CN109183987A - A kind of adjustable steel column installation elevation to ear connecting plate node and its application method - Google Patents

A kind of adjustable steel column installation elevation to ear connecting plate node and its application method Download PDF

Info

Publication number
CN109183987A
CN109183987A CN201811009921.9A CN201811009921A CN109183987A CN 109183987 A CN109183987 A CN 109183987A CN 201811009921 A CN201811009921 A CN 201811009921A CN 109183987 A CN109183987 A CN 109183987A
Authority
CN
China
Prior art keywords
otic placode
clamping plate
away
hole
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811009921.9A
Other languages
Chinese (zh)
Other versions
CN109183987B (en
Inventor
刘颖
贾亮
许键
唐韦韦
杨卫平
张黎黎
侯兴才
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Original Assignee
China MCC20 Group Corp Ltd
Shanghai Ershiye Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd, Shanghai Ershiye Construction Co Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201811009921.9A priority Critical patent/CN109183987B/en
Publication of CN109183987A publication Critical patent/CN109183987A/en
Application granted granted Critical
Publication of CN109183987B publication Critical patent/CN109183987B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2415Brackets, gussets, joining plates
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2418Details of bolting
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/2439Adjustable connections, e.g. using elongated slots or threaded adjustment elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/24Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of metal
    • E04B1/2403Connection details of the elongated load-supporting parts
    • E04B2001/246Post to post connections

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Joining Of Building Structures In Genera (AREA)

Abstract

The present invention relates to steel construction Multi-section column erecting bed construction field, specially a kind of adjustable steel column installation elevation to ear connecting plate node;It is characterized in that: it includes upper prop otic placode, lower prop otic placode, variable orifice away from clamping plate and installation bolt;Upper prop otic placode is longitudinally uniformly distributed four bolts hole, and lower prop otic placode is uniformly distributed three bolts hole;Six away from clamping plate genesis analysis circular holes of variable orifice and an elliptical aperture realize the regulatory function of steel column height mark in steel column installation process by the combination of otic placode, clamping plate and bolt;Above-mentioned docking node is respectively provided with identical connection otic placode and clamping plate at box column four sides, i.e., in the every one side of box column, is respectively provided with one piece of upper prop otic placode, one piece of lower prop otic placode and two pieces of variable orifice away from clamping plate.The present invention can be such that steel column butt joint mouth is holding out against completely respectively, do not stay gap, do not need by the external equipment such as jack.

Description

A kind of adjustable steel column installation elevation to ear connecting plate node and its application method
Technical field
The present invention relates to steel construction Multi-section column erecting bed construction field, specially a kind of adjustable steel column installation elevation To ear connecting plate node.
Background technique
In high-rise and tier building steel construction, due to the elevating capacity limitation of hoisting machinery, limitation of transfiniting, production are transported Factors, a steel columns such as condition limitation would generally be divided into several lifting elements and be lifted.When more piece steel column lifts, steel column is just It is first fixed using temporary connecting joint behind position, welds after having adjusted absolute altitude, axis and verticality, after the completion of welding, then tear open Except being fixed temporarily node.And in building construction process, the sedimentation of ground can generate the negative common difference of building absolute altitude, multilayer and height Layer building should all be paid close attention to settle the influence to building elevation when installing each section steel column, and pass through fine tuning steel column butt joint mouth Gap sedimentation is compensated, it usually needs increase to the gap of interface.Requirement according to specification to absolute altitude deviation, steel column Absolute altitude is that an adjusting unit had not only been able to achieve compensation sedimentation, but also met specification and want without realizing accurate step-less adjustment, with 5mm It asks.And the control that 10mm is unfavorable for welding quality is greater than to interface gaps.
Summary of the invention
It is an object of the invention to overcome drawbacks described above, provide a kind of adjustable steel column installation elevation to ear connecting plate section Point, to be compensated according to practice of construction demand to sedimentation.
A kind of adjustable steel column installation elevation to ear connecting plate node, it includes upper prop otic placode, lower prop otic placode, variable orifice away from folder Plate and installation bolt;Upper prop otic placode is longitudinally uniformly distributed four bolts hole, pitch of holes L;Lower prop otic placode is uniformly distributed three Bolt hole;Six away from clamping plate genesis analysis circular holes of variable orifice and an elliptical aperture, the circular hole distribution spacing of lower end three is the same as lower prop otic placode On three bolts hole, in the circular hole of upper end three, from the bottom to top, it is topmost ellipse that circular hole spacing, which is respectively L+5mm and L+10mm, Circular hole realizes the regulatory function of steel column height mark in steel column installation process by the combination of otic placode, clamping plate and bolt;On above-mentioned Column otic placode bottom bolt hole and lower prop otic placode the top bolt hole, when upper lower prop interface is held out against completely, center is away from answering With clamping plate from bottom to top the center of third bolt hole and the 4th bolt hole away from equal;7 holes are arranged in above-mentioned connecting cleat altogether, It is topmost elliptical aperture, remaining is circular hole, and elliptical aperture should ensure that in any combined situation, can cooperate with upper prop otic placode and penetrate Bolt;Topmost three circular holes should meet variable orifice away from requiring for above-mentioned connecting cleat, i.e., pitch-row is L+5mm and L+ from the bottom to top 10mm;Above-mentioned docking node is respectively provided with identical connection otic placode and clamping plate at box column four sides, i.e., in the every one side of box column, is all provided with One piece of upper prop otic placode, one piece of lower prop otic placode and two pieces of variable orifice are set away from clamping plate.
The adjustable steel column installation elevation to ear connecting plate node, bolt hole of the variable orifice away from clamping plate top is become by three Pitch-row circular hole and an elliptical aperture composition, the bolt hole of lower part are made of three equidistantly uniformly distributed bolts hole.
The adjustable steel column installation elevation to ear connecting plate node, after steel column installation is in place, variable orifice away from clamping plate with Lower prop otic placode penetrates fixation by three bolts, and variable orifice penetrates fixation by twice bolt away from clamping plate and upper prop otic placode.
The adjustable steel column installation elevation to ear connecting plate node, when upper lower prop holds out against gapless completely, upper prop The 4th hole is aligned and penetrates bolt and fix from top to bottom away from clamping plate for otic placode bottom hole and variable orifice, while upper prop otic placode is topmost Hole and variable orifice penetrate bolt away from clamping plate elliptical aperture and fix.
The adjustable steel column installation elevation to ear connecting plate node, as upper and lower intercolumniation gap 5mm, upper prop otic placode under And away from clamping plate, third hole (is aligned and penetrates bolt and fix, while upper prop otic placode is most upper from top to bottom with variable orifice in upper second hole Stomidium and variable orifice penetrate bolt away from clamping plate elliptical aperture and fix.
A kind of adjustable steel column installation elevation to ear connecting plate node, as upper and lower intercolumniation gap 10mm, upper prop ear Second hole is aligned and penetrates bolt and fix plate from top to bottom away from clamping plate for third hole and variable orifice from bottom to top, while upper prop otic placode The top hole and variable orifice penetrate bolt away from clamping plate elliptical aperture and fix.
The application method to ear connecting plate node of the adjustable steel column installation elevation, including
Step 1, to measure lower prop top mark according to in-site installation actual conditions high, it is determined whether reserved butt-joint clearance and gap it is big It is small;
Variable orifice is mounted on upper prop otic placode away from clamping plate according to above-mentioned 5,6,7 rules by step 2, and bolt is not tightened, and is retained more than installation Amount;
Steel column is saved in step 3, lifting, variable orifice is connected and fixed away from clamping plate and lower prop otic placode;
Step 4, all bolts of fastening.
The present invention can be such that steel column butt joint mouth is holding out against completely respectively, do not stay gap, upper prop absolute altitude+5mm, stay 5mm to interface Gap, upper prop absolute altitude+10mm, stay the gap 10mm to interface;It is installed, is not needed by jack etc. under three kinds of mounting heights External equipment, and install, adjust a step it is in place, on the basis of preparatory repetition measurement lower prop absolute altitude, once mounting is in place, save de-regulation The step of steel column height mark;If discovery installed height mark needs Secondary Control after installation is complete, jack only need to be cooperated, by upper ear Centering is overlapped and penetrates bolt again for plate and clamping plate respective bolt holes, without for a long time using jack cooperation welding anchoring.
Detailed description of the invention
Fig. 1 is a kind of adjustable steel column installation elevation of the present invention to part schematic diagram each before ear connecting plate combination of nodes.
Fig. 2 is a kind of adjustable steel column installation elevation of the present invention to steel column gapless work upper and lower after ear connecting plate node installation Condition schematic diagram.
Fig. 3 is a kind of adjustable steel column installation elevation of the present invention to the gap steel column 5mm upper and lower after ear connecting plate node installation Operating condition schematic diagram.
Fig. 4 is a kind of adjustable steel column installation elevation of the present invention to the gap steel column 10mm upper and lower after ear connecting plate node installation Operating condition schematic diagram.
Specific embodiment
The present invention is further illustrated below by way of specific embodiment.
As shown in Figure 1, a kind of adjustable steel column installation elevation to ear connecting plate node, it includes upper prop otic placode 3, lower prop ear Plate 1, variable orifice are away from clamping plate 2 and installation bolt.Upper prop otic placode 3 is longitudinal to be uniformly distributed four bolts hole 10,11,12,13, pitch of holes For L;Lower prop otic placode is uniformly distributed three bolts hole 4;Variable orifice is away from 2 genesis analysis of clamping plate, 6 circular holes 5,7,8,9 and an elliptical aperture 6, three circular holes 5 in lower end are distributed spacing with three bolts hole 4 on lower prop otic placode, in the circular hole of upper end three 7,8,9, circular hole 8,9 Away from L+5mm, circular hole 7,8 centers are topmost elliptical aperture 6 away from L+10mm at center, pass through otic placode 1,3, the group of clamping plate 2 and bolt It closes, realizes the regulatory function of steel column height mark in steel column installation process.
As shown in Figure 1, the bolt hole 4 of the top of the bolt hole 13 and lower prop otic placode 1 of above-mentioned upper prop otic placode 3, upper and lower When column interface is held out against completely, center is away from should be with the center of 2 the top bolt hole 5 of clamping plate and bolt hole 9 away from equal.
As shown in Figure 1,7 holes are arranged in above-mentioned connecting cleat 2 altogether, it is topmost elliptical aperture 6, remaining is circular hole, elliptical aperture 6 It should ensure that in any combined situation, can cooperate with upper prop otic placode and penetrate bolt.
As shown in Figure 1, topmost three circular holes 7,8,9 should meet variable orifice away from requiring, in circular hole 8,9 to above-mentioned connecting cleat 2 The heart is away from L+5mm, and circular hole 7,8 centers are away from L+10mm.
As shown in Figure 1, above-mentioned docking node is respectively provided with identical connection otic placode 1,3 and clamping plate 2 at box column four sides, i.e., In the every one side of box column, one piece of upper prop otic placode, 3, one pieces of lower prop otic placodes 1 and two pieces of variable orifice are respectively provided with away from clamping plate 2.The present invention is only with regard to it It is middle to be illustrated on one side.
As shown in Figure 1, bolt hole of the variable orifice away from 2 top of clamping plate is by three variable orifice away from circular hole 6,7,8 and one 6 groups of elliptical aperture At the bolt hole of lower part is made of three equidistantly uniformly distributed bolts hole 5.
As shown in Figure 1,2,3, 4, after steel column installation is in place, variable orifice is worn with lower prop otic placode 1 by three bolts 14 away from clamping plate 2 Enter fixation, variable orifice penetrates fixation by twice bolt 15,16 away from clamping plate 2 and upper prop otic placode 3.
As shown in Figure 1, 2, when upper lower prop holds out against gapless completely, the bolt hole 13 and variable orifice of upper prop otic placode 3 are away from clamping plate 2 Bolt hole 9 be aligned and to penetrate bolt 16 fixed, while the bolt hole 10 of upper prop otic placode 3 and variable orifice are worn away from the elliptical aperture 6 of clamping plate 2 Enter bolt to fix.
As shown in Figure 1,3, as upper and lower intercolumniation gap 5mm, the bolt of bolt hole 12 and variable orifice away from clamping plate 2 of upper prop otic placode 3 Hole 8 is aligned and penetrates bolt 16 and fixes, while the bolt hole 10 of upper prop otic placode 3 and variable orifice penetrate bolt away from the elliptical aperture 6 of clamping plate 2 It is fixed.
As shown in Fig. 1,4, as upper and lower intercolumniation gap 10mm, the bolt of bolt hole 11 and variable orifice away from clamping plate 2 of upper prop otic placode 3 Hole 7 is aligned and penetrates bolt 16 and fixes, while the bolt hole 10 of upper prop otic placode 3 and variable orifice penetrate bolt away from the elliptical aperture 6 of clamping plate 2 It is fixed.
As shown in Figure 1,2,3, 4, a kind of application method to ear connecting plate node of adjustable steel column installation elevation, comprising:
Step 1, to measure lower prop top mark according to in-site installation actual conditions high, it is determined whether reserved butt-joint clearance and gap it is big It is small;
Variable orifice is mounted on upper prop otic placode 3 away from clamping plate 2 according to determining gap and installation rule, bolt 15,16 by step 2 It does not tighten, retains installation surplus;
Steel column is saved in step 3, lifting, variable orifice is connected and fixed away from clamping plate 2 and lower prop otic placode 1;
Step 4, all bolts 14,15,16 of fastening.
Steel construction multi-section general assemble formula bracing means of the present invention and its application method, have an advantage that
(1) can make steel column butt joint mouth respectively hold out against (do not stay gap) completely, upper prop absolute altitude+5mm(stays the gap 5mm to interface), Upper prop absolute altitude+10mm(stays the gap 10mm to interface) it installs under three kinds of mounting heights, it does not need external by jack etc. Equipment, and install, adjust a step it is in place, on the basis of preparatory repetition measurement lower prop absolute altitude, once mounting is in place, save de-regulation steel column The step of absolute altitude, is conducive to improve construction quality, saves the construction time;
(2) if discovery installed height mark needs Secondary Control after installation is complete, jack only need to be cooperated, by upper ear plate and clamping plate Again centering is overlapped and penetrates bolt to respective bolt holes, without for a long time using jack cooperation welding anchoring.Improve construction The turnover utilization rate of equipment, improves construction efficiency.

Claims (7)

1. a kind of adjustable steel column installation elevation to ear connecting plate node, it is characterized in that: it include upper prop otic placode, lower prop otic placode, Variable orifice is away from clamping plate and installation bolt;Upper prop otic placode is longitudinally uniformly distributed four bolts hole, pitch of holes L;Lower prop otic placode is uniform It is distributed three bolts hole;Six away from clamping plate genesis analysis circular holes of variable orifice and an elliptical aperture, the circular hole distribution spacing of lower end three are same Three bolts hole on lower prop otic placode, in the circular hole of upper end three, from the bottom to top, circular hole spacing is respectively L+5mm and L+10mm, most Upper end is elliptical aperture, by the combination of otic placode, clamping plate and bolt, realizes the adjusting function of steel column height mark in steel column installation process Energy;Above-mentioned upper prop otic placode bottom bolt hole and lower prop otic placode the top bolt hole, when upper lower prop interface is held out against completely, Center away from should with clamping plate from bottom to top the center of third bolt hole and the 4th bolt hole away from equal;Above-mentioned connecting cleat is set altogether 7 holes are set, are topmost elliptical aperture, remaining is circular hole, and elliptical aperture should ensure that in any combined situation, can be with upper prop otic placode Cooperation penetrates bolt;Topmost three circular holes should meet variable orifice away from requiring for above-mentioned connecting cleat, i.e., pitch-row is L+5mm from the bottom to top And L+10mm;Above-mentioned docking node is respectively provided with identical connection otic placode and clamping plate at box column four sides, i.e., in the every one side of box column, One piece of upper prop otic placode, one piece of lower prop otic placode and two pieces of variable orifice are respectively provided with away from clamping plate.
2. adjustable steel column installation elevation according to claim 1 to ear connecting plate node, it is characterized in that: variable orifice is away from clamping plate The bolt hole on top is made of three variable orifice away from circular hole and an elliptical aperture, and the bolt hole of lower part is by three equidistantly uniformly distributed bolts Hole composition.
3. adjustable steel column installation elevation according to claim 1 to ear connecting plate node, it is characterized in that: steel column install After in place, variable orifice penetrates fixation by three bolts away from clamping plate and lower prop otic placode, and variable orifice is away from clamping plate and upper prop otic placode by twice bolt Penetrate fixation.
4. adjustable steel column installation elevation according to claim 1 to ear connecting plate node, it is characterized in that: when upper lower prop it is complete Full when holding out against gapless, the 4th hole is aligned from top to bottom and to penetrate bolt solid away from clamping plate for upper prop otic placode bottom hole and variable orifice It is fixed, while upper prop otic placode the top hole and variable orifice penetrate bolt away from clamping plate elliptical aperture and fix.
5. adjustable steel column installation elevation according to claim 1 to ear connecting plate node, it is characterized in that: work as upper and lower intercolumniation When gap 5mm, away from clamping plate, third hole (is aligned and penetrates bolt and consolidate upper prop otic placode from top to bottom with variable orifice in second hole from bottom to top It is fixed, while upper prop otic placode the top hole and variable orifice penetrate bolt away from clamping plate elliptical aperture and fix.
6. a kind of adjustable steel column installation elevation according to claim 1 to ear connecting plate node, it is characterized in that: when up and down When intercolumniation gap 10mm, away from clamping plate, second hole is aligned and penetrates spiral shell upper prop otic placode from top to bottom with variable orifice in third hole from bottom to top Bolt is fixed, while upper prop otic placode the top hole and variable orifice penetrate bolt away from clamping plate elliptical aperture and fix.
7. the application method to ear connecting plate node of steel column installation elevation is adjusted described in claim 1, it is characterized in that: including
Step 1, to measure lower prop top mark according to in-site installation actual conditions high, it is determined whether reserved butt-joint clearance and gap it is big It is small;
Variable orifice is mounted on upper prop otic placode away from clamping plate according to above-mentioned 5,6,7 rules by step 2, and bolt is not tightened, and is retained more than installation Amount;
Steel column is saved in step 3, lifting, variable orifice is connected and fixed away from clamping plate and lower prop otic placode;
Step 4, all bolts of fastening.
CN201811009921.9A 2018-08-31 2018-08-31 Butt-joint lug plate node capable of adjusting installation elevation of steel column and using method of butt-joint lug plate node Active CN109183987B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811009921.9A CN109183987B (en) 2018-08-31 2018-08-31 Butt-joint lug plate node capable of adjusting installation elevation of steel column and using method of butt-joint lug plate node

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811009921.9A CN109183987B (en) 2018-08-31 2018-08-31 Butt-joint lug plate node capable of adjusting installation elevation of steel column and using method of butt-joint lug plate node

Publications (2)

Publication Number Publication Date
CN109183987A true CN109183987A (en) 2019-01-11
CN109183987B CN109183987B (en) 2021-03-26

Family

ID=64917556

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811009921.9A Active CN109183987B (en) 2018-08-31 2018-08-31 Butt-joint lug plate node capable of adjusting installation elevation of steel column and using method of butt-joint lug plate node

Country Status (1)

Country Link
CN (1) CN109183987B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502451A (en) * 2020-11-06 2021-03-16 上海建工二建集团有限公司 Device for preventing stiff column from connecting deviation
CN112575896A (en) * 2020-12-29 2021-03-30 中铁三局集团建筑安装工程有限公司 Complex steel reinforced concrete composite structure and construction method
CN112609575A (en) * 2020-11-19 2021-04-06 中铁二局集团有限公司 Steel pipe column alignment structure and steel pipe column alignment method
CN112709329A (en) * 2020-12-28 2021-04-27 浙江精工钢结构集团有限公司 Steel column butt joint installation three-axis adjusting device and construction method thereof
CN115030310A (en) * 2022-06-24 2022-09-09 洛阳万乐钢结构工程有限公司 Steel structure beam column and splicing assembly thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906849A (en) * 2010-07-14 2010-12-08 中建钢构有限公司 Connecting device of steel column butt joint and installing method
CN202299464U (en) * 2012-02-16 2012-07-04 山东锦城钢结构有限责任公司 Steel column rapid hoisting and in-position correcting device
CN203330607U (en) * 2013-05-29 2013-12-11 中建钢构江苏有限公司 On-site butt joint connection and location device for construction steel structure box type section steel column
CN105735471A (en) * 2016-02-17 2016-07-06 浙江远大钢构实业有限公司 Connecting structure for steel-structure box columns
JP2017137697A (en) * 2016-02-03 2017-08-10 野村 恭三 Column or beam structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101906849A (en) * 2010-07-14 2010-12-08 中建钢构有限公司 Connecting device of steel column butt joint and installing method
CN202299464U (en) * 2012-02-16 2012-07-04 山东锦城钢结构有限责任公司 Steel column rapid hoisting and in-position correcting device
CN203330607U (en) * 2013-05-29 2013-12-11 中建钢构江苏有限公司 On-site butt joint connection and location device for construction steel structure box type section steel column
JP2017137697A (en) * 2016-02-03 2017-08-10 野村 恭三 Column or beam structure
CN105735471A (en) * 2016-02-17 2016-07-06 浙江远大钢构实业有限公司 Connecting structure for steel-structure box columns

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112502451A (en) * 2020-11-06 2021-03-16 上海建工二建集团有限公司 Device for preventing stiff column from connecting deviation
CN112609575A (en) * 2020-11-19 2021-04-06 中铁二局集团有限公司 Steel pipe column alignment structure and steel pipe column alignment method
CN112709329A (en) * 2020-12-28 2021-04-27 浙江精工钢结构集团有限公司 Steel column butt joint installation three-axis adjusting device and construction method thereof
CN112575896A (en) * 2020-12-29 2021-03-30 中铁三局集团建筑安装工程有限公司 Complex steel reinforced concrete composite structure and construction method
CN112575896B (en) * 2020-12-29 2022-03-29 中铁三局集团建筑安装工程有限公司 Complex steel reinforced concrete composite structure and construction method
CN115030310A (en) * 2022-06-24 2022-09-09 洛阳万乐钢结构工程有限公司 Steel structure beam column and splicing assembly thereof
CN115030310B (en) * 2022-06-24 2023-09-29 洛阳万乐钢结构工程有限公司 Steel construction beam column and concatenation subassembly thereof

Also Published As

Publication number Publication date
CN109183987B (en) 2021-03-26

Similar Documents

Publication Publication Date Title
CN109183987A (en) A kind of adjustable steel column installation elevation to ear connecting plate node and its application method
CN102095052B (en) Installing method of foundation bolt anchoring system and method for installing industrial equipment
CN105649325B (en) The adjustable tripod support system of assembly concrete shear wall structure and method
US11168457B2 (en) Foundation for a structure
CN106006404A (en) Super high-rise external hanging movable arm tower crane climbing supporting device
CN203625921U (en) Precision control device for pre-embedded mounting of foundation bolts
CN103243746A (en) Wind generator foundation ring precision calibrating system and construction method thereof
CN207392771U (en) A kind of guide type steel column locator
CN105887590A (en) Height direction adjusting system and method after railway foundation subsidence
CN111593666A (en) Bent cap hoop mounting platform and integral beam hoop mounting process
CN215564736U (en) Temporary supporting system for overweight steel beam
CN110512527A (en) The device and adjusting method precisely adjusted for prefabricated stand column verticality
CN102777044A (en) Hoisting method of steel-structured spraying layer of urea prilling tower
CN205531317U (en) Assembled concrete shear wall structure adjustable tripod support system
CN108374350B (en) Assembly jig frame of steel anchor beam and steel corbel unit and installation method
CN103938912A (en) Device for connecting high-rise structure with foundation and manufacturing method of device
CN208266673U (en) A kind of adjustable laminated rubber bearing
CN202519621U (en) Steel hoop used for suspending support system
CN115341475A (en) Steel anchor box positioning and mounting method
CN210684493U (en) Can demolish interim support fast
CN205933000U (en) Super high-rise external hanging movable arm tower crane climbing supporting device
CN110523933B (en) Continuous casting machine guide rail replacement streamlined installation method
CN211080288U (en) Adjusting device for mounting anchor bolt cage of wind driven generator
CN210827533U (en) Device for embedding foundation bolt group
CN209907886U (en) Adjustable assembled stair construction platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant