipe working well to the pipe curtain adapter tube active well with the push-bench head spacing.
Further, the front deck of the push-bench reception device is mounted on push-bench receiving platform.
Compared with prior art, advantageous effects of the invention: broken by being precisely controlled plain concrete wall in the present invention Broken opportunity reduces and can smoothly enter into reception cabin probability because mass concrete influences head, is in addition precisely controlled push-bench reception, realizes Push-bench is safe and smooth to be entered reception cabin and protects cabin to increase recycling rate of waterused by being precisely controlled push-bench reception, Reduce construction cost.
Detailed description of the invention
The invention will be further described for explanation with reference to the accompanying drawing.
Fig. 1 is the push pipe schematic diagram in present invention realization push-bench precisely received control method;
Fig. 2 is the adapter tube schematic diagram in present invention realization push-bench precisely received control method;
Description of symbols: 101- pipe curtain upper pipe working well;102- active well inwall;The first reinforced concrete of 103- soil Lower diaphragm wall;104- the first plain concrete diaphram wall;105- the first pipe curtain tube coupling;106- hydraulic jack;107- is originated Sealing ring;108- tube coupling deceleration line;109- tube coupling breaks wall line;110- tube coupling terminated line;111- pipe curtain originates platform;201- pipe curtain Adapter tube active well;202- the second armored concrete diaphram wall;203- the second plain concrete diaphram wall;204- push-bench Head;205- the second pipe curtain tube coupling;206- receives orifice tube;207- front deck;208- middle deck;209- deck store;210- push-bench connects It is closed flat platform.
Specific embodiment
Schematic diagram of the present invention in pipe curtain upper pipe working well 101 as shown in Figure 1, wherein operating personnel passes through hydraulic jack 106 progress jacking tube coupling of top is to push push-bench head 204 towards the adapter tube dress in the pipe curtain adapter tube active well 201 in figure two It sets.
First prepare a set of push-bench reception device, the orifice tube of device is embedded in and is received in well opening wall, orifice tube peace During dress, the position of orifice tube need to be measured, when push-bench is close to received well, the axis of push-bench is surveyed Amount and adjustment, it is ensured that push-bench can break wall within the specified range, including break wall line 109 using in tube coupling deceleration line 108, tube coupling It determines corresponding control node position by way of calculating respectively with tube coupling terminated line 110, and proceeds as follows step:
A, the tube coupling deceleration line 108 refer to when push-bench head 204 the jacking of head cutterhead to the second plain concrete In lower diaphragm wall 203 and when residual thickness is 50cm, pass through the hydraulic jack 106 in regulation pipe curtain upper pipe working well 101 Fltting speed is to control the head cutterhead move speed of the push-bench head 204, so that the row of the push-bench head 204 It is 3-4cm/min into speed, and at the same time second plain concrete underground of control 201 peripheral side of pipe curtain adapter tube active well connects The broken speed 1-2cm/min of continuous wall 203, slow down and at the uniform velocity carry out brokenly wall, to avoid generating relatively large concrete, It reduces because the presence of mass concrete enters the influence of reception cabin safety, especially push-bench to the push-bench head 204 Head 204 and the interface for receiving cabin;
B, the broken wall line 109 of the tube coupling refers to that the second plain concrete underground described in 204 bursting of push-bench head is continuous Wall 203 and initially enter receive orifice tube 206 when, in pipe curtain upper pipe working well 101 the first pipe curtain tube coupling 105 arrival originates When sealing ring 107, it is noted for determining the position on broken wall opportunity on periproct steel sleeve, after reaching the broken wall line 109 of the tube coupling, 204 travel speed of push-bench head is in 1-2cm/min, head rotating 4-5 circle/min, slow broken the second plain coagulation described out Native diaphram wall 203;
C, the tube coupling terminated line 110 refers to head completely into the top being arranged in the pipe curtain adapter tube active well 201 The front deck 207 of pipe machine reception device, changeover portion are in sealed compartment position by aperture pipe flange, abolish the described second plain coagulation After the completion of native diaphram wall 203, the push-bench head 204, which slowly enters, receives cabin speed in 1-2cm/min, reaches and terminates After line, the head of the push-bench head 204 stops rotating and stops the hydraulic jack 106 to the push-bench head 204 jacking.
The position of the tube coupling deceleration line 108 be located at push-bench head 204 it is coaxial on periproct steel sleeve on, and with 204 spacing of push-bench head is the spacing that the pipe curtain upper pipe working well 101 arrives pipe curtain adapter tube active well 201.The pipe Save broken wall line 109 position be located at push-bench head 204 it is coaxial on periproct steel sleeve on, and with the push-bench head 204 spacing are the spacing that the pipe curtain upper pipe working well 101 arrives the pipe curtain adapter tube active well 201.The tube coupling terminated line 110 Position be located at push-bench head 204 it is coaxial on periproct steel sleeve on, and be institute with 204 spacing of push-bench head State the spacing that pipe curtain upper pipe working well 101 arrives the pipe curtain adapter tube active well 201.The front deck 207 of the push-bench reception device It is mounted on push-bench receiving platform 210.
In the description of the present invention, it is to be understood that, term " longitudinal direction ", " transverse direction ", "upper", "lower", "front", "rear", The orientation or positional relationship of the instructions such as "left", "right", "vertical", "horizontal", "top", "bottom", "inner", "outside" is based on attached drawing institute The orientation or positional relationship shown is merely for convenience of the description present invention, rather than the device or element of indication or suggestion meaning must There must be specific orientation, be constructed and operated in a specific orientation, therefore be not considered as limiting the invention.
Embodiment described above is only that preferred embodiment of the invention is described, and is not carried out to the scope of the present invention It limits, without departing from the spirit of the design of the present invention, those of ordinary skill in the art make technical solution of the present invention Various changes and improvements, should all fall into claims of the present invention determine protection scope in.

Claims (5)

1. a kind of accurate received control method of realization push-bench, first prepares a set of push-bench reception device, by the aperture of device Pipe, which is embedded in, to be received in well opening wall, during orifice tube is installed, need to be measured to the position of orifice tube, be leaned in push-bench When nearly received well, the axis of push-bench is measured and adjusted, it is ensured that push-bench can break wall, feature within the specified range It is: including breaking wall line (109) and the corresponding control of tube coupling terminated line (110) using in tube coupling deceleration line (108), tube coupling Node location proceeds as follows step:
(a), the tube coupling deceleration line (108) refers to the head cutterhead jacking when push-bench head (204) to the second plain concrete In diaphram wall (203) and when residual thickness is 50cm, pass through the hydraulic jack in regulation pipe curtain upper pipe working well (101) (106) fltting speed is to control the head cutterhead move speed of the push-bench head (204), so that the push-bench machine The travel speed of head (204) is 3-4cm/min, and at the same time described the second of control pipe curtain adapter tube active well (201) peripheral side The broken speed 1-2cm/min of plain concrete diaphram wall (203), to reduce because the presence of mass concrete is to the top Pipe machine head (204) enters the influence for receiving cabin safety;
(b), the tube coupling broken wall line (109) refers to that the second plain concrete underground described in push-bench head (204) bursting connects When continuing wall (203) and initially entering reception orifice tube (206), the first pipe curtain tube coupling in pipe curtain upper pipe working well (101) (105) it when arrival originates sealing ring (107), is noted for determining the position on broken wall opportunity on periproct steel sleeve.Described in arrival After tube coupling breaks wall line (109), push-bench head (204) travel speed is delayed in 1-2cm/min, head rotating 4-5 circle/min The broken second plain concrete diaphram wall (203) out of speed;
(c), the tube coupling terminated line (110) refers to head completely into the setting in the pipe curtain adapter tube active well (201) The front deck (207) of push-bench reception device, changeover portion are in sealed compartment position by aperture pipe flange, abolish second element After the completion of concrete underground continuous wall (203), the push-bench head (204), which slowly enters, receives cabin speed in 1-2cm/min, After reaching terminated line, the head of the push-bench head (204) stops rotating and stops the hydraulic jack (106) to described The jacking of push-bench head (204).
2. the accurate received control method of realization push-bench according to claim 1, it is characterised in that: the tube coupling slows down The position of line (108) be located at push-bench head (204) it is coaxial on periproct steel sleeve on, and with the push-bench head (204) spacing is the spacing that the pipe curtain upper pipe working well (101) arrives pipe curtain adapter tube active well (201).
3. the accurate received control method of realization push-bench according to claim 1, it is characterised in that: the tube coupling breaks wall The position of line (109) be located at push-bench head (204) it is coaxial on periproct steel sleeve on, and with the push-bench head (204) spacing is the spacing that the pipe curtain upper pipe working well (101) arrives the pipe curtain adapter tube active well (201).
4. the accurate received control method of realization push-bench according to claim 1, it is characterised in that: the tube coupling terminates The position of line (110) be located at push-bench head (204) it is coaxial on periproct steel sleeve on, and with the push-bench head (204) spacing is the spacing that the pipe curtain upper pipe working well (101) arrives the pipe curtain adapter tube active well (201).
5. the accurate received control method of realization push-bench according to claim 1, it is characterised in that: the push-bench connects The front deck (207) of receiving apparatus is mounted on push-bench receiving platform (210).
CN201811294364.XA 2018-11-01 2018-11-01 A kind of accurate received control method of realization push-bench Pending CN109184729A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811294364.XA CN109184729A (en) 2018-11-01 2018-11-01 A kind of accurate received control method of realization push-bench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811294364.XA CN109184729A (en) 2018-11-01 2018-11-01 A kind of accurate received control method of realization push-bench

Publications (1)

Publication Number Publication Date
CN109184729A true CN109184729A (en) 2019-01-11

Family

ID=64941261

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811294364.XA Pending CN109184729A (en) 2018-11-01 2018-11-01 A kind of accurate received control method of realization push-bench

Country Status (1)

Country Link
CN (1) CN109184729A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100927461B1 (en) * 2009-06-10 2009-11-19 (주)팬아시아레인워터 Construction apparatus for horizontal well and method thereof
CN104455724A (en) * 2014-09-30 2015-03-25 中铁十八局集团有限公司 Tube push bench receiving device and method under high-water-pressure condition
CN104763436A (en) * 2015-03-09 2015-07-08 中国地质大学(武汉) Method and device for receiving pipe jacking machine under condition of high water pressure complicated geological conditions
CN105257299A (en) * 2015-11-04 2016-01-20 中铁十八局集团有限公司 Slurry-balanced pipe jacking machine receiving device and technology under high water condition

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100927461B1 (en) * 2009-06-10 2009-11-19 (주)팬아시아레인워터 Construction apparatus for horizontal well and method thereof
CN104455724A (en) * 2014-09-30 2015-03-25 中铁十八局集团有限公司 Tube push bench receiving device and method under high-water-pressure condition
CN104763436A (en) * 2015-03-09 2015-07-08 中国地质大学(武汉) Method and device for receiving pipe jacking machine under condition of high water pressure complicated geological conditions
CN105257299A (en) * 2015-11-04 2016-01-20 中铁十八局集团有限公司 Slurry-balanced pipe jacking machine receiving device and technology under high water condition

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张鹏等: "拱北隧道曲线顶管管幕施工关键技术", 《隧道建设》 *

Similar Documents

Publication Publication Date Title
CN106285693B (en) A kind of closed reception construction method of shield steel bushing
CN106761785B (en) A kind of subway tunnel shield originates construction technology
CN101608550B (en) Observation window device applied on shield machine
CN104912560B (en) Gravel clay layer small-radius shield curve originates construction technology
CN109356596A (en) The method of shield machine is originated and received using recyclable diaphram wall and steel bushing
CN102505945B (en) Construction method for enabling rectangular pipe jacking machine to enter into tunnel in existing building
CN108691550B (en) Vertical shaft shield machine for underground upward construction and construction method thereof
CN110130936B (en) Construction method for sudden encountering untreated karst cave or crack in shield tunneling process
CN110159274B (en) Sea area high water pressure shield method tunnel emergency tool changing structure and construction method
CN107747488B (en) The construction method of big cross section shape of a hoof shield launching
CN109594990B (en) Large-section jacking pipe construction method for complex stratum
CN110030007B (en) Shield horizontal freezing receiving construction method
CN108425682A (en) A kind of shield tool changing ground-connecting-wall ruggedized construction and reinforced construction method
CN112664200A (en) Method for drilling horizontal freezing hole under complex working condition
CN106089252B (en) Grouting reinforcement method for inhomogeneous loose bodies
CN109184729A (en) A kind of accurate received control method of realization push-bench
CN111980718B (en) Tunneling method for small-radius turning and downward penetrating of building of shield tunneling machine
CN111706347B (en) Reverse obstacle clearing construction method for jacking pipe
CN103953350A (en) Tunnel portal breaking method by using shield tunneling machine on quicksand strata
CN205778905U (en) A kind of for shield machine closed origin and the device of arrival
CN112727467A (en) Chamber construction method for repairing shield cutter head cutter
CN110792443A (en) Construction method for shield tunnel to penetrate through seabed shallow covered silt and silt clay
CN106522972A (en) Tunnel boring machine (TBM) cutterhead and shield jamming processing method
CN102635365B (en) Construction method for holing of shield machine
CN111022068A (en) Construction method for enabling pipe-jacking tunnel to penetrate existing building downwards and construction working face of construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190111