CN109174759A - A kind of turbine blade set of gas turbine - Google Patents

A kind of turbine blade set of gas turbine Download PDF

Info

Publication number
CN109174759A
CN109174759A CN201811005266.XA CN201811005266A CN109174759A CN 109174759 A CN109174759 A CN 109174759A CN 201811005266 A CN201811005266 A CN 201811005266A CN 109174759 A CN109174759 A CN 109174759A
Authority
CN
China
Prior art keywords
rotary shaft
gear
bevel gear
chamber
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201811005266.XA
Other languages
Chinese (zh)
Inventor
李冬兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201811005266.XA priority Critical patent/CN109174759A/en
Publication of CN109174759A publication Critical patent/CN109174759A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B13/00Accessories or details of general applicability for machines or apparatus for cleaning
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/02Cleaning by the force of jets or sprays
    • B08B3/022Cleaning travelling work
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B08CLEANING
    • B08BCLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
    • B08B3/00Cleaning by methods involving the use or presence of liquid or steam
    • B08B3/04Cleaning involving contact with liquid
    • B08B3/08Cleaning involving contact with liquid the liquid having chemical or dissolving effect
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D25/00Component parts, details, or accessories, not provided for in, or of interest apart from, other groups
    • F01D25/002Cleaning of turbomachines
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F01MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
    • F01DNON-POSITIVE DISPLACEMENT MACHINES OR ENGINES, e.g. STEAM TURBINES
    • F01D5/00Blades; Blade-carrying members; Heating, heat-insulating, cooling or antivibration means on the blades or the members
    • F01D5/12Blades

Abstract

A kind of turbine blade set of gas turbine of the invention, including apparatus main body, it is set to the intracorporal cleaning device of described device master and is set to the intracorporal placing device of described device master, the cleaning device includes being set to intracorporal first working chamber of described device master, motor is installed in end wall on the left of first working chamber, the transmission shaft extended to the right is installed on the output shaft of the motor, first bevel gear is installed on the transmission shaft, the first bevel gear front and back end is engaged respectively is connected with second bevel gear and third hand tap gear;The present apparatus in the case where turbo blade rotates, on turbo blade greasy dirt and dust clean, facilitate the service time of personnel, run turbo blade can normally after prolonged work, prolong its service life.

Description

A kind of turbine blade set of gas turbine
Technical field
The present invention relates to turbine field, the turbine blade set of specifically a kind of gas turbine.
Background technique
Turbine when in use between in longer situation, used in order to not influence normal, it is necessary to which turbo blade is carried out Maintenance, although there is air filter in turbine, can not block fine particle, and crankcase waste oil tube is connected in air intake duct Together, the combination of waste oil paint and dust, is adsorbed on turbo blade, will affect the balance fortune of admission space and turbo blade Turn, therefore we are in addition to normal operation, it should also be taken into account that how to be cleaned to turbo blade, when facilitating the operation of personnel Between, it does not need to clean entire pipeline, causes unnecessary waste, therefore design a kind of turbo blade of gas turbine Device it is really necessary to.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of turbine blade sets of gas turbine, are able to solve The problems in above-mentioned present technology.
The present invention is achieved through the following technical solutions: a kind of turbine blade set of gas turbine of the invention, Including apparatus main body, it is set to the intracorporal cleaning device of described device master and is set to the intracorporal placement dress of described device master It sets, the cleaning device includes being set to intracorporal first working chamber of described device master, on the left of first working chamber in end wall It is installed with motor, the transmission shaft extended to the right is installed on the output shaft of the motor, the first cone is installed on the transmission shaft Gear, the first bevel gear front and back end is engaged respectively is connected with second bevel gear and third hand tap gear, second cone Gear axis is installed with end wall on front side of front end and first working chamber and is rotatably assorted the first rotary shaft of connection, first rotation The 4th bevel gear is installed in shaft, the 4th bevel gear upper end engagement is connected with the 5th bevel gear, first work Make to be equipped with gear cavity on the upside of chamber in end wall, the 5th bevel gear axle center is installed with second extended upwardly into the gear cavity Rotary shaft, second rotary shaft upper end are installed with the 6th bevel gear, the third hand tap gear axle center be installed with rear end with it is described End wall is rotatably assorted the third rotary shaft of connection on rear side of first working chamber, is installed with the 7th bevel gear in the third rotary shaft, The 7th bevel gear upper end engagement is connected with the 8th bevel gear, and the 8th bevel gear axle center, which is installed with, to be extended upwardly into The 4th rotary shaft in the gear cavity, the 5th rotary shaft upper end are installed with the 9th bevel gear, side before and after the gear cavity End wall connection is equipped with the opposite slide block chamber that is open, and is installed with cylinder, the output shaft of the cylinder in end wall on rear side of the slide block chamber On be installed with the first sliding block, first slip front is rotatably assorted the 6th rotary shaft for being connected with and extending forward, the described 6th Rotary shaft front end is rotatably assorted the second sliding block being connected with slide block chamber sliding connection, and second slip front is solid Equipped with the first spring being fixedly connected with end wall on front side of affiliated slide block chamber, it is installed with forward movement respectively in the 6th rotary shaft The tenth bevel gear cooperated, the first spur gear, the second spur gear are engaged with lower end with the 9th bevel gear afterwards and is moved back Dynamic posterior end engages the 11st bevel gear of connection with the 6th bevel gear, and second spur gear moves backward rear left end and nibbles Conjunction is connected with third spur gear, third spur gear axle center be installed with both ends respectively with side wall before and after the gear cavity Be rotatably assorted the 7th rotary shaft of connection, is installed with first pulley in the 7th rotary shaft, the first pulley passes through belt It is rotatably assorted and is connected with the second belt wheel, second belt wheel axle center is installed with both ends and turns respectively with side wall before and after the gear cavity The 8th rotary shaft being cooperatively connected is moved, the 4th spur gear is installed in the 8th rotary shaft, connection is set on the upside of the gear cavity There is the first slide plate chamber, the 4th spur gear upper end is connected with by rack gear engagement and is slidably connected with the first slide plate chamber The first slide plate, connection is equipped with duct chamber on the left of the first slide plate chamber, and side wall is rotatably assorted connection before and after the duct chamber Have around pipe axis, described that the pipeline being in communication with the outside is wound on pipe axis, the pipeline extends into first slide plate and connects It is connected to spray head, the first solenoid valve is equipped between the spray head and the pipeline, the 5th first spur gear moves forward Right end engagement afterwards is connected with the 5th spur gear, and the 5th spur gear axle center is installed with both ends respectively and before the gear cavity Rear side end wall is rotatably assorted the 9th rotary shaft of connection, third belt wheel is installed in the 9th rotary shaft, the gear cavity is right Side connection is equipped with belt chamber, and connection is equipped with the second working chamber on the right side of the belt chamber, and the third belt wheel is matched by belt rotation Conjunction is connected with the 4th belt wheel, and the 4th belt wheel axle center is installed with both ends and is rotatably assorted respectively with second working chamber connection Tenth rotary shaft is installed with the 6th spur gear in the tenth rotary shaft, and it is sliding to be equipped with second for connection on the left of second working chamber Plate chamber, the 6th spur gear left end are connected be slidably connected with the second slide plate chamber the by rack gear engagement Two slide plates.
The placing device includes being set to the intracorporal third working chamber of described device master as a preferred technical solution, Rectangular cleaning barrel is slidably connected in the third working chamber, the third working chamber left and right sides end wall connection, which is equipped with, opens The spring cavity that mouth is connected to on the right side of the first slide plate chamber, on the left of the second slide plate chamber relatively and respectively, the cleaning barrel left side It is installed with the third sliding block with spring cavity sliding connection, third sliding block lower end surface is installed with lower end and the bullet The second spring that end wall is fixedly connected on the downside of spring chamber, the cleaning barrel bottom center, which is rotatably assorted to practice, is connected with the 11st rotation Axis, is installed with support base in the 11st rotary shaft, fixedly secured on the support base to have turbo blade, the 11st rotation Shaft lower end is installed with the 7th spur gear, and connection is equipped with the 4th working chamber, the 7th spur gear on the downside of the third working chamber It moves down rear left end engagement and is connected with the 8th spur gear, be equipped with the 5th work on the downside of the 4th working chamber in end wall Chamber, the 8th spur gear axle center, which is installed with upper end and is rotatably assorted with end wall on the upside of the 4th working chamber, to be connect and extends downwardly Entering the 12nd rotary shaft of the 5th working chamber, the 12nd rotary shaft lower end is installed with the 12nd bevel gear, and described The engagement of 12 bevel gear left ends is connected with the tenth third hand tap gear being fixedly arranged on the transmission shaft.
The component of the placing device is symmetrical as a preferred technical solution, simple for structure.
Described clean in logical bottom is equipped with drainage hole as a preferred technical solution, is installed with second in the drainage hole Solenoid valve, the drainage hole lower end are communicated with telescopic pipes, are communicated with wastewater disposal basin on the left of the telescopic pipes, the wastewater disposal basin can To store a certain amount of waste water, periodic cleaning avoids the random exhaust emission environment of waste water.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, turbo blade cleaning is carried out by the present apparatus When, turbo blade is placed in the 11st rotary shaft by operator, is fixedly mounted, and motor is started, and motor is driven by transmission shaft The rotation of tenth triconodont wheel then drives the 8th spur gear to drive the rotation of the 12nd rotary shaft by the tenth plug tap gear Rotation, at the same time, transmission shaft drive second bevel gear and third hand tap gear to rotate by first bevel gear, to pass through respectively First rotary shaft and third rotary shaft drive the 4th bevel gear and the rotation of the 7th bevel gear, then respectively by the 5th bevel gear and 8th bevel gear drives the second rotary shaft and the rotation of the 5th rotary shaft, finally the 6th bevel gear and the 9th bevel gear is driven to turn respectively It is dynamic, it opens cylinder and the first sliding block is driven to move forward, the 9th bevel gear drives the rotation of the 6th rotary shaft by the tenth bevel gear, from And the rotation of the 5th spur gear is driven by the first spur gear, and the rotation of third belt wheel is then driven by the 9th rotary shaft, it is final logical It crosses the 4th belt wheel and drives the rotation of the tenth rotary shaft, the tenth rotary shaft drives the second slide plate to move down by the 6th spur gear, from And drive cleaning barrel to move down by third sliding block, it then drives telescopic pipes to shorten, drives the tenth by the 7th spur gear The rotation of one rotary shaft is then turned on cylinder and the first sliding block is driven to move backward so that turbo blade be driven to rotate, the 6th bevel gear The rotation of the 6th rotary shaft is driven by the 11st bevel gear, to drive the rotation of third spur gear by the second spur gear, then First pulley rotation is driven by the 7th rotary shaft, drives the rotation of the 8th rotary shaft, the 8th rotary shaft eventually by the second belt wheel Drive the first slide plate to move right by the 8th rotary shaft, so that pipeline be driven to move right, by pipeline be passed through cleaning agent into Row cleaning, removes the greasy dirt and dust on turbo blade, is passed through clear water by pipeline and removes spot on turbo blade, opens the The sewage of cleaning is discharged into wastewater disposal basin by drainage hole, focused on by two solenoid valves, and the present apparatus is rotated in turbo blade In the case of, on turbo blade greasy dirt and dust clean, facilitate the service time of personnel, make turbo blade for a long time Work after can normally run, prolong its service life.
Detailed description of the invention
The present invention is described in detail by following specific embodiments and drawings for ease of explanation,.
Fig. 1 is a kind of schematic diagram of internal structure of the turbine blade set of gas turbine of the invention;
Fig. 2 is the schematic top plan view in direction " A-A " in Fig. 1;
Fig. 3 is the right side view in direction " B-B " in Fig. 1;
Fig. 4 is the elevational schematic view in direction " C-C " in Fig. 1.
Specific embodiment
As Figure 1-Figure 4, the turbine blade set of a kind of gas turbine of the invention, including apparatus main body 10, setting In the cleaning device in described device main body 10 and it is set to the intracorporal placing device of described device master, the cleaning device packet The first working chamber 11 being set in described device main body 10 is included, is installed with motor in the 11 left side end wall of the first working chamber 12, the transmission shaft 13 extended to the right is installed on the output shaft of the motor 12, and the first cone tooth is installed on the transmission shaft 13 Wheel 14,14 front and back end of first bevel gear is engaged respectively is connected with second bevel gear 15 and third hand tap gear 16, described First rotary shaft of connection that 15 axle center of second bevel gear is installed with front end and the 11 front side end wall of the first working chamber is rotatably assorted 78, it is installed with the 4th bevel gear 17 in first rotary shaft 78,17 upper end of the 4th bevel gear engagement is connected with the Five bevel gears 18, the 11 upside end wall of the first working chamber is interior to be equipped with gear cavity 19, and 18 axle center of the 5th bevel gear is installed with The second rotary shaft 20 in the gear cavity 19 is extended upwardly into, 20 upper end of the second rotary shaft is installed with the 6th bevel gear 21, the third for connection that 16 axle center of third hand tap gear is installed with rear end and the 11 rear side end wall of the first working chamber is rotatably assorted Rotary shaft 22, the 7th bevel gear 23 is installed in the third rotary shaft 22, and 23 upper end of the 7th bevel gear engagement cooperation connects It is connected to the 8th bevel gear 24,24 axle center of the 8th bevel gear is installed with the 4th rotation extended upwardly into the gear cavity 19 Axis 25,25 upper end of the 5th rotary shaft are installed with the 9th bevel gear 26, and 19 front and back side wall of the gear cavity connection, which is equipped with, opens Mouthful opposite slide block chamber 27, is installed with cylinder 28 in the 27 rear side end wall of slide block chamber, fixed on the output shaft of the cylinder 28 There is the first sliding block 29,29 front end of the first sliding block is rotatably assorted the 6th rotary shaft 30 for being connected with and extending forward, and the described 6th 30 front end of rotary shaft be rotatably assorted be connected with the slide block chamber 27 sliding connection the second sliding block 31, second sliding block 31 front ends are installed with the first spring 32 being fixedly connected with affiliated 27 front side end wall of slide block chamber, distinguish in the 6th rotary shaft 30 Be installed with move forward after engaged with lower end with the 9th bevel gear 26 cooperate the tenth bevel gear 33, the first spur gear 34, Second spur gear 35 and the 11st bevel gear 36 that posterior end engages connection with the 6th bevel gear is moved backward, described the Two spur gears 35 move backward rear left end engagement and are connected with third spur gear 37, and 37 axle center of third spur gear is installed with Both ends are rotatably assorted with the 19 front and back side wall of gear cavity the 7th rotary shaft 38 of connection respectively, in the 7th rotary shaft 38 It is installed with first pulley 39, the first pulley 39 is rotatably assorted by belt is connected with the second belt wheel 40, second belt wheel 40 axle center are installed with both ends and are rotatably assorted respectively with the 19 front and back side wall of gear cavity the 8th rotary shaft 41 of connection, and described The 4th spur gear 42 is installed in eight rotary shafts 41, connection is equipped with the first slide plate chamber 43, the 4th straight-tooth on the upside of the gear cavity 19 It takes turns 42 upper ends and the first slide plate 44 being slidably connected with the first slide plate chamber 43 is connected with by rack gear engagement, it is described Connection is equipped with duct chamber 45 on the left of first slide plate chamber 43, and the 45 front and back side wall of duct chamber, which is rotatably assorted, to be connected with around pipe axis 46, it is described to be wound with the pipeline 47 being in communication with the outside on pipe axis 46, the pipeline 47 extend into first slide plate 44 and It is connected with spray head 48, the first solenoid valve 49, the 5th first spur gear are equipped between the spray head and the pipeline 47 Right end engagement is connected with the 5th spur gear 50 after 34 forward movements, and 50 axle center of the 5th spur gear is installed with both ends difference Be rotatably assorted the 9th rotary shaft 51 of connection with the 19 front and back side wall of gear cavity, is installed in the 9th rotary shaft 51 Three belt wheels 52, connection is equipped with belt chamber 53 on the right side of the gear cavity 19, and connection is equipped with the second working chamber on the right side of the belt chamber 53 54, the third belt wheel 52 is rotatably assorted by belt is connected with the 4th belt wheel 54, and 55 axle center of the 4th belt wheel is installed with two End is rotatably assorted with second working chamber 54 the tenth rotary shaft 56 of connection respectively, and the is installed in the tenth rotary shaft 56 Six spur gears 57, connection is equipped with the second slide plate chamber 58 on the left of second working chamber 54, and 57 left end of the 6th spur gear passes through Rack gear engagement is connected with the second slide plate 59 with the second slide plate chamber 58 sliding connection.
The placing device includes the third working chamber 60 being set in described device main body 10, the third working chamber 60 It is inside slidably connected with rectangular cleaning barrel 61,60 left and right sides end wall of the third working chamber connection is equipped with opening relatively and divides Not with the spring cavity 62 that is connected on the left of 43 right side of the first slide plate chamber, the second slide plate chamber 58,61 left side of cleaning barrel is solid Equipped with the third sliding block 63 being slidably connected with the spring cavity 62,63 lower end surface of third sliding block is installed with lower end and institute State the second spring 76 that 62 downside end wall of spring cavity is fixedly connected, 61 bottom center of cleaning barrel, which is rotatably assorted to practice, is connected with the 11 rotary shafts 64, are installed with support base 65 in the 11st rotary shaft 64, fixedly secured on the support base 65 to have turbine Blade 66,64 lower end of the 11st rotary shaft are installed with the 7th spur gear 67, are connected to and are equipped on the downside of the third working chamber 60 4th working chamber 68, the 7th spur gear 67 move down the engagement of rear left end and are connected with the 8th spur gear 69, and described the The 5th working chamber 70 is equipped in four working chambers, 68 downside end wall, 69 axle center of the 8th spur gear is installed with upper end and the described 4th 68 upside end wall of working chamber, which is rotatably assorted, connects and extends down into the 12nd rotary shaft 71 of the 5th working chamber 70, described 12nd rotary shaft, 71 lower end is installed with the 12nd bevel gear 72, and 72 left end of the 12nd bevel gear engagement is connected with solid The tenth third hand tap gear 73 on the transmission shaft 13.
Valuably, the component of the placing device is symmetrical, simple for structure.
Valuably, described clean in logical 61 bottoms is equipped with drainage hole 74, is installed with second solenoid valve in the drainage hole 74 79,74 lower end of drainage hole is communicated with telescopic pipes 75, and wastewater disposal basin 77, the waste water are communicated on the left of the telescopic pipes 75 Pond 77 can store a certain amount of waste water, and periodic cleaning avoids the random exhaust emission environment of waste water.
When original state, first spring 32 and the second spring 76 are relaxation state.
When carrying out turbo blade cleaning by the present apparatus, turbo blade 66 is placed in the 11st rotary shaft 64 by operator On, it is fixedly mounted, starts motor 12, motor 12 drives the rotation of the tenth third hand tap gear 73 by transmission shaft 13, to pass through the tenth Two bevel gears 72 drive the rotation of the 12nd rotary shaft 71, then drive the rotation of the 8th spur gear 69, and at the same time, transmission shaft 13 is logical Crossing first bevel gear 14 drives second bevel gear 15 and third hand tap gear 16 to rotate, to pass through the first rotary shaft 78 and the respectively Three rotary shafts 22 drive the 4th bevel gear 17 and the rotation of the 7th bevel gear 23, then pass through the 5th bevel gear 18 and the 8th cone respectively Gear 24 drives the second rotary shaft 20 and the rotation of the 5th rotary shaft 25, finally drives the 6th bevel gear 21 and the 9th bevel gear respectively 26 rotations open cylinder 28 and the first sliding block 29 are driven to move forward, and the 9th bevel gear 26 drives the 6th by the tenth bevel gear 33 Rotary shaft 30 rotates, to drive the rotation of the 5th spur gear 50 by the first spur gear 34, then passes through 51 band of the 9th rotary shaft Dynamic third belt wheel 52 rotates, and drives the rotation of the tenth rotary shaft 56 eventually by the 4th belt wheel 55, the tenth rotary shaft 56 passes through the 6th Spur gear 57 drives the second slide plate 59 to move down, and drives cleaning barrel 61 to move down to pass through third sliding block 63, then band Dynamic telescopic pipes 75 shorten, and 69 drive the rotation of the 11st rotary shaft 64 by the 7th spur gear 67, to drive turbo blade 66 Rotation is then turned on cylinder 28 and the first sliding block 29 is driven to move backward, and the 6th bevel gear 21 is driven by the 11st bevel gear 36 The rotation of 6th rotary shaft 30 then passes through the 7th rotary shaft to drive third spur gear 37 to rotate by the second spur gear 35 38 drive first pulley 39 to rotate, and drive the rotation of the 8th rotary shaft 41 eventually by the second belt wheel 40, the 8th rotary shaft 41 passes through 8th rotary shaft 42 drives the first slide plate 44 to move right, so that pipeline 47 be driven to move right, is passed through cleaning by pipeline 47 Agent is cleaned, and greasy dirt and dust on turbo blade 66 are removed, and is passed through clear water by pipeline 47 and is removed on turbo blade 66 Spot opens second solenoid valve 79, and the sewage of cleaning is discharged into wastewater disposal basin 77 by drainage hole 74, is focused on.
The beneficial effects of the present invention are: the configuration of the present invention is simple, easy to operate, turbo blade cleaning is carried out by the present apparatus When, turbo blade is placed in the 11st rotary shaft by operator, is fixedly mounted, and motor is started, and motor is driven by transmission shaft The rotation of tenth triconodont wheel then drives the 8th spur gear to drive the rotation of the 12nd rotary shaft by the tenth plug tap gear Rotation, at the same time, transmission shaft drive second bevel gear and third hand tap gear to rotate by first bevel gear, to pass through respectively First rotary shaft and third rotary shaft drive the 4th bevel gear and the rotation of the 7th bevel gear, then respectively by the 5th bevel gear and 8th bevel gear drives the second rotary shaft and the rotation of the 5th rotary shaft, finally the 6th bevel gear and the 9th bevel gear is driven to turn respectively It is dynamic, it opens cylinder and the first sliding block is driven to move forward, the 9th bevel gear drives the rotation of the 6th rotary shaft by the tenth bevel gear, from And the rotation of the 5th spur gear is driven by the first spur gear, and the rotation of third belt wheel is then driven by the 9th rotary shaft, it is final logical It crosses the 4th belt wheel and drives the rotation of the tenth rotary shaft, the tenth rotary shaft drives the second slide plate to move down by the 6th spur gear, from And drive cleaning barrel to move down by third sliding block, it then drives telescopic pipes to shorten, drives the tenth by the 7th spur gear The rotation of one rotary shaft is then turned on cylinder and the first sliding block is driven to move backward so that turbo blade be driven to rotate, the 6th bevel gear The rotation of the 6th rotary shaft is driven by the 11st bevel gear, to drive the rotation of third spur gear by the second spur gear, then First pulley rotation is driven by the 7th rotary shaft, drives the rotation of the 8th rotary shaft, the 8th rotary shaft eventually by the second belt wheel Drive the first slide plate to move right by the 8th rotary shaft, so that pipeline be driven to move right, by pipeline be passed through cleaning agent into Row cleaning, removes the greasy dirt and dust on turbo blade, is passed through clear water by pipeline and removes spot on turbo blade, opens the The sewage of cleaning is discharged into wastewater disposal basin by drainage hole, focused on by two solenoid valves, and the present apparatus is rotated in turbo blade In the case of, on turbo blade greasy dirt and dust clean, facilitate the service time of personnel, make turbo blade for a long time Work after can normally run, prolong its service life.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention Protection scope should be determined by the scope of protection defined in the claims.

Claims (4)

1. a kind of turbine blade set of gas turbine of the invention, including apparatus main body, to be set to described device master intracorporal Cleaning device and it is set to the intracorporal placing device of described device master, it is characterised in that: the cleaning device includes being set to Intracorporal first working chamber of described device master is installed with motor, the output of the motor in end wall on the left of first working chamber It is installed with the transmission shaft extended to the right on axis, first bevel gear, the first bevel gear front and back end are installed on the transmission shaft Engagement is connected with second bevel gear and third hand tap gear respectively, and the second bevel gear axle center is installed with front end and described the End wall is rotatably assorted the first rotary shaft of connection on front side of one working chamber, is installed with the 4th bevel gear, institute in first rotary shaft It states the engagement of the 4th bevel gear upper end and is connected with the 5th bevel gear, be equipped with gear cavity on the upside of first working chamber in end wall, The 5th bevel gear axle center is installed with the second rotary shaft extended upwardly into the gear cavity, second rotary shaft upper end It is installed with the 6th bevel gear, the third hand tap gear axle center is installed with rear end and is rotatably assorted with end wall on rear side of first working chamber The third rotary shaft of connection is installed with the 7th bevel gear, the 7th bevel gear upper end engagement cooperation in the third rotary shaft It is connected with the 8th bevel gear, the 8th bevel gear axle center is installed with the 4th rotary shaft extended upwardly into the gear cavity, The 5th rotary shaft upper end is installed with the 9th bevel gear, and wall connection in side is equipped with the opposite sliding block that is open before and after the gear cavity Chamber is installed with cylinder in end wall on rear side of the slide block chamber, the first sliding block is installed on the output shaft of the cylinder, described first is sliding Block front end is rotatably assorted the 6th rotary shaft for being connected with and extending forward, and the 6th rotary shaft front end, which is rotatably assorted, to be connected with and institute The second sliding block of slide block chamber sliding connection is stated, second slip front is installed with fixes with end wall on front side of affiliated slide block chamber First spring of connection engages after being installed with forward movement in the 6th rotary shaft respectively with lower end with the 9th bevel gear It tenth bevel gear of cooperation, the first spur gear, the second spur gear and moves backward posterior end and is engaged with the 6th bevel gear 11st bevel gear of connection, second spur gear moves backward rear left end engagement and is connected with third spur gear, described Third spur gear axle center is installed with both ends and is rotatably assorted respectively with side wall before and after the gear cavity the 7th rotary shaft of connection, institute It states and is installed with first pulley in the 7th rotary shaft, the first pulley is rotatably assorted by belt is connected with the second belt wheel, described Second belt wheel axle center is installed with both ends and is rotatably assorted respectively with side wall before and after the gear cavity the 8th rotary shaft of connection, described The 4th spur gear is installed in 8th rotary shaft, connection is equipped with the first slide plate chamber, the 4th spur gear upper end on the upside of the gear cavity It is connected with the first slide plate with the first slide plate chamber sliding connection by rack gear engagement, the first slide plate chamber is left Side connection is equipped with duct chamber, and side wall, which is rotatably assorted, before and after the duct chamber is connected with around pipe axis, described to be wound on pipe axis The pipeline being in communication with the outside, the pipeline extend into first slide plate and are connected with spray head, the spray head and the pipeline Between be equipped with the first solenoid valve, right end engagement is connected with the 5th straight-tooth after the 5th first spur gear moves forward Wheel, the 5th spur gear axle center are installed with both ends and are rotatably assorted respectively with side wall before and after the gear cavity the 9th rotation of connection Shaft is installed with third belt wheel in the 9th rotary shaft, and connection is equipped with belt chamber on the right side of the gear cavity, and the belt chamber is right Side connection is equipped with the second working chamber, and the third belt wheel is rotatably assorted by belt is connected with the 4th belt wheel, the 4th belt wheel Axle center is installed with both ends and is rotatably assorted respectively with second working chamber the tenth rotary shaft of connection, solid in the tenth rotary shaft Equipped with the 6th spur gear, connection is equipped with the second slide plate chamber on the left of second working chamber, and the 6th spur gear left end passes through tooth Item engagement is connected with the second slide plate with the second slide plate chamber sliding connection.
2. a kind of turbine blade set of gas turbine according to claim 1, it is characterised in that: the placing device Including being set to the intracorporal third working chamber of described device master, rectangular cleaning is slidably connected in the third working chamber Barrel, the third working chamber left and right sides end wall, which is connected to, to be equipped with opening relatively and slides respectively with the first slide plate chamber right side, second The spring cavity being connected on the left of plate chamber, the cleaning barrel left side are installed with sliding with the third of spring cavity sliding connection Block, third sliding block lower end surface is installed with the second spring that lower end is fixedly connected with end wall on the downside of the spring cavity, described clear Cask washing bottom center, which is rotatably assorted to practice, is connected with the 11st rotary shaft, is installed with support base in the 11st rotary shaft, described Fixedly secured on support base to have turbo blade, the 11st rotary shaft lower end is installed with the 7th spur gear, the third work Connection is equipped with the 4th working chamber on the downside of chamber, and the 7th spur gear moves down rear left end engagement and is connected with the 8th straight-tooth Wheel, is equipped with the 5th working chamber on the downside of the 4th working chamber in end wall, the 8th spur gear axle center be installed with upper end with it is described End wall, which is rotatably assorted, on the upside of 4th working chamber connection and extends down into the 12nd rotary shaft of the 5th working chamber, and described the 12 rotary shaft lower ends are installed with the 12nd bevel gear, the 12nd bevel gear left end engagement be connected be fixedly arranged on it is described The tenth third hand tap gear on transmission shaft.
3. a kind of turbine blade set of gas turbine according to claim 1, it is characterised in that: the placing device Component it is symmetrical, it is simple for structure.
4. a kind of turbine blade set of gas turbine according to claim 1, it is characterised in that: described to clean logical bottom It is equipped with drainage hole in portion, is installed with second solenoid valve in the drainage hole, the drainage hole lower end is communicated with telescopic pipes, described It is communicated with wastewater disposal basin on the left of telescopic pipes, the wastewater disposal basin can store a certain amount of waste water, and periodic cleaning avoids waste water random Exhaust emission environment.
CN201811005266.XA 2018-08-30 2018-08-30 A kind of turbine blade set of gas turbine Withdrawn CN109174759A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811005266.XA CN109174759A (en) 2018-08-30 2018-08-30 A kind of turbine blade set of gas turbine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811005266.XA CN109174759A (en) 2018-08-30 2018-08-30 A kind of turbine blade set of gas turbine

Publications (1)

Publication Number Publication Date
CN109174759A true CN109174759A (en) 2019-01-11

Family

ID=64917073

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811005266.XA Withdrawn CN109174759A (en) 2018-08-30 2018-08-30 A kind of turbine blade set of gas turbine

Country Status (1)

Country Link
CN (1) CN109174759A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110813879A (en) * 2019-11-28 2020-02-21 广州莹冲涡轮增压器有限公司 Maintenance cleaning device for turbine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110813879A (en) * 2019-11-28 2020-02-21 广州莹冲涡轮增压器有限公司 Maintenance cleaning device for turbine

Similar Documents

Publication Publication Date Title
CN108080304B (en) Oil drill pipe surface cleaning device
CN109363582A (en) A kind of atomizing air clarifier
CN109174759A (en) A kind of turbine blade set of gas turbine
CN108786350A (en) A kind of exhaust gas processing device for environmental protection
CN109127533A (en) A kind of turbo blade and its application method of gas turbine
CN111714968A (en) Industrial dust purification device
CN111425301B (en) Purifier capable of preventing dirt of automobile exhaust pipe
CN208193954U (en) A kind of multielement synchronous slow fertilizer specially for wheat process units
CN208815463U (en) A kind of road construction cleaner
CN108295583A (en) A kind of unidirectional gas permeability washing property air purifier of double-pressure type
CN105854440B (en) A kind of industrial waste gas filtration purifier
CN110227318A (en) A kind for the treatment of apparatus for exhaust gas of oil smoke of hot pepper fried in oil processing industry
CN109372094A (en) Deep inspection shaft intelligence dredging vehicle
CN108655042A (en) A kind of toy for children silica gel Molars rod production cleaning equipment
CN207931679U (en) A kind of cleaning device of automotive wheel
CN208245296U (en) A kind of comprehensive artificial tooth model cleaning equipment
CN205896361U (en) Ball valve formula filter that drains
CN110986237B (en) New trend system filter equipment
CN108310884A (en) A kind of water washing air purifier
CN208526187U (en) Weldering smoke pipeline outlet air treatment facilities for workshop environmental protection
CN109107293A (en) A kind of industrial dedusting equipment
CN110917751A (en) Dust remover
CN112642827A (en) Environment-friendly cleaning equipment
CN206730636U (en) A kind of Novel sewage handles Rose Box
CN205598464U (en) Mask filtration

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WW01 Invention patent application withdrawn after publication
WW01 Invention patent application withdrawn after publication

Application publication date: 20190111