CN109162247A - Bladder support flood control sub-embankment with intelligent control and Simple connecting structure - Google Patents

Bladder support flood control sub-embankment with intelligent control and Simple connecting structure Download PDF

Info

Publication number
CN109162247A
CN109162247A CN201811263071.5A CN201811263071A CN109162247A CN 109162247 A CN109162247 A CN 109162247A CN 201811263071 A CN201811263071 A CN 201811263071A CN 109162247 A CN109162247 A CN 109162247A
Authority
CN
China
Prior art keywords
scuta
flood
air bag
control
connection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811263071.5A
Other languages
Chinese (zh)
Inventor
朱加林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Huayu Institute Of Ecological Intelligence Urban Water Resources
Guangzhou Jiecheng Energy Conservation And Environmental Protection Technology Co Ltd
GUANGDONG RAINWATER TECHNOLOGY Co Ltd
Original Assignee
Guangdong Huayu Institute Of Ecological Intelligence Urban Water Resources
Guangzhou Jiecheng Energy Conservation And Environmental Protection Technology Co Ltd
GUANGDONG RAINWATER TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Huayu Institute Of Ecological Intelligence Urban Water Resources, Guangzhou Jiecheng Energy Conservation And Environmental Protection Technology Co Ltd, GUANGDONG RAINWATER TECHNOLOGY Co Ltd filed Critical Guangdong Huayu Institute Of Ecological Intelligence Urban Water Resources
Priority to CN201811263071.5A priority Critical patent/CN109162247A/en
Publication of CN109162247A publication Critical patent/CN109162247A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours
    • E02B3/10Dams; Dykes; Sluice ways or other structures for dykes, dams, or the like
    • E02B3/106Temporary dykes

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The present invention relates to the bladder support flood control sub-embankments with intelligent control and Simple connecting structure, it is characterised in that: is connected and composed by one or two or more modular unit, Modular units structure setting is on flood bank, including scuta, air bag and pneumatically fills/heat-extraction system;The bottom end of scuta is connected on flood bank, forms rotary type connection structure;Limit band is equipped with so that scuta keeps the consistency of each scuta high and low position when rising at the back side of scuta, and limit band forms gusseted rock-steady structure with scuta, air bag;It is equipped at the back side of scuta and blocks curtain, form airbag restraint and environmental protection structure;/ the control output end of the control signal of heat-extraction system connection PLC control system is pneumatically filled, the automatic or manual for forming air bag fills/exhaust structure;The back side of scuta is equipped with support rod, forms simple connection formula support construction;Constitute the bladder support Modular units structure with intelligent control and simple connection formula support construction.Have the characteristics that simple structure, connection and lifting are convenient, security and stability is high, visual Landscape is good.

Description

Bladder support flood control sub-embankment with intelligent control and Simple connecting structure
Technical field
The present invention relates to a kind of bladder support flood control sub-embankment with intelligent control and Simple connecting structure, is that one kind passes through Air bag, which is filled/is vented, realizes big vast (wave) equipment of the gear of lifting.Belong to hydraulic structure technical field.
Background technique
Control flood (wave) small dike, is a kind of for waters and land-based area intersection, can promote river dykes and dams and coastal breakwater Dam control flood (tide), wave resistance impact capacity waterwork structure, have quickly improve river dyke and sea wall flood control wave resistance standard, Promote the significances such as urban flood defence ability.But the flood control sub-embankment of the prior art, due to its unreasonable structure, it is multiple that there are structures The problems such as (being difficult to realize quick despatch) miscellaneous, difficult to load and unload, security reliability difference and poor visual Landscape effect.
Summary of the invention
The purpose of the present invention is to solve the flood control sub-embankment of the prior art in the presence of structure is complicated, difficult to load and unload, safe and reliable Property difference and the problems such as poor visual Landscape effect, provide and a kind of control flood son with the bladder support of intelligent control and Simple connecting structure Dike is a kind of reinforced bladder support flood control sub-embankment equipment with intelligent control function., connection simple with structure and lifting Conveniently, substantive distinguishing features outstanding and the technological progresses such as security and stability is high, visual Landscape is good.
The purpose of the present invention can be reached by adopting the following technical scheme that:
Bladder support flood control sub-embankment with intelligent control and Simple connecting structure, design feature are: by one or Two or more modular units connect and compose, and are simple easy connection structure when being made of two or more modular units;The module Formula cellular construction is arranged on flood bank, including scuta, air bag and pneumatically fills/heat-extraction system;The bottom end of the scuta is connected to anti- On big vast dike, rotary type connection structure is formed;Limit band is equipped with so that the scuta is kept when rising at the back side of the scuta The consistency of each scuta high and low position, limit band form gusseted rock-steady structure with scuta, air bag;At the back side of the scuta Equipped with curtain is blocked, airbag restraint and environmental protection structure are formed;It is described pneumatically to fill the/control signal of heat-extraction system connection PLC The control output end of control system pneumatically fills/air inlet/exhaust end of the control output end of heat-extraction system connection air bag, forms air bag Automatic or manual fill/exhaust structure;The back side of scuta is equipped with support rod, the bottom end of the support rod is fixed on flood bank, Upper end activity is connected to the back side upper end of scuta, forms simple connection formula support construction;By the way that air bag is automatically or manually controlled Charge/discharge gas drives the lifting and simple connection formula support construction of scuta, and constituting has intelligent control and simple connection formula support knot The bladder support Modular units structure of structure.
The purpose of the present invention can also be reached by adopting the following technical scheme that:
One embodiment of the present invention is: the limit band and to block curtain be respectively flexible structure, formation follow air bag fill/ The self-relaxation structure of exhaust.
One embodiment of the present invention is: the top of the support rod be in hook solid, with connecing at the top of the scuta back side Jack cooperatively forms simple connection formula connection structure.
One embodiment of the present invention is: recess, the scuta to place landing, air bag, gas being arranged on flood bank Air inlet/exhaust end of capsule, blocks curtain, support rod and pneumatically fills/heat-extraction system connecting tube limit band;When air bags postnotum Landing, scuta, air inlet/exhaust end of air bag, limit band, block curtain, support rod and pneumatically fill/heat-extraction system connecting tube air bag Be placed in the recess, by scuta bezel cover on recess, form plane cover structure.
One embodiment of the present invention is: a strip groove being arranged on the recess of flood bank, to place support rod; The horizontally-arranged lower section in scuta of air bag forms the shape structure to remain basically stable with flood bank plane so that air bags postnotum is laid flat It makes.
One embodiment of the present invention is: it is described pneumatically fill/heat-extraction system is live fixed structure form or vehicle-carried mobile Structural formula, when using live fixed structure form, pneumatically fill/the concave groove body that is embedded in after scuta of the snorkel of heat-extraction system in, It forms fast pneumatic and fills/exhaust structure.
One embodiment of the present invention is: remote communication module being arranged in PLC control system, constitutes long-range control knot Structure;Or constitute long-range control and jointly control structure with manually control combination, in order to link with urban flood defence systematic connection.
One embodiment of the present invention is: the scuta and support rod that the flood control sub-embankment is related to are mounted directly by anchoring On existing flood bank, the height of scuta can require flexibly setting according to practical flood control and wave resistance, be put with improving dykes and dams flood control Unrestrained standard.
One embodiment of the present invention is: scuta, support rod and anchoring piece are made of carbon steel or stainless steel material, described Carbon steel has anti-corrosion layer structure, to guarantee the anti-corrosion ability of critical component.
One embodiment of the present invention is: being made of the sequential connection of N number of modular unit, wherein N is 2,3,4 ..., 100 Or 100 or more natural number, be fixedly connected using polymer rubber pad between the scuta of each modular unit or tight type squeeze and connects It connects, to guarantee its sealing performance.
The present invention has following substantive distinguishing features outstanding and significant technological progress:
1, the present invention is connected and composed by one or two or more modular unit, is when being made of two or more modular units Simple connecting structure;The modular unit is arranged on flood bank, including scuta, air bag and pneumatically fills/heat-extraction system;The bottom of scuta End is connected on flood bank, forms rotary type connection structure;Be equipped with limit band at the back side of scuta and block curtain, formed sunshade and Sand block anti-pollution structure, the limit band and to block curtain be respectively flexible structure form the self-relaxation structure for rising/contracting with air bag;Institute State pneumatically fill/heat-extraction system connection air bag air inlet/exhaust end, form the air sac supporting structure of intelligent control;The branch at the scuta back side Strut forms simple connection formula support construction;Pass through the air sac supporting structure and simple connection formula support construction of intelligent control, structure At the bladder support Modular units structure with intelligent control and simple connection formula support construction;Therefore, it is able to solve existing There is the problems such as structure is complicated, difficult to load and unload, security reliability is poor and visual Landscape effect is poor in the flood control sub-embankment of technology, have knot Substantive distinguishing features outstanding and the technological progresses such as structure is simple, connection and lifting are convenient, security and stability is high, visual Landscape is good.
2, the present invention is by answering the working principle of the bladder support water blocking gate dam (i.e. gas shield dam) for river water blocking With on the water fronts such as flood control dam, sea wall, new structural flood control installation is formed on the water fronts such as original flood control dam, sea wall, A kind of novel flood control sub-embankment, non-flood control period does not influence the original pedestrian's driving function of dykes and dams, and can be realized structures and City river and the features such as being perfectly combined of sea wall landscape.
3, the present invention passes through the Simple connecting structure between setup module unit and the simple connection formula being connected with scuta Support construction solves the problems, such as that the existing handling of existing flood control sub-embankment and connection, structure is complicated and security reliability is poor, has The technical advantages such as structure is simple, connection and easy for construction, cost performance is high, visual appearance and long service life, have a wide range of application, city Field space is huge.
4, the configuration of the present invention is simple, easy for construction, short construction period;Air bag fills/is vented quickly, operational management and maintenance letter Just;Long service life, comprehensive benefit are high;The original pedestrian of flood dam and driving function are not influenced, can be realized structures and city River and sea wall landscape are perfectly combined.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the specific embodiment of the invention 1.
Fig. 2 is the right view of Fig. 1.
Specific embodiment
Specific embodiment 1:
Referring to Figures 1 and 2, this specific embodiment 1 is connected and composed by one or two or more modular unit, when by two with It is Simple connecting structure when upper mold module unit is constituted;The Modular units structure setting on flood bank 10, including scuta 2, Air bag 1 and pneumatically fill/heat-extraction system 8;The bottom end of the scuta 2 is connected on flood bank 10, forms rotary type connection structure;Institute The back side for stating scuta 2 is equipped with limit band 3 so that the scuta 2 keeps the consistency of each scuta high and low position, limit when rising Band 3 and scuta 2, air bag 1 form gusseted rock-steady structure;It is equipped at the back side of the scuta 2 and blocks curtain 4, form air bag Protection and environmental protection structure;It is described pneumatically to fill the/control output of the control signal of heat-extraction system 8 connection PLC control system 9 End pneumatically fills/air inlet/exhaust end 1-1 of the control output end of heat-extraction system 8 connection air bag 1, forms the automatic or manual of air bag 1 Fill/exhaust structure;The back side of scuta 2 is equipped with support rod 5, and the bottom end of the support rod 5 is fixed on flood bank 10, upper end is movable It is connected to the back side upper end of scuta 2, forms simple connection formula support construction;By the charge/discharge gas that air bag 1 is automatically or manually controlled The lifting and simple connection formula support construction of scuta 2 are driven, the gas with intelligent control and simple connection formula support construction is constituted Capsule supporting module formula cellular construction.
In the present embodiment:
The limit band 3 of setting and curtain 4 is blocked at 2 back side of scuta, and the effect of the limit band 3 is guarantor when rising scuta The consistency of high and low position is held, and forms gusseted rock-steady structure with scuta 2, air bag 1;The effect for blocking curtain 4 is to prevent Rubbish incidental enters, and prevents child from falling into injury, protective air-bag 1 is destroyed from external force, and improves dykes and dams aesthetics;Can by pair The intelligent control that air bag is filled/is vented drives the automatic lifting (while also having the function of to manually control) of scuta;The back side of scuta 2 is set Some support rods 5 can form and easily assemble and disassemble movable support connection structure, and effect is to reinforce its small dike when scuta 2 rises Security and stability and capacity of anti-storm, to constitute the bladder support flood control sub-embankment with intelligent control and Simple connecting structure.
The limit band 3 is respectively flexible structure with curtain 4 is blocked, and forms the self-relaxation structure for following air bag 1 to fill/be vented.
The top of the support rod 5 is in hook solid, to cooperatively form simple connection formula with the jointing holes at the top of 2 back side of scuta Connection structure 5-1.
Recess (being not drawn into figure) is set on flood bank 10, to place the scuta 2 of landing, air bag 1, air bag 1 into Gas/exhaust end 1-1, blocks curtain 4, support rod 5 and pneumatically fills/heat-extraction system connecting tube limit band 3;When air bag 1 is vented postnotum 2 Landing, scuta 2, air inlet/exhaust end 1-1 of air bag 1, limit band 3, block curtain 4, support rod 5 and pneumatically fill/heat-extraction system air bag 1 Connecting tube is placed in the recess, by 2 bezel cover of scuta on recess, form plane cover structure.
A strip groove 7 is set on the recess (being not drawn into figure) of flood bank 10, to place support rod 5;Air bag 1 is sleeping It sets in the lower section of scuta 2, so that air bag 1 is vented postnotum 2 and is laid flat, forms the shape structure to remain basically stable with 10 plane of flood bank It makes.
The horizontally-arranged lower section in scuta 2 of air bag 1, so that air bag 1 is vented postnotum 2 and is laid flat, is formed and 10 plane base of flood bank This fair shape design.
It is described pneumatically fill/heat-extraction system 8 is live fixed structure form or vehicle-carried mobile structural formula, using live fixed structure When form, pneumatically fill/the conveying institute pipe of heat-extraction system 8 is embedded in the concave groove body (being not drawn into figure) of 2 behind of scuta, it is formed fast Speed pneumatically fills/exhaust structure.
Remote communication module is set in PLC control system 9, constitutes remote control structure;Or constitute long-range control with Manually control combination jointly controls structure, in order to link with urban flood defence systematic connection.
The scuta 2 and support rod that the flood control sub-embankment is related to are directly installed on existing flood bank 1 by anchoring, scuta 2 height can require flexibly setting according to reality flood control and wave resistance, to improve the unrestrained standard of dykes and dams flood control.
Scuta 2, support rod 5 and anchoring piece are made of carbon steel or stainless steel material, and the carbon steel has anti-corrosion layer structure.
The present embodiment by N number of modular unit sequential connection constitute modularized combination type flood control sub-embankment, wherein N be 2,3, 4 ..., 100 or 100 or more natural number, length can according to need unlimited extension;It is used between the scuta 2 of each unit module Polymer rubber pad is fixedly connected or tight type is press-connected structure, to guarantee its sealing performance.
Specific embodiment 2:
The characteristics of specific embodiment of the invention 2, is: limit band 3 lower end and support rod 5 lower end connect with flood bank 10, Form a fixed connection structure, limits the upper end of band 3 and the upper end of support rod 5 is connect with scuta 2, form a fixed connection structure;Structure At and limit belt composite structure.Remaining is the same as specific embodiment 1.
Specific embodiment 3:
The characteristics of specific embodiment of the invention 3 is: PLC control system 9 is arranged on the spot, the control terminal of automatic bending structure, The air inlet input terminal of air bag 1 and pneumatically fill/control signal of heat-extraction system 8 respectively connects the control output of PLC control system 9 on the spot End, constitutes intelligent automatic control structure.Remaining is the same as specific embodiment 1 or specific embodiment 2.
Specific embodiment 4:
The characteristics of specific embodiment of the invention 4 is: what air bag 1 connected pneumatically fills/heat-extraction system 8, is that manual type is pneumatic / heat-extraction system is filled, to control the inflation or exhaust of air bag 1.Remaining is the same as specific embodiment 1 or specific embodiment 2 or specific embodiment 3。
In conclusion the present invention has following innovative point:
1) innovation and application after the dam technological improvement of gas shield is quickly mentioned in wave resistance of controlling flood on the dykes and dams of waters and land-based area intersection High flood control standard.
2) relative to fixed and detachable flood control sub-embankment product, the technical pattern is simple, easy to connect, using flexible, Fast lifting, safe and reliable, O&M convenience, long service life etc. advantage are prominent.
3) when in use, water blocking scuta is inflated with air bag quickly rises water blocking wave resistance, and small dike's scuta falls in non-validity period Volt is consistent with female dam plane, with being perfectly combined for river and sea wall landscape, does not block visual Landscape, do not influence pedestrian and drive a vehicle etc. Function.
4) length of flood control sub-embankment can take block combiner to extend according to actual requirement, and macromolecule is used between every group of scuta Rubber pad is fixedly connected or tight type is press-connected, to guarantee its sealing performance.
5) movable support rod can be installed additional at every group of scuta rear portion, enhance the stabilization that its small dike uses under the conditions of special weather Property and safety, support rod dismounting dismounting side is guaranteed using mechanical lock buckle structure (referring to the support top principle of automobile and its cover board) Just.
6) flood control sub-embankment reverse slope covers polymer rubber curtain, prevents child and visitor or sundries from falling into groove and threatens people Body safety and influence small dike's landing function, and improve small dike's overall aesthetic degree.
7) the flood control sub-embankment technology described in also can be applicable in the construction such as shallow water cofferdam, Dredger Filling Engineering cofferdam, foundation pit water blocking, It eliminates earth excavation, fill, the multiple working procedures such as cofferdam demolition, it is equal to the protection of project progress and cost control and land resource There are certain values.
8) the present invention is mainly suitable for city river emphasis sections and seawalls in coastal cities to be transformed, and quickly improves flood control wave resistance The problems such as standard, the investment that solution city heightening of embankment protection strengthening reconstruction is faced is greatly and expropriation of land land used is difficult.
9) it is equipped with by the back side of the scuta in flood control sub-embankment and blocks curtain, have the function of protective air-bag and beautification dam body, And can prevent child from falling into injury, prevent rubbish incidental from entering, the safety of raising used;
10) support rod is had additional by the back side of the scuta in flood control sub-embankment, forms simple connection formula support construction, it can be big Stability and safety when big enhancing flood control sub-embankment is run under the conditions of special weather.
11) it by intelligent control and remote online monitoring, realizes in the automatic lifting control and operational process of flood control sub-embankment Monitoring management, while can also by manual control system realize to small dike's lifting pipe manage, improve real-time, the side of operational management Just property and safety.
The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be said that Specific implementation of the invention is only limited to these instructions.For those of ordinary skill in the art to which the present invention belongs, exist Under the premise of not departing from present inventive concept, a number of simple deductions or replacements can also be made, all shall be regarded as belonging to of the invention Protection scope.

Claims (10)

1. the bladder support flood control sub-embankment with intelligent control and Simple connecting structure, it is characterised in that: by one or two with Upper mold module unit connects and composes, and is simple easy connection structure when being made of two or more modular units;The Modular units Structure setting is on flood bank (10), including scuta (2), air bag (1) and pneumatically fills/heat-extraction system (8);The bottom of the scuta (2) End is connected on flood bank (10), forms rotary type connection structure;The back side of the scuta (2) be equipped with limit band (3) so that The scuta (2) keeps the consistency of each scuta high and low position, limit band (3) and scuta (2), air bag (1) formation when rising Gusseted rock-steady structure;It is equipped with and blocks curtain (4) at the back side of the scuta (2), form airbag restraint and environmental protection knot Structure;It is described pneumatically to fill the/control output end of the control signal of heat-extraction system (8) connection PLC control system (9), it pneumatically fills/arranges and be Air inlet/exhaust end (1-1) of control output end connection air bag (1) of system (8), the automatic or manual for forming air bag (1) are filled/are vented Structure;The back side of scuta (2) is equipped with support rod (5), and the bottom end of the support rod (5) is fixed on flood bank (10), upper end is living The dynamic back side upper end for being connected to scuta (2), forms simple connection formula support construction;By the way that air bag (1) is automatically or manually controlled Charge/discharge gas drives the lifting and simple connection formula support construction of scuta (2), and constituting, there is intelligent control and simple connection formula to support The bladder support Modular units structure of structure.
2. the bladder support flood control sub-embankment according to claim 1 with intelligent control and Simple connecting structure, feature It is: limit band (3) and to block curtain (4) respectively be flexible structure, the self-relaxation knot that formation follows air bag (1) to fill/be vented Structure.
3. the bladder support flood control sub-embankment according to claim 1 or 2 with intelligent control and Simple connecting structure, special Sign is: the top of the support rod (5) is in hook solid, is simply connected with cooperatively forming with the jointing holes at the top of scuta (2) back side Meet formula connection structure (5-1).
4. the bladder support flood control sub-embankment according to claim 3 with intelligent control and Simple connecting structure, feature It is: recess is set on flood bank (10), air inlet/exhaust of scuta (2), air bag (1), air bag (1) to place landing End (1-1), blocks curtain (4), support rod (5) and pneumatically fills/heat-extraction system connecting tube limit band (3);After air bag (1) exhaust Scuta (2) landing, scuta (2), air bag (1), air bag (1) air inlet/exhaust end (1-1), limit band (3), block curtain (4), Support rod (5) and pneumatically fill/heat-extraction system connecting tube is placed in the recess, by scuta (2) bezel cover on recess, form plane envelope Lid structure.
5. the bladder support flood control sub-embankment according to claim 4 with intelligent control and Simple connecting structure, feature It is: a strip groove (7) is set on the recess of flood bank (10), to place support rod (5);Air bag (1) is horizontally-arranged in shield The lower section of plate (2) forms the shape structure to remain basically stable with flood bank (10) plane so that air bag (1) exhaust postnotum (2) is laid flat It makes.
6. the bladder support flood control sub-embankment according to claim 3 with intelligent control and Simple connecting structure, feature Be: it is described pneumatically fill/heat-extraction system (8) is live fixed structure form or vehicle-carried mobile structural formula, using live fixed structure When form, pneumatically fill/the concave groove body that is embedded in after scuta (2) of the snorkel of heat-extraction system (8) in, form fast pneumatic and fill/arrange Depressed structure.
7. the bladder support flood control sub-embankment according to claim 3 with intelligent control and Simple connecting structure, feature It is: remote communication module is set in PLC control system (9), constitutes remote control structure;Or constitute long-range control and hand What dynamic control combined jointly controls structure, in order to link with urban flood defence systematic connection.
8. the bladder support flood control sub-embankment according to claim 1 with intelligent control and Simple connecting structure, feature Be: the scuta (2) and supporting element that the flood control sub-embankment is related to are directly installed on existing flood bank (1) by anchoring, shield The height of plate (2) can require flexibly setting according to reality flood control and wave resistance, to improve the unrestrained standard of dykes and dams flood control.
9. the bladder support flood control sub-embankment according to claim 1 with intelligent control and Simple connecting structure, feature Be: scuta (2), support rod (5) and anchoring piece are made of carbon steel or stainless steel material, and the carbon steel has anti-corrosion layer structure, To guarantee the anti-corrosion ability of critical component.
10. the bladder support flood control sub-embankment according to claim 3 with intelligent control and Simple connecting structure, feature It is: is made of the sequential connection of N number of modular unit, the natural number that wherein N is 2,3,4 ..., 100 or 100 or more, each module list It is fixedly connected between the scuta (2) of member using polymer rubber pad or tight type is press-connected, to guarantee its sealing performance.
CN201811263071.5A 2018-10-27 2018-10-27 Bladder support flood control sub-embankment with intelligent control and Simple connecting structure Pending CN109162247A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811263071.5A CN109162247A (en) 2018-10-27 2018-10-27 Bladder support flood control sub-embankment with intelligent control and Simple connecting structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811263071.5A CN109162247A (en) 2018-10-27 2018-10-27 Bladder support flood control sub-embankment with intelligent control and Simple connecting structure

Publications (1)

Publication Number Publication Date
CN109162247A true CN109162247A (en) 2019-01-08

Family

ID=64875355

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811263071.5A Pending CN109162247A (en) 2018-10-27 2018-10-27 Bladder support flood control sub-embankment with intelligent control and Simple connecting structure

Country Status (1)

Country Link
CN (1) CN109162247A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853464A (en) * 2019-01-22 2019-06-07 张谦 A kind of vehicle-mounted floatage-type checkdam and its application method
CN112962524A (en) * 2021-02-20 2021-06-15 长江水利委员会长江科学院 Integral water-filled electronic dike structure for emergency rescue and construction method thereof
CN114560038A (en) * 2022-03-21 2022-05-31 芜湖造船厂有限公司 Wave pressing plate structure for amphibious vehicle or ship
CN114606907A (en) * 2022-02-23 2022-06-10 陈曦 Bidirectional water retaining and water gas filling shield dam

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109853464A (en) * 2019-01-22 2019-06-07 张谦 A kind of vehicle-mounted floatage-type checkdam and its application method
CN112962524A (en) * 2021-02-20 2021-06-15 长江水利委员会长江科学院 Integral water-filled electronic dike structure for emergency rescue and construction method thereof
CN114606907A (en) * 2022-02-23 2022-06-10 陈曦 Bidirectional water retaining and water gas filling shield dam
CN114606907B (en) * 2022-02-23 2024-05-31 铁岭尔凡橡塑研发有限公司 Bidirectional water retaining and filling air shield dam
CN114560038A (en) * 2022-03-21 2022-05-31 芜湖造船厂有限公司 Wave pressing plate structure for amphibious vehicle or ship

Similar Documents

Publication Publication Date Title
CN109162247A (en) Bladder support flood control sub-embankment with intelligent control and Simple connecting structure
CN201169767Y (en) Steel shutter capable of lodging without middle pier
CN205100165U (en) Inflatable automatic start/stop sluice device
CN100389238C (en) Flexible dam with aid of buoyancy and its construction method
CN209603049U (en) A kind of prefabricated waterwall
CN107022976A (en) A kind of assembled for punishing piping encloses well and its construction method
CN209260654U (en) Bladder support flood control sub-embankment with intelligent control and Simple connecting structure
CN109208544A (en) Reinforced two-way water blocking gas shield dam with intelligent control structure
CN202509445U (en) Self-floating double-layer flood control wall
CN105951667A (en) Riverway structure reserved in reclamation district through mud filling pipe bags and construction method of riverway structure
CN103205951A (en) Sludge-type soil combined secondary dike-back pressure diking method
CN201424654Y (en) Wrecking back-pressure water bag
CN207597339U (en) A kind of assembled for punishing piping encloses well
CN212129032U (en) Inflatable rubber dam sand flushing and discharging system for preventing silt behind high-pile wharf
CN101205711A (en) Three-cavity water/gas filling expansion dam and cofferdam construction method
CN105714740A (en) Rapid dike leaking stoppage equipment
CN2483314Y (en) Lifting/lowering type air floating water-proof curtain
CN206941506U (en) A kind of penetrating circular arc shaped steel frame flood control structure of large span landscape
CN105908764B (en) The seepage control system that plastic concrete cut-off wall and Reinforced Concrete Retaining Walls are combined
CN2391910Y (en) Truss for blocking break of a dike
CN207143866U (en) A kind of dam, which discharges water, uses sluice
CN207987861U (en) A kind of flood control sub-embankment
CN205662937U (en) Anti -seepage system that plastic concrete cut -pff wall and reinforced concrete barricade combined together
CN201074313Y (en) Portable assembled earthwork cloth relief bounding well (water keeping basin)
CN220952910U (en) Water bridge structure

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190108