CN109174829B - 基于热风除雪装置的特高压设备远程除雪方法 - Google Patents
基于热风除雪装置的特高压设备远程除雪方法 Download PDFInfo
- Publication number
- CN109174829B CN109174829B CN201810812410.4A CN201810812410A CN109174829B CN 109174829 B CN109174829 B CN 109174829B CN 201810812410 A CN201810812410 A CN 201810812410A CN 109174829 B CN109174829 B CN 109174829B
- Authority
- CN
- China
- Prior art keywords
- snow
- equipment
- melting
- hot air
- removing device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B7/00—Cleaning by methods not provided for in a single other subclass or a single group in this subclass
- B08B7/0064—Cleaning by methods not provided for in a single other subclass or a single group in this subclass by temperature changes
- B08B7/0071—Cleaning by methods not provided for in a single other subclass or a single group in this subclass by temperature changes by heating
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B13/00—Accessories or details of general applicability for machines or apparatus for cleaning
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本发明提出了一种基于热风除雪装置的特高压设备远程除雪方法,包括:确定待除雪设备融雪的单位长度,并根据融雪的单位长度确定热风除雪装置的出风口宽度;选择待除雪设备绝缘部分的中间位置做为融雪起始位置,开启热风除雪装置进行融雪,当起始位置融雪完成之后,再对待除雪设备绝缘部分的低压端融雪,然后对高压端进行融雪;当待除雪设备上的积雪融化,且表面无滴水时,关闭热风除雪装置完成除雪。通过选择待除雪设备干弧距离的15%‑20%为融雪的单位长度,选择热风除雪装置除雪,提高了融雪效率和融雪效果,通过对融雪位置的选择,在不引起运行设备局部放电的前提下有效除雪,能够有效的预防特高压绝缘设备的融雪闪络,保证设备的安全稳定运行。
Description
技术领域
本发明涉及高压设备远程除雪技术领域,具体而言,涉及一种基于热风除雪装置的特高压设备远程除雪方法。
背景技术
覆雪条件下,穿墙套管的电气性能会急剧下降,引发局部放电,严重时导致闪络,造成停电事故,严重影响电气设备、线路的安全可靠运行。国内外在寒冷气候条件下覆冰覆雪时曾发生多次绝缘闪络和击穿事故,造成极大危害和经济损失,引起电力运行部门和学者们的极大关注。
我国工业集中地区穿墙套管的积污水平在冬季少雨条件下达到峰值,降雪天气使得外绝缘设备上大量积雪,不仅会对设备产生额外的负重,还可能在融雪过程中造成设备绝缘性能的下降。在一些地区,冬季雾霾天气与降雪天气衔接紧密,降雪过程一方面清洁空气,一方面将雾霾空气中的盐分和颗粒物聚集、沉降在绝缘子表面,既为绝缘子表面原有的污层提供了准湿润条件,又补充了污秽层的灰分和盐分,在融雪阶段对绝缘子绝缘水平产生明显影响。
运行经验和文献调查显示,覆雪闪络经常发生在覆雪融化时且与绝缘子电场分布密切相关。因此在带电运行情况下,盲目进行融雪极有可能引起局部放电现象,严重时甚至会有绝缘闪络的危险。那么,这就需要提出一种行之有效且不能影响绝缘的除雪方法。
发明内容
鉴于此,本发明提出了一种基于热风除雪装置的特高压设备远程除雪方法,旨在解决在带电条件下特高压设备上除雪时,预防特高压绝缘设备的融雪闪络的问题。
一个方面,本发明提出了一种基于热风除雪装置的特高压设备远程除雪方法,包括:
步骤一:确定待除雪设备融雪的单位长度,并根据所述融雪的单位长度确定热风除雪装置的出风口宽度;
步骤二:选择所述待除雪设备绝缘部分的中间位置做为融雪起始位置,开启所述热风除雪装置进行融雪,当所述起始位置融雪完成之后,再对所述待除雪设备绝缘部分的低压端一侧进行融雪,然后对所述待除雪设备绝缘部分的高压端一侧进行融雪;
步骤三:当所述待除雪设备上的积雪融化,且所述待除雪设备表面无滴水时,关闭所述热风除雪装置完成除雪。
进一步地,在所述步骤二中,根据融雪位置,确定所述热风除雪装置的安装位置。
进一步地,在所述步骤二中,当所述所述融雪起始位置除雪完成后,对所述待除雪设备绝缘部分的接地端侧进行除雪。
进一步地,在所述步骤二中,当所述待除雪设备绝缘部分的接地端侧除雪完成后,对所述待除雪设备绝缘部分的高压端侧进行除雪。
进一步地,选取所述待除雪设备的干弧距离的15%-20%作为所述融雪的单位长度。
与现有技术相比,本发明的有益效果在于:通过选择待除雪设备的干弧距离的15%-20%为融雪的单位长度,同时选择热风除雪装置进行除雪,极大地提高了融雪效率和融雪效果,同时,通过首先对待除雪设备的中间位融雪,然后在对低压端进行融雪,当低压端融雪完成后对高压端进行融雪,通过对融雪位置的选择,进而能够在不引起运行设备局部放电的前提下有效除雪,能够有效的预防特高压绝缘设备的融雪闪络,保证设备的安全稳定运行。
附图说明
通过阅读下文优选实施方式的详细描述,各种其他的优点和益处对于本领域普通技术人员将变得清楚明了。附图仅用于示出优选实施方式的目的,而并不认为是对本发明的限制。而且在整个附图中,用相同的参考符号表示相同的部件。在附图中:
图1为本发明实施例提供的除雪流程图。
具体实施方式
下面将参照附图更详细地描述本公开的示例性实施例。虽然附图中显示了本公开的示例性实施例,然而应当理解,可以以各种形式实现本公开而不应被这里阐述的实施例所限制。相反,提供这些实施例是为了能够更透彻地理解本公开,并且能够将本公开的范围完整的传达给本领域的技术人员。需要说明的是,在不冲突的情况下,本发明中的实施例及实施例中的特征可以相互组合。下面将参考附图并结合实施例来详细说明本发明。
参阅图1所示,本实施例提供了一种基于热风除雪装置的特高压设备远程除雪方法,包括:
步骤一S101:确定待除雪设备融雪的单位长度,并根据融雪的单位长度确定热风除雪装置的出风口宽度;
步骤二S102:选择待除雪设备绝缘部分的中间位置做为融雪起始位置,开启热风除雪装置进行融雪,当起始位置融雪完成之后,再对待除雪设备绝缘部分的低压端一侧进行融雪,然后对待除雪设备绝缘部分的高压端一侧进行融雪;
步骤三S103:当待除雪设备上的积雪融化,且待除雪设备表面无滴水时,关闭热风除雪装置完成除雪。
具体而言,在步骤二S102中,根据融雪位置,确定热风除雪装置的安装位置。选择待除雪设备绝缘部分的中间位置,做为融雪起始位置。当融雪起始位置除雪完成后,对待除雪设备绝缘部分的接地端(接地端)侧进行除雪。当待除雪设备绝缘部分的接地端侧除雪完成后,对待除雪设备绝缘部分的高压端侧进行除雪。
具体而言,选取待除雪设备的干弧距离的15%-20%作为融雪的单位长度。
具体而言,热风除雪装置可以选用30kW功率的风机,任意位置需除雪20min,即绝缘部分的高压端侧除雪20min、绝缘部分的接地端侧除雪20min、绝缘部分的中间位置除雪20min。
可以理解的是,通过选择待除雪设备的干弧距离的15%-20%为融雪的单位长度,同时选择热风除雪装置进行除雪,极大地提高了融雪效率和融雪效果,同时,通过首先对待除雪设备的中间位融雪,然后在对低压端进行融雪,当低压端融雪完成后对高压端进行融雪,通过对融雪位置的选择,进而能够在不引起运行设备局部放电的前提下有效除雪,能够有效的预防特高压绝缘设备的融雪闪络,保证设备的安全稳定运行。
具体而言,上述远程除雪方法还可以为以下步骤:
S1、选取待除雪设备的干弧距离的15%-20%为融雪的单位长度,并据此调整安装完成热风除雪装置的出风口宽度;
S2、调整融雪位置,选择待除雪设备绝缘部分的中间位置为起始除雪点开始除雪;
S3、待除雪位置上覆雪全部融化,且观察设备绝缘表面无滴水时;
S4、选择紧接上次且靠近接地端一侧位置,重复S1,S2,S3步骤,直到接地端位置除雪完成;
S5、选择起始位置且靠近高压端一侧位置,重复S1,S2,S3步骤,直到设备绝缘全段除雪完成。
具体而言,上述方法可以用于除雪,还可以用于除冰,除雪与除冰的方法相同。
显然,本领域的技术人员可以对本发明进行各种改动和变型而不脱离本发明的精神和范围。这样,倘若本发明的这些修改和变型属于本发明权利要求及其等同技术的范围之内,则本发明也意图包含这些改动和变型在内。
Claims (3)
1.一种基于热风除雪装置的特高压设备远程除雪方法,其特征在于,包括:
步骤一:确定待除雪设备融雪的单位长度,并根据所述融雪的单位长度确定热风除雪装置的出风口宽度;
步骤二:选择所述待除雪设备绝缘部分的中间位置做为融雪起始位置,开启所述热风除雪装置进行融雪,当所述起始位置融雪完成之后,再对所述待除雪设备绝缘部分的低压端一侧进行融雪,然后对所述待除雪设备绝缘部分的高压端一侧进行融雪;
步骤三:当所述待除雪设备上的积雪融化,且所述待除雪设备表面无滴水时,关闭所述热风除雪装置完成除雪。
2.根据权利要求1所述的基于热风除雪装置的特高压设备远程除雪方法,其特征在于,在所述步骤二中,根据融雪位置,确定所述热风除雪装置的安装位置。
3.根据权利要求1或2所述的基于热风除雪装置的特高压设备远程除雪方法,其特征在于,选取所述待除雪设备的干弧距离的15%-20%作为所述融雪的单位长度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810812410.4A CN109174829B (zh) | 2018-07-23 | 2018-07-23 | 基于热风除雪装置的特高压设备远程除雪方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810812410.4A CN109174829B (zh) | 2018-07-23 | 2018-07-23 | 基于热风除雪装置的特高压设备远程除雪方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109174829A CN109174829A (zh) | 2019-01-11 |
CN109174829B true CN109174829B (zh) | 2021-08-24 |
Family
ID=64937154
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810812410.4A Active CN109174829B (zh) | 2018-07-23 | 2018-07-23 | 基于热风除雪装置的特高压设备远程除雪方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109174829B (zh) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05211707A (ja) * | 1992-01-31 | 1993-08-20 | Hitachi Cable Ltd | 難着雪リング撤去装置 |
CN202042863U (zh) * | 2011-05-19 | 2011-11-16 | 西南交通大学 | 一种电力输电线路工频在线防冰融冰装置 |
CN103591745A (zh) * | 2013-11-15 | 2014-02-19 | 国家电网公司 | 一种v型绝缘子串覆雪试验用造雪装置及其操作方法 |
CN103701080A (zh) * | 2014-01-07 | 2014-04-02 | 国家电网公司 | 利用输电线路负荷电流融冰的方法 |
CN205096125U (zh) * | 2015-11-05 | 2016-03-23 | 国网河南南召县供电公司 | 一种电力设备积雪清除装置 |
CN105826860A (zh) * | 2016-05-04 | 2016-08-03 | 国网新疆电力公司哈密供电公司 | 一种输电线路的融冰融雪方法 |
CN106199353A (zh) * | 2016-06-27 | 2016-12-07 | 中国电力科学研究院 | 特高压绝缘子湿雪闪络试验方法 |
CN106602455A (zh) * | 2016-12-23 | 2017-04-26 | 中国电力科学研究院 | 送风式穿墙套管用除雪装置 |
CN106786123A (zh) * | 2016-12-23 | 2017-05-31 | 中国电力科学研究院 | 穿墙套管除雪除冰装置及方法 |
CN107482560A (zh) * | 2017-07-27 | 2017-12-15 | 王伟 | 一种电力设备表面除雪烘干一体式设备 |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5450996A (en) * | 1977-09-30 | 1979-04-21 | Mitsubishi Electric Corp | Snow remover for the wire |
KR101599267B1 (ko) * | 2013-09-05 | 2016-03-04 | 한국전력공사 | 송전선로 빙설 제거장치 |
CN104753016B (zh) * | 2015-04-25 | 2018-02-09 | 李艳红 | 一种远程遥控喷气式电线除冰机 |
CN207409900U (zh) * | 2017-10-30 | 2018-05-25 | 国网河南省电力公司登封市供电公司 | 变电站带电除冰雪装置 |
-
2018
- 2018-07-23 CN CN201810812410.4A patent/CN109174829B/zh active Active
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05211707A (ja) * | 1992-01-31 | 1993-08-20 | Hitachi Cable Ltd | 難着雪リング撤去装置 |
CN202042863U (zh) * | 2011-05-19 | 2011-11-16 | 西南交通大学 | 一种电力输电线路工频在线防冰融冰装置 |
CN103591745A (zh) * | 2013-11-15 | 2014-02-19 | 国家电网公司 | 一种v型绝缘子串覆雪试验用造雪装置及其操作方法 |
CN103701080A (zh) * | 2014-01-07 | 2014-04-02 | 国家电网公司 | 利用输电线路负荷电流融冰的方法 |
CN205096125U (zh) * | 2015-11-05 | 2016-03-23 | 国网河南南召县供电公司 | 一种电力设备积雪清除装置 |
CN105826860A (zh) * | 2016-05-04 | 2016-08-03 | 国网新疆电力公司哈密供电公司 | 一种输电线路的融冰融雪方法 |
CN106199353A (zh) * | 2016-06-27 | 2016-12-07 | 中国电力科学研究院 | 特高压绝缘子湿雪闪络试验方法 |
CN106602455A (zh) * | 2016-12-23 | 2017-04-26 | 中国电力科学研究院 | 送风式穿墙套管用除雪装置 |
CN106786123A (zh) * | 2016-12-23 | 2017-05-31 | 中国电力科学研究院 | 穿墙套管除雪除冰装置及方法 |
CN107482560A (zh) * | 2017-07-27 | 2017-12-15 | 王伟 | 一种电力设备表面除雪烘干一体式设备 |
Also Published As
Publication number | Publication date |
---|---|
CN109174829A (zh) | 2019-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100511899C (zh) | 换流站交流进线融冰接线方案 | |
JP2008154438A (ja) | 架空送電線の着氷雪の除去 | |
CN104952562A (zh) | 用于10kV输电线路的防雷防冰针式复合绝缘子 | |
Watanabe | Flashover tests of insulators covered with ice or snow | |
CN106098264A (zh) | 一种10kV多功能防灾害绝缘子及制备方法 | |
CN102931609B (zh) | 带负荷更换10kV跌落式熔断器的作业方法 | |
CN109174829B (zh) | 基于热风除雪装置的特高压设备远程除雪方法 | |
CN105529667A (zh) | 特高压地线的直流融冰系统和直流融冰方法 | |
CN103701080A (zh) | 利用输电线路负荷电流融冰的方法 | |
CN105788775A (zh) | 10kV输电线路用针式复合绝缘子 | |
CN205862897U (zh) | 一种10kV多功能防灾害绝缘子 | |
US8298343B2 (en) | Method and apparatus for removing ice accumulations on power lines | |
CN201465640U (zh) | 一种发热除冰电缆 | |
CN201408615Y (zh) | 电力高压绝缘瓷瓶吹雪融冰装置 | |
CN207781306U (zh) | 地线型玻璃绝缘子 | |
CN204732237U (zh) | 用于10kV输电线路的防雷防冰针式复合绝缘子 | |
CN2798261Y (zh) | 一种高压绝缘子防闪络装置 | |
CN101262125A (zh) | 输电线路除冰的方法 | |
CN201549283U (zh) | 融冰型复合绝缘子 | |
Panosch et al. | 20 kV overhead lines with covered conductors | |
CN210137116U (zh) | 一种高压供电用配电箱防护装置 | |
CN103106978A (zh) | 一种除冰雪导线 | |
CN105826860A (zh) | 一种输电线路的融冰融雪方法 | |
Farzaneh et al. | Critical conditions of AC arc propagation on ice surfaces | |
CN201422170Y (zh) | 一种缠绕电热丝线的输电线 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |