CN109176386A - A kind of steel tube tower in electric transmission line K-type mutually passes through pipe assembling method - Google Patents
A kind of steel tube tower in electric transmission line K-type mutually passes through pipe assembling method Download PDFInfo
- Publication number
- CN109176386A CN109176386A CN201811186459.XA CN201811186459A CN109176386A CN 109176386 A CN109176386 A CN 109176386A CN 201811186459 A CN201811186459 A CN 201811186459A CN 109176386 A CN109176386 A CN 109176386A
- Authority
- CN
- China
- Prior art keywords
- pipe
- mutually
- flange
- supervisor
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B25—HAND TOOLS; PORTABLE POWER-DRIVEN TOOLS; MANIPULATORS
- B25B—TOOLS OR BENCH DEVICES NOT OTHERWISE PROVIDED FOR, FOR FASTENING, CONNECTING, DISENGAGING OR HOLDING
- B25B27/00—Hand tools, specially adapted for fitting together or separating parts or objects whether or not involving some deformation, not otherwise provided for
Abstract
The present invention provides a kind of steel tube tower in electric transmission line K-type and mutually passes through pipe assembling method, comprising the following steps: will mobile floral disc center messenger wire perpendicular to ground, find center up and down and the left and right central point of supervisor's flange accurately;Mould steel plate is on guide rail and fixed with being laid with setting-out in advance;Center line is marked according to central point line on ground mould steel plate, draws the center line for mutually passing through pipe on ground mould surface of steel plate further according to drawing size;Removable push-plate is placed in ground mould surface, it is ensured that the center line of mobile push-plate mutually passes through center line with ground mould steel plate and is overlapped;Vertical angle steel fetal membrane is organized on removable push-plate;It measures supervisor's flange respectively using level meter and mutually passes through the centre-height of pipe flange, and ensure the two in sustained height;Pipe flange will mutually be passed through and be fixed on angle steel fetal membrane;Pipe is mutually passed through in assembly supervisor and assembly.Steel tube tower in electric transmission line K-type of the invention mutually passes through pipe assembling method and effectively improves assembled quality, reduces production cost.
Description
Technical field
The present invention relates to steel tube tower in electric transmission line assembling technique field more particularly to a kind of steel tube tower in electric transmission line K-type phases
Pass through pipe assembling method.
Background technique
In the prior art, the supervisor and Xiang Guanguan of steel tube tower in electric transmission line K-type node be easy to appear in assembly angle with
And position length is easy to appear error, and it is of poor quality so as to cause the assembly of steel tube tower in electric transmission line K-type node, so that overall package
Quality decline.
Summary of the invention
The present invention provides one kind and effectively avoids error occur when the angle and position length assembly of Xiang Guanguan and supervisor, improves
Assembled quality, the steel tube tower in electric transmission line K-type for reducing production cost mutually pass through pipe assembling method.
The technical solution adopted by the present invention are as follows: a kind of steel tube tower in electric transmission line K-type mutually passes through pipe assembling method, including following
Step:
Step 1: supervisor's flange being lifted to floral disc, using tray support supervisor's flange on floral disc, and rotates and extremely schemes
The assembled angle of paper technical requirements;Find the center up and down of supervisor's flange accurately;Vertical line is hung along supervisor's flange hole, in conjunction with the quarter on floral disc
The left and right center of the determining supervisor's flange of degree will be responsible for locking positioning after flange is fixed on floral disc and rotates to the angle of requirement;
Step 2: mould steel plate is on guide rail and fixed with being laid with setting-out in advance;On the basis of the center up and down for being responsible for flange,
It draws center line to be placed on ground mould steel plate, then measures upper supervisor's flange face to the K font section being responsible for by drawing technical requirements
The size of point;
Step 3: drawing the center line for mutually passing through pipe by 1:1 actual size at K font node, measure K font node and arrive
The actual size of plane on pipe flange is mutually passed through, and makes 90 ° of vertical lines for mutually passing through plane on pipe flange on ground mould steel plate;
Step 4: the center vertical line of removable push-plate is drawn, so that in removable push-plate Flange Plane and removable push-plate
Heart vertical line is overlapped, and is then placed in removable push-plate at 90 ° of vertical lines for mutually passing through plane on pipe flange, so that removable push-plate method
Blue plane is overlapped with 90 ° of vertical lines of ground mould steel plate, fixed removable push-plate;
Step 5: vertical angle steel fetal membrane is organized on removable push-plate;
Step 6: measuring supervisor's flange respectively using level meter and mutually pass through the centre-height of pipe flange, and ensure that the two exists
Sustained height;Then it will mutually pass through pipe flange and be fixed on angle steel fetal membrane, so that mutually passing through the center of pipe flange and the center line for mutually passing through pipe
It is with one heart and vertical;
Step 7: assembly supervisor;
Step 8: pipe is mutually passed through in assembly.
Further, in step 7, when assembled, one piece of limit plate is respectively positioned in two pipe ends of supervisor.
Further, in step 8, assembled first group mutually passes through pipe, mutually passes through pipe in the front assembly of supervisor and mutually passes through pipe flange;
When assembled, it is mutually to pass through the 1/2 of pipe flange thickness that control, which mutually passes through Guan Yuxiang and passes through the insertion depth of pipe flange mouth,.
Further, in step 8, first group is mutually passed through after the completion of pipe assembly, exits removable push-plate in suitable position, then
Supervisor is rotated by 90 °, mutually pass through pipe in the assembly of the side of supervisor according to the method for step 2- step 6 and mutually passes through pipe flange.
Further, when assembled, it is mutually to pass through pipe flange thickness that control, which mutually passes through Guan Yuxiang and passes through the insertion depth of pipe flange mouth,
1/2。
Compared to the prior art, steel tube tower in electric transmission line K-type of the invention is mutually passed through pipe assembling method and is passed through in K font node
Place is drawn the centric angle line for mutually passing through pipe by 1:1 actual size, measures K font node to the reality for mutually passing through plane on pipe flange
Size, and 90 ° of vertical lines for mutually passing through plane on pipe flange are made on ground mould steel plate;Then removable push-plate is fixed on and mutually passes through pipe
On flange at 90 ° of vertical lines of plane, fixed removable push-plate;Supervisor's flange is measured respectively using level meter and mutually passes through pipe flange
Centre-height, and both ensure in sustained height;Then it will mutually pass through pipe flange and be fixed on angle steel fetal membrane, so that mutually passing through pipe flange
Center it is concentric and vertical with the center line for mutually passing through pipe;To effectively avoid the angle of Xiang Guanguan and supervisor and position length from spelling
Occur error when dress, improves assembled quality, reduce production cost.
Detailed description of the invention
The drawings are intended to provide a further understanding of the invention, and constitutes part of specification, and following specific
Embodiment is used to explain the present invention together, but should not be construed as limiting the invention.In the accompanying drawings,
Fig. 1: supervisor's flange of the invention positions figure;
Fig. 2: of the invention mutually passes through pipe flange scribing line positioning schematic diagram;
Fig. 3: steel tube tower in electric transmission line K-type of the invention mutually passes through the assembled schematic diagram of pipe;
Fig. 4: Fig. 3 partial enlarged view.
Specific embodiment
Below in conjunction with attached drawing, detailed description of the preferred embodiments.It should be understood that this place is retouched
The specific embodiment stated is merely to illustrate and explain the present invention, and is not intended to restrict the invention.
As shown in Figures 1 to 4, steel tube tower in electric transmission line K-type of the invention mutually pass through pipe assembling method the following steps are included:
Step 1: by supervisor's lifting to floral disc 2 of flange 1, using the support supervisor's flange 1 of tray 3 on floral disc 2, and rotating
To the assembled angle of drawing technical requirements;Find the center up and down of supervisor's flange 1 accurately;Vertical line a is hung along supervisor's flange hole 15, in conjunction with flower
Scale on disk 2 determines the left and right center of supervisor's flange 1, will be responsible for flange 1 and is fixed on floral disc 2 and rotates to desired angle
Locking positioning afterwards;
Wherein it is possible to adjust a left side for supervisor's flange 1 by vertical line a by the upper-lower height of the fine tuning supervisor's flange 1 of tray 3
Right position.
Step 2: referring to Fig. 2, mould steel plate 4 is on guide rail 5 and fixed with being laid with setting-out in advance;To be responsible for the upper of flange 1
On the basis of lower center, draws center line and be placed on ground mould steel plate 4, then measure upper supervisor's flange face 6 by drawing technical requirements
To the size b of the K font node 7 of supervisor A.
Step 3: drawing the center line 14 for mutually passing through pipe B by 1:1 actual size at K font node 7, measure K font section
Point is made on ground mould steel plate 4 and mutually to pass through 90 ° of plane 8 on pipe flange and hang down 7 to the actual size for mutually passing through plane 8 on pipe flange
Line.
Step 4: the center vertical line of removable push-plate 10 is drawn, so that removable push-plate Flange Plane 11 and removable push-plate
10 center vertical line is overlapped, and is then placed in removable push-plate 10 at 90 ° of vertical lines for mutually passing through plane 8 on pipe flange, so that can
Mobile push-plate Flange Plane 11 is overlapped with 90 ° of vertical lines of ground mould steel plate 4, fixed removable push-plate 10.
Step 5: organizing vertical angle steel fetal membrane 12 on removable push-plate 10, mutually pass through pipe flange 13 for positioning.
Step 6: supervisor's flange 1 being measured using level meter respectively and mutually passes through the centre-height of pipe flange 13, and ensures two
Person is in sustained height;Then it will mutually pass through pipe flange 13 and be fixed on angle steel fetal membrane 12, so that mutually passing through the center of pipe flange 13 and mutually passing through
The center line 14 of pipe B is with one heart and vertical, it may be assumed that mutually passes through pipe B and is mutually perpendicular to pipe flange 13 is mutually passed through.
Step 7: assembly supervisor A.
When assembled, supervisor A controls length to supervisor A as group by drawing size to total length with 1 group of supervisor's flange, in master
Two pipe ends of pipe A respectively position the limit plate of one piece of insertion flange depth;
Step 8: pipe B is mutually passed through in assembly.
Firstly, assembled first group mutually passes through pipe B (pipe is mutually passed through in front), pipe B is mutually passed through in the front assembly of supervisor A and mutually passes through tube method
Orchid 13;When assembled, need to control and mutually pass through pipe B with the insertion depth for mutually passing through pipe flange mouth is mutually to pass through the 1/2 of 13 thickness of pipe flange.
Then, mutually pass through pipe B for assembled second group (pipe is mutually passed through in side);First group mutually passes through after the completion of pipe B assembly, exits removable
Then supervisor A is rotated by 90 ° by push-plate 10 in suitable position, according to the method for step 2- step 6 in the side assembly phase for being responsible for A
It passes through pipe B and mutually passes through pipe flange 13.When assembled, need to control and mutually pass through pipe B with the insertion depth for mutually passing through pipe flange mouth is mutually to pass through pipe flange
The 1/2 of 13 thickness.
To sum up, steel tube tower in electric transmission line K-type of the invention mutually pass through pipe assembling method pass through at K font node 7 by 1:1 reality
Border size draws the centric angle line for mutually passing through pipe B, measures K font node 7 to the actual size for mutually passing through plane 8 on pipe flange,
And 90 ° of vertical lines for mutually passing through plane 8 on pipe flange are made on ground mould steel plate 4;Then removable push-plate 10 is fixed on and mutually passes through pipe
On flange at 90 ° of vertical lines of plane 8, fixed removable push-plate 10;Supervisor's flange 1 is measured respectively using level meter and mutually passes through pipe
The centre-height of flange 13, and ensure the two in sustained height;Then it will mutually pass through pipe flange 13 and be fixed on angle steel fetal membrane 12, so that
The center for mutually passing through pipe flange 13 is concentric and vertical with the center line for mutually passing through pipe B;To effectively avoid mutually passing through pipe B and be responsible for the angle of A
Degree and position length occur error in assembly, improve assembled quality, reduce production cost.
Without departing from the thought of the invention, any combination is carried out to various different embodiments of the invention, it should all
When being considered as present disclosure;Within the scope of the technical concept of the present invention, a variety of simple modifications are carried out to technical solution
And any combination of the thought without prejudice to the invention that different embodiments carry out, should all protection scope of the present invention it
It is interior.
Claims (5)
1. a kind of steel tube tower in electric transmission line K-type mutually passes through pipe assembling method, which comprises the following steps:
Step 1: by supervisor flange (1) lifting to floral disc (2), it is responsible for flange (1) using tray (3) support on floral disc (2),
And it rotates to the assembled angle of drawing technical requirements;Find the center up and down of supervisor flange (1) accurately;It is hung along supervisor flange hole (15) vertical
Line (a) determines the left and right center of supervisor flange (1) in conjunction with the scale on floral disc (2), and supervisor flange (1) is fixed on floral disc (2)
Locking positioning after going up and rotating to desired angle;
Step 2: mould steel plate (4) is on guide rail (5) and fixed with being laid with setting-out in advance;It is to be responsible for the center up and down of flange (1)
Benchmark is drawn center line and is placed on ground mould steel plate (4), then measures upper supervisor's flange face (6) to master by drawing technical requirements
Manage the size (b) of the K font node (7) of (A);
Step 3: drawing the center line (14) for mutually passing through pipe (B) by 1:1 actual size at K font node (7), measure K font
Node (7) makes on ground mould steel plate (4) to the actual size for mutually passing through plane on pipe flange (8) and mutually passes through plane on pipe flange
(8) 90 ° of vertical lines;
Step 4: the center vertical line of removable push-plate (10) is drawn, so that removable push-plate Flange Plane (11) and removable push-plate
(10) center vertical line is overlapped, and is then placed in removable push-plate (10) at 90 ° of vertical lines for mutually passing through plane on pipe flange (8),
So that removable push-plate Flange Plane (11) are overlapped with 90 ° of vertical lines of ground mould steel plate (4), it is fixed removable push-plate (10);
Step 5: being organized on removable push-plate (10) vertical angle steel fetal membrane (12);
Step 6: supervisor flange (1) being measured using level meter respectively and mutually passes through the centre-height of pipe flange (13), and ensures two
Person is in sustained height;Then it will mutually pass through pipe flange (13) and be fixed on angle steel fetal membrane (12), so that mutually passing through the center of pipe flange (13)
It is concentric and vertical with the center line (14) for mutually passing through pipe (B);
Step 7: assembly supervisor (A);
Step 8: pipe (B) is mutually passed through in assembly.
2. steel tube tower in electric transmission line K-type as described in claim 1 mutually passes through pipe assembling method, it is characterised in that: in step 7, spell
When dress, one piece of limit plate is respectively positioned in two pipe ends of supervisor (A).
3. steel tube tower in electric transmission line K-type as described in claim 1 mutually passes through pipe assembling method, it is characterised in that: in step 8, spell
It fills first group and mutually passes through pipe (B), mutually pass through pipe (B) in the front assembly of supervisor (A) and mutually pass through pipe flange (13);When assembled, phase is controlled
It is mutually to pass through the 1/2 of pipe flange (13) thickness that pipe (B), which is passed through, with the insertion depth for mutually passing through pipe flange mouth.
4. steel tube tower in electric transmission line K-type as claimed in claim 3 mutually passes through pipe assembling method, it is characterised in that: in step 8, the
One group mutually passes through after the completion of pipe (B) assembly, exits removable push-plate (10) in suitable position, is then rotated by 90 ° supervisor (A), presses
The method for taking step 2- step 6 is passed through pipe (B) in the assembled picture in the side of supervisor (A) and is mutually passed through pipe flange (13).
5. steel tube tower in electric transmission line K-type as claimed in claim 4 mutually passes through pipe assembling method, it is characterised in that: when assembled, control
Xiang Guanguan (B) is mutually to pass through the 1/2 of pipe flange (13) thickness with the insertion depth for mutually passing through pipe flange mouth.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811186459.XA CN109176386B (en) | 2018-10-12 | 2018-10-12 | K-shaped intersecting pipe assembling method for power transmission line steel pipe tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811186459.XA CN109176386B (en) | 2018-10-12 | 2018-10-12 | K-shaped intersecting pipe assembling method for power transmission line steel pipe tower |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109176386A true CN109176386A (en) | 2019-01-11 |
CN109176386B CN109176386B (en) | 2020-05-22 |
Family
ID=64948012
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811186459.XA Active CN109176386B (en) | 2018-10-12 | 2018-10-12 | K-shaped intersecting pipe assembling method for power transmission line steel pipe tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109176386B (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009150728A1 (en) * | 2008-06-11 | 2009-12-17 | 三菱重工業株式会社 | Flange joint for structural member |
WO2010022930A1 (en) * | 2008-08-27 | 2010-03-04 | Armoline Gmbh | Device for preparing the end faces of thin-walled jackets for welding |
CN204690777U (en) * | 2015-06-17 | 2015-10-07 | 国家电网公司 | A kind of Novel prefabricated steel pipe pile foundation being applicable to electric power line pole tower |
CN206448600U (en) * | 2017-02-20 | 2017-08-29 | 赵丽芸 | A kind of steel tube tower in electric transmission line |
CN207289333U (en) * | 2017-10-11 | 2018-05-01 | 浙江宁远塔桅制造有限公司 | A kind of assemblage platform |
CN207526141U (en) * | 2017-11-16 | 2018-06-22 | 中国建筑一局(集团)有限公司 | A kind of small bore tower steel structure assembling formula operating platform |
CN108480874A (en) * | 2018-06-14 | 2018-09-04 | 安徽宏源铁塔有限公司 | A kind of steel tube tower transmission line of electricity ball node splicing process |
-
2018
- 2018-10-12 CN CN201811186459.XA patent/CN109176386B/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2009150728A1 (en) * | 2008-06-11 | 2009-12-17 | 三菱重工業株式会社 | Flange joint for structural member |
WO2010022930A1 (en) * | 2008-08-27 | 2010-03-04 | Armoline Gmbh | Device for preparing the end faces of thin-walled jackets for welding |
CN204690777U (en) * | 2015-06-17 | 2015-10-07 | 国家电网公司 | A kind of Novel prefabricated steel pipe pile foundation being applicable to electric power line pole tower |
CN206448600U (en) * | 2017-02-20 | 2017-08-29 | 赵丽芸 | A kind of steel tube tower in electric transmission line |
CN207289333U (en) * | 2017-10-11 | 2018-05-01 | 浙江宁远塔桅制造有限公司 | A kind of assemblage platform |
CN207526141U (en) * | 2017-11-16 | 2018-06-22 | 中国建筑一局(集团)有限公司 | A kind of small bore tower steel structure assembling formula operating platform |
CN108480874A (en) * | 2018-06-14 | 2018-09-04 | 安徽宏源铁塔有限公司 | A kind of steel tube tower transmission line of electricity ball node splicing process |
Also Published As
Publication number | Publication date |
---|---|
CN109176386B (en) | 2020-05-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202737650U (en) | Motor fixing device | |
CN109176386A (en) | A kind of steel tube tower in electric transmission line K-type mutually passes through pipe assembling method | |
CN103537627B (en) | A kind of circular sand core localization method | |
CN208176109U (en) | A kind of size measuring device | |
CN205395510U (en) | Sticky tool for invoices with holes in two sides | |
CN103418752B (en) | A kind of ultrahigh circular sand core localization method | |
CN206154431U (en) | Mould of die -cut cover membrane of flexible line way board volume to volume | |
CN206005928U (en) | A kind of cigarette pole slip positioner in barn | |
CN207498980U (en) | Pedestal assembly foundation | |
CN204955497U (en) | Molded depth degree adjustable film clamp goes into | |
CN106289643B (en) | The center of gravity measurement tooling of on-circular cross-section product | |
CN210741467U (en) | But building engineering is with spirit level of high accuracy regulation | |
CN105587979B (en) | Projector's hoisting bracket | |
CN205363006U (en) | High -precision laser marking machine | |
CN205085582U (en) | Bench automatic weld support | |
CN203792867U (en) | Multipurpose silk-screen printing equipment | |
CN203959526U (en) | A kind of guide frame that holds steel wire | |
CN210137651U (en) | Agricultural seedling frame with adjustable | |
CN106792295B (en) | Multi-degree-of-freedom adjustable loudspeaker support | |
CN207835979U (en) | A kind of autonomous collating unit of the network equipment | |
CN208712796U (en) | A kind of positioning device of sand core molding machine | |
CN109779273A (en) | A kind of polyhedron tube structure Template Location system and method | |
CN203649757U (en) | Welding tooling of Coriolis mass flow meter | |
CN106373768B (en) | The preparation method of transformer yoke insulation | |
CN204405987U (en) | The vertical machine of group |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: An assembly method of K-type intersecting pipe of transmission line steel pipe tower Effective date of registration: 20211209 Granted publication date: 20200522 Pledgee: China Co. truction Bank Corp Guangzhou Zengcheng branch Pledgor: GUANGZHOU ZENGLI STEEL STRUCTURE Co.,Ltd. Registration number: Y2021440000367 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |