A kind of safe and convenient strong brine transport holding vessel toppled over from protection
Technical field
The present invention is a kind of safe and convenient strong brine transport holding vessel toppled over from protection, belongs to strong brine transport holding vessel
Field.
Background technique
It is usually may require that for the usage amount of fresh water, in life through seawater and desalt processing offer fresh water is provided, and
Sea water desalination, which handles its remaining water after obtaining fresh water, to be contained as the strong brine of high concentration, this strong brine because of it
The salt of high-content, discharge are easy to cause environmental disruption and pollution, and high in salt it are made people and to have the substance of moisture to have one
Fixed risk, and strong brine transports holding vessel, used safety can when as strong brine transports, Lai Jinhang strong brine is light
The protection deposit in the transportational process of processing is collected after change.
Traditional strong brine transports holding vessel, 1, be merely able to singly deposit storage protection is carried out by tank body, be easy because inclining
Colliding with leads to the damage of tank body, and strong brine is caused to leak, so as to cause dangerous and pollution;2, processing discharge and collection are being carried out
When have to be extracted by other equipment, and be to be easy to cause overspray in extraction, cause using inconvenience.
Summary of the invention
In view of the deficienciess of the prior art, it is an object of the present invention to provide a kind of safe and convenient strong brines toppled over from protection
Transport holding vessel, transport holding vessel to solve traditional strong brine, 1, be merely able to singly deposit storage protection is carried out by tank body, hold
Easily lead to the damage of tank body because toppling over to collide with, strong brine is caused to leak, so as to cause dangerous and pollution;2, processing row is being carried out
It has to be extracted by other equipment out and when collecting, and is to be easy to cause overspray in extraction, cause using not
Just the problem of.
To achieve the goals above, the present invention is to realize by the following technical solutions: a kind of peace toppled over from protection
Complete convenient strong brine transports holding vessel, and structure includes cover, transport tank body, protective base, and the transport tank body is cylindrical body
And bottom end is snapped with protective base, the cover is round estrade, and bottom end and transport tank body coat interlocking, the transport tank body packet
It includes base, strong brine storage device, covered from triggering protective device, outer shield tank body, protection separate slot, water inlet, manual pump drainage water
Connector, the outer shield tank body is cylindrical body and top middle portion integration inlays and is equipped with protection separate slot, and the base is half elliptic
And cambered surface is buckled in protection separate slot bottom end upward, it is described from triggering protective device be equipped with 8 and up and down each 4 uniform weldings in anti-
Protect separate slot up and down two sides, it is described from triggering protective device run through outer shield tank body and with outer shield tank body clearance fit, the outer shield
Interlocking is inlayed with including cover bottom end in tank body top, and the strong brine storage device is cylindrical body and is set in protection separate slot, institute
It states strong brine storage device bottom end to be placed on base and connect with from triggering protective device up and down, the manual pump drainage water connects
Headgear is connected on the right side of strong brine storage device top, and the water inlet capping interlocking is in strong brine storage device top left hand.
Further, the strong brine storage device includes water inlet partition, deposit main tank body, ball sealer position-limiting tube, blocks
Ball, outlet pass, water flowing connector, ventilating joint, blow vent, gravity baffle ring, the deposit main tank body are cylindrical body, the deposit master
Tank body is placed on base and connects up and down with from triggering protective device, and the deposit main tank body top left hand is welded with water flowing
Ventilating joint is welded on the right side of connector and top, the deposit main tank body, which coats interlocking by water flowing connector, has water inlet capping simultaneously
It is socketed with manual pump drainage water swivel by ventilating joint, the blow vent integration, which runs through, to be set on the right side of deposit main tank body top simultaneously
It is communicated with ventilating joint, the outlet pass integration, which runs through, to be set to deposit main tank body top left hand and communicate with water flowing connector, institute
It states into water partition and is welded in the main tank interior left side of deposit and spaced, the ball sealer limit with main tank interior bottom end is laid in
Position pipe splicing is on the right side of main tank interior and all spaced with upper and lower ends inside main tank interior, and the ball sealer is set to envelope
Inside stifled ball position-limiting tube and with ball sealer position-limiting tube clearance fit, the ball sealer is located at immediately below blow vent, and the gravity is kept off
Ring is torus and inlays set on ball sealer position-limiting tube top that the gravity baffle ring height is than in ball sealer position-limiting tube and main tank body
Interval between portion top it is long and with ball sealer position-limiting tube clearance fit.
Further, described to include triggering mandril, extension spring, assemble top plate, compressed spring, branch from triggering protective device
Fagging, triggering buck plate, the triggering buck plate and outer shield tank body welding, the triggering buck plate are set in protection separate slot, institute
State support plate through outer shield tank body and with outer shield tank body clearance fit, the support plate passes through compressed spring after the outer shield tank body
With assembly top plate one end interlocking, the assembly top plate other end is by inlaying interlocking inside extension spring and triggering buck plate, institute
It states to be vertically welded with triggering mandril in the middle part of assembly top plate and extension spring interlocking end and pass through triggering mandril and be assembled with through triggering
Plate connects with deposit main tank body.
Further, the manual pump drainage water swivel includes rubber bell and spigot joint, the first check valve, rubber pneumatic bag ball, second
Check valve, the rubber pneumatic bag ball is Elliptic Cylinder and upper and lower ends integration is equipped with rubber bell and spigot joint, the rubber pneumatic bag
Ball passes through bottom end rubber bell and spigot joint and ventilating joint cladding is socketed, and first check valve and second one-way valve are placed in the same direction and divided
Splicing is not inlayed in the middle part of rubber pneumatic bag ball upper and lower ends.
Beneficial effect
The present invention is a kind of to topple over the safe and convenient strong brine transport holding vessel from protection in use, first, and user can provide
Unscrew cover and water inlet capping, and strong brine water source connect with water flowing connector, after can manual pump drainage water swivel aspirated
The assembly of equipment provides the rubber pneumatic bag ball of the manual pump drainage water swivel of extruding to carry out the extraction of salt water, when user carries out rubber
When the extruding of air bag ball, air can press the first check valve and be discharged, and negative pressure is formed in rubber pneumatic bag ball, when user unclamps
After rubber pneumatic bag ball, air can pull second one-way valve and from the extraction for laying in main tank interior progress gas, make to lay in main tank
It forms negative pressure in vivo and is extracted from water flowing connector, and user can connect ventilation is assemblied in after the inversion of manual pump drainage water swivel
Head presses the deposit main tank body of equipment by air pressure and is discharged, and repeatedly, can carry out manually strong brine and extract or arrange
Out, realize that equipment is also able to carry out pumping in the case where no particular device and is pressed into water or draining;Second, the deposit main tank body of equipment
Inside is by being equipped with water inlet partition, so that make the water outlet of equipment strong brine all can only be delivered to from the inner bottom of deposit main tank body
Top water flowing connector is conveyed, and stock of equipment main tank body is by being equipped with ball sealer position-limiting tube, and in ball sealer position-limiting tube
Equipped with ball sealer, make the strong brine for laying in main tank interior that can press ball sealer after increase and float, and when ball sealer float to
After to a certain degree, blow vent can be blocked, is leaked to place sprinkling caused by spill-over, and ball sealer position-limiting tube is also set on top
There is gravity baffle ring, make to lay in main tank body when being inverted, gravity baffle ring can be fallen because of gravity, make ball sealer position-limiting tube and block to ventilate
Mouth is closed, so that the ball sealer that press inverted strong brine only can enough in ball sealer position-limiting tube blocks blow vent, without floating
Ball sealer is played, danger and inconvenience caused by making equipment using safer, and can preferably prevent strong brine from leaking, spray etc.;
Third, when equipment is toppled over, the deposit main tank that equipment is equipped with is known from experience because gravity slides on the arc top surface of base, and can press
The triggering mandril of respective direction makes the triggering mandril of respective opposed that can press assembly top plate and compressed spring, support plate is driven to move outside,
To make to carry out the buffer protection of toppling direction outside the outer shield tank body of support plate stretching, and compressed spring, support plate are toppling over reply
After reply can be pullled by extension spring, scratch Deng inconvenience are prevented, to enable a device to more preferably guarantee the dense salt when toppling over
Water storage safety, is easy to use;In conclusion the present invention is in use, 1, equipment can be carried out manually by included extraction head
The extraction and discharge of strong brine, convenient for the use in no extracting device, and equipment makes equipment by being equipped with the devices such as floating ball
Used time can prevent the sprinkling extracted and the leakage toppled over, so that it is more convenient, safer to use equipment;2, equipment is by being equipped with
The buffer unit of arc inner seat and press triggering, enables equipment to automatically turn on the buffer unit of corresponding direction when toppling over, and
The automatic drawing back when not toppling over, making equipment preferably prevents from toppling over the damage collided with, and is easy to use.
Detailed description of the invention
Upon reading the detailed description of non-limiting embodiments with reference to the following drawings, other feature of the invention,
Objects and advantages will become more apparent upon:
Fig. 1, which is that the present invention is a kind of, topples over the structural schematic diagram that holding vessel is transported from the safe and convenient strong brine of protection.
Fig. 2 is the structural schematic diagram of present invention transport tank body.
Fig. 3 is the structural schematic diagram of A in Fig. 2 of the present invention.
Fig. 4 is the structural schematic diagram of B in Fig. 2 of the present invention.
In figure: cover -1, protective base -3, base -201, strong brine storage device -202, triggers transport tank body -2 certainly
Protective device -203, outer shield tank body -204, protection separate slot -205, water inlet capping -206, manual pump drainage water swivel -207, water inlet
Partition -20201, ball sealer position-limiting tube -20203, ball sealer -20204, outlet pass -20205, leads to deposit main tank body -20202
Water swivel -20206, blow vent -20208, gravity baffle ring -20209, triggering mandril -20301, stretches bullet at ventilating joint -20207
Spring -20302, assembly top plate -20303, compressed spring -20304, support plate -20305, triggering buck plate -20306, rubber socket
Head -20701, the first check valve -20702, rubber pneumatic bag ball -20703, second one-way valve -20704.
Specific embodiment
To be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, below with reference to
Specific embodiment, the present invention is further explained.
Fig. 1-Fig. 4 is please referred to, the present invention provides a kind of safe and convenient strong brine transport holding vessel technology toppled over from protection
Scheme: its structure includes cover 1, transport tank body 2, protective base 3, the transport tank body 2 for cylindrical body and bottom end be snapped with it is anti-
River bottom protection seat 3, the cover 1 be round estrade, and bottom end and transport tank body 2 coat interlocking, the transport tank body 2 including base 201,
Strong brine storage device 202 covers 206, hand from triggering protective device 203, outer shield tank body 204, protection separate slot 205, water inlet
Dynamic pump drainage water swivel 207, the outer shield tank body 204 is cylindrical body and top middle portion integration inlays and is equipped with protection separate slot 205,
The base 201 is half elliptic and cambered surface is buckled in protection 205 bottom end of separate slot upward, described to set from triggering protective device 203
There are 8 and each 4 uniform weldings are described to run through outer shield from triggering protective device 203 in protection about 205 two sides of separate slot up and down
Tank body 204 and with outer 204 clearance fit of shield tank body, outer 204 top of shield tank body with include 1 bottom end of cover inlay interlocking, institute
It states strong brine storage device 202 and is cylindrical body and is set in protection separate slot 205 that 202 bottom end of strong brine storage device is placed
In connecting on base 201 and up and down with from triggering protective device 203, the manual pump drainage water swivel 207 is socketed on strong brine
On the right side of 202 top of storage device, the water inlet covers 206 interlockings in 202 top left hand of strong brine storage device, the dense salt
Water storage device 202 includes water inlet partition 20201, deposit main tank body 20202, ball sealer position-limiting tube 20203, ball sealer
20204, outlet pass 20205, water flowing connector 20206, ventilating joint 20207, blow vent 20208, gravity baffle ring 20209, it is described
Deposit main tank body 20202 is cylindrical body, and the deposit main tank body 20202 is placed on base 201 and prevents up and down with from triggering
Protection unit 203 connects, and 20202 top left hand of deposit main tank body is welded on the right side of water flowing connector 20206 and top and is welded with
Ventilating joint 20207, the deposit main tank body 20202, which coats interlocking by water flowing connector 20206, has water inlet capping 206 simultaneously
It is socketed with manual pump drainage water swivel 207 by ventilating joint 20207,20208 integration of blow vent is led through deposit is set to
It is communicated on the right side of 20202 top of tank body and with ventilating joint 20207,20205 integration of outlet pass is through set on deposit main tank
It 20202 top left hand of body and is communicated with water flowing connector 20206, the water inlet partition 20201 is welded in deposit main tank body 20202
On the left of portion and spaced with deposit 20202 inner bottom of main tank body, the ball sealer position-limiting tube 20203 is glued in main tank body
20202 inner right sides are simultaneously all spaced with 20202 internal-internal upper and lower ends of main tank body, and the ball sealer 20204 is set to envelope
Stifled 20203 inside of ball position-limiting tube and with 20203 clearance fit of ball sealer position-limiting tube, the ball sealer 20204 is located at blow vent
Immediately below 20208, the gravity baffle ring 20209 is torus and inlays set on 20203 top of ball sealer position-limiting tube, the gravity
20209 height of baffle ring is longer than the interval between 20202 inner tip of ball sealer position-limiting tube 20203 and main tank body and limits with ball sealer
Position 20203 clearance fit of pipe, it is described to include triggering mandril 20301, extension spring 20302, assembly top from triggering protective device 203
Plate 20303, compressed spring 20304, support plate 20305, triggering buck plate 20306, the triggering buck plate 20306 and outer shield
Tank body 204 welds, and the triggering buck plate 20306 is set in protection separate slot 205, and the support plate 20305 runs through outer shield tank body
204 and with outer 204 clearance fit of shield tank body, the support plate 20305 runs through after outer shield tank body 204 through compressed spring 20304
With assembly 20303 one end interlocking of top plate, 20303 other end of assembly top plate passes through extension spring 20302 and triggering buck plate
Interlocking is inlayed inside 20306, and triggering top is vertically welded in the middle part of the assembly top plate 20303 and 20302 interlocking end of extension spring
Bar 20301 is simultaneously connected with through triggering buck plate 20306 with deposit main tank body 20202 by triggering mandril 20301, the hand
Dynamic pump drainage water swivel 207 includes rubber bell and spigot joint 20701, the first check valve 20702, rubber pneumatic bag ball 20703, second one-way valve
20704, the rubber pneumatic bag ball 20703 is Elliptic Cylinder and upper and lower ends integration is equipped with rubber bell and spigot joint 20701, described
Rubber pneumatic bag ball 20703 is socketed by bottom end rubber bell and spigot joint 20701 and the cladding of ventilating joint 20207, first check valve
20702 place in the same direction with second one-way valve 20704 and inlay splicing respectively in the middle part of 20703 upper and lower ends of rubber pneumatic bag ball.
The method is mainly characterized in that: user can provide unscrewing cover 1 and water inlet capping 206, and by strong brine water source
Connect with water flowing connector 20206, after can manual pump drainage water swivel 207 carry out the assembly of pumping equipment or provide to squeeze manual pump drainage
The rubber pneumatic bag ball 20703 of water swivel 207 carries out the extraction of salt water, when user carries out the extruding of rubber pneumatic bag ball 20703,
Air can press the first check valve 20702 and be discharged, and negative pressure is formed in rubber pneumatic bag ball 20703, when user unclamps rubber
After air bag ball 20703, air can pull second one-way valve 20704 and carry out the extraction of gas inside deposit main tank body 20202,
Make to lay in main tank body 20202 and form negative pressure and extracted from water flowing connector 20206, and user can connect manual pump drainage water
It is assemblied in ventilating joint 20207 after first 207 inversion, the deposit main tank body 20202 of equipment is pressed by air pressure and is discharged, it is so anti-
It is multiple, manually strong brine can be carried out and extract or be discharged, realize that equipment is also able to carry out pumping pressure in the case where no particular device
Water inlet or draining.
The method is mainly characterized in that: by being equipped with water inlet partition 20201 inside the deposit main tank body 20202 of equipment, from
And the water outlet of equipment strong brine is made all only to be delivered to top water flowing connector 20206 from the inner bottom of deposit main tank body 20202
It is conveyed, and stock of equipment main tank body 20202 is by being equipped with ball sealer position-limiting tube 20203, and in ball sealer position-limiting tube
It is equipped with ball sealer 20204 in 20203, makes the strong brine laid in inside main tank body 20202 that can press ball sealer 20204 after increase
Float, and when ball sealer 20204 float to a certain degree after, blow vent 20208 can be blocked, to place spray caused by spill-over
It spills and leaks, and ball sealer position-limiting tube 20203 is also equipped with gravity baffle ring 20209 on top, be inverted deposit main tank body 20202
When, gravity baffle ring 20209 can be fallen because of gravity, keep ball sealer position-limiting tube 20203 and closure blow vent 20208 closed, to make
The ball sealer 20204 that inverted strong brine only can enough press in ball sealer position-limiting tube 20203 blocks blow vent 20208, without
Float ball sealer 20204, danger caused by making equipment using safer, and can preferably prevent strong brine from leaking, spray etc.
And inconvenience.
The method is mainly characterized in that: when equipment is toppled over, the deposit main tank body 20202 that equipment is equipped with can be because gravity exists
It is slided on the arc top surface of base 201, and the triggering mandril 20301 of respective direction can be pressed, make the triggering mandril of respective opposed
20301, which can press assembly top plate 20303, drives compressed spring 20304, support plate 20305 to move outside, to make support plate 20305
The buffer protection of toppling direction is carried out outside the outer shield tank body 204 of stretching, and compressed spring 20304, support plate 20305 are toppling over reply
After can pull reply by extension spring 20302, scratch Deng inconvenience are prevented, to enable a device to more preferably guarantee when toppling over
Strong brine storage safety, is easy to use.
Problems solved by the invention is traditional strong brine transport holding vessel, 1, being stored up by tank body of being merely able to singly deposit
Protection is deposited, is easy to lead to the damage of tank body because toppling over to collide with, strong brine is caused to leak, so as to cause dangerous and pollution;2, exist
It carries out processing discharge and has to be extracted by other equipment when collecting, and be to be easy to cause overspray in extraction, lead
The inconvenience caused, the present invention are combined with each other by above-mentioned component, enable the invention to realize, 1, equipment can be by included
Extraction head carry out the extraction and discharge of manual strong brine, convenient for the use in no extracting device, and equipment pass through be equipped with it is floating
The devices such as ball, enable equipment using when prevent the sprinkling extracted and the leakage toppled over, thus make equipment using it is more convenient, more pacify
Entirely;2, equipment enables equipment to automatically turn on correspondence when toppling over by being equipped with arc inner seat and pressing the buffer unit of triggering
The buffer unit in direction, and the automatic drawing back when not toppling over, making equipment preferably prevents from toppling over the damage collided with, and is easy to use.
The above shows and describes the basic principles and main features of the present invention and the advantages of the present invention, for this field skill
For art personnel, it is clear that invention is not limited to the details of the above exemplary embodiments, and without departing substantially from spirit of the invention or
In the case where essential characteristic, the present invention can be realized in other specific forms.Therefore, in all respects, should all incite somebody to action
Embodiment regards exemplary as, and is non-limiting, the scope of the present invention by appended claims rather than on state
Bright restriction, it is intended that including all changes that fall within the meaning and scope of the equivalent elements of the claims in the present invention
It is interior.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped
Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should
It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
The other embodiments being understood that.