Bathroom chassis and its manufacturing method Download PDFInfo
- Publication number
- CN109171519A CN109171519A CN201811012574.5A CN201811012574A CN109171519A CN 109171519 A CN109171519 A CN 109171519A CN 201811012574 A CN201811012574 A CN 201811012574A CN 109171519 A CN109171519 A CN 109171519A
- Authority
- CN
- China
- Prior art keywords
- chassis
- grid beam
- water
- bathroom
- proof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- A—HUMAN NECESSITIES
- A47—FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
- A47K—SANITARY EQUIPMENT NOT OTHERWISE PROVIDED FOR; TOILET ACCESSORIES
- A47K3/00—Baths; Douches; Appurtenances therefor
- A47K3/28—Showers or bathing douches
- A47K3/40—Pans or trays
Landscapes
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Epidemiology (AREA)
- General Health & Medical Sciences (AREA)
- Residential Or Office Buildings (AREA)
Abstract
The present invention relates to a kind of bathroom chassis and its manufacturing method, the bathroom chassis includes water-proof chassis and grid beam.The water-proof chassis includes bottom plate and the waterproof side plate that is circumferentially arranged around the bottom plate side.The grid beam includes along the spaced multiple crossbeams of transverse direction and spaced multiple stringers in a longitudinal direction.The crossbeam and the stringer interlaced arrangement and it is connected with each other in the same plane, the grid beam is set to below the water-proof chassis.Above-mentioned bathroom chassis, the crossbeam of grid beam and stringer specifically can using being welded to each other by the way of, bolt connecting mode or be clamped connection type and be attached to form grid beam, the mode of the rib grid of SMC material is obtained without such as traditional mold compression moulding, so as to improve product qualification rate, processing easy to produce, it is lower to mold requirement simultaneously, die cost can be substantially reduced.
Description
Technical field
The present invention relates to bathroom chassis technical fields, more particularly to a kind of bathroom chassis and its manufacturing method.
Background technique
Traditional SMC bathroom chassis structure generally goes out the rib grid of SMC material by mold direct pressing, and will
Rib grid is as supporting structure.However, it is contemplated that SMC material higher cost, rib in length and breadth in rib grid compared with
It is elongated, thus rib grid overall stiffness is unsatisfactory.In addition, rib grid is made by mold, to the system of mold
It is required higher, further improves die cost.It increases, reduces simultaneously for the technique controlling difficulty of SMC compression molding
Bathroom chassis product qualification rate.
Summary of the invention
Based on this, it is necessary to overcome the deficiencies of existing technologies, provide a kind of bathroom chassis and its manufacturing method, it can be mentioned
High production yield, processing easy to produce, and meanwhile it is lower to mold requirement, die cost can be substantially reduced.
Its technical solution is as follows: a kind of bathroom chassis, comprising: water-proof chassis, the water-proof chassis include bottom plate and around institute
State the waterproof side plate that bottom plate side is circumferentially arranged;Grid beam, the grid beam include spaced multiple along transverse direction
Crossbeam and spaced multiple stringers in a longitudinal direction, the crossbeam is with the stringer interlaced arrangement and interconnection is in
On same plane, the grid beam is set to below the water-proof chassis.
Above-mentioned bathroom chassis, the crossbeam of grid beam and stringer specifically can by the way of being welded to each other, be bolted
Mode or clamping connection type are attached to form grid beam, obtain SMC material without such as traditional mold compression moulding
The mode of the rib grid of matter, so as to improve product qualification rate, processing easy to produce, at the same mold is required it is lower,
Die cost can be substantially reduced.
The crossbeam and the stringer are steel tubular beam, iron pipe beam or copper pipe beam in one of the embodiments,;The cross
Beam is connect, is bolted or is clamped connection by welding manner with the stringer.
The pipe thickness of the crossbeam and the stringer is 2mm~4mm in one of the embodiments,;The adjacent cross
Clear spacing between beam, the adjacent stringer is no more than 1m.
The lower surface of the water-proof chassis and the upper surface of the grid beam pass through viscose glue phase in one of the embodiments,
Mutually bonding.
The bathroom chassis further includes filler material in one of the embodiments, and the filler material is filled in the net
In the space of screen work.
The filler material is polyurathamc, foamed cement, foamed ceramic, granular polystyrene in one of the embodiments,
Composite material or benzene plate.
The bathroom chassis further includes lift adjustment part in one of the embodiments, and the lift adjustment part is used for
The grid beam lifting action is driven, the lift adjustment part is for being installed between the grid beam and installation ground.
The lift adjustment part is to adjust bolt in one of the embodiments, the bottom surface of the grid beam be equipped with
The threaded hole for adjusting bolt cooperation.
The lift adjustment part is multiple in one of the embodiments, and is spaced apart from each other and is arranged on the grid beam.
A kind of manufacturing method of the bathroom chassis, includes the following steps:
Preparing chassis mould, the chassis mould includes end template and the baffle that is circumferentially arranged around the end template side,
The end template upper surface and the baffle surround groove, and end template upper surface side is circumferentially around being equipped with and the waterproof side
The adaptable recess portion of plate;
It is coated with chassis material uniformly over the surface in the end template of chassis mould, and synchronizes and chassis material is introduced into bed die
In recess portion in plate surface, so that chassis material is integrally formed to obtain water-proof chassis;
By water-proof chassis stripping operation;
Make grid beam;
The bottom surface of the grid beam of production and water-proof chassis is fixed together.
The manufacturing method of above-mentioned bathroom chassis, the crossbeam and stringer of grid beam specifically can be using the sides being welded to each other
Formula, bolt connecting mode or clamping connection type are attached to form grid beam, are pressed into without such as traditional mold
Type obtains the mode of the rib grid of SMC material, so as to improve product qualification rate, processing easy to produce, while to mould
Tool requires lower, can substantially reduce die cost.
In one of the embodiments, by the bottom surface of the grid beam of production and water-proof chassis be fixed together step it
It further comprises the steps of: and is filled into filler material in the space of the grid beam afterwards.
Detailed description of the invention
Fig. 1 is the decomposition diagram one of bathroom chassis described in one embodiment of the invention;
Fig. 2 is the decomposition diagram two of bathroom chassis described in one embodiment of the invention
Fig. 3 is the structural schematic diagram of bathroom chassis described in one embodiment of the invention;
Fig. 4 is the structural schematic diagram of the grid beam of bathroom chassis described in one embodiment of the invention;
Fig. 5 is the enlarged diagram in Fig. 4 at A;
Fig. 6 is schematic diagram when chassis mould described in one embodiment of the invention manufactures water-proof chassis.
Appended drawing reference:
10, water-proof chassis, 11, bottom plate, 12, waterproof side plate, 20, grid beam, 21, crossbeam, 22, stringer, 23, threaded hole,
24, space, 30, filler material, 40, chassis mould, 41, end template, 42, baffle, 43, recess portion.
Specific embodiment
In order to make the foregoing objectives, features and advantages of the present invention clearer and more comprehensible, with reference to the accompanying drawing to the present invention
Specific embodiment be described in detail.Many details are explained in the following description in order to fully understand this hair
It is bright.But the invention can be embodied in many other ways as described herein, those skilled in the art can be not
Similar improvement is done in the case where violating intension of the present invention, therefore the present invention is not limited by the specific embodiments disclosed below.
In the description of the present invention, it is to be understood that, term " first ", " second " are used for description purposes only, and cannot
It is interpreted as indication or suggestion relative importance or implicitly indicates the quantity of indicated technical characteristic.Define as a result, " the
One ", the feature of " second " can explicitly or implicitly include at least one of the features.In the description of the present invention, " multiple "
It is meant that at least two, such as two, three etc., unless otherwise specifically defined.
It in the description of the present invention, it is to be understood that, can be with when an element is considered as " connection " another element
It is directly to another element or may be simultaneously present intermediary element.On the contrary, when element be referred to as " direct " with it is another
When element connects, intermediary element is not present.
In one embodiment, a kind of bathroom chassis, including water-proof chassis 10 and grid beam 20 referring to FIG. 1 to FIG. 4,.
The water-proof chassis 10 includes bottom plate 11 and the waterproof side plate 12 being circumferentially arranged around 11 side of bottom plate.The grid beam 20 wraps
It includes along the spaced multiple crossbeams 21 of transverse direction and spaced multiple stringers 22 in a longitudinal direction.The crossbeam
21 with 22 interlaced arrangement of stringer and be connected with each other it is in the same plane, the grid beam 20 is set to the water-proof chassis
10 lower sections.
Above-mentioned bathroom chassis, the crossbeam 21 and stringer 22 of grid beam 20 specifically can be by the way of being welded to each other, spiral shells
Bolt connection type or clamping connection type are attached to form grid beam 20, without such as traditional mold compression moulding
The mode of the rib grid of SMC material is obtained, so as to improve product qualification rate, processing easy to produce, while to mold
It is required that it is lower, die cost can be substantially reduced.
In one embodiment, the crossbeam 21 and the stringer 22 are steel tubular beam, iron pipe beam or copper pipe beam.The cross
Beam 21 connect by welding manner, is bolted or is clamped connection with the stringer 22.In this way, grid beam 20 is firm
Degree is higher, and without in addition constructing by mold, construction is more convenient, low in cost.Wherein, steel tubular beam assembles shape
At the support of grid beam 20, power transmission and plane stiffness it is preferable, play entire water-proof chassis 10 general simultaneously as chassis skeletal support
10 upper load of water-proof chassis transmits downwards.
Specifically, crossbeam 21 and stringer 22 are the identical hollow square steel Guan Liang of specification, hollow square iron pipe beam or sky
Heart side's copper pipe beam.It so, it is possible to guarantee that crossbeam 21 more can firmly be connect with stringer 22, in addition assemble the grid beam of formation
The flatness of 20 upper surfaces is preferable.Optionally, crossbeam 21 and stringer 22 are the identical solid girder steel of specification, solid-iron beam
Or solid Tongliang County, weight is slightly heavier, and material cost is higher, but remaining performance is identical.
It is to guarantee that grid beam 20 has certain a rigidity and stability, between net between adjacent beams 21, adjacent stringer 22
Away from must not exceed 1m.In addition, the pipe thickness of crossbeam 21 and stringer 22 is 2mm~4mm.In addition, the periphery of grid beam 20 is flat
Face size is consistent with 10 size of water-proof chassis, and the inside mesh size of grid beam 20 can be adjusted accordingly according to the actual situation.
In one embodiment, the lower surface of the water-proof chassis 10 and the upper surface of the grid beam 20 pass through viscose glue phase
Mutually bonding.Specifically, it is bonded between grid beam 20 and water-proof chassis 10 using strong structure glue, and preferably uses full bonding (will
The section that steel pipe is contacted with chassis fills structure glue).Wherein, the upper table of grid beam 20 should be made after the completion of the welding of hollow steel pipe beam
Face is maintained at same plane, in this way 20 upper surface of grid beam can just be bonded closely with 10 lower surface of water-proof chassis, avoid the occurrence of
Bond the bad phenomenon loosely or disengaged.
Further, the bathroom chassis further includes filler material 30.The filler material 30 is filled in the grid beam 20
Space 24 in.In this way, filler material 30 can increase the solid sense of bathroom chassis, pressure-bearing effect is good, is avoided that and causes bathroom bottom
Disk occurs biggish rub-a-dub when trampling and (returns caused by the cavity that water-proof chassis 10, grid beam 20 and installation ground surround
Sound).Specifically, light thermal-insulation type filler material 30 can be selected in filler material 30.In this way, the effect of light filler 30 mainly has increase
The multiple functions such as solid sense, loss of weight, heat preservation, pressure-bearing.
Specifically, the filler material 30 be polyurathamc, foamed cement, foamed ceramic, granular polystyrene composite material or
Benzene plate.In this way, filler material 30 is the light heat insulation material with certain rigidity, it is intended to enhance 20 plane stiffness of grid beam and improve
Shock resistance, while the thermal insulation property of bathroom chassis is improved with energy saving.
In addition, further, cast in situs can be used in filler material 30 or the method for later period stickup is constructed.Wherein, existing
Field, which pours, to be referred to water-proof chassis 10 and grid beam 20 being that mold carries out pouring filling, this method is easy to operate, and it is firm to bond, whole
Body is strong.Later period stickup then refers to first making or purchasing the production board made of light filler, then production board is passed through bonding
Agent is bonded in the space 24 in grid beam 20, this method production efficiency is higher.
In one embodiment, the bathroom chassis further includes lift adjustment part (not indicating in figure).The rising-falling tone
Section part is for driving 20 lifting action of grid beam, and the lift adjustment part is for being installed in the grid beam 20 and installation ground
Between face.In this way, the height of grid beam 20 can be changed after lift adjustment part lifting action, it can accordingly make 20 phase of grid beam
Horizontal plane is obliquely installed, so that bathroom chassis is convenient for water discharging operation, is avoided that seeping phenomenon, while nothing
Slope operation need to be carried out to the upper surface of glass reinforced plastic bathroom chassis, reduce production manufacturing cost.Specifically, lift adjustment
As long as part is not arranged in the center of grid beam 20, can be set in the off-centered position of grid beam 20, it just can be real
Existing grid beam 20 is obliquely installed, and then realizes that the upper surface of water-proof chassis 10 is obliquely installed.
Further, referring to Figure 4 together with Fig. 5, the lift adjustment part is to adjust bolt, the bottom of the grid beam 20
Face is equipped with the threaded hole 23 with the adjusting bolt cooperation.In this way, rotating bolt, just can grid beam 20 along being moved down on bolt
It is dynamic, so as to adjust bathroom chassis upper surface gradient.Optionally, lift adjustment part can also be driven using other liftings
Structure, without repeating.
Further, the lift adjustment part is multiple, and is spaced apart from each other and is arranged on the grid beam 20.Optionally,
Lift adjustment part is evenly arranged on grid beam 20.It so, it is possible the bottom for preferably raising bathroom chassis, so that bathroom chassis
Bottom and installation ground reserve certain space arrangement water circuit spool, and structural stability is preferable;In addition, being adjusted by harmony
The height of each regulating part at different location, so that the upper surface of glass reinforced plastic bathroom chassis is obliquely installed to form the gradient, thus
It can be convenient for draining, waterproofness can be promoted.
Further, the bathroom chassis further includes finish coat.The finish coat is laid on the upper table of the bottom plate 11
Face.Finish coat can specifically stick in the upper surface of bottom plate 11, and finish coat can play the role of antiskid decorative.
Specifically, the finish coat includes the multiple tapestry bricks being stitched together;Gap between two neighboring tapestry brick
Filled with waterproof gasket cement.Optionally, tapestry brick is ceramic tile, Ceramic Tiles, Parqueting block or quartzite brick.Tapestry brick specifically uses
The fast hard adhesive of rapid-curing cutback sticks in the upper surface of bottom plate 11.Adhesive is, for example, cloud stone glue, AB glue or epoxy resin mortar.In this way,
The adhesive used is the fast hard binding material of rapid-curing cutback, and compared with traditional glue for tile, have following advantage: the first, adhesive is solid
It is fast to change speed, it is general only to need 1 hour to 2 hours, it can also accelerate according to demand, but glue for tile belongs to modified cement matrix
Material, hardened forming is needed a day or two, due to that can not carry out the processes such as subsequent joint filling, packaging and carrying upon hardening, so making
Discontinuous at production, technique interval time is very long;The second, adhesive usage amount is few, when tapestry brick paving generally will not excessive glue,
And use to squeeze when glue for tile paving it is easy to appear glue for tile and overflow pollution tapestry brick, further increase subsequent cleaning face brick pollution
Process.
In addition, waterproof gasket cement is specifically for example: silicone sealant, MS sealant or polyurethane sealant.
In one embodiment, Fig. 1 and Fig. 6, a kind of manufacturing method of the bathroom chassis are please referred to, including is walked as follows
It is rapid:
S100, prepare chassis mould 40, the chassis mould 40 is including end template 41 and around 41 side of the end template week
To the baffle 42 of setting, 41 upper surface of end template and the baffle 42 surround groove, the 41 upper surface side of end template
Circumferentially around equipped with the recess portion 43 being adapted with the waterproof side plate 12;
In this way, only side is equipped with the recess portion 43 being adapted with waterproof side plate 12, bottom on the end template 41 of chassis mould 40
Design grid trellis groove is not necessarily on the cover board of disk mold 40, simple regular, machine-shaping is convenient.Due to water-proof chassis 10 structure letter
Single, so 40 moulding of chassis mould is simple, manufacture difficulty is smaller, and product qualification rate also obtains while production efficiency gets a promotion
It improves.
S200, chassis material is coated with uniformly over the surface in the end template 41 of chassis mould 40, and synchronous by chassis material
It is introduced into the recess portion 43 on 41 surface of end template, so that chassis material is integrally formed to obtain water-proof chassis 10;
Wherein, SMC (Sheet molding compound, i.e. sheet molding compound), BMC can be used in water-proof chassis 10
(Bulk Molding Compound, i.e. tubular molding compound), PMMA (Polymethyl methacrylate, organic glass),
Artificial quartz stone raw material etc. passes through die casting mode rapid shaping.Water-proof chassis 10 mainly plays waterproof action, without as knot
Structure support, therefore the thickness of the bottom plate 11 of water-proof chassis 10 can be as small as possible.
S300, by 10 stripping operation of water-proof chassis;
S400, production grid beam 20;
Specifically, grid beam 20 is using the identical hollow square steel Guan Liang of specification, hollow square iron pipe beam or hollow side's copper
Pipe beam welding assembly is formed.
S500, the grid beam 20 of production and the bottom surface of water-proof chassis 10 are fixed together.
Specifically, grid beam 20 is adhesively fixed on the bottom surface of water-proof chassis 10 using viscose glue.More specifically, grid beam
It is bonded between 20 and water-proof chassis 10 using strong structure glue, and preferably uses the full bonding (section for contacting steel pipe with chassis
Fill structure glue).
The manufacturing method of above-mentioned bathroom chassis, the crossbeam 21 of grid beam 20 can specifically be used with stringer 22 to be welded to each other
Mode, bolt connecting mode or clamping connection type be attached to form grid beam 20, without such as traditional mold
Compression moulding obtains the mode of the rib grid of SMC material, so as to improve product qualification rate, processing easy to produce, together
When to mold require it is lower, die cost can be substantially reduced.
In one embodiment, further include step S600 after step S500: filler material 30 is filled into the grid
In the space 24 of frame 20.
Specifically, cast in situs can be used in filler material 30 or the method for later period stickup is constructed.Wherein, cast in situs refers to
Be with water-proof chassis 10 and grid beam 20 be that mold carries out pouring filling, this method is easy to operate, and bonding is firm, and globality is strong.
Later period stickup then refers to first making or purchasing the production board made of light filler, then production board is bonded in by binder
In space 24 in grid beam 20, this method production efficiency is higher.
Wherein, step S400 can be before any one step of step S100 to step S300, and step S300 can be with
Behind any one step of step S400 to step S600.
Each technical characteristic of embodiment described above can be combined arbitrarily, for simplicity of description, not to above-mentioned reality
It applies all possible combination of each technical characteristic in example to be all described, as long as however, the combination of these technical characteristics is not deposited
In contradiction, all should be considered as described in this specification.
The embodiments described above only express several embodiments of the present invention, and the description thereof is more specific and detailed, but simultaneously
It cannot therefore be construed as limiting the scope of the patent.It should be pointed out that coming for those of ordinary skill in the art
It says, without departing from the inventive concept of the premise, various modifications and improvements can be made, these belong to protection of the invention
Range.Therefore, the scope of protection of the patent of the invention shall be subject to the appended claims.
Claims (11)
1. a kind of bathroom chassis characterized by comprising
Water-proof chassis, the water-proof chassis include bottom plate and the waterproof side plate that is circumferentially arranged around the bottom plate side;
Grid beam, the grid beam include being arranged along the spaced multiple crossbeams of transverse direction and interval in a longitudinal direction
Multiple stringers, the crossbeam and the stringer interlaced arrangement and be connected with each other in the same plane, the grid beam setting
Below the water-proof chassis.
2. bathroom chassis according to claim 1, which is characterized in that the crossbeam and the stringer are steel tubular beam, iron
Pipe beam or copper pipe beam;The crossbeam is connect, is bolted or is clamped connection by welding manner with the stringer.
3. bathroom chassis according to claim 2, which is characterized in that the pipe thickness of the crossbeam and the stringer is
2mm~4mm;Clear spacing between the adjacent crossbeam, the adjacent stringer is no more than 1m.
4. bathroom chassis according to claim 1, which is characterized in that the lower surface of the water-proof chassis and the grid beam
Upper surface be mutually bonded by viscose glue.
5. bathroom chassis according to claim 1, which is characterized in that further include filler material, the filler material is filled in institute
It states in the space of grid beam.
6. bathroom chassis according to claim 5, which is characterized in that the filler material be polyurathamc, foamed cement,
Foamed ceramic, granular polystyrene composite material or benzene plate.
7. bathroom chassis according to claim 1, which is characterized in that it further include lift adjustment part, the lift adjustment part
For driving the grid beam lifting action, the lift adjustment part is for being installed between the grid beam and installation ground.
8. bathroom chassis according to claim 7, which is characterized in that the lift adjustment part is to adjust bolt, the net
The bottom surface of screen work is equipped with the threaded hole with the adjusting bolt cooperation.
9. bathroom chassis according to claim 7, which is characterized in that the lift adjustment part is multiple, and is spaced apart from each other
It is arranged on the grid beam.
10. a kind of manufacturing method of bathroom chassis as claimed in any one of claims 1 to 9, which is characterized in that including as follows
Step:
Prepare chassis mould, the chassis mould includes end template and the baffle that is circumferentially arranged around the end template side, described
End template upper surface and the baffle surround groove, and end template upper surface side is circumferentially around being equipped with and the waterproof side plate phase
The recess portion of adaptation;
It is coated with chassis material uniformly over the surface in the end template of chassis mould, and synchronizes and chassis material is introduced into end template table
In recess portion on face, so that chassis material is integrally formed to obtain water-proof chassis;
By water-proof chassis stripping operation;
Make grid beam;
The bottom surface of the grid beam of production and water-proof chassis is fixed together.
11. the manufacturing method of bathroom chassis according to claim 10, which is characterized in that by the grid beam and waterproof of production
The bottom surface on chassis is fixed together after step to further comprise the steps of: and be filled into filler material in the space of the grid beam.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811012574.5A CN109171519A (en) | 2018-08-31 | 2018-08-31 | Bathroom chassis and its manufacturing method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811012574.5A CN109171519A (en) | 2018-08-31 | 2018-08-31 | Bathroom chassis and its manufacturing method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109171519A true CN109171519A (en) | 2019-01-11 |
Family
ID=64917321
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811012574.5A Pending CN109171519A (en) | 2018-08-31 | 2018-08-31 | Bathroom chassis and its manufacturing method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109171519A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110725388A (en) * | 2019-11-05 | 2020-01-24 | 董魁 | Reinforced assembly structure of waterproof chassis of integral toilet |
CN111745980A (en) * | 2019-03-27 | 2020-10-09 | 南京诺尔泰复合材料设备制造有限公司 | High-performance grid continuous production forming equipment and processing method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201223334Y (en) * | 2008-07-22 | 2009-04-22 | 陈忠义 | Integral U type base plate reinforcing rods for toilet and bathroom |
AU2012211471A1 (en) * | 2012-08-11 | 2014-02-27 | New Wave Housing Pty Limited | Insulated relocatable building |
CN204370841U (en) * | 2014-12-25 | 2015-06-03 | 禧屋家居科技(昆山)有限公司 | A kind of bathroom chassis raises horizontal structure |
CN204645733U (en) * | 2015-06-02 | 2015-09-16 | 那波利卫浴设备(江苏)有限公司 | A kind of water-proof chassis of integral bathroom |
CN206337857U (en) * | 2016-12-29 | 2017-07-18 | 中民筑友科技投资有限公司 | bathroom chassis and integral bathroom |
CN207277581U (en) * | 2017-09-15 | 2018-04-27 | 方绪龙 | There is the thermal insulation board of pressure-bearing |
CN207306593U (en) * | 2017-03-28 | 2018-05-04 | 华科住宅工业(东莞)有限公司 | A kind of waterproof, light-duty integral bathroom chassis |
CN207377197U (en) * | 2017-11-06 | 2018-05-18 | 北京好生活住工科技发展有限公司 | Bathroom water-proof drainage chassis system |
-
2018
- 2018-08-31 CN CN201811012574.5A patent/CN109171519A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201223334Y (en) * | 2008-07-22 | 2009-04-22 | 陈忠义 | Integral U type base plate reinforcing rods for toilet and bathroom |
AU2012211471A1 (en) * | 2012-08-11 | 2014-02-27 | New Wave Housing Pty Limited | Insulated relocatable building |
CN204370841U (en) * | 2014-12-25 | 2015-06-03 | 禧屋家居科技(昆山)有限公司 | A kind of bathroom chassis raises horizontal structure |
CN204645733U (en) * | 2015-06-02 | 2015-09-16 | 那波利卫浴设备(江苏)有限公司 | A kind of water-proof chassis of integral bathroom |
CN206337857U (en) * | 2016-12-29 | 2017-07-18 | 中民筑友科技投资有限公司 | bathroom chassis and integral bathroom |
CN207306593U (en) * | 2017-03-28 | 2018-05-04 | 华科住宅工业(东莞)有限公司 | A kind of waterproof, light-duty integral bathroom chassis |
CN207277581U (en) * | 2017-09-15 | 2018-04-27 | 方绪龙 | There is the thermal insulation board of pressure-bearing |
CN207377197U (en) * | 2017-11-06 | 2018-05-18 | 北京好生活住工科技发展有限公司 | Bathroom water-proof drainage chassis system |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111745980A (en) * | 2019-03-27 | 2020-10-09 | 南京诺尔泰复合材料设备制造有限公司 | High-performance grid continuous production forming equipment and processing method |
CN110725388A (en) * | 2019-11-05 | 2020-01-24 | 董魁 | Reinforced assembly structure of waterproof chassis of integral toilet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106968378B (en) | Reinforced fiber woven mesh concrete floor and manufacturing method and mounting method thereof | |
CN109171519A (en) | Bathroom chassis and its manufacturing method | |
CN109008733A (en) | Punch forming bathroom chassis and its manufacturing method | |
CN111186000A (en) | Heat-insulating concrete block and manufacturing mold thereof | |
CN112549250B (en) | Pouring process for cold-formed thin-wall steel light concrete heat-insulation decorative composite integrated wallboard | |
CN109171520A (en) | Artificial quartz stone bathroom chassis and its manufacturing method | |
CN109162375A (en) | Light steel phase transformation energy conservation Combined concrete wall of assembled and preparation method thereof | |
CN101139855B (en) | Lightweight tyre mould component for cast-in-situs concrete | |
CN1944881B (en) | Light mould member for cast-in-situ concrete | |
CN116950299A (en) | Prefabricated heat-insulating floor slab and production method thereof | |
CN109811632A (en) | Assembling bridge | |
CN101187227A (en) | Light carcass mould member for in-situ casting | |
CN101260695A (en) | Light weight tire shuttering member for cast-in-situ concrete | |
CN101311444A (en) | Lightweight mold component for cast-in-place concrete | |
CN1963063A (en) | Light moulding bed component for cast-in-situ concrete | |
CN101311436A (en) | Lightweight mold component for cast-in-place concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190505 Address after: 528300 Guanglong Industrial Park, Chencun Town, Shunde District, Foshan City, Guangdong Province, No. 6, No. 14 Xingye Road Applicant after: Guangdong Liancheng Housing Equipment Information Technology Co., Ltd. Address before: 315832 Room 118, No.1 Office Building, Meishan Salt Farm, Beilun District, Ningbo City, Zhejiang Province Applicant before: Ningbo Liancheng Housing Technology Co., Ltd. |
|
TA01 | Transfer of patent application right | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20190111 |
|
RJ01 | Rejection of invention patent application after publication |