CN109183824A - 自平衡沉箱(井)及其工艺 - Google Patents
自平衡沉箱(井)及其工艺 Download PDFInfo
- Publication number
- CN109183824A CN109183824A CN201810851764.XA CN201810851764A CN109183824A CN 109183824 A CN109183824 A CN 109183824A CN 201810851764 A CN201810851764 A CN 201810851764A CN 109183824 A CN109183824 A CN 109183824A
- Authority
- CN
- China
- Prior art keywords
- caisson
- size
- mudhole
- extension pipe
- basement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D23/00—Caissons; Construction or placing of caissons
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D23/00—Caissons; Construction or placing of caissons
- E02D23/08—Lowering or sinking caissons
Abstract
本发明涉及沉箱(井)技术领域,尤其涉及一种自平衡沉箱(井),包括中小型地下室或沉箱或沉井,在中小型地下室或沉箱或沉井的底部设有若干个出泥孔,所述出泥孔上连接有法兰,所述法兰上与出泥孔加长管连通,所述出泥孔加长管的顶部在地下水位之上。本发明在现有的结构基础上增加了出泥孔加长管,并将出泥孔加长管的顶部设置在地下水位之上,这样就避免了周围的地下水倒灌到地下室内部的情况,在下沉的过程中避免了对周围建筑物的影响。
Description
技术领域
本发明涉及沉箱(井)技术领域,尤其涉及一种自平衡沉箱(井)及其工艺。
背景技术
目前,申请人申请了一种整体施工式中小型地下室或沉箱或沉井及其施工方法,专利号:201510929200.X,该专利在不影响周围建筑的情况下完成地下室的构建。但在实际使用过程中发现,在一些特殊的地质条件下,比如地下水位较高的情况下,地下水就会从地下室的出泥孔进入到地下室中,如果大量的进入就会影响到周围的建筑物。为此,亟待解决地下水倒灌的问题。
发明内容
本发明的目的在于克服上述技术的不足,而提供一种自平衡沉箱(井)及其工艺,解决地下水倒灌影响周围建筑物的问题。
本发明为实现上述目的,采用以下技术方案:一种自平衡沉箱(井),其特征在于:包括中小型地下室或沉箱或沉井,在中小型地下室或沉箱或沉井的底部设有若干个出泥孔,所述出泥孔上连接有法兰,所述法兰上与出泥孔加长管连通,所述出泥孔加长管的顶部在地下水位之上。
优选地,所述出泥孔加长管内部的泥浆从出泥孔加长管流入到中小型地下室或沉箱或沉井的内部。
一种自平衡沉箱(井)工艺,其特征在于:包括以下步骤:
1)清理地面杂填土直至露出原土;
2)在原土上将中小型地下室或沉箱或沉井整体预制完成,将出泥孔通过法兰与出泥孔加长管连通,并将出泥孔加长管的顶部伸出到地下水位之上;
3)逐一或分组或同时将通孔下方及周边的泥土掏出;
4)地下室整体在自重的作用下将地下室下方掏出的孔穴挤压塌陷并整体平稳下沉;
5)重复步骤3)—4)直至下降至预定深度。
优选地,在步骤3)中,将高压旋转喷头深入出泥孔加长管内并深入到中小型地下室或沉箱或沉井的底部进行环周喷射以切割周围土体,切割形成的泥浆从出泥孔加长管中排出。
优选地,所述出泥孔加长管中的泥浆直接排入到中小型地下室或沉箱或沉井的内部。
本发明的有益效果是:相对于现有技术,本发明在现有的结构基础上增加了出泥孔加长管,并将出泥孔加长管的顶部设置在地下水位之上,这样就避免了周围的地下水倒灌到地下室内部的情况,在下沉的过程中避免了对周围建筑物的影响。另外,本装置利用泥浆回填的方式对中小型地下室或沉箱或沉井进行加重,从而替代了增加配重的情况,有效防止中小型地下室或沉箱或沉井发生偏移的问题,使中小型地下室或沉箱或沉井能够始终平稳,在平衡状态下的整体下降施工。
附图说明
图1为本发明的主视图。
具体实施方式
下面结合附图及较佳实施例详细说明本发明的具体实施方式。如图1所示,一种自平衡沉箱(井),包括中小型地下室或沉箱或沉井1,在中小型地下室或沉箱或沉井的底部设有若干个出泥孔2,所述出泥孔上连接有法兰3,所述法兰上与出泥孔加长管4连通,所述出泥孔加长管的顶部在地下水位5之上。通过设置出泥孔加长管可以有效的解决地下水位倒灌的问题,下沉过程对周围环境没有影响。
利用本装置在下沉过程中,随着中小型地下室或沉箱或沉井的下沉变深,地面的握裹力增大,为了使地下室顺利下沉,需要在中小型地下室或沉箱或沉井的上部增加一些配重,从而使中小型地下室或沉箱或沉井的自身重量增大,才能顺利的下沉,但在实际使用过程中,增加配重的方式并不理想,比较容易导致中小型地下室或沉箱或沉井发生倾斜偏移的情况,需要不断的修正,这样就增加了施工难度,为此,本装置将所述出泥孔加长管内部的泥浆从出泥孔加长管流入到中小型地下室或沉箱或沉井的内部。利用泥浆回填的方式对中小型地下室或沉箱或沉井进行加重,从而替代了增加配重的情况,有效防止中小型地下室或沉箱或沉井发生偏移的问题,使中小型地下室或沉箱或沉井能够始终平稳,在平衡状态下的整体下降施工。
工作原理:
1)清理地面杂填土直至露出原土;
2)在原土上将中小型地下室或沉箱或沉井整体预制完成,将出泥孔通过法兰与出泥孔加长管连通,并将出泥孔加长管的顶部伸出到地下水位之上;
3)逐一或分组或同时将通孔下方及周边的泥土掏出,具体为,将高压旋转喷头深入出泥孔加长管内并深入到中小型地下室或沉箱或沉井的底部进行环周喷射以切割周围土体,切割形成的泥浆从出泥孔加长管中排出。
4)地下室整体在自重的作用下将地下室下方掏出的孔穴挤压塌陷并整体平稳下沉;
5)重复步骤3)—4)直至下降至预定深度。
本发明在现有的结构基础上增加了出泥孔加长管,并将出泥孔加长管的顶部设置在地下水位之上,这样就避免了周围的地下水倒灌到地下室内部的情况,在下沉的过程中避免了对周围建筑物的影响。
以上所述仅是本发明的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以做出若干改进和润饰,这些改进和润饰也应视为本发明的保护范围。
Claims (5)
1.一种自平衡沉箱(井),其特征在于:包括中小型地下室或沉箱或沉井,在中小型地下室或沉箱或沉井的底部设有若干个出泥孔,所述出泥孔上连接有法兰,所述法兰上与出泥孔加长管连通,所述出泥孔加长管的顶部在地下水位之上。
2.根据其权利要求1所述的自平衡沉箱(井),其特征在于:所述出泥孔加长管内部的泥浆从出泥孔加长管流入到中小型地下室或沉箱或沉井的内部。
3.一种如权利要求1和2任意一项所述的自平衡沉箱(井)工艺,其特征在于:包括以下步骤:
1)清理地面杂填土直至露出原土;
2)在原土上将中小型地下室或沉箱或沉井整体预制完成,将出泥孔通过法兰与出泥孔加长管连通,并将出泥孔加长管的顶部伸出到地下水位之上;
3)逐一或分组或同时将通孔下方及周边的泥土掏出;
4)地下室整体在自重的作用下将地下室下方掏出的孔穴挤压塌陷并整体平稳下沉;
5)重复步骤3)—4)直至下降至预定深度。
4.根据其权利要求3所述的自平衡沉箱(井)工艺,其特征在于:在步骤3)中,将高压旋转喷头深入出泥孔加长管内并深入到中小型地下室或沉箱或沉井的底部进行环周喷射以切割周围土体,切割形成的泥浆从出泥孔加长管中排出。
5.根据其权利要求4所述的自平衡沉箱(井)工艺,其特征在于:所述出泥孔加长管中的泥浆直接排入到中小型地下室或沉箱或沉井的内部。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810851764.XA CN109183824A (zh) | 2018-07-30 | 2018-07-30 | 自平衡沉箱(井)及其工艺 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810851764.XA CN109183824A (zh) | 2018-07-30 | 2018-07-30 | 自平衡沉箱(井)及其工艺 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109183824A true CN109183824A (zh) | 2019-01-11 |
Family
ID=64937858
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810851764.XA Pending CN109183824A (zh) | 2018-07-30 | 2018-07-30 | 自平衡沉箱(井)及其工艺 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109183824A (zh) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110158738A (zh) * | 2019-05-29 | 2019-08-23 | 天津建岩岩土工程有限公司 | 海绵城市储水系统及其建造工艺 |
CN110258574A (zh) * | 2019-06-10 | 2019-09-20 | 天津建岩岩土工程有限公司 | 基坑施工方法 |
CN112903974A (zh) * | 2021-03-19 | 2021-06-04 | 青海省地质调查局 | 一种深部矿床勘查预测系统 |
CN113309129A (zh) * | 2021-05-18 | 2021-08-27 | 天津建岩岩土工程有限公司 | 针对塑体状土的地区整体施工式地下室的施工方法 |
CN113605430A (zh) * | 2021-08-24 | 2021-11-05 | 中国建筑第二工程局有限公司 | 一种利用连通器的沉箱施工结构及其施工方法 |
CN113622445A (zh) * | 2021-09-01 | 2021-11-09 | 安徽地矿建设工程有限责任公司 | 尾砂库内可控压差沉井法 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1110753A (zh) * | 1994-07-30 | 1995-10-25 | 海勃湾矿务局基本建设第一工程处 | 一种斜井沉井方法 |
JP2008208533A (ja) * | 2007-02-23 | 2008-09-11 | Daiho Constr Co Ltd | ケーソンおよびその施工方法 |
CN105386462A (zh) * | 2015-12-11 | 2016-03-09 | 神翼航空器科技(天津)有限公司 | 整体施工式中小型地下室及其施工方法 |
CN107023026A (zh) * | 2017-06-02 | 2017-08-08 | 中国矿业大学 | 一种封底式沉井井壁及施工方法 |
CN108049424A (zh) * | 2017-12-12 | 2018-05-18 | 叶香雄 | 下沉式地下室结构 |
CN208884554U (zh) * | 2018-07-30 | 2019-05-21 | 神翼航空器科技(天津)有限公司 | 自平衡沉箱或沉井 |
-
2018
- 2018-07-30 CN CN201810851764.XA patent/CN109183824A/zh active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1110753A (zh) * | 1994-07-30 | 1995-10-25 | 海勃湾矿务局基本建设第一工程处 | 一种斜井沉井方法 |
JP2008208533A (ja) * | 2007-02-23 | 2008-09-11 | Daiho Constr Co Ltd | ケーソンおよびその施工方法 |
CN105386462A (zh) * | 2015-12-11 | 2016-03-09 | 神翼航空器科技(天津)有限公司 | 整体施工式中小型地下室及其施工方法 |
CN107023026A (zh) * | 2017-06-02 | 2017-08-08 | 中国矿业大学 | 一种封底式沉井井壁及施工方法 |
CN108049424A (zh) * | 2017-12-12 | 2018-05-18 | 叶香雄 | 下沉式地下室结构 |
CN208884554U (zh) * | 2018-07-30 | 2019-05-21 | 神翼航空器科技(天津)有限公司 | 自平衡沉箱或沉井 |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110158738A (zh) * | 2019-05-29 | 2019-08-23 | 天津建岩岩土工程有限公司 | 海绵城市储水系统及其建造工艺 |
CN110258574A (zh) * | 2019-06-10 | 2019-09-20 | 天津建岩岩土工程有限公司 | 基坑施工方法 |
CN112903974A (zh) * | 2021-03-19 | 2021-06-04 | 青海省地质调查局 | 一种深部矿床勘查预测系统 |
CN112903974B (zh) * | 2021-03-19 | 2023-02-03 | 青海省地质调查局 | 一种深部矿床勘查预测系统 |
CN113309129A (zh) * | 2021-05-18 | 2021-08-27 | 天津建岩岩土工程有限公司 | 针对塑体状土的地区整体施工式地下室的施工方法 |
CN113605430A (zh) * | 2021-08-24 | 2021-11-05 | 中国建筑第二工程局有限公司 | 一种利用连通器的沉箱施工结构及其施工方法 |
CN113605430B (zh) * | 2021-08-24 | 2022-05-24 | 中国建筑第二工程局有限公司 | 一种利用连通器的沉箱施工结构及其施工方法 |
CN113622445A (zh) * | 2021-09-01 | 2021-11-09 | 安徽地矿建设工程有限责任公司 | 尾砂库内可控压差沉井法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109183824A (zh) | 自平衡沉箱(井)及其工艺 | |
CN205152968U (zh) | 一种降水管井构造 | |
CN103883796B (zh) | 泥砂淤泥区手掘式顶管施工装置及方法 | |
CN104775433B (zh) | 一种拔桩施工的方法 | |
CN107816051A (zh) | 承压性潜水含水层深基坑组合井降水施工方法 | |
CN110093941A (zh) | 深基坑降水施工方法 | |
CN111005760A (zh) | 一种岩溶隧道引流式排水系统 | |
CN206090597U (zh) | 单孔多管管井 | |
CN109083177B (zh) | 一体式定向真空井点管的降水工艺 | |
CN105401606A (zh) | 深掏管式纠倾法及掏深装置 | |
CN208884554U (zh) | 自平衡沉箱或沉井 | |
CN208668442U (zh) | 新型深井降水装置 | |
CN105386462A (zh) | 整体施工式中小型地下室及其施工方法 | |
CN110670613B (zh) | 一种基坑电梯井防渗水结构及其施工方法 | |
CN208816080U (zh) | 一种钻孔注浆用同径套管止水装置 | |
CN208251127U (zh) | 一种建筑施工用基坑排水装置 | |
CN209798792U (zh) | 一种明挖基坑深淤泥层真空降水系统 | |
CN107447751B (zh) | 海上抛石区灌注桩漏浆控制装置和方法 | |
JP5872960B2 (ja) | 釜場の構造 | |
CN204982940U (zh) | 一种排水式挡土墙 | |
CN104975610A (zh) | 一种扩大端降压井、深基坑结构及其施工方法 | |
CN104234039B (zh) | 一种钻孔灌注桩空孔部分填充物的置换装置及方法 | |
CN213086764U (zh) | 一种建筑工程排水装置 | |
CN211037023U (zh) | 置于地下连续墙底部的管井降水井 | |
JP6331009B2 (ja) | 揚水井戸構造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |