CN109184062A - The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform and its fabrication and installation method - Google Patents
The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform and its fabrication and installation method Download PDFInfo
- Publication number
- CN109184062A CN109184062A CN201811288048.1A CN201811288048A CN109184062A CN 109184062 A CN109184062 A CN 109184062A CN 201811288048 A CN201811288048 A CN 201811288048A CN 109184062 A CN109184062 A CN 109184062A
- Authority
- CN
- China
- Prior art keywords
- platform sling
- standard platform
- standard
- component
- furred ceiling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 36
- HCHKCACWOHOZIP-UHFFFAOYSA-N Zinc Chemical compound [Zn] HCHKCACWOHOZIP-UHFFFAOYSA-N 0.000 title claims abstract description 36
- 239000010959 steel Substances 0.000 title claims abstract description 36
- 229910052725 zinc Inorganic materials 0.000 title claims abstract description 36
- 239000011701 zinc Substances 0.000 title claims abstract description 36
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 26
- 238000000034 method Methods 0.000 title claims abstract description 24
- 238000009434 installation Methods 0.000 title claims abstract description 17
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 10
- 239000000463 material Substances 0.000 claims abstract description 9
- 229910001335 Galvanized steel Inorganic materials 0.000 claims description 27
- 239000008397 galvanized steel Substances 0.000 claims description 27
- 239000007921 spray Substances 0.000 claims description 17
- 239000003973 paint Substances 0.000 claims description 13
- 238000012545 processing Methods 0.000 claims description 8
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 6
- 238000005507 spraying Methods 0.000 claims description 6
- 230000000712 assembly Effects 0.000 claims description 5
- 238000000429 assembly Methods 0.000 claims description 5
- 238000005553 drilling Methods 0.000 claims description 5
- 238000013461 design Methods 0.000 claims description 4
- 238000003780 insertion Methods 0.000 claims description 4
- 230000037431 insertion Effects 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 4
- 239000004593 Epoxy Substances 0.000 claims description 3
- 230000001154 acute effect Effects 0.000 claims description 3
- 238000005452 bending Methods 0.000 claims description 3
- 238000005520 cutting process Methods 0.000 claims description 3
- 229910052742 iron Inorganic materials 0.000 claims description 3
- 238000005498 polishing Methods 0.000 claims description 3
- 241001074085 Scophthalmus aquosus Species 0.000 claims description 2
- 238000003032 molecular docking Methods 0.000 claims description 2
- 230000000694 effects Effects 0.000 abstract description 6
- 238000010276 construction Methods 0.000 abstract description 4
- 229910000838 Al alloy Inorganic materials 0.000 abstract description 2
- 230000035939 shock Effects 0.000 abstract description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 5
- 229910052782 aluminium Inorganic materials 0.000 description 5
- 239000004411 aluminium Substances 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000008447 perception Effects 0.000 description 2
- BQCADISMDOOEFD-UHFFFAOYSA-N Silver Chemical compound [Ag] BQCADISMDOOEFD-UHFFFAOYSA-N 0.000 description 1
- PRPAGESBURMWTI-UHFFFAOYSA-N [C].[F] Chemical compound [C].[F] PRPAGESBURMWTI-UHFFFAOYSA-N 0.000 description 1
- 238000002485 combustion reaction Methods 0.000 description 1
- 238000007598 dipping method Methods 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 239000003063 flame retardant Substances 0.000 description 1
- 238000011900 installation process Methods 0.000 description 1
- 229910052709 silver Inorganic materials 0.000 description 1
- 239000004332 silver Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/06—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/18—Means for suspending the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B9/00—Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
- E04B9/22—Connection of slabs, panels, sheets or the like to the supporting construction
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Abstract
The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform, including the several groups furred ceiling component arranged along the longitudinal direction, every group of furred ceiling component includes the five row's platform sling component of A, B, C, D, E for being arranged successively arrangement along the longitudinal direction, furred ceiling component is divided into the 1st, 2,3 from front to back ..., n group, n is natural number, and wherein five row's platform sling components in odd number group are A → B → C → D → E arrangement, and five row's platform sling components in even number set are E → D → C → B → A arrangement.Invention additionally discloses the fabrication and installation methods of the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform.Material therefor of the present invention can be processed in factory, in-site installation, it is very convenient using the construction of the facilities such as jack up hoistable platform or aluminium alloy fixed shape operating platform in installation exercise, labour cost is low, the ripple that strip is formed by the different permutation and combination between standard platform sling and non-standard platform sling, has reached the flowing water shock effect that gleams of light are reflecting on waves in the river.
Description
Technical field
The invention belongs to indoor decorating field of engineering technology in construction, and in particular to a kind of water wave waveform fluorine
Carbon sprays electrolytic zinc-coated steel sheet furred ceiling and its fabrication and installation method.
Background technique
Water wave waveform represents the mobility of dampening, it is generally the case that for public building, such as showroom engineering, in order to
The effect of furred ceiling water flow ripple is highlighted, design would generally assign showroom one kind by the image of flowing water and brave the wind and the waves, brave toward straight
Before, untiring implied meaning, and how really to reflect flowing water effect with one climax following another, the selection of furred ceiling and specification and
Arrangement requires to be emphasis.
Interior waveform furred ceiling is mostly that wood based panel or pvc plate matter are process at present, although lighter in weight, is used
This material requires the disadvantage is that non-ignitable combustion rating is not achieved, and ceiling board splicing position gap is more obvious, imprecision,
It cannot be used for public building, if using solid aluminium sheet, although metal-like is very strong, the quiet depth on water wave road can be shown
It is remote, but heavier-weight, the processing of joints gap position is difficult, and it is high to the requirement for bearing capacity of ceiling joist and ceiling, have
Some potential safety problems, although light weight and texture is strong, has that fold welding processing tired if using honeycomb aluminum plate
It is difficult, it is difficult to reach the requirement of thin-walled and arc.
Summary of the invention
The present invention in order to solve shortcoming in the prior art, provide one kind be easily installed, be light-weight, fire protecting performance
It gets well, the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform and its fabrication and installation method that installation quality and perception quality are good.
In order to solve the above technical problems, the present invention adopts the following technical scheme: the fluorocarbon-sprayed electrolytic zinc-coated steel sheet of water wave waveform is hung
Top, including the several groups furred ceiling component arranged along the longitudinal direction, every group of furred ceiling component includes being arranged successively cloth along the longitudinal direction
The five row's platform sling component of A, B, C, D, E set, furred ceiling component are divided into the 1st, 2,3 from front to back ..., and n group, n is natural number,
Wherein five row's platform sling components in odd number group are A → B → C → D → E arrangement, five row's platform sling components in even number set be E →
D → C → B → A arrangement;
A, five row's platform sling component of B, C, D, E includes the concatenated several pieces of marks of non-standard platform sling and middle section in left and right ends portion
On the upper side edge edge of quasi- platform sling, non-standard platform sling and concatenated several pieces of standard platform slings flushes, lower side is formed in left-right direction
The wavelike structure of lower fluctuating, the wave crest or trough of the wavelike structure on the five row's platform sling component lower side edge A, B, C, D, E are in the same direction
It successively promotes, the line of five row's platform sling component of A, B, C, D, E adjacent wave crest or adjacent trough is same straight line, the straight line
Angle with left and right horizontal direction is acute angle.
Every row's platform sling component further includes horizontally disposed keel hanger, and keel hanger includes along left and right and anterior-posterior horizontal side
Logical to several galvanized steel sides being arranged in a crisscross manner, the logical top in galvanized steel side is fixedly connected on roof, and galvanized steel side is all
It crosses several hanger bolt components and is connected with U-shaped platform sling fixture, platform sling fixture lower end is open, standard platform sling and non-standard platform sling
Upper side edge extend into platform sling fixture and is connect by several connection bolt assemblies with platform sling fixture.
Standard platform sling and non-standard platform sling are hollow structure, and the left end and right end of standard platform sling and non-standard platform sling are spacious
Mouthful, the connection between adjacent two pieces of standard platform slings and standard platform sling and adjacent non-standard platform sling is docked by plugboard, is inserted
It is inserted into standard platform sling or non-standard platform sling at left and right sides of fishplate bar, the thickness of plugboard is equal to standard platform sling and non-standard hangs
The thickness of the hollow cavity of plate, standard platform sling, non-standard platform sling and plugboard are made of electrolytic zinc-coated steel sheet;
The length of every piece of standard platform sling be 2000mm, two sides height be respectively 410mm and 200mm, under standard platform sling
Side is along the side for the 410mm height for being wave, adjacent two pieces of standard platform slings or standard platform sling and adjacent non-standard platform sling
Docking forms the side pair of the 200mm height of wave crest, adjacent two pieces of standard platform slings or standard platform sling and adjacent non-standard platform sling
It connects to form trough.
Two institutes are respectively set on the front and back side of platform sling fixture at left and right sides of the lower section of each hanger bolt component
The connection bolt assembly stated, this two connection bolt assemblies are horizontally disposed and one high and one low in height along the longitudinal direction.
The size of non-standard platform sling is all or part of of standard platform sling.
The fabrication and installation method of the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform, includes the following steps,
(1) material is processed: according to design drawing, electrolytic zinc-coated steel sheet is processed as several pieces of standard platform slings, non-standard platform sling and plugboard,
Plugboard has two kinds of sizes being adapted to respectively with standard platform sling two sides, and plugboard is inserted into the left side cavity of standard platform sling
Or in the cavity of right side, plugboard stretches out standard platform sling, and then plugboard and standard platform sling are welded as a whole;Processing and fabricating platform sling
Fixture;It drills at the top of side and platform sling fixture to standard platform sling, non-standard platform sling and platform sling fixture;
(2) spray treatment is carried out to standard platform sling, non-standard platform sling and platform sling fixture;
(3) the logical top in several galvanized steel sides, is welded to the steel knot on roof by the transparent mounting hole of the logical upper brill in galvanized steel side
On structure;
(4) hanger bolt component lower end first penetrates the drilling of U-shaped platform sling clamp top and tightens the nut of lower part and fixes, then will
Hanger bolt component top penetrates in the mounting hole that galvanized steel side leads to, and adjusts the whole absolute altitude of platform sling fixture, it is ensured that absolute altitude exists
The logical fixation of nut and galvanized steel side on hanger bolt component top is tightened after in error range;
(5) it the installation of standard platform sling and non-standard platform sling: first determines several groups furred ceiling component erection sequence from the front to the back, then determines
The erection sequence of five row's platform sling component of A, B, C, D, E from the front to the back in every group of furred ceiling component, finally determines every row's platform sling component
Erection sequence from left to right;
The erection sequence of one row's platform sling component from left to right are as follows: using connection bolt assembly first by one piece of non-standard platform sling of left end
It is installed on the platform sling fixture of left side, is then inserted into one piece of pre-set plugboard in standard platform sling left end of the leftmost side
In the right end cavity of the mounted non-standard platform sling in left end, using connection bolt assembly by the non-standard platform sling and platform sling of left end
Fixture connection successively installs this row's platform sling component in such a way that first corresponding insertion plugboard screws on connection bolt assembly again
One piece of non-standard platform sling of standard platform sling and right end;
The standard platform sling of first group of furred ceiling component and non-standard platform sling are pacified then according to the mounting means of this row's platform sling component
It installs into;
Then the standard platform sling and non-standard platform sling for installing second group of furred ceiling component, until by indoor all groups of furred ceiling component
Standard platform sling and non-standard platform sling are completed.
It is to select that electrolytic zinc-coated steel sheet, which is processed as the detailed process of several pieces of standard platform slings, non-standard platform sling and plugboard, in step (1)
With the electrolytic zinc-coated steel sheet of wall thickness 0.5mm, in factory after cutting, folding, welding, polishing, in a wherein side for standard platform sling
It is inserted into and plugboard and welds in inner cavity, plugboard stretches out the length 100mm outside standard platform sling, finally in standard platform sling and non-standard
The top set point of platform sling drills;
The detailed process of processing and fabricating platform sling fixture are as follows: first use the galvanized steel plain sheet of 1.5mm thickness, intercept 2000mm long, 165mm wide
It carries out bending and forms U-shaped structure, then drill in the setting position of two sides and top surface.
The process of spray treatment is in step (2), and spray treatment uses F-C paint spraying process, first spraying zinc rich primer
One time, be prime coat;Then it sprays epoxy micaceous iron paint one time, is middle paint layer;It finally sprays F-C paint one time, is top coat layer.
By adopting the above technical scheme, the present invention has the following technical effects;
The ceiling board to be formed is combined using the electrolytic zinc-coated steel sheet of hollow arc thin-wall, surface can highlight same aluminium sheet by F-C paint spraying
The same metal-like of surface silver color, electrolytic zinc-coated steel sheet are divided into standard platform sling and non-standard platform sling, by standard platform sling and non-standard hang
Different permutation and combination between plate form the ripple of strip, have reached the flowing water shock effect that gleams of light are reflecting on waves in the river.
The hollow thin-wall waveform standard platform sling and non-standard platform sling to be formed are processed using electrolytic zinc-coated steel sheet, with aluminium or other conjunctions
Golden material compared to cheap, and it is internal be it is hollow, saved material and construction cost, there is light weight, meet fire-retardant want
It asks, keeps metal-like, there is the perception quality the same with aluminium sheet after fluorocarbon-sprayed.
Standard platform sling and non-standard platform sling are connected by platform sling fixture and the same ceiling joist of bolt assembly (galvanized steel side is logical),
Meet the requirement of safe bearing capacity.
Spliced by way of grafting between standard platform sling and non-standard platform sling and standard platform sling, seam is tight, splicing
It works well, muti-piece platform sling has been spliced to form the water wave waveform effect of whole perforation.
Material therefor of the present invention can be processed in factory, and field installation process is simple, and stable connection is reliable, make in installation
Very convenient using the construction of the facilities such as jack up hoistable platform or aluminium alloy fixed shape operating platform when industry, labour cost is low.
Detailed description of the invention
Fig. 1 is plan view of the invention (bottom view);
Fig. 2 is the elevational schematic view of five row's platform sling component of A, B, C, D, E in the present invention in every group of furred ceiling component;
Fig. 3 is a kind of schematic diagram that galvanized steel side leads to, connects between platform sling fixture and standard platform sling in the present invention;
Fig. 4 is a kind of schematic diagram that galvanized steel side leads to, connects between platform sling fixture and standard platform sling in the present invention
A-A cross-sectional view in Fig. 5 Fig. 3;
Fig. 6 is the enlarged drawing in Fig. 3 at N.
Specific embodiment
As shown in figs 1 to 6, the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform of the invention, including arrange along the longitudinal direction
Several groups furred ceiling component, every group of furred ceiling component includes the five row's platform sling of A, B, C, D, E for being arranged successively arrangement along the longitudinal direction
Component, furred ceiling component are divided into the 1st, 2,3 from front to back ..., and n group, n is natural number, wherein five row's platform slings in odd number group
Component is A → B → C → D → E arrangement, and five row's platform sling components in even number set are E → D → C → B → A arrangement;
A, five row's platform sling component of B, C, D, E includes non-standard platform sling 1 and concatenated several pieces of the middle section in left and right ends portion
The upper side edge of standard platform sling 2, non-standard platform sling 1 and concatenated several pieces of standard platform slings 2 along flush, lower side shape in left-right direction
At the wavelike structure of dipping and heaving, the wave crest or trough of the wavelike structure on the five row's platform sling component lower side edge A, B, C, D, E
It successively promotes in the same direction, the line of five row's platform sling component of A, B, C, D, E adjacent wave crest or adjacent trough is same straight line, should
Straight line and the angle in left and right horizontal direction are acute angle.
Every row's platform sling component further includes horizontally disposed keel hanger, and keel hanger includes along left and right and anterior-posterior horizontal side
To several galvanized steel sides being arranged in a crisscross manner logical 3, logical 3 top in galvanized steel side is fixedly connected on roof, galvanized steel side logical 3
It is connected with U-shaped platform sling fixture 5 by several hanger bolt components 4,5 lower end of platform sling fixture is open, standard platform sling 2 and nonstandard
Quasi- 1 upper side edge of platform sling extend into platform sling fixture 5 and is connect by several connection bolt assemblies 6 with platform sling fixture 5.
Standard platform sling 2 and non-standard platform sling 1 are hollow structure, the left end and right end of standard platform sling 2 and non-standard platform sling 1
Open, the connection between adjacent two pieces of standard platform slings 2 and standard platform sling 2 and adjacent non-standard platform sling 1 passes through plugboard 7
It docks, is inserted into standard platform sling 2 or non-standard platform sling 1 at left and right sides of plugboard 7, the thickness of plugboard 7 is hung equal to standard
The thickness of the hollow cavity of plate 2 and non-standard platform sling 1, standard platform sling 2, non-standard platform sling 1 and plugboard 7 are by electrolytic zinc-coated steel sheet system
At;
The length of every piece of standard platform sling 2 be 2000mm, two sides height be respectively 410mm and 200mm, standard platform sling 2
Lower side edge is wave 8, the 410mm height of adjacent two pieces of standard platform slings 2 or standard platform sling 2 and adjacent non-standard platform sling 1
Side dock to form wave crest, the 200mm height of adjacent two pieces of standard platform slings 2 or standard platform sling 2 and adjacent non-standard platform sling 1
Side dock to form trough.
Two are respectively set at left and right sides of the lower section of each hanger bolt component 4 on the front and back side of platform sling fixture 5
The connection bolt assembly 6, this two connection bolt assemblies 6 are horizontally disposed with and one high by one in height along the longitudinal direction
It is low.
The size of non-standard platform sling 1 is all or part of of standard platform sling 2.
The fabrication and installation method of the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform, includes the following steps,
(1) material is processed: according to design drawing, electrolytic zinc-coated steel sheet being processed as several pieces of standard platform slings 2, non-standard platform sling 1 and grafting
Plate 7, plugboard 7 have two kinds of sizes being adapted to respectively with 2 two sides of standard platform sling, plugboard 7 are inserted into a left side for standard platform sling 2
In the cavity of side or in the cavity of right side, plugboard 7 stretches out standard platform sling 2, and then plugboard 7 and standard platform sling 2 are welded as a whole;
Processing and fabricating platform sling fixture 5;The top of side and platform sling fixture 5 to standard platform sling 2, non-standard platform sling 1 and platform sling fixture 5
It drills;
(2) spray treatment is carried out to standard platform sling 2, non-standard platform sling 1 and platform sling fixture 5;
(3) transparent mounting hole is bored in galvanized steel side logical 3, logical 3 top in several galvanized steel sides is welded to the steel on roof
In structure;
(4) 4 lower end of hanger bolt component first penetrates the drilling at 5 top of U-shaped platform sling fixture and tightens the nut of lower part and fixes, then
4 top of hanger bolt component is penetrated in the mounting hole in galvanized steel side logical 3, adjusts the whole absolute altitude of platform sling fixture 5, it is ensured that mark
Height tightens the nut on 4 top of hanger bolt component afterwards in error range and galvanized steel side logical 3 is fixed;
(5) installation of standard platform sling 2 and non-standard platform sling 1: several groups furred ceiling component erection sequence from the front to the back is first determined, then really
The erection sequence of five row's platform sling component of A, B, C, D, E from the front to the back in fixed every group of furred ceiling component, finally determines every row's platform sling group
The erection sequence of part from left to right;
The erection sequence of one row's platform sling component from left to right are as follows: first non-standard hung one piece of left end using connection bolt assembly 6
Plate 1 is installed on the platform sling fixture 5 of left side, then by one piece of pre-set plugboard 7 in 2 left end of standard platform sling of the leftmost side
It is inserted into the right end cavity of the mounted non-standard platform sling 1 in left end, is hung the non-standard of left end using connection bolt assembly 6
Plate 1 is connect with platform sling fixture 5, successively installs this in such a way that first corresponding insertion plugboard 7 screws on connection bolt assembly 6 again
Arrange the standard platform sling 2 of platform sling component and one piece of non-standard platform sling 1 of right end;
Then according to this row's platform sling component mounting means by the standard platform sling 2 and non-standard platform sling 1 of first group of furred ceiling component
It is installed;
Then the standard platform sling 2 and non-standard platform sling 1 for installing second group of furred ceiling component, until by indoor all groups of furred ceiling component
Standard platform sling 2 and non-standard platform sling 1 complete.
Electrolytic zinc-coated steel sheet is processed as the detailed process of several pieces of standard platform slings 2, non-standard platform sling 1 and plugboard 7 in step (1)
For, select wall thickness 0.5mm electrolytic zinc-coated steel sheet, in factory after cutting, folding, welding, polishing, standard platform sling 2 wherein
It is inserted into plugboard 7 in one side inner cavity and welds, plugboard 7 stretches out the length 100mm outside standard platform sling 2, finally hangs in standard
The drilling of the top set point of plate 2 and non-standard platform sling 1;
The detailed process of processing and fabricating platform sling fixture 5 are as follows: first use the galvanized steel plain sheet of 1.5mm thickness, intercept 2000mm long, 165mm
Width carries out bending and forms U-shaped structure, then drills in the setting position of two sides and top surface.
The process of spray treatment is in step (2), and spray treatment uses F-C paint spraying process, first spraying zinc rich primer
One time, be prime coat;Then it sprays epoxy micaceous iron paint one time, is middle paint layer;It finally sprays F-C paint one time, is top coat layer.
The present embodiment not makes any form of restriction shape of the invention, material, structure etc., all according to this hair
Bright technical spirit any simple modification, equivalent change and modification to the above embodiments, belong to the technology of the present invention side
The protection scope of case.
Claims (8)
1. the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform, it is characterised in that: including the several groups furred ceiling arranged along the longitudinal direction
Component, every group of furred ceiling component include the five row's platform sling component of A, B, C, D, E for being arranged successively arrangement along the longitudinal direction, furred ceiling component
It is divided into the 1st, 2,3 from front to back ..., n group, n is natural number, and wherein five row's platform sling components in odd number group are A → B
→ C → D → E is arranged, and five row's platform sling components in even number set are E → D → C → B → A arrangement;
A, five row's platform sling component of B, C, D, E includes the concatenated several pieces of marks of non-standard platform sling and middle section in left and right ends portion
On the upper side edge edge of quasi- platform sling, non-standard platform sling and concatenated several pieces of standard platform slings flushes, lower side is formed in left-right direction
The wavelike structure of lower fluctuating, the wave crest or trough of the wavelike structure on the five row's platform sling component lower side edge A, B, C, D, E are in the same direction
It successively promotes, the line of five row's platform sling component of A, B, C, D, E adjacent wave crest or adjacent trough is same straight line, the straight line
Angle with left and right horizontal direction is acute angle.
2. the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform according to claim 1, it is characterised in that: every row's platform sling component
Further include horizontally disposed keel hanger, keel hanger include be arranged in a crisscross manner along left and right and anterior-posterior horizontal direction it is several
Root galvanized steel side is logical, and the logical top in galvanized steel side is fixedly connected on roof, galvanized steel side's several hanger bolt components excessively all
It is connected with U-shaped platform sling fixture, platform sling fixture lower end is open, and standard platform sling and non-standard platform sling upper side edge extend into platform sling fixture
It is interior and connect with platform sling fixture by several connection bolt assemblies.
3. the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform according to claim 2, it is characterised in that: standard platform sling and non-
Standard platform sling is hollow structure, and the left end and right end of standard platform sling and non-standard platform sling are open, adjacent two pieces of standard platform slings
And the connection between standard platform sling and adjacent non-standard platform sling is docked by plugboard, is inserted at left and right sides of plugboard
In standard platform sling or non-standard platform sling, the thickness of plugboard is equal to the thickness of the hollow cavity of standard platform sling and non-standard platform sling,
Standard platform sling, non-standard platform sling and plugboard are made of electrolytic zinc-coated steel sheet;
The length of every piece of standard platform sling be 2000mm, two sides height be respectively 410mm and 200mm, under standard platform sling
Side is along the side for the 410mm height for being wave, adjacent two pieces of standard platform slings or standard platform sling and adjacent non-standard platform sling
Docking forms the side pair of the 200mm height of wave crest, adjacent two pieces of standard platform slings or standard platform sling and adjacent non-standard platform sling
It connects to form trough.
4. the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform according to claim 3, it is characterised in that: before platform sling fixture
Connection bolt assembly described in two are respectively set at left and right sides of the lower section of each hanger bolt component in rear lateral portion, this two
It is horizontally disposed and one high and one low in height along the longitudinal direction that item connects bolt assembly.
5. the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform according to claim 4, it is characterised in that: non-standard platform sling
Size is all or part of of standard platform sling.
6. the fabrication and installation method of the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform according to claim 5, feature exist
In: include the following steps,
(1) material is processed: according to design drawing, electrolytic zinc-coated steel sheet is processed as several pieces of standard platform slings, non-standard platform sling and plugboard,
Plugboard has two kinds of sizes being adapted to respectively with standard platform sling two sides, and plugboard is inserted into the left side cavity of standard platform sling
Or in the cavity of right side, plugboard stretches out standard platform sling, and then plugboard and standard platform sling are welded as a whole;Processing and fabricating platform sling
Fixture;It drills at the top of side and platform sling fixture to standard platform sling, non-standard platform sling and platform sling fixture;
(2) spray treatment is carried out to standard platform sling, non-standard platform sling and platform sling fixture;
(3) the logical top in several galvanized steel sides, is welded to the steel knot on roof by the transparent mounting hole of the logical upper brill in galvanized steel side
On structure;
(4) hanger bolt component lower end first penetrates the drilling of U-shaped platform sling clamp top and tightens the nut of lower part and fixes, then will
Hanger bolt component top penetrates in the mounting hole that galvanized steel side leads to, and adjusts the whole absolute altitude of platform sling fixture, it is ensured that absolute altitude exists
The logical fixation of nut and galvanized steel side on hanger bolt component top is tightened after in error range;
(5) it the installation of standard platform sling and non-standard platform sling: first determines several groups furred ceiling component erection sequence from the front to the back, then determines
The erection sequence of five row's platform sling component of A, B, C, D, E from the front to the back in every group of furred ceiling component, finally determines every row's platform sling component
Erection sequence from left to right;
The erection sequence of one row's platform sling component from left to right are as follows: using connection bolt assembly first by one piece of non-standard platform sling of left end
It is installed on the platform sling fixture of left side, is then inserted into one piece of pre-set plugboard in standard platform sling left end of the leftmost side
In the right end cavity of the mounted non-standard platform sling in left end, using connection bolt assembly by the non-standard platform sling and platform sling of left end
Fixture connection successively installs this row's platform sling component in such a way that first corresponding insertion plugboard screws on connection bolt assembly again
One piece of non-standard platform sling of standard platform sling and right end;
The standard platform sling of first group of furred ceiling component and non-standard platform sling are pacified then according to the mounting means of this row's platform sling component
It installs into;
Then the standard platform sling and non-standard platform sling for installing second group of furred ceiling component, until by indoor all groups of furred ceiling component
Standard platform sling and non-standard platform sling are completed.
7. the fabrication and installation method of the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform according to claim 6, feature exist
In: it is to select wall that electrolytic zinc-coated steel sheet, which is processed as the detailed process of several pieces of standard platform slings, non-standard platform sling and plugboard, in step (1)
The electrolytic zinc-coated steel sheet of thick 0.5mm, in factory after cutting, folding, welding, polishing, in a wherein side inner cavity for standard platform sling
Interior insertion plugboard simultaneously welds, and plugboard stretches out the length 100mm outside standard platform sling, finally in standard platform sling and non-standard platform sling
Top set point drilling;
The detailed process of processing and fabricating platform sling fixture are as follows: first use the galvanized steel plain sheet of 1.5mm thickness, intercept 2000mm long, 165mm wide
It carries out bending and forms U-shaped structure, then drill in the setting position of two sides and top surface.
8. the fabrication and installation method of the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform according to claim 6, feature exist
In: the process of spray treatment is in step (2), and spray treatment uses F-C paint spraying process, sprays zinc rich primer one time first,
For prime coat;Then it sprays epoxy micaceous iron paint one time, is middle paint layer;It finally sprays F-C paint one time, is top coat layer.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811288048.1A CN109184062B (en) | 2018-10-31 | 2018-10-31 | Water wave-shaped fluorocarbon spraying electrolytic plate suspended ceiling and manufacturing and mounting method thereof |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811288048.1A CN109184062B (en) | 2018-10-31 | 2018-10-31 | Water wave-shaped fluorocarbon spraying electrolytic plate suspended ceiling and manufacturing and mounting method thereof |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109184062A true CN109184062A (en) | 2019-01-11 |
CN109184062B CN109184062B (en) | 2023-11-03 |
Family
ID=64941080
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811288048.1A Active CN109184062B (en) | 2018-10-31 | 2018-10-31 | Water wave-shaped fluorocarbon spraying electrolytic plate suspended ceiling and manufacturing and mounting method thereof |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109184062B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112223944A (en) * | 2020-09-03 | 2021-01-15 | 南京晨光艺术工程有限公司 | Copper wall plate pre-coating method |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130192772A1 (en) * | 2012-01-26 | 2013-08-01 | 3Form, Inc. | Decorative multi-slat system |
CN103388371A (en) * | 2013-07-25 | 2013-11-13 | 苏州金螳螂建筑装饰股份有限公司 | Bamboo-wood suspended ceiling |
KR101851194B1 (en) * | 2017-07-27 | 2018-04-23 | 김명열 | A screen louver for decorating a building |
CN207646998U (en) * | 2017-11-30 | 2018-07-24 | 广州康普顿至高建材有限公司 | A kind of curved surface smallpox |
US20180283004A1 (en) * | 2016-06-30 | 2018-10-04 | Jason Gillette | Apparatus and system for dynamic acoustic drop ceiling system and methods thereof |
CN209066695U (en) * | 2018-10-31 | 2019-07-05 | 中建二局第二建筑工程有限公司 | The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform |
-
2018
- 2018-10-31 CN CN201811288048.1A patent/CN109184062B/en active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20130192772A1 (en) * | 2012-01-26 | 2013-08-01 | 3Form, Inc. | Decorative multi-slat system |
CN103388371A (en) * | 2013-07-25 | 2013-11-13 | 苏州金螳螂建筑装饰股份有限公司 | Bamboo-wood suspended ceiling |
US20180283004A1 (en) * | 2016-06-30 | 2018-10-04 | Jason Gillette | Apparatus and system for dynamic acoustic drop ceiling system and methods thereof |
KR101851194B1 (en) * | 2017-07-27 | 2018-04-23 | 김명열 | A screen louver for decorating a building |
CN207646998U (en) * | 2017-11-30 | 2018-07-24 | 广州康普顿至高建材有限公司 | A kind of curved surface smallpox |
CN209066695U (en) * | 2018-10-31 | 2019-07-05 | 中建二局第二建筑工程有限公司 | The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112223944A (en) * | 2020-09-03 | 2021-01-15 | 南京晨光艺术工程有限公司 | Copper wall plate pre-coating method |
Also Published As
Publication number | Publication date |
---|---|
CN109184062B (en) | 2023-11-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20180274221A1 (en) | Snap-in Structure of Aluminum Alloy Wallboard, Roof Panel, and Corner-Connecting Materials | |
CN108331209B (en) | Assembled light partition wall | |
CN105804305B (en) | Corrugated metal plate ceiling system and its installation method | |
CN209066695U (en) | The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform | |
CN109184062A (en) | The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform and its fabrication and installation method | |
CN107327015A (en) | A kind of assembled cylinder Tower Building and its construction method | |
CN2866323Y (en) | Overwater floating room | |
CN110130551A (en) | A kind of bolt method cell cube GRC curtain wall construction and its construction method | |
CN213741790U (en) | Connecting structure of strip-shaped metal curtain wall sandwich board and steel upright post | |
CN202390970U (en) | Text curtain wall | |
CN105298145A (en) | Vertical external sun-shading welding-free construction method of hidden-frame curtain wall | |
CN215254199U (en) | Wall aluminum plate's mounting structure and aluminum plate wall | |
CN205712904U (en) | Abnormity metope moulding scalable gusseted point hang device | |
CN110126978B (en) | Assembling structure and process of ship accommodation chamber wall plate | |
CN107419857A (en) | Built-up roofing Durchgangshohle node and its construction method | |
CN208137246U (en) | Without keel furred ceiling | |
CN204609092U (en) | A kind of combined type conversion layer connector | |
CN208248418U (en) | H grades/A grades fire resisting soundproof walls of ship ocean engineering | |
CN210238924U (en) | Assembled integrated wallboard and system for modular steel structure building | |
CN211286153U (en) | Assembled waterproof wall | |
CN106481077A (en) | A kind of novel reinforced system of template and its construction technology | |
CN204691315U (en) | A kind of combined type sunshade | |
CN217782504U (en) | Outer wall bridging vertical joint hole waterproof structure | |
CN219508959U (en) | Arc aluminum plate furred ceiling structure | |
CN205153229U (en) | Special -shaped curtain board mounting structure is chosen to one side to high hovering |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |