CN109182940A - A kind of galvanizing equipment - Google Patents
A kind of galvanizing equipment Download PDFInfo
- Publication number
- CN109182940A CN109182940A CN201811350191.9A CN201811350191A CN109182940A CN 109182940 A CN109182940 A CN 109182940A CN 201811350191 A CN201811350191 A CN 201811350191A CN 109182940 A CN109182940 A CN 109182940A
- Authority
- CN
- China
- Prior art keywords
- heater box
- heat channel
- liquid
- transmission device
- heat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C2/00—Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
- C23C2/003—Apparatus
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C2/00—Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
- C23C2/02—Pretreatment of the material to be coated, e.g. for coating on selected surface areas
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C2/00—Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
- C23C2/04—Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the coating material
- C23C2/06—Zinc or cadmium or alloys based thereon
-
- C—CHEMISTRY; METALLURGY
- C23—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
- C23C—COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
- C23C2/00—Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
- C23C2/34—Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the shape of the material to be treated
- C23C2/36—Elongated material
- C23C2/40—Plates; Strips
Landscapes
- Chemical & Material Sciences (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Mechanical Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Manufacture And Refinement Of Metals (AREA)
Abstract
The invention belongs to galvanizing equipment technical field, specifically a kind of galvanizing equipment, including pre- heat channel, heater box and leaching zinc furnace, pre- heat channel is interior to be equipped with transmission device and blanking plate;The top of transmission device is arranged in heater box, and bottom is equipped with heating board in heater box, is equipped with elastic helix plate above heating board;The through hole of heater box is fixed in the middle part of leaching zinc furnace by air inlet annular groove, the top of leaching zinc furnace is equipped with feed openings, and zinc liquid is equipped in leaching zinc furnace, and leaching zinc furnace is equipped with No.1 air inlet;Air inlet annular groove is equipped with No. two air inlets;The check valve for being equipped with pressure sensor is equipped in No. two air inlets;The outside of pre- heat channel is equipped with motor;The output end of motor is equipped with rotating bar;The top of rotating bar is equipped with cross bar;Cross bar is equipped with handgrip;The present invention is heated simultaneously by the upper and lower part to zinc liquid, and the time needed for reducing the heating of zinc liquid improves the rate of heat addition, improves working efficiency.
Description
Technical field
The invention belongs to galvanizing equipment technical field, specifically a kind of galvanizing equipment.
Background technique
Galvanizing is called galvanizing by dipping, as a kind of effective anti-corrosion of metal mode, has been widely used for the gold of every profession and trade
Belong on structural facilities.
Zinc is soluble in acid, can also be dissolved in alkali, therefore it is referred to as amphoteric metal.Zinc hardly happens change in dry air
Change.In wet air, zinc surface can generate fine and close basic zinc carbonate film.Containing sulfur dioxide, hydrogen sulfide and ocean
In property atmosphere, the corrosion resistance of zinc is poor, and especially in atmosphere of the high temperature and humidity containing organic acid, zinc coating is easily corroded.Zinc
Standard electrode potential is -0.76V, and for steel substrate, zinc coating belongs to anodic coating, it is mainly used for preventing steel
Corrosion, the superiority and inferiority and thickness of coating relationship of protective performance are very big.After the passivated processing of zinc coating, dyeing or coating shield photo etching,
Its protective and dicoration can be significantly improved.And in the prior art, the efficiency of heat dip zinc treating is more low, and time-consuming is too long.
Summary of the invention
In order to make up for the deficiencies of the prior art, a kind of galvanizing equipment proposed by the present invention, present invention is mainly used for solutions
The more low problem of the efficiency of zinc-plated processing.
The technical solution adopted by the present invention to solve the technical problems is: a kind of galvanizing equipment of the present invention, packet
Pre- heat channel, heater box and leaching zinc furnace are included, is equipped with transmission device and blanking plate in the pre- heat channel, pre- heat channel is interior filled with liquid, liquid
Body height is lower than the axis height of transmission device;The transmission device horizontally hinged middle part, the biography of transmission device in pre- heat channel
Sending band is steel band;The upper end of the blanking plate is fixed on pre- heat channel left side wall top, and the lower end of blanking plate is arranged in transmission device
Top;The top of transmission device is arranged in the heater box, and heater box is fixed on the front and rear wall of pre- heat channel, and heating upper box part is set
There is a through-hole, filled with liquid in heater box, bottom is equipped with heating board in heater box, is equipped with elastic helix plate above heating board;It is described
The through hole of heater box is fixed in the middle part of leaching zinc furnace by air inlet annular groove, the lower part of leaching zinc furnace is contacted with the liquid in heater box,
The top for soaking zinc furnace is equipped with feed openings, and zinc liquid is equipped in leaching zinc furnace, and the position that leaching zinc furnace corresponds to air inlet annular groove is equipped with several
Group No.1 air inlet;The air inlet annular groove is equipped with No. two air inlets;Space in the outside of No. two air inlets and heater box
Perforation connection, is equipped with the check valve for being equipped with pressure sensor in No. two air inlets, pressure sensor be served only for induction two into
Air pressure outside stomata;The outside of the pre- heat channel is equipped with the motor that output shaft is set up;It is set on the output end of the motor
There is rotating bar;The top of the rotating bar is equipped with cross bar;The handgrip of automatic lifting is slidably connected on the cross bar;
When work, workpiece to be treated enters transmission device by blanking plate, and conveyer belt running moves right with workpiece
It is dynamic, pass through below the heating board of heater box, the heat that heating board issues preheats workpiece, convenient at subsequent leaching zinc
Reason improves the effect of leaching zinc, improves working efficiency;Conveyer belt is steel band, and steel band is wear-resistant, high temperature resistant, long service life, together
When, steel band thermal conductivity is good, improves the effect of preheating, the conveyer belt of rotation stirs the liquid in pre- heat channel, improves pre- heat channel
Liquid improves the cleaning effect to conveyer belt to the cooling effect of conveyer belt;At the same time, the heat of heating plate makes heater box
Interior liquid heating, liquid are warming up to the bubble generated when boiling, push the vibration of elastic helix plate, further stir liquid
It is dynamic, the temperature Quick uniform of liquid in heater box is increased, the zinc liquid in leaching zinc furnace is heated, the heating institute of zinc liquid is reduced
The time needed improves working efficiency;When the air pressure that the boiling of case internal cause generates reaches the influence value of pressure sensor setting, feedback
It to controller, to open check valve, is passed through hot steam in zinc liquid, makes zinc liquid while lower part is heated, to top zinc liquid
Also it is heated, improves the rate of heat addition, improve working efficiency;Workpiece quilt when zinc liquid heats up to a certain extent, after preheating
Handgrip, which is sent into zinc liquid, carries out leaching zinc processing.
Preferably, shift plate is hinged on the side wall of the heater box;The shift plate is connect with elastic helix plate by spring;
When work, the vibration of elastic helix plate drives shift plate to stir liquid, on the one hand, further to stir liquid, keep liquid fast by spring
Speed heating;On the other hand, liquid is stirred to make liquid be aerated, increases the air pressure in heater box quickly, improves hot gas
It is passed through the rate of zinc liquid, reduces the heating time used, improves working efficiency.
Preferably, the lower end of the heater box is equipped with the equally distributed elastic heat dissipating piece of several groups;The elastic heat dissipating
Piece is made of three elastic sheets, has gap between each elastic sheet;When work, several groups elastic heat dissipating piece makes preheating
Equalizing temperature improves the effect of workpiece preheating;Meanwhile the elastic heat dissipating piece being made of three elastic sheets is contacted with workpiece,
The oxide of workpiece surface is struck off, the effect of workpiece leaching zinc processing is improved;Elastic sheet and workpiece juxtaposition metamorphose, gap
Interior gas is extruded, and can be blown away the oxide scraped, be avoided being attached to workpiece surface again.
Preferably, cooling bath is equipped in the two sidewalls of the pre- heat channel;The lower end of the cooling bath and preheating tank liquid
Perforation connection;When work, with the progress of preheating, the liquid in pre- heat channel can also heat up, so that the cell wall temperature liter of pre- heat channel
Height reduces the thickness of the cell wall of pre- heat channel, and then increase the heat dissipation of pre- heat channel by the way that cooling bath is arranged in the cell wall of pre- heat channel
Effect avoids pre- heat channel overheat scald worker.
Preferably, the conveyer belt is equipped with several equally distributed protrusions;The blanking plate is elastic plate, blanking plate
Lower end and transmission device on projection contacts;When work, with the movement of conveyer belt, the protrusion on conveyer belt is constantly stirred down
Flitch makes blanking plate not stop to shake, and the row for keeping workpiece orderly on a moving belt, avoids workpiece from being blocked at blanking plate, influences work
Make efficiency;Protrusion can limit workpiece displacement simultaneously, improve the effect that spring cooling fin strikes off workpiece surface oxide, improve subsequent
Leaching zinc effect.
Preferably, it is connected with strainer on the preheating trench bottom, strainer is obliquely installed, and the upper end of strainer is connected with brush head;
The position that brush head is corresponded on the preheating trench bottom is equipped with accommodating chamber, is hinged on the position of corresponding accommodating chamber on the outside of pre- heat channel
Valve, valve are equipped with magnet;When work, the oxide that a part is scraped is attached on a moving belt, will by the brush head of setting
Oxide, which is swept, to be fallen, and avoids accumulating, and is swept after the oxide fallen is obstructed by strainer and is fallen into accommodating chamber, is collected, and by regular
It opens valve and the liquid in pre- heat channel replace and clear up the impurity of collection, guarantee that the stabilization of work is mentioned
High working efficiency;The strainer being obliquely installed cooperates the liquid stirred by conveyer belt, avoids strainer and is blocked in filtering by impurity,
Influence filter effect;Magnet can adsorb irony sundries, convenient for collecting.
Beneficial effects of the present invention are as follows:
1. the present invention is operated by conveyer belt, it is convenient for below the heating board of heater box by being preheated with workpiece
Subsequent leaching zinc processing, improves the effect of leaching zinc, improves working efficiency.
2. the present invention carries out the heating of lower part to the zinc liquid in leaching zinc furnace by the liquid being heated in heater box, meanwhile,
Cooperation hot steam top zinc liquid is also heated, and the time needed for reducing the heating of zinc liquid improves the rate of heat addition, improves work
Efficiency.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings.
Fig. 1 is main view of the invention;
Fig. 2 is partial enlarged view at A in Fig. 1;
Fig. 3 is partial enlarged view at B in Fig. 1;
In figure: pre- heat channel 1, heater box 2, heating board 21, elastic helix plate 22, shift plate 23, leaching zinc furnace 3, No.1 air inlet
31, blanking plate 4,5, No. two air inlets 51 of air inlet annular groove, handgrip 6, elastic heat dissipating piece 7, elastic sheet 71, cooling bath 8, strainer 9,
Brush head 10, accommodating chamber 11.
Specific embodiment
It is carried out using a kind of galvanizing equipment of Fig. 1-Fig. 3 to an embodiment of the present invention as described below.
As depicted in figs. 1 and 2, a kind of galvanizing equipment of the present invention, including pre- heat channel 1, heater box 2 and leaching zinc furnace
3, the pre- heat channel 1 is interior to be equipped with transmission device and blanking plate 4, and pre- heat channel 1 is interior filled with liquid, and liquid height is lower than transmission device
Axis height;The horizontally hinged middle part in pre- heat channel 1 of the transmission device, the conveyer belt of transmission device is steel band;The blanking
The upper end of plate 4 is fixed on pre- 1 left side wall top of heat channel, and the lower end of blanking plate 4 is arranged above transmission device;The heater box 2
The top of transmission device is set, and heater box 2 is fixed on the front and rear wall of pre- heat channel 1, and 2 top of heater box is equipped with through-hole, heating
Filled with liquid in case 2, bottom is equipped with heating board 21 in heater box 2, is equipped with elastic helix plate 22 above heating board 21;The leaching zinc
The through hole of heater box 2 is fixed in the middle part of furnace 3 by air inlet annular groove 5, the lower part of leaching zinc furnace 3 is contacted with the liquid in heater box 2,
The top for soaking zinc furnace 3 is equipped with feed openings, and zinc liquid is equipped in leaching zinc furnace 3, and the position of the corresponding air inlet annular groove 5 of leaching zinc furnace 3 is equipped with
Several groups No.1 air inlet 31;The air inlet annular groove 5 is equipped with No. two air inlets 51;The outside of No. two air inlets 51 with plus
Perforation connection in space in hot tank 2, No. two air inlets 51 are interior to be equipped with the check valve for being equipped with pressure sensor, and pressure sensor is only used
Air pressure outside No. two air inlets 51 of induction;The outside of the pre- heat channel 1 is equipped with the motor that output shaft is set up;The electricity
The output end of machine is equipped with rotating bar;The top of the rotating bar is equipped with cross bar;Automatic lifting is slidably connected on the cross bar
Handgrip 6;
When work, workpiece to be treated enters transmission device by blanking plate 4, and conveyer belt operates, to the right with workpiece
It is mobile, pass through below the heating board 21 of heater box 2, the heat that heating board 21 issues preheats workpiece, convenient for subsequent
Zinc processing is soaked, the effect of leaching zinc is improved, improves working efficiency;Conveyer belt is steel band, and steel band is wear-resistant, high temperature resistant, service life
It is long, meanwhile, steel band thermal conductivity is good, improves the effect of preheating, and the conveyer belt of rotation stirs the liquid in pre- heat channel 1, improves pre-
The liquid of heat channel 1 improves the cleaning effect to conveyer belt to the cooling effect of conveyer belt;At the same time, the heat of heating plate
The liquid in heater box 2 is set to heat up, liquid is warming up to the bubble generated when boiling, pushes elastic helix plate 22 to shake, further
Liquid is stirred, the temperature Quick uniform of liquid in heater box 2 is increased, the zinc liquid in leaching zinc furnace 3 is heated, is subtracted
Time needed for the heating of few zinc liquid, improve working efficiency;When the air pressure that the boiling of case internal cause generates reaches pressure sensor setting
Influence value when, feed back to controller, to open check valve, be passed through hot steam in zinc liquid, heat zinc liquid in lower part
Meanwhile top zinc liquid is also heated, the rate of heat addition is improved, working efficiency is improved;When zinc liquid heats up to a certain extent,
Workpiece after preheating is sent into zinc liquid by handgrip 6 carries out leaching zinc processing.
As shown in Figure 1, being hinged with shift plate 23 on the side wall of the heater box 2;The shift plate 23 and elastic helix plate 22 are logical
Cross spring connection;When work, elastic helix plate 22 shakes, and drives shift plate 23 to stir liquid by spring, on the one hand, further to stir
Hydrodynamic body, makes liquid be rapidly heated;On the other hand, liquid is stirred to make liquid be aerated, and keeps the air pressure in heater box 2 fast
Speed increases, and improves the rate that hot gas is passed through zinc liquid, reduces the heating time used, improves working efficiency.
As shown in figures 1 and 3, the lower end of the heater box 2 is equipped with the equally distributed elastic heat dissipating piece 7 of several groups;Institute
It states elastic heat dissipating piece 7 to be made of three elastic sheets 71, has gap between each elastic sheet 71;When work, several groups elasticity
Cooling fin 7 makes the equalizing temperature of preheating, improves the effect of workpiece preheating;Meanwhile the elasticity being made of three elastic sheets 71
Cooling fin 7 is contacted with workpiece, and the oxide of workpiece surface is struck off, and improves the effect of workpiece leaching zinc processing;Elastic sheet
71 with workpiece juxtaposition metamorphose, gas is extruded in gap, can be blown away the oxide scraped, be avoided being attached to workpiece surface again.
As shown in Figure 1, being equipped with cooling bath 8 in the two sidewalls of the pre- heat channel 1;The lower end of the cooling bath 8 and pre- heat channel 1
Interior fluid communication connection;When work, with the progress of preheating, the liquid in pre- heat channel 1 can also heat up, so that the slot of pre- heat channel 1
Wall temperature increases, and by the way that cooling bath 8 is arranged in the cell wall of pre- heat channel 1, reduces the thickness of the cell wall of pre- heat channel 1, and then increase
The heat dissipation effect of pre- heat channel 1 avoids the pre- overheat of heat channel 1 scald worker.
As shown in Figure 1, the conveyer belt is equipped with several equally distributed protrusions;The blanking plate 4 is elastic plate, under
Projection contacts on the lower end and transmission device of flitch 4;When work, with the movement of conveyer belt, the protrusion on conveyer belt is continuous
Blanking plate 4 is stirred, blanking plate 4 is made not stop to shake, the row for keeping workpiece orderly on a moving belt, avoids workpiece from being blocked in blanking plate 4
Place, influences working efficiency;Protrusion can limit workpiece displacement simultaneously, improve the effect that spring cooling fin strikes off workpiece surface oxide
Fruit improves subsequent leaching zinc effect.
As shown in Figure 1, being connected with strainer 9 on 1 bottom of pre- heat channel, strainer 9 is obliquely installed, and the upper end of strainer 9 is affixed
There is brush head 10;The position that brush head 10 is corresponded on 1 bottom of pre- heat channel is equipped with accommodating chamber 11, corresponding receiving on the outside of pre- heat channel 1
Valve is hinged on the position of chamber 11, valve is equipped with magnet;When work, the oxide that a part is scraped is attached to conveyer belt
On, oxide is swept by the brush head 10 of setting and is fallen, avoids accumulating, sweeps after the oxide fallen is obstructed by strainer 9 and falls into accommodating chamber
It in 11, is collected, and replacement is carried out to the liquid in pre- heat channel 1 and to the impurity progress of collection by periodically opening valve
Cleaning, guarantees that the stabilization of work carries out raising working efficiency;The strainer 9 being obliquely installed cooperates the liquid stirred by conveyer belt, keeps away
Exempt from strainer 9 to be blocked in filtering by impurity, influences filter effect;Magnet can adsorb irony sundries, convenient for collecting.
Specific workflow is as follows:
When work, workpiece to be treated enters transmission device by blanking plate 4, and conveyer belt operates, to the right with workpiece
It is mobile, pass through below the heating board 21 of heater box 2, the heat that heating board 21 issues preheats workpiece, convenient for subsequent
Zinc processing is soaked, the effect of leaching zinc is improved, improves working efficiency;Conveyer belt is steel band, and steel band is wear-resistant, high temperature resistant, service life
It is long, meanwhile, steel band thermal conductivity is good, improves the effect of preheating, and the conveyer belt of rotation stirs the liquid in pre- heat channel 1, improves pre-
The liquid of heat channel 1 improves the cleaning effect to conveyer belt to the cooling effect of conveyer belt;At the same time, the heat of heating plate
The liquid in heater box 2 is set to heat up, being warming up to boiling by liquid makes the bubble generated, and push elastic helix plate 22 to shake, into
One step stirs liquid, increases the temperature Quick uniform of liquid in heater box 2, adds to the zinc liquid in leaching zinc furnace 3
Heat, time needed for reducing the heating of zinc liquid improve working efficiency;When the air pressure that the boiling of case internal cause generates reaches pressure sensor
When the influence value of setting, controller is fed back to, to open check valve, is passed through hot steam in zinc liquid, adds zinc liquid in lower part
While hot, top zinc liquid is also heated, improves the rate of heat addition, improves working efficiency;When zinc liquid is warming up to certain journey
When spending, the workpiece after preheating is sent into zinc liquid by handgrip 6 carries out leaching zinc processing.
In the description of the present invention, it is to be understood that, term " center ", "front", "rear", "vertical", "horizontal",
The orientation or positional relationship of the instructions such as "top", "bottom" "inner", "outside" be based on the orientation or positional relationship shown in the drawings, be only for
Convenient for the description present invention and simplify description, rather than the device or element of indication or suggestion meaning there must be specific side
Position is constructed and operated in a specific orientation, therefore should not be understood as limiting the scope of the invention.
Although the present invention be illustrated by specific embodiment, it will be appreciated by those skilled in the art that, do not departing from
In the case where the scope of the invention, various transformation and equivalent substitute can also be carried out to the present invention.In addition, being directed to particular condition or material
Material, can do various modifications to the present invention, without departing from the scope of the present invention.Therefore, the present invention is not limited to disclosed tool
Body embodiment, and should include the whole embodiments fallen within the scope of the appended claims.
Claims (6)
1. a kind of galvanizing equipment, it is characterised in that: including pre- heat channel (1), heater box (2) and leaching zinc furnace (3), the pre- heat channel
(1) transmission device and blanking plate (4) are equipped in, pre- heat channel (1) is interior filled with liquid, and liquid height is high lower than the axis of transmission device
Degree;The horizontally hinged middle part in pre- heat channel (1) of the transmission device, the conveyer belt of transmission device is steel band;The blanking plate (4)
Upper end be fixed on pre- heat channel (1) left side wall top, the lower end of blanking plate (4) is arranged above transmission device;The heater box
(2) top of transmission device is set, and heater box (2) is fixed on the front and rear wall of pre- heat channel (1), and heater box (2) top is equipped with
Through-hole, heater box (2) is interior filled with liquid, and heater box (2) interior bottom is equipped with heating board (21), and elasticity is equipped with above heating board (21)
Spiral plate (22);The through hole of heater box (2) is fixed in the middle part of leaching zinc furnace (3) by air inlet annular groove (5), is soaked zinc furnace (3)
Lower part contacted with the liquid in heater box (2), leaching zinc furnace (3) top be equipped with feed openings, leaching zinc furnace (3) in be equipped with zinc
The position of liquid, leaching zinc furnace (3) corresponding air inlet annular groove (5) is equipped with several groups No.1 air inlet (31);On the air inlet annular groove (5)
Equipped with No. two air inlets (51);The interior space perforation in the outside and heater box (2) of No. two air inlets (51) connects, No. two air inlets
The check valve for being equipped with pressure sensor is equipped in hole (51), pressure sensor is served only for No. two air inlets (51) outsides of induction
Air pressure;The outside of the pre- heat channel (1) is equipped with the motor that output shaft is set up;The output end of the motor is equipped with rotation
Bar;The top of the rotating bar is equipped with cross bar;The handgrip (6) of automatic lifting is slidably connected on the cross bar.
2. a kind of galvanizing equipment according to claim 1, it is characterised in that: hinged on the side wall of the heater box (2)
There are shift plate (23);The shift plate (23) is connect with elastic helix plate (22) by spring.
3. a kind of galvanizing equipment according to claim 1, it is characterised in that: the lower end of the heater box (2) is equipped with
The equally distributed elastic heat dissipating piece (7) of several groups;The elastic heat dissipating piece (7) is made of three elastic sheets (71), each bullet
There is gap between property thin slice (71).
4. a kind of galvanizing equipment according to claim 1, it is characterised in that: set in the two sidewalls of the pre- heat channel (1)
There are cooling bath (8);The lower end of the cooling bath (8) is connect with pre- heat channel (1) interior fluid communication.
5. a kind of galvanizing equipment according to claim 1, it is characterised in that: the conveyer belt is equipped with several uniformly
The protrusion of distribution;The blanking plate (4) is elastic plate, the projection contacts on the lower end and transmission device of blanking plate (4).
6. a kind of galvanizing equipment according to claim 1, it is characterised in that: be connected on pre- heat channel (1) bottom
Strainer (9), strainer (9) are obliquely installed, and the upper end of strainer (9) is connected with brush head (10);Corresponding brush on pre- heat channel (1) bottom
The position of head (10) is equipped with accommodating chamber (11), is hinged with valve, valve on the position of corresponding accommodating chamber (11) on the outside of pre- heat channel (1)
Door is equipped with magnet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811350191.9A CN109182940A (en) | 2018-11-14 | 2018-11-14 | A kind of galvanizing equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811350191.9A CN109182940A (en) | 2018-11-14 | 2018-11-14 | A kind of galvanizing equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109182940A true CN109182940A (en) | 2019-01-11 |
Family
ID=64939805
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811350191.9A Withdrawn CN109182940A (en) | 2018-11-14 | 2018-11-14 | A kind of galvanizing equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109182940A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112359307A (en) * | 2020-11-11 | 2021-02-12 | 嘉兴恒瑞金属科技股份有限公司 | Environment-friendly hot dip galvanizing processing equipment |
-
2018
- 2018-11-14 CN CN201811350191.9A patent/CN109182940A/en not_active Withdrawn
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112359307A (en) * | 2020-11-11 | 2021-02-12 | 嘉兴恒瑞金属科技股份有限公司 | Environment-friendly hot dip galvanizing processing equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109182940A (en) | A kind of galvanizing equipment | |
CN113023832B (en) | Rotary electrochemical continuous hardness removal device | |
CN109182941A (en) | A kind of hot dipping zinc technology | |
CN112143998A (en) | Nose zinc ash treatment device of continuous hot galvanizing furnace | |
CN110358999B (en) | Hot galvanizing furnace nose with zinc ash blowing and diffusing treatment function | |
CN204503726U (en) | The galvanizing device for eliminating smoke and dust that a kind of pressure-vaccum combines | |
CN104550177A (en) | Blowing and suction combined hot galvanizing smoke prevention and dust removal device | |
CN110819925A (en) | On-line treatment method for furnace nose zinc ash of galvanized strip steel production line | |
CN210856354U (en) | Pickling bath for tin furnace position of continuous annealing tinning machine | |
CN212857074U (en) | Hot galvanizing flue gas recovery device with arc-shaped guide plate | |
CN101451180A (en) | Rotary firebox type isothermal quench integrated apparatus | |
CN212955220U (en) | Annealing equipment | |
CN114768515A (en) | Desulfurization and denitrification treatment method for flue gas of steel smelting boiler | |
CN213771406U (en) | Ammonia still capable of efficiently removing ammonia nitrogen | |
CN103382562A (en) | Recycled pot gas pot distribution | |
KR101999029B1 (en) | Galvanizing Snout | |
CN207891432U (en) | A kind of UTILIZATION OF VESIDUAL HEAT IN heats steel plate pre-treatment water installations indirectly | |
CN1128250C (en) | Acidic displacing solution for electroplating of zinc | |
CN205279663U (en) | Electroplating drying machine | |
CN219674610U (en) | Drying equipment is used in hot-galvanize iron nail processing | |
CN215481188U (en) | Water-saving hot galvanizing production line | |
CN219032320U (en) | Zinc ash removing and inhibiting forming device for hot galvanizing production of strip steel | |
CN214060613U (en) | Full-automatic hot-dip galvanizing production line | |
CN201785470U (en) | Reciprocating liquid zinc pumping and deslagging device | |
CN212821458U (en) | Quenching workpiece cleaning system arranged at rear path of mesh belt quenching furnace |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20190111 |
|
WW01 | Invention patent application withdrawn after publication |