CN109184062A - The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform and its fabrication and installation method - Google Patents

The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform and its fabrication and installation method Download PDF

Info

Publication number
CN109184062A
CN109184062A CN201811288048.1A CN201811288048A CN109184062A CN 109184062 A CN109184062 A CN 109184062A CN 201811288048 A CN201811288048 A CN 201811288048A CN 109184062 A CN109184062 A CN 109184062A
Authority
CN
China
Prior art keywords
platform sling
standard platform
standard
component
furred ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811288048.1A
Other languages
Chinese (zh)
Other versions
CN109184062B (en
Inventor
张龙洋
李斌
田晓航
刘国全
陈小飞
李煜麟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN201811288048.1A priority Critical patent/CN109184062B/en
Publication of CN109184062A publication Critical patent/CN109184062A/en
Application granted granted Critical
Publication of CN109184062B publication Critical patent/CN109184062B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/06Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation characterised by constructional features of the supporting construction, e.g. cross section or material of framework members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/18Means for suspending the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B9/00Ceilings; Construction of ceilings, e.g. false ceilings; Ceiling construction with regard to insulation
    • E04B9/22Connection of slabs, panels, sheets or the like to the supporting construction
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform, including the several groups furred ceiling component arranged along the longitudinal direction, every group of furred ceiling component includes the five row's platform sling component of A, B, C, D, E for being arranged successively arrangement along the longitudinal direction, furred ceiling component is divided into the 1st, 2,3 from front to back ..., n group, n is natural number, and wherein five row's platform sling components in odd number group are A → B → C → D → E arrangement, and five row's platform sling components in even number set are E → D → C → B → A arrangement.Invention additionally discloses the fabrication and installation methods of the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform.Material therefor of the present invention can be processed in factory, in-site installation, it is very convenient using the construction of the facilities such as jack up hoistable platform or aluminium alloy fixed shape operating platform in installation exercise, labour cost is low, the ripple that strip is formed by the different permutation and combination between standard platform sling and non-standard platform sling, has reached the flowing water shock effect that gleams of light are reflecting on waves in the river.

Description

The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform and its fabrication and installation method
Technical field
The invention belongs to indoor decorating field of engineering technology in construction, and in particular to a kind of water wave waveform fluorine Carbon sprays electrolytic zinc-coated steel sheet furred ceiling and its fabrication and installation method.
Background technique
Water wave waveform represents the mobility of dampening, it is generally the case that for public building, such as showroom engineering, in order to The effect of furred ceiling water flow ripple is highlighted, design would generally assign showroom one kind by the image of flowing water and brave the wind and the waves, brave toward straight Before, untiring implied meaning, and how really to reflect flowing water effect with one climax following another, the selection of furred ceiling and specification and Arrangement requires to be emphasis.
Interior waveform furred ceiling is mostly that wood based panel or pvc plate matter are process at present, although lighter in weight, is used This material requires the disadvantage is that non-ignitable combustion rating is not achieved, and ceiling board splicing position gap is more obvious, imprecision, It cannot be used for public building, if using solid aluminium sheet, although metal-like is very strong, the quiet depth on water wave road can be shown It is remote, but heavier-weight, the processing of joints gap position is difficult, and it is high to the requirement for bearing capacity of ceiling joist and ceiling, have Some potential safety problems, although light weight and texture is strong, has that fold welding processing tired if using honeycomb aluminum plate It is difficult, it is difficult to reach the requirement of thin-walled and arc.
Summary of the invention
The present invention in order to solve shortcoming in the prior art, provide one kind be easily installed, be light-weight, fire protecting performance It gets well, the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform and its fabrication and installation method that installation quality and perception quality are good.
In order to solve the above technical problems, the present invention adopts the following technical scheme: the fluorocarbon-sprayed electrolytic zinc-coated steel sheet of water wave waveform is hung Top, including the several groups furred ceiling component arranged along the longitudinal direction, every group of furred ceiling component includes being arranged successively cloth along the longitudinal direction The five row's platform sling component of A, B, C, D, E set, furred ceiling component are divided into the 1st, 2,3 from front to back ..., and n group, n is natural number, Wherein five row's platform sling components in odd number group are A → B → C → D → E arrangement, five row's platform sling components in even number set be E → D → C → B → A arrangement;
A, five row's platform sling component of B, C, D, E includes the concatenated several pieces of marks of non-standard platform sling and middle section in left and right ends portion On the upper side edge edge of quasi- platform sling, non-standard platform sling and concatenated several pieces of standard platform slings flushes, lower side is formed in left-right direction The wavelike structure of lower fluctuating, the wave crest or trough of the wavelike structure on the five row's platform sling component lower side edge A, B, C, D, E are in the same direction It successively promotes, the line of five row's platform sling component of A, B, C, D, E adjacent wave crest or adjacent trough is same straight line, the straight line Angle with left and right horizontal direction is acute angle.
Every row's platform sling component further includes horizontally disposed keel hanger, and keel hanger includes along left and right and anterior-posterior horizontal side Logical to several galvanized steel sides being arranged in a crisscross manner, the logical top in galvanized steel side is fixedly connected on roof, and galvanized steel side is all It crosses several hanger bolt components and is connected with U-shaped platform sling fixture, platform sling fixture lower end is open, standard platform sling and non-standard platform sling Upper side edge extend into platform sling fixture and is connect by several connection bolt assemblies with platform sling fixture.
Standard platform sling and non-standard platform sling are hollow structure, and the left end and right end of standard platform sling and non-standard platform sling are spacious Mouthful, the connection between adjacent two pieces of standard platform slings and standard platform sling and adjacent non-standard platform sling is docked by plugboard, is inserted It is inserted into standard platform sling or non-standard platform sling at left and right sides of fishplate bar, the thickness of plugboard is equal to standard platform sling and non-standard hangs The thickness of the hollow cavity of plate, standard platform sling, non-standard platform sling and plugboard are made of electrolytic zinc-coated steel sheet;
The length of every piece of standard platform sling be 2000mm, two sides height be respectively 410mm and 200mm, under standard platform sling Side is along the side for the 410mm height for being wave, adjacent two pieces of standard platform slings or standard platform sling and adjacent non-standard platform sling Docking forms the side pair of the 200mm height of wave crest, adjacent two pieces of standard platform slings or standard platform sling and adjacent non-standard platform sling It connects to form trough.
Two institutes are respectively set on the front and back side of platform sling fixture at left and right sides of the lower section of each hanger bolt component The connection bolt assembly stated, this two connection bolt assemblies are horizontally disposed and one high and one low in height along the longitudinal direction.
The size of non-standard platform sling is all or part of of standard platform sling.
The fabrication and installation method of the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform, includes the following steps,
(1) material is processed: according to design drawing, electrolytic zinc-coated steel sheet is processed as several pieces of standard platform slings, non-standard platform sling and plugboard, Plugboard has two kinds of sizes being adapted to respectively with standard platform sling two sides, and plugboard is inserted into the left side cavity of standard platform sling Or in the cavity of right side, plugboard stretches out standard platform sling, and then plugboard and standard platform sling are welded as a whole;Processing and fabricating platform sling Fixture;It drills at the top of side and platform sling fixture to standard platform sling, non-standard platform sling and platform sling fixture;
(2) spray treatment is carried out to standard platform sling, non-standard platform sling and platform sling fixture;
(3) the logical top in several galvanized steel sides, is welded to the steel knot on roof by the transparent mounting hole of the logical upper brill in galvanized steel side On structure;
(4) hanger bolt component lower end first penetrates the drilling of U-shaped platform sling clamp top and tightens the nut of lower part and fixes, then will Hanger bolt component top penetrates in the mounting hole that galvanized steel side leads to, and adjusts the whole absolute altitude of platform sling fixture, it is ensured that absolute altitude exists The logical fixation of nut and galvanized steel side on hanger bolt component top is tightened after in error range;
(5) it the installation of standard platform sling and non-standard platform sling: first determines several groups furred ceiling component erection sequence from the front to the back, then determines The erection sequence of five row's platform sling component of A, B, C, D, E from the front to the back in every group of furred ceiling component, finally determines every row's platform sling component Erection sequence from left to right;
The erection sequence of one row's platform sling component from left to right are as follows: using connection bolt assembly first by one piece of non-standard platform sling of left end It is installed on the platform sling fixture of left side, is then inserted into one piece of pre-set plugboard in standard platform sling left end of the leftmost side In the right end cavity of the mounted non-standard platform sling in left end, using connection bolt assembly by the non-standard platform sling and platform sling of left end Fixture connection successively installs this row's platform sling component in such a way that first corresponding insertion plugboard screws on connection bolt assembly again One piece of non-standard platform sling of standard platform sling and right end;
The standard platform sling of first group of furred ceiling component and non-standard platform sling are pacified then according to the mounting means of this row's platform sling component It installs into;
Then the standard platform sling and non-standard platform sling for installing second group of furred ceiling component, until by indoor all groups of furred ceiling component Standard platform sling and non-standard platform sling are completed.
It is to select that electrolytic zinc-coated steel sheet, which is processed as the detailed process of several pieces of standard platform slings, non-standard platform sling and plugboard, in step (1) With the electrolytic zinc-coated steel sheet of wall thickness 0.5mm, in factory after cutting, folding, welding, polishing, in a wherein side for standard platform sling It is inserted into and plugboard and welds in inner cavity, plugboard stretches out the length 100mm outside standard platform sling, finally in standard platform sling and non-standard The top set point of platform sling drills;
The detailed process of processing and fabricating platform sling fixture are as follows: first use the galvanized steel plain sheet of 1.5mm thickness, intercept 2000mm long, 165mm wide It carries out bending and forms U-shaped structure, then drill in the setting position of two sides and top surface.
The process of spray treatment is in step (2), and spray treatment uses F-C paint spraying process, first spraying zinc rich primer One time, be prime coat;Then it sprays epoxy micaceous iron paint one time, is middle paint layer;It finally sprays F-C paint one time, is top coat layer.
By adopting the above technical scheme, the present invention has the following technical effects;
The ceiling board to be formed is combined using the electrolytic zinc-coated steel sheet of hollow arc thin-wall, surface can highlight same aluminium sheet by F-C paint spraying The same metal-like of surface silver color, electrolytic zinc-coated steel sheet are divided into standard platform sling and non-standard platform sling, by standard platform sling and non-standard hang Different permutation and combination between plate form the ripple of strip, have reached the flowing water shock effect that gleams of light are reflecting on waves in the river.
The hollow thin-wall waveform standard platform sling and non-standard platform sling to be formed are processed using electrolytic zinc-coated steel sheet, with aluminium or other conjunctions Golden material compared to cheap, and it is internal be it is hollow, saved material and construction cost, there is light weight, meet fire-retardant want It asks, keeps metal-like, there is the perception quality the same with aluminium sheet after fluorocarbon-sprayed.
Standard platform sling and non-standard platform sling are connected by platform sling fixture and the same ceiling joist of bolt assembly (galvanized steel side is logical), Meet the requirement of safe bearing capacity.
Spliced by way of grafting between standard platform sling and non-standard platform sling and standard platform sling, seam is tight, splicing It works well, muti-piece platform sling has been spliced to form the water wave waveform effect of whole perforation.
Material therefor of the present invention can be processed in factory, and field installation process is simple, and stable connection is reliable, make in installation Very convenient using the construction of the facilities such as jack up hoistable platform or aluminium alloy fixed shape operating platform when industry, labour cost is low.
Detailed description of the invention
Fig. 1 is plan view of the invention (bottom view);
Fig. 2 is the elevational schematic view of five row's platform sling component of A, B, C, D, E in the present invention in every group of furred ceiling component;
Fig. 3 is a kind of schematic diagram that galvanized steel side leads to, connects between platform sling fixture and standard platform sling in the present invention;
Fig. 4 is a kind of schematic diagram that galvanized steel side leads to, connects between platform sling fixture and standard platform sling in the present invention
A-A cross-sectional view in Fig. 5 Fig. 3;
Fig. 6 is the enlarged drawing in Fig. 3 at N.
Specific embodiment
As shown in figs 1 to 6, the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform of the invention, including arrange along the longitudinal direction Several groups furred ceiling component, every group of furred ceiling component includes the five row's platform sling of A, B, C, D, E for being arranged successively arrangement along the longitudinal direction Component, furred ceiling component are divided into the 1st, 2,3 from front to back ..., and n group, n is natural number, wherein five row's platform slings in odd number group Component is A → B → C → D → E arrangement, and five row's platform sling components in even number set are E → D → C → B → A arrangement;
A, five row's platform sling component of B, C, D, E includes non-standard platform sling 1 and concatenated several pieces of the middle section in left and right ends portion The upper side edge of standard platform sling 2, non-standard platform sling 1 and concatenated several pieces of standard platform slings 2 along flush, lower side shape in left-right direction At the wavelike structure of dipping and heaving, the wave crest or trough of the wavelike structure on the five row's platform sling component lower side edge A, B, C, D, E It successively promotes in the same direction, the line of five row's platform sling component of A, B, C, D, E adjacent wave crest or adjacent trough is same straight line, should Straight line and the angle in left and right horizontal direction are acute angle.
Every row's platform sling component further includes horizontally disposed keel hanger, and keel hanger includes along left and right and anterior-posterior horizontal side To several galvanized steel sides being arranged in a crisscross manner logical 3, logical 3 top in galvanized steel side is fixedly connected on roof, galvanized steel side logical 3 It is connected with U-shaped platform sling fixture 5 by several hanger bolt components 4,5 lower end of platform sling fixture is open, standard platform sling 2 and nonstandard Quasi- 1 upper side edge of platform sling extend into platform sling fixture 5 and is connect by several connection bolt assemblies 6 with platform sling fixture 5.
Standard platform sling 2 and non-standard platform sling 1 are hollow structure, the left end and right end of standard platform sling 2 and non-standard platform sling 1 Open, the connection between adjacent two pieces of standard platform slings 2 and standard platform sling 2 and adjacent non-standard platform sling 1 passes through plugboard 7 It docks, is inserted into standard platform sling 2 or non-standard platform sling 1 at left and right sides of plugboard 7, the thickness of plugboard 7 is hung equal to standard The thickness of the hollow cavity of plate 2 and non-standard platform sling 1, standard platform sling 2, non-standard platform sling 1 and plugboard 7 are by electrolytic zinc-coated steel sheet system At;
The length of every piece of standard platform sling 2 be 2000mm, two sides height be respectively 410mm and 200mm, standard platform sling 2 Lower side edge is wave 8, the 410mm height of adjacent two pieces of standard platform slings 2 or standard platform sling 2 and adjacent non-standard platform sling 1 Side dock to form wave crest, the 200mm height of adjacent two pieces of standard platform slings 2 or standard platform sling 2 and adjacent non-standard platform sling 1 Side dock to form trough.
Two are respectively set at left and right sides of the lower section of each hanger bolt component 4 on the front and back side of platform sling fixture 5 The connection bolt assembly 6, this two connection bolt assemblies 6 are horizontally disposed with and one high by one in height along the longitudinal direction It is low.
The size of non-standard platform sling 1 is all or part of of standard platform sling 2.
The fabrication and installation method of the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform, includes the following steps,
(1) material is processed: according to design drawing, electrolytic zinc-coated steel sheet being processed as several pieces of standard platform slings 2, non-standard platform sling 1 and grafting Plate 7, plugboard 7 have two kinds of sizes being adapted to respectively with 2 two sides of standard platform sling, plugboard 7 are inserted into a left side for standard platform sling 2 In the cavity of side or in the cavity of right side, plugboard 7 stretches out standard platform sling 2, and then plugboard 7 and standard platform sling 2 are welded as a whole; Processing and fabricating platform sling fixture 5;The top of side and platform sling fixture 5 to standard platform sling 2, non-standard platform sling 1 and platform sling fixture 5 It drills;
(2) spray treatment is carried out to standard platform sling 2, non-standard platform sling 1 and platform sling fixture 5;
(3) transparent mounting hole is bored in galvanized steel side logical 3, logical 3 top in several galvanized steel sides is welded to the steel on roof In structure;
(4) 4 lower end of hanger bolt component first penetrates the drilling at 5 top of U-shaped platform sling fixture and tightens the nut of lower part and fixes, then 4 top of hanger bolt component is penetrated in the mounting hole in galvanized steel side logical 3, adjusts the whole absolute altitude of platform sling fixture 5, it is ensured that mark Height tightens the nut on 4 top of hanger bolt component afterwards in error range and galvanized steel side logical 3 is fixed;
(5) installation of standard platform sling 2 and non-standard platform sling 1: several groups furred ceiling component erection sequence from the front to the back is first determined, then really The erection sequence of five row's platform sling component of A, B, C, D, E from the front to the back in fixed every group of furred ceiling component, finally determines every row's platform sling group The erection sequence of part from left to right;
The erection sequence of one row's platform sling component from left to right are as follows: first non-standard hung one piece of left end using connection bolt assembly 6 Plate 1 is installed on the platform sling fixture 5 of left side, then by one piece of pre-set plugboard 7 in 2 left end of standard platform sling of the leftmost side It is inserted into the right end cavity of the mounted non-standard platform sling 1 in left end, is hung the non-standard of left end using connection bolt assembly 6 Plate 1 is connect with platform sling fixture 5, successively installs this in such a way that first corresponding insertion plugboard 7 screws on connection bolt assembly 6 again Arrange the standard platform sling 2 of platform sling component and one piece of non-standard platform sling 1 of right end;
Then according to this row's platform sling component mounting means by the standard platform sling 2 and non-standard platform sling 1 of first group of furred ceiling component It is installed;
Then the standard platform sling 2 and non-standard platform sling 1 for installing second group of furred ceiling component, until by indoor all groups of furred ceiling component Standard platform sling 2 and non-standard platform sling 1 complete.
Electrolytic zinc-coated steel sheet is processed as the detailed process of several pieces of standard platform slings 2, non-standard platform sling 1 and plugboard 7 in step (1) For, select wall thickness 0.5mm electrolytic zinc-coated steel sheet, in factory after cutting, folding, welding, polishing, standard platform sling 2 wherein It is inserted into plugboard 7 in one side inner cavity and welds, plugboard 7 stretches out the length 100mm outside standard platform sling 2, finally hangs in standard The drilling of the top set point of plate 2 and non-standard platform sling 1;
The detailed process of processing and fabricating platform sling fixture 5 are as follows: first use the galvanized steel plain sheet of 1.5mm thickness, intercept 2000mm long, 165mm Width carries out bending and forms U-shaped structure, then drills in the setting position of two sides and top surface.
The process of spray treatment is in step (2), and spray treatment uses F-C paint spraying process, first spraying zinc rich primer One time, be prime coat;Then it sprays epoxy micaceous iron paint one time, is middle paint layer;It finally sprays F-C paint one time, is top coat layer.
The present embodiment not makes any form of restriction shape of the invention, material, structure etc., all according to this hair Bright technical spirit any simple modification, equivalent change and modification to the above embodiments, belong to the technology of the present invention side The protection scope of case.

Claims (8)

1. the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform, it is characterised in that: including the several groups furred ceiling arranged along the longitudinal direction Component, every group of furred ceiling component include the five row's platform sling component of A, B, C, D, E for being arranged successively arrangement along the longitudinal direction, furred ceiling component It is divided into the 1st, 2,3 from front to back ..., n group, n is natural number, and wherein five row's platform sling components in odd number group are A → B → C → D → E is arranged, and five row's platform sling components in even number set are E → D → C → B → A arrangement;
A, five row's platform sling component of B, C, D, E includes the concatenated several pieces of marks of non-standard platform sling and middle section in left and right ends portion On the upper side edge edge of quasi- platform sling, non-standard platform sling and concatenated several pieces of standard platform slings flushes, lower side is formed in left-right direction The wavelike structure of lower fluctuating, the wave crest or trough of the wavelike structure on the five row's platform sling component lower side edge A, B, C, D, E are in the same direction It successively promotes, the line of five row's platform sling component of A, B, C, D, E adjacent wave crest or adjacent trough is same straight line, the straight line Angle with left and right horizontal direction is acute angle.
2. the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform according to claim 1, it is characterised in that: every row's platform sling component Further include horizontally disposed keel hanger, keel hanger include be arranged in a crisscross manner along left and right and anterior-posterior horizontal direction it is several Root galvanized steel side is logical, and the logical top in galvanized steel side is fixedly connected on roof, galvanized steel side's several hanger bolt components excessively all It is connected with U-shaped platform sling fixture, platform sling fixture lower end is open, and standard platform sling and non-standard platform sling upper side edge extend into platform sling fixture It is interior and connect with platform sling fixture by several connection bolt assemblies.
3. the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform according to claim 2, it is characterised in that: standard platform sling and non- Standard platform sling is hollow structure, and the left end and right end of standard platform sling and non-standard platform sling are open, adjacent two pieces of standard platform slings And the connection between standard platform sling and adjacent non-standard platform sling is docked by plugboard, is inserted at left and right sides of plugboard In standard platform sling or non-standard platform sling, the thickness of plugboard is equal to the thickness of the hollow cavity of standard platform sling and non-standard platform sling, Standard platform sling, non-standard platform sling and plugboard are made of electrolytic zinc-coated steel sheet;
The length of every piece of standard platform sling be 2000mm, two sides height be respectively 410mm and 200mm, under standard platform sling Side is along the side for the 410mm height for being wave, adjacent two pieces of standard platform slings or standard platform sling and adjacent non-standard platform sling Docking forms the side pair of the 200mm height of wave crest, adjacent two pieces of standard platform slings or standard platform sling and adjacent non-standard platform sling It connects to form trough.
4. the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform according to claim 3, it is characterised in that: before platform sling fixture Connection bolt assembly described in two are respectively set at left and right sides of the lower section of each hanger bolt component in rear lateral portion, this two It is horizontally disposed and one high and one low in height along the longitudinal direction that item connects bolt assembly.
5. the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform according to claim 4, it is characterised in that: non-standard platform sling Size is all or part of of standard platform sling.
6. the fabrication and installation method of the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform according to claim 5, feature exist In: include the following steps,
(1) material is processed: according to design drawing, electrolytic zinc-coated steel sheet is processed as several pieces of standard platform slings, non-standard platform sling and plugboard, Plugboard has two kinds of sizes being adapted to respectively with standard platform sling two sides, and plugboard is inserted into the left side cavity of standard platform sling Or in the cavity of right side, plugboard stretches out standard platform sling, and then plugboard and standard platform sling are welded as a whole;Processing and fabricating platform sling Fixture;It drills at the top of side and platform sling fixture to standard platform sling, non-standard platform sling and platform sling fixture;
(2) spray treatment is carried out to standard platform sling, non-standard platform sling and platform sling fixture;
(3) the logical top in several galvanized steel sides, is welded to the steel knot on roof by the transparent mounting hole of the logical upper brill in galvanized steel side On structure;
(4) hanger bolt component lower end first penetrates the drilling of U-shaped platform sling clamp top and tightens the nut of lower part and fixes, then will Hanger bolt component top penetrates in the mounting hole that galvanized steel side leads to, and adjusts the whole absolute altitude of platform sling fixture, it is ensured that absolute altitude exists The logical fixation of nut and galvanized steel side on hanger bolt component top is tightened after in error range;
(5) it the installation of standard platform sling and non-standard platform sling: first determines several groups furred ceiling component erection sequence from the front to the back, then determines The erection sequence of five row's platform sling component of A, B, C, D, E from the front to the back in every group of furred ceiling component, finally determines every row's platform sling component Erection sequence from left to right;
The erection sequence of one row's platform sling component from left to right are as follows: using connection bolt assembly first by one piece of non-standard platform sling of left end It is installed on the platform sling fixture of left side, is then inserted into one piece of pre-set plugboard in standard platform sling left end of the leftmost side In the right end cavity of the mounted non-standard platform sling in left end, using connection bolt assembly by the non-standard platform sling and platform sling of left end Fixture connection successively installs this row's platform sling component in such a way that first corresponding insertion plugboard screws on connection bolt assembly again One piece of non-standard platform sling of standard platform sling and right end;
The standard platform sling of first group of furred ceiling component and non-standard platform sling are pacified then according to the mounting means of this row's platform sling component It installs into;
Then the standard platform sling and non-standard platform sling for installing second group of furred ceiling component, until by indoor all groups of furred ceiling component Standard platform sling and non-standard platform sling are completed.
7. the fabrication and installation method of the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform according to claim 6, feature exist In: it is to select wall that electrolytic zinc-coated steel sheet, which is processed as the detailed process of several pieces of standard platform slings, non-standard platform sling and plugboard, in step (1) The electrolytic zinc-coated steel sheet of thick 0.5mm, in factory after cutting, folding, welding, polishing, in a wherein side inner cavity for standard platform sling Interior insertion plugboard simultaneously welds, and plugboard stretches out the length 100mm outside standard platform sling, finally in standard platform sling and non-standard platform sling Top set point drilling;
The detailed process of processing and fabricating platform sling fixture are as follows: first use the galvanized steel plain sheet of 1.5mm thickness, intercept 2000mm long, 165mm wide It carries out bending and forms U-shaped structure, then drill in the setting position of two sides and top surface.
8. the fabrication and installation method of the fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform according to claim 6, feature exist In: the process of spray treatment is in step (2), and spray treatment uses F-C paint spraying process, sprays zinc rich primer one time first, For prime coat;Then it sprays epoxy micaceous iron paint one time, is middle paint layer;It finally sprays F-C paint one time, is top coat layer.
CN201811288048.1A 2018-10-31 2018-10-31 Water wave-shaped fluorocarbon spraying electrolytic plate suspended ceiling and manufacturing and mounting method thereof Active CN109184062B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811288048.1A CN109184062B (en) 2018-10-31 2018-10-31 Water wave-shaped fluorocarbon spraying electrolytic plate suspended ceiling and manufacturing and mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811288048.1A CN109184062B (en) 2018-10-31 2018-10-31 Water wave-shaped fluorocarbon spraying electrolytic plate suspended ceiling and manufacturing and mounting method thereof

Publications (2)

Publication Number Publication Date
CN109184062A true CN109184062A (en) 2019-01-11
CN109184062B CN109184062B (en) 2023-11-03

Family

ID=64941080

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811288048.1A Active CN109184062B (en) 2018-10-31 2018-10-31 Water wave-shaped fluorocarbon spraying electrolytic plate suspended ceiling and manufacturing and mounting method thereof

Country Status (1)

Country Link
CN (1) CN109184062B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112223944A (en) * 2020-09-03 2021-01-15 南京晨光艺术工程有限公司 Copper wall plate pre-coating method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130192772A1 (en) * 2012-01-26 2013-08-01 3Form, Inc. Decorative multi-slat system
CN103388371A (en) * 2013-07-25 2013-11-13 苏州金螳螂建筑装饰股份有限公司 Bamboo-wood suspended ceiling
KR101851194B1 (en) * 2017-07-27 2018-04-23 김명열 A screen louver for decorating a building
CN207646998U (en) * 2017-11-30 2018-07-24 广州康普顿至高建材有限公司 A kind of curved surface smallpox
US20180283004A1 (en) * 2016-06-30 2018-10-04 Jason Gillette Apparatus and system for dynamic acoustic drop ceiling system and methods thereof
CN209066695U (en) * 2018-10-31 2019-07-05 中建二局第二建筑工程有限公司 The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20130192772A1 (en) * 2012-01-26 2013-08-01 3Form, Inc. Decorative multi-slat system
CN103388371A (en) * 2013-07-25 2013-11-13 苏州金螳螂建筑装饰股份有限公司 Bamboo-wood suspended ceiling
US20180283004A1 (en) * 2016-06-30 2018-10-04 Jason Gillette Apparatus and system for dynamic acoustic drop ceiling system and methods thereof
KR101851194B1 (en) * 2017-07-27 2018-04-23 김명열 A screen louver for decorating a building
CN207646998U (en) * 2017-11-30 2018-07-24 广州康普顿至高建材有限公司 A kind of curved surface smallpox
CN209066695U (en) * 2018-10-31 2019-07-05 中建二局第二建筑工程有限公司 The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112223944A (en) * 2020-09-03 2021-01-15 南京晨光艺术工程有限公司 Copper wall plate pre-coating method

Also Published As

Publication number Publication date
CN109184062B (en) 2023-11-03

Similar Documents

Publication Publication Date Title
US20180274221A1 (en) Snap-in Structure of Aluminum Alloy Wallboard, Roof Panel, and Corner-Connecting Materials
CN108331209B (en) Assembled light partition wall
CN105804305B (en) Corrugated metal plate ceiling system and its installation method
CN209066695U (en) The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform
CN109184062A (en) The fluorocarbon-sprayed electrolytic zinc-coated steel sheet furred ceiling of water wave waveform and its fabrication and installation method
CN107327015A (en) A kind of assembled cylinder Tower Building and its construction method
CN2866323Y (en) Overwater floating room
CN110130551A (en) A kind of bolt method cell cube GRC curtain wall construction and its construction method
CN213741790U (en) Connecting structure of strip-shaped metal curtain wall sandwich board and steel upright post
CN202390970U (en) Text curtain wall
CN105298145A (en) Vertical external sun-shading welding-free construction method of hidden-frame curtain wall
CN215254199U (en) Wall aluminum plate's mounting structure and aluminum plate wall
CN205712904U (en) Abnormity metope moulding scalable gusseted point hang device
CN110126978B (en) Assembling structure and process of ship accommodation chamber wall plate
CN107419857A (en) Built-up roofing Durchgangshohle node and its construction method
CN208137246U (en) Without keel furred ceiling
CN204609092U (en) A kind of combined type conversion layer connector
CN208248418U (en) H grades/A grades fire resisting soundproof walls of ship ocean engineering
CN210238924U (en) Assembled integrated wallboard and system for modular steel structure building
CN211286153U (en) Assembled waterproof wall
CN106481077A (en) A kind of novel reinforced system of template and its construction technology
CN204691315U (en) A kind of combined type sunshade
CN217782504U (en) Outer wall bridging vertical joint hole waterproof structure
CN219508959U (en) Arc aluminum plate furred ceiling structure
CN205153229U (en) Special -shaped curtain board mounting structure is chosen to one side to high hovering

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant