CN109182940A - A kind of galvanizing equipment - Google Patents

A kind of galvanizing equipment Download PDF

Info

Publication number
CN109182940A
CN109182940A CN201811350191.9A CN201811350191A CN109182940A CN 109182940 A CN109182940 A CN 109182940A CN 201811350191 A CN201811350191 A CN 201811350191A CN 109182940 A CN109182940 A CN 109182940A
Authority
CN
China
Prior art keywords
heater box
heat channel
liquid
transmission device
heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811350191.9A
Other languages
Chinese (zh)
Inventor
不公告发明人
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811350191.9A priority Critical patent/CN109182940A/en
Publication of CN109182940A publication Critical patent/CN109182940A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/003Apparatus
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/02Pretreatment of the material to be coated, e.g. for coating on selected surface areas
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/04Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the coating material
    • C23C2/06Zinc or cadmium or alloys based thereon
    • CCHEMISTRY; METALLURGY
    • C23COATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; CHEMICAL SURFACE TREATMENT; DIFFUSION TREATMENT OF METALLIC MATERIAL; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL; INHIBITING CORROSION OF METALLIC MATERIAL OR INCRUSTATION IN GENERAL
    • C23CCOATING METALLIC MATERIAL; COATING MATERIAL WITH METALLIC MATERIAL; SURFACE TREATMENT OF METALLIC MATERIAL BY DIFFUSION INTO THE SURFACE, BY CHEMICAL CONVERSION OR SUBSTITUTION; COATING BY VACUUM EVAPORATION, BY SPUTTERING, BY ION IMPLANTATION OR BY CHEMICAL VAPOUR DEPOSITION, IN GENERAL
    • C23C2/00Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor
    • C23C2/34Hot-dipping or immersion processes for applying the coating material in the molten state without affecting the shape; Apparatus therefor characterised by the shape of the material to be treated
    • C23C2/36Elongated material
    • C23C2/40Plates; Strips

Landscapes

  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Engineering & Computer Science (AREA)
  • Materials Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Metallurgy (AREA)
  • Organic Chemistry (AREA)
  • Manufacture And Refinement Of Metals (AREA)

Abstract

The invention belongs to galvanizing equipment technical field, specifically a kind of galvanizing equipment, including pre- heat channel, heater box and leaching zinc furnace, pre- heat channel is interior to be equipped with transmission device and blanking plate;The top of transmission device is arranged in heater box, and bottom is equipped with heating board in heater box, is equipped with elastic helix plate above heating board;The through hole of heater box is fixed in the middle part of leaching zinc furnace by air inlet annular groove, the top of leaching zinc furnace is equipped with feed openings, and zinc liquid is equipped in leaching zinc furnace, and leaching zinc furnace is equipped with No.1 air inlet;Air inlet annular groove is equipped with No. two air inlets;The check valve for being equipped with pressure sensor is equipped in No. two air inlets;The outside of pre- heat channel is equipped with motor;The output end of motor is equipped with rotating bar;The top of rotating bar is equipped with cross bar;Cross bar is equipped with handgrip;The present invention is heated simultaneously by the upper and lower part to zinc liquid, and the time needed for reducing the heating of zinc liquid improves the rate of heat addition, improves working efficiency.

Description

A kind of galvanizing equipment
Technical field
The invention belongs to galvanizing equipment technical field, specifically a kind of galvanizing equipment.
Background technique
Galvanizing is called galvanizing by dipping, as a kind of effective anti-corrosion of metal mode, has been widely used for the gold of every profession and trade Belong on structural facilities.
Zinc is soluble in acid, can also be dissolved in alkali, therefore it is referred to as amphoteric metal.Zinc hardly happens change in dry air Change.In wet air, zinc surface can generate fine and close basic zinc carbonate film.Containing sulfur dioxide, hydrogen sulfide and ocean In property atmosphere, the corrosion resistance of zinc is poor, and especially in atmosphere of the high temperature and humidity containing organic acid, zinc coating is easily corroded.Zinc Standard electrode potential is -0.76V, and for steel substrate, zinc coating belongs to anodic coating, it is mainly used for preventing steel Corrosion, the superiority and inferiority and thickness of coating relationship of protective performance are very big.After the passivated processing of zinc coating, dyeing or coating shield photo etching, Its protective and dicoration can be significantly improved.And in the prior art, the efficiency of heat dip zinc treating is more low, and time-consuming is too long.
Summary of the invention
In order to make up for the deficiencies of the prior art, a kind of galvanizing equipment proposed by the present invention, present invention is mainly used for solutions The more low problem of the efficiency of zinc-plated processing.
The technical solution adopted by the present invention to solve the technical problems is: a kind of galvanizing equipment of the present invention, packet Pre- heat channel, heater box and leaching zinc furnace are included, is equipped with transmission device and blanking plate in the pre- heat channel, pre- heat channel is interior filled with liquid, liquid Body height is lower than the axis height of transmission device;The transmission device horizontally hinged middle part, the biography of transmission device in pre- heat channel Sending band is steel band;The upper end of the blanking plate is fixed on pre- heat channel left side wall top, and the lower end of blanking plate is arranged in transmission device Top;The top of transmission device is arranged in the heater box, and heater box is fixed on the front and rear wall of pre- heat channel, and heating upper box part is set There is a through-hole, filled with liquid in heater box, bottom is equipped with heating board in heater box, is equipped with elastic helix plate above heating board;It is described The through hole of heater box is fixed in the middle part of leaching zinc furnace by air inlet annular groove, the lower part of leaching zinc furnace is contacted with the liquid in heater box, The top for soaking zinc furnace is equipped with feed openings, and zinc liquid is equipped in leaching zinc furnace, and the position that leaching zinc furnace corresponds to air inlet annular groove is equipped with several Group No.1 air inlet;The air inlet annular groove is equipped with No. two air inlets;Space in the outside of No. two air inlets and heater box Perforation connection, is equipped with the check valve for being equipped with pressure sensor in No. two air inlets, pressure sensor be served only for induction two into Air pressure outside stomata;The outside of the pre- heat channel is equipped with the motor that output shaft is set up;It is set on the output end of the motor There is rotating bar;The top of the rotating bar is equipped with cross bar;The handgrip of automatic lifting is slidably connected on the cross bar;
When work, workpiece to be treated enters transmission device by blanking plate, and conveyer belt running moves right with workpiece It is dynamic, pass through below the heating board of heater box, the heat that heating board issues preheats workpiece, convenient at subsequent leaching zinc Reason improves the effect of leaching zinc, improves working efficiency;Conveyer belt is steel band, and steel band is wear-resistant, high temperature resistant, long service life, together When, steel band thermal conductivity is good, improves the effect of preheating, the conveyer belt of rotation stirs the liquid in pre- heat channel, improves pre- heat channel Liquid improves the cleaning effect to conveyer belt to the cooling effect of conveyer belt;At the same time, the heat of heating plate makes heater box Interior liquid heating, liquid are warming up to the bubble generated when boiling, push the vibration of elastic helix plate, further stir liquid It is dynamic, the temperature Quick uniform of liquid in heater box is increased, the zinc liquid in leaching zinc furnace is heated, the heating institute of zinc liquid is reduced The time needed improves working efficiency;When the air pressure that the boiling of case internal cause generates reaches the influence value of pressure sensor setting, feedback It to controller, to open check valve, is passed through hot steam in zinc liquid, makes zinc liquid while lower part is heated, to top zinc liquid Also it is heated, improves the rate of heat addition, improve working efficiency;Workpiece quilt when zinc liquid heats up to a certain extent, after preheating Handgrip, which is sent into zinc liquid, carries out leaching zinc processing.
Preferably, shift plate is hinged on the side wall of the heater box;The shift plate is connect with elastic helix plate by spring; When work, the vibration of elastic helix plate drives shift plate to stir liquid, on the one hand, further to stir liquid, keep liquid fast by spring Speed heating;On the other hand, liquid is stirred to make liquid be aerated, increases the air pressure in heater box quickly, improves hot gas It is passed through the rate of zinc liquid, reduces the heating time used, improves working efficiency.
Preferably, the lower end of the heater box is equipped with the equally distributed elastic heat dissipating piece of several groups;The elastic heat dissipating Piece is made of three elastic sheets, has gap between each elastic sheet;When work, several groups elastic heat dissipating piece makes preheating Equalizing temperature improves the effect of workpiece preheating;Meanwhile the elastic heat dissipating piece being made of three elastic sheets is contacted with workpiece, The oxide of workpiece surface is struck off, the effect of workpiece leaching zinc processing is improved;Elastic sheet and workpiece juxtaposition metamorphose, gap Interior gas is extruded, and can be blown away the oxide scraped, be avoided being attached to workpiece surface again.
Preferably, cooling bath is equipped in the two sidewalls of the pre- heat channel;The lower end of the cooling bath and preheating tank liquid Perforation connection;When work, with the progress of preheating, the liquid in pre- heat channel can also heat up, so that the cell wall temperature liter of pre- heat channel Height reduces the thickness of the cell wall of pre- heat channel, and then increase the heat dissipation of pre- heat channel by the way that cooling bath is arranged in the cell wall of pre- heat channel Effect avoids pre- heat channel overheat scald worker.
Preferably, the conveyer belt is equipped with several equally distributed protrusions;The blanking plate is elastic plate, blanking plate Lower end and transmission device on projection contacts;When work, with the movement of conveyer belt, the protrusion on conveyer belt is constantly stirred down Flitch makes blanking plate not stop to shake, and the row for keeping workpiece orderly on a moving belt, avoids workpiece from being blocked at blanking plate, influences work Make efficiency;Protrusion can limit workpiece displacement simultaneously, improve the effect that spring cooling fin strikes off workpiece surface oxide, improve subsequent Leaching zinc effect.
Preferably, it is connected with strainer on the preheating trench bottom, strainer is obliquely installed, and the upper end of strainer is connected with brush head; The position that brush head is corresponded on the preheating trench bottom is equipped with accommodating chamber, is hinged on the position of corresponding accommodating chamber on the outside of pre- heat channel Valve, valve are equipped with magnet;When work, the oxide that a part is scraped is attached on a moving belt, will by the brush head of setting Oxide, which is swept, to be fallen, and avoids accumulating, and is swept after the oxide fallen is obstructed by strainer and is fallen into accommodating chamber, is collected, and by regular It opens valve and the liquid in pre- heat channel replace and clear up the impurity of collection, guarantee that the stabilization of work is mentioned High working efficiency;The strainer being obliquely installed cooperates the liquid stirred by conveyer belt, avoids strainer and is blocked in filtering by impurity, Influence filter effect;Magnet can adsorb irony sundries, convenient for collecting.
Beneficial effects of the present invention are as follows:
1. the present invention is operated by conveyer belt, it is convenient for below the heating board of heater box by being preheated with workpiece Subsequent leaching zinc processing, improves the effect of leaching zinc, improves working efficiency.
2. the present invention carries out the heating of lower part to the zinc liquid in leaching zinc furnace by the liquid being heated in heater box, meanwhile, Cooperation hot steam top zinc liquid is also heated, and the time needed for reducing the heating of zinc liquid improves the rate of heat addition, improves work Efficiency.
Detailed description of the invention
The present invention will be further explained below with reference to the attached drawings.
Fig. 1 is main view of the invention;
Fig. 2 is partial enlarged view at A in Fig. 1;
Fig. 3 is partial enlarged view at B in Fig. 1;
In figure: pre- heat channel 1, heater box 2, heating board 21, elastic helix plate 22, shift plate 23, leaching zinc furnace 3, No.1 air inlet 31, blanking plate 4,5, No. two air inlets 51 of air inlet annular groove, handgrip 6, elastic heat dissipating piece 7, elastic sheet 71, cooling bath 8, strainer 9, Brush head 10, accommodating chamber 11.
Specific embodiment
It is carried out using a kind of galvanizing equipment of Fig. 1-Fig. 3 to an embodiment of the present invention as described below.
As depicted in figs. 1 and 2, a kind of galvanizing equipment of the present invention, including pre- heat channel 1, heater box 2 and leaching zinc furnace 3, the pre- heat channel 1 is interior to be equipped with transmission device and blanking plate 4, and pre- heat channel 1 is interior filled with liquid, and liquid height is lower than transmission device Axis height;The horizontally hinged middle part in pre- heat channel 1 of the transmission device, the conveyer belt of transmission device is steel band;The blanking The upper end of plate 4 is fixed on pre- 1 left side wall top of heat channel, and the lower end of blanking plate 4 is arranged above transmission device;The heater box 2 The top of transmission device is set, and heater box 2 is fixed on the front and rear wall of pre- heat channel 1, and 2 top of heater box is equipped with through-hole, heating Filled with liquid in case 2, bottom is equipped with heating board 21 in heater box 2, is equipped with elastic helix plate 22 above heating board 21;The leaching zinc The through hole of heater box 2 is fixed in the middle part of furnace 3 by air inlet annular groove 5, the lower part of leaching zinc furnace 3 is contacted with the liquid in heater box 2, The top for soaking zinc furnace 3 is equipped with feed openings, and zinc liquid is equipped in leaching zinc furnace 3, and the position of the corresponding air inlet annular groove 5 of leaching zinc furnace 3 is equipped with Several groups No.1 air inlet 31;The air inlet annular groove 5 is equipped with No. two air inlets 51;The outside of No. two air inlets 51 with plus Perforation connection in space in hot tank 2, No. two air inlets 51 are interior to be equipped with the check valve for being equipped with pressure sensor, and pressure sensor is only used Air pressure outside No. two air inlets 51 of induction;The outside of the pre- heat channel 1 is equipped with the motor that output shaft is set up;The electricity The output end of machine is equipped with rotating bar;The top of the rotating bar is equipped with cross bar;Automatic lifting is slidably connected on the cross bar Handgrip 6;
When work, workpiece to be treated enters transmission device by blanking plate 4, and conveyer belt operates, to the right with workpiece It is mobile, pass through below the heating board 21 of heater box 2, the heat that heating board 21 issues preheats workpiece, convenient for subsequent Zinc processing is soaked, the effect of leaching zinc is improved, improves working efficiency;Conveyer belt is steel band, and steel band is wear-resistant, high temperature resistant, service life It is long, meanwhile, steel band thermal conductivity is good, improves the effect of preheating, and the conveyer belt of rotation stirs the liquid in pre- heat channel 1, improves pre- The liquid of heat channel 1 improves the cleaning effect to conveyer belt to the cooling effect of conveyer belt;At the same time, the heat of heating plate The liquid in heater box 2 is set to heat up, liquid is warming up to the bubble generated when boiling, pushes elastic helix plate 22 to shake, further Liquid is stirred, the temperature Quick uniform of liquid in heater box 2 is increased, the zinc liquid in leaching zinc furnace 3 is heated, is subtracted Time needed for the heating of few zinc liquid, improve working efficiency;When the air pressure that the boiling of case internal cause generates reaches pressure sensor setting Influence value when, feed back to controller, to open check valve, be passed through hot steam in zinc liquid, heat zinc liquid in lower part Meanwhile top zinc liquid is also heated, the rate of heat addition is improved, working efficiency is improved;When zinc liquid heats up to a certain extent, Workpiece after preheating is sent into zinc liquid by handgrip 6 carries out leaching zinc processing.
As shown in Figure 1, being hinged with shift plate 23 on the side wall of the heater box 2;The shift plate 23 and elastic helix plate 22 are logical Cross spring connection;When work, elastic helix plate 22 shakes, and drives shift plate 23 to stir liquid by spring, on the one hand, further to stir Hydrodynamic body, makes liquid be rapidly heated;On the other hand, liquid is stirred to make liquid be aerated, and keeps the air pressure in heater box 2 fast Speed increases, and improves the rate that hot gas is passed through zinc liquid, reduces the heating time used, improves working efficiency.
As shown in figures 1 and 3, the lower end of the heater box 2 is equipped with the equally distributed elastic heat dissipating piece 7 of several groups;Institute It states elastic heat dissipating piece 7 to be made of three elastic sheets 71, has gap between each elastic sheet 71;When work, several groups elasticity Cooling fin 7 makes the equalizing temperature of preheating, improves the effect of workpiece preheating;Meanwhile the elasticity being made of three elastic sheets 71 Cooling fin 7 is contacted with workpiece, and the oxide of workpiece surface is struck off, and improves the effect of workpiece leaching zinc processing;Elastic sheet 71 with workpiece juxtaposition metamorphose, gas is extruded in gap, can be blown away the oxide scraped, be avoided being attached to workpiece surface again.
As shown in Figure 1, being equipped with cooling bath 8 in the two sidewalls of the pre- heat channel 1;The lower end of the cooling bath 8 and pre- heat channel 1 Interior fluid communication connection;When work, with the progress of preheating, the liquid in pre- heat channel 1 can also heat up, so that the slot of pre- heat channel 1 Wall temperature increases, and by the way that cooling bath 8 is arranged in the cell wall of pre- heat channel 1, reduces the thickness of the cell wall of pre- heat channel 1, and then increase The heat dissipation effect of pre- heat channel 1 avoids the pre- overheat of heat channel 1 scald worker.
As shown in Figure 1, the conveyer belt is equipped with several equally distributed protrusions;The blanking plate 4 is elastic plate, under Projection contacts on the lower end and transmission device of flitch 4;When work, with the movement of conveyer belt, the protrusion on conveyer belt is continuous Blanking plate 4 is stirred, blanking plate 4 is made not stop to shake, the row for keeping workpiece orderly on a moving belt, avoids workpiece from being blocked in blanking plate 4 Place, influences working efficiency;Protrusion can limit workpiece displacement simultaneously, improve the effect that spring cooling fin strikes off workpiece surface oxide Fruit improves subsequent leaching zinc effect.
As shown in Figure 1, being connected with strainer 9 on 1 bottom of pre- heat channel, strainer 9 is obliquely installed, and the upper end of strainer 9 is affixed There is brush head 10;The position that brush head 10 is corresponded on 1 bottom of pre- heat channel is equipped with accommodating chamber 11, corresponding receiving on the outside of pre- heat channel 1 Valve is hinged on the position of chamber 11, valve is equipped with magnet;When work, the oxide that a part is scraped is attached to conveyer belt On, oxide is swept by the brush head 10 of setting and is fallen, avoids accumulating, sweeps after the oxide fallen is obstructed by strainer 9 and falls into accommodating chamber It in 11, is collected, and replacement is carried out to the liquid in pre- heat channel 1 and to the impurity progress of collection by periodically opening valve Cleaning, guarantees that the stabilization of work carries out raising working efficiency;The strainer 9 being obliquely installed cooperates the liquid stirred by conveyer belt, keeps away Exempt from strainer 9 to be blocked in filtering by impurity, influences filter effect;Magnet can adsorb irony sundries, convenient for collecting.
Specific workflow is as follows:
When work, workpiece to be treated enters transmission device by blanking plate 4, and conveyer belt operates, to the right with workpiece It is mobile, pass through below the heating board 21 of heater box 2, the heat that heating board 21 issues preheats workpiece, convenient for subsequent Zinc processing is soaked, the effect of leaching zinc is improved, improves working efficiency;Conveyer belt is steel band, and steel band is wear-resistant, high temperature resistant, service life It is long, meanwhile, steel band thermal conductivity is good, improves the effect of preheating, and the conveyer belt of rotation stirs the liquid in pre- heat channel 1, improves pre- The liquid of heat channel 1 improves the cleaning effect to conveyer belt to the cooling effect of conveyer belt;At the same time, the heat of heating plate The liquid in heater box 2 is set to heat up, being warming up to boiling by liquid makes the bubble generated, and push elastic helix plate 22 to shake, into One step stirs liquid, increases the temperature Quick uniform of liquid in heater box 2, adds to the zinc liquid in leaching zinc furnace 3 Heat, time needed for reducing the heating of zinc liquid improve working efficiency;When the air pressure that the boiling of case internal cause generates reaches pressure sensor When the influence value of setting, controller is fed back to, to open check valve, is passed through hot steam in zinc liquid, adds zinc liquid in lower part While hot, top zinc liquid is also heated, improves the rate of heat addition, improves working efficiency;When zinc liquid is warming up to certain journey When spending, the workpiece after preheating is sent into zinc liquid by handgrip 6 carries out leaching zinc processing.
In the description of the present invention, it is to be understood that, term " center ", "front", "rear", "vertical", "horizontal", The orientation or positional relationship of the instructions such as "top", "bottom" "inner", "outside" be based on the orientation or positional relationship shown in the drawings, be only for Convenient for the description present invention and simplify description, rather than the device or element of indication or suggestion meaning there must be specific side Position is constructed and operated in a specific orientation, therefore should not be understood as limiting the scope of the invention.
Although the present invention be illustrated by specific embodiment, it will be appreciated by those skilled in the art that, do not departing from In the case where the scope of the invention, various transformation and equivalent substitute can also be carried out to the present invention.In addition, being directed to particular condition or material Material, can do various modifications to the present invention, without departing from the scope of the present invention.Therefore, the present invention is not limited to disclosed tool Body embodiment, and should include the whole embodiments fallen within the scope of the appended claims.

Claims (6)

1. a kind of galvanizing equipment, it is characterised in that: including pre- heat channel (1), heater box (2) and leaching zinc furnace (3), the pre- heat channel (1) transmission device and blanking plate (4) are equipped in, pre- heat channel (1) is interior filled with liquid, and liquid height is high lower than the axis of transmission device Degree;The horizontally hinged middle part in pre- heat channel (1) of the transmission device, the conveyer belt of transmission device is steel band;The blanking plate (4) Upper end be fixed on pre- heat channel (1) left side wall top, the lower end of blanking plate (4) is arranged above transmission device;The heater box (2) top of transmission device is set, and heater box (2) is fixed on the front and rear wall of pre- heat channel (1), and heater box (2) top is equipped with Through-hole, heater box (2) is interior filled with liquid, and heater box (2) interior bottom is equipped with heating board (21), and elasticity is equipped with above heating board (21) Spiral plate (22);The through hole of heater box (2) is fixed in the middle part of leaching zinc furnace (3) by air inlet annular groove (5), is soaked zinc furnace (3) Lower part contacted with the liquid in heater box (2), leaching zinc furnace (3) top be equipped with feed openings, leaching zinc furnace (3) in be equipped with zinc The position of liquid, leaching zinc furnace (3) corresponding air inlet annular groove (5) is equipped with several groups No.1 air inlet (31);On the air inlet annular groove (5) Equipped with No. two air inlets (51);The interior space perforation in the outside and heater box (2) of No. two air inlets (51) connects, No. two air inlets The check valve for being equipped with pressure sensor is equipped in hole (51), pressure sensor is served only for No. two air inlets (51) outsides of induction Air pressure;The outside of the pre- heat channel (1) is equipped with the motor that output shaft is set up;The output end of the motor is equipped with rotation Bar;The top of the rotating bar is equipped with cross bar;The handgrip (6) of automatic lifting is slidably connected on the cross bar.
2. a kind of galvanizing equipment according to claim 1, it is characterised in that: hinged on the side wall of the heater box (2) There are shift plate (23);The shift plate (23) is connect with elastic helix plate (22) by spring.
3. a kind of galvanizing equipment according to claim 1, it is characterised in that: the lower end of the heater box (2) is equipped with The equally distributed elastic heat dissipating piece (7) of several groups;The elastic heat dissipating piece (7) is made of three elastic sheets (71), each bullet There is gap between property thin slice (71).
4. a kind of galvanizing equipment according to claim 1, it is characterised in that: set in the two sidewalls of the pre- heat channel (1) There are cooling bath (8);The lower end of the cooling bath (8) is connect with pre- heat channel (1) interior fluid communication.
5. a kind of galvanizing equipment according to claim 1, it is characterised in that: the conveyer belt is equipped with several uniformly The protrusion of distribution;The blanking plate (4) is elastic plate, the projection contacts on the lower end and transmission device of blanking plate (4).
6. a kind of galvanizing equipment according to claim 1, it is characterised in that: be connected on pre- heat channel (1) bottom Strainer (9), strainer (9) are obliquely installed, and the upper end of strainer (9) is connected with brush head (10);Corresponding brush on pre- heat channel (1) bottom The position of head (10) is equipped with accommodating chamber (11), is hinged with valve, valve on the position of corresponding accommodating chamber (11) on the outside of pre- heat channel (1) Door is equipped with magnet.
CN201811350191.9A 2018-11-14 2018-11-14 A kind of galvanizing equipment Withdrawn CN109182940A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811350191.9A CN109182940A (en) 2018-11-14 2018-11-14 A kind of galvanizing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811350191.9A CN109182940A (en) 2018-11-14 2018-11-14 A kind of galvanizing equipment

Publications (1)

Publication Number Publication Date
CN109182940A true CN109182940A (en) 2019-01-11

Family

ID=64939805

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811350191.9A Withdrawn CN109182940A (en) 2018-11-14 2018-11-14 A kind of galvanizing equipment

Country Status (1)

Country Link
CN (1) CN109182940A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359307A (en) * 2020-11-11 2021-02-12 嘉兴恒瑞金属科技股份有限公司 Environment-friendly hot dip galvanizing processing equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112359307A (en) * 2020-11-11 2021-02-12 嘉兴恒瑞金属科技股份有限公司 Environment-friendly hot dip galvanizing processing equipment

Similar Documents

Publication Publication Date Title
CN109182940A (en) A kind of galvanizing equipment
CN113023832B (en) Rotary electrochemical continuous hardness removal device
CN109182941A (en) A kind of hot dipping zinc technology
CN112143998A (en) Nose zinc ash treatment device of continuous hot galvanizing furnace
CN110358999B (en) Hot galvanizing furnace nose with zinc ash blowing and diffusing treatment function
CN204503726U (en) The galvanizing device for eliminating smoke and dust that a kind of pressure-vaccum combines
CN104550177A (en) Blowing and suction combined hot galvanizing smoke prevention and dust removal device
CN110819925A (en) On-line treatment method for furnace nose zinc ash of galvanized strip steel production line
CN210856354U (en) Pickling bath for tin furnace position of continuous annealing tinning machine
CN212857074U (en) Hot galvanizing flue gas recovery device with arc-shaped guide plate
CN101451180A (en) Rotary firebox type isothermal quench integrated apparatus
CN212955220U (en) Annealing equipment
CN114768515A (en) Desulfurization and denitrification treatment method for flue gas of steel smelting boiler
CN213771406U (en) Ammonia still capable of efficiently removing ammonia nitrogen
CN103382562A (en) Recycled pot gas pot distribution
KR101999029B1 (en) Galvanizing Snout
CN207891432U (en) A kind of UTILIZATION OF VESIDUAL HEAT IN heats steel plate pre-treatment water installations indirectly
CN1128250C (en) Acidic displacing solution for electroplating of zinc
CN205279663U (en) Electroplating drying machine
CN219674610U (en) Drying equipment is used in hot-galvanize iron nail processing
CN215481188U (en) Water-saving hot galvanizing production line
CN219032320U (en) Zinc ash removing and inhibiting forming device for hot galvanizing production of strip steel
CN214060613U (en) Full-automatic hot-dip galvanizing production line
CN201785470U (en) Reciprocating liquid zinc pumping and deslagging device
CN212821458U (en) Quenching workpiece cleaning system arranged at rear path of mesh belt quenching furnace

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20190111

WW01 Invention patent application withdrawn after publication