CN109158505A - A kind of process equipment of AC gold metal plate chassis - Google Patents

A kind of process equipment of AC gold metal plate chassis Download PDF

Info

Publication number
CN109158505A
CN109158505A CN201811015688.5A CN201811015688A CN109158505A CN 109158505 A CN109158505 A CN 109158505A CN 201811015688 A CN201811015688 A CN 201811015688A CN 109158505 A CN109158505 A CN 109158505A
Authority
CN
China
Prior art keywords
plate
mounting rack
transfer roller
steel band
mounting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811015688.5A
Other languages
Chinese (zh)
Other versions
CN109158505B (en
Inventor
徐建方
金平
王尧森
徐许吉
韩坚栋
王丽娟
陶晓琦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang state auspicious Limited by Share Ltd
Original Assignee
Shaoxing Shangyu Guoheng Refrigeration Parts Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shaoxing Shangyu Guoheng Refrigeration Parts Co Ltd filed Critical Shaoxing Shangyu Guoheng Refrigeration Parts Co Ltd
Priority to CN201811015688.5A priority Critical patent/CN109158505B/en
Publication of CN109158505A publication Critical patent/CN109158505A/en
Application granted granted Critical
Publication of CN109158505B publication Critical patent/CN109158505B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D55/00Safety devices protecting the machine or the operator, specially adapted for apparatus or machines dealt with in this subclass
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P23/00Machines or arrangements of machines for performing specified combinations of different metal-working operations not covered by a single other subclass
    • B23P23/02Machine tools for performing different machining operations

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Sawing (AREA)

Abstract

The invention discloses a kind of process equipments of AC gold metal plate chassis, including the first mounting rack, overload protection arrangement on first mounting rack, perforating device on first mounting rack and the disconnecting device on first mounting rack, deformation component is additionally provided on first mounting rack, the deformation component is set between the perforating device and the disconnecting device, the overload protection arrangement includes the second mounting rack, first hydraulic cylinder on second mounting rack, the third mounting rack being connected with second mounting rack, the first installs case on the third mounting rack and the first support plate below first installs case, the first cutter is equipped in first installs case;Protective effect by overload protection component to process equipment; when some part in process equipment breaks down; quickly steel band raw material can be cut off, avoid steel band from continuing into equipment that equipment is stuck, the safety for increasing equipment extends service life of equipment.

Description

A kind of process equipment of AC gold metal plate chassis
Technical field
The invention belongs to air-conditioning technical fields, more particularly, to a kind of process equipment of AC gold metal plate chassis.
Background technique
As the improvement of people's living standards, air conditioner becomes common household electrical appliance in people's daily life.In air-conditioning In the use process of machine, the installation quality of air conditioner has a great impact to its subsequent use, so the quality of Air-Conditioning Bracket Problem can directly affect the installation quality of air conditioner and influence the use quality of air conditioner indirectly.It is existing to AC gold metal plate bottom The mode that the equipment that frame is processed generallys use assembly line is processed metal plate, once some part in assembly line After going wrong, the work of whole assembly line can all be affected, and metal plate raw material are easy to twist in equipment and cause to damage to equipment Bad, device security is not high.
Summary of the invention
The present invention for overcome the deficiencies in the prior art, provides a kind of adding for the AC gold metal plate chassis of lifting means safety Construction equipment.
To achieve the goals above, the invention adopts the following technical scheme: a kind of process equipment of AC gold metal plate chassis, packet Include the first mounting rack, the overload protection arrangement on first mounting rack, the punching dress on first mounting rack It sets and the disconnecting device on first mounting rack, is additionally provided with deformation component, the deformation group on first mounting rack Part is set between the perforating device and the disconnecting device, and the overload protection arrangement includes the second mounting rack, set on described First hydraulic cylinder on second mounting rack, is set to the third mounting rack at the third mounting rack being connected with second mounting rack On the first installs case and the first support plate below first installs case, first is equipped in first installs case and is cut Knife;Protective effect by overload protection component to process equipment can be fast when some part in process equipment breaks down Speed cuts off steel band raw material, avoids steel band from continuing into equipment that equipment is stuck, damages to equipment, increase is set Standby safety extends service life of equipment.
Preferably, first mounting rack is equipped with the first mounting plate, first mounting plate bottom surface is equipped with first and passes Driving wheel, first mounting plate side are equipped with multiple groups to roller, described to be set to the overload protection arrangement side to roller;Pass through multiple groups It contacts with each other to roller and steel band, squeezing action is risen to steel band, so that steel band is done pressing processing under the action of to roller, makes steel band Smooth enters in process equipment, convenient for the working process to steel band;Cooperate overload protection arrangement simultaneously, fills overload protection Setting can be more easily by steel strip cutting, and avoiding, which continues into steel band in equipment after equipment breaks down, causes equipment Damage.
Preferably, the deformation component includes the first transfer roller on first mounting rack, the second transfer roller and the Three transfer rollers and the 4th transfer roller matched with first transfer roller, the 5th transfer roller matched with second transfer roller and with it is described The 6th transfer roller that third transfer roller matches, first transfer roller be equipped with the first pinch roller, the 4th transfer roller be equipped with it is described The first umbrella shape wheel that first pinch roller matches;By the mutual cooperation between transfer roller, make steel band during transmission in pinch roller Deformation is generated under the action of umbrella shape wheel, steel band is made gradually to start to deform, avoids in the steel band short time that stress is excessive, prevents steel There is phenomenon of rupture in band, promotes the processing effect to steel band.
Preferably, being additionally provided with styling components on first mounting rack, the styling components include being set to described first Boost assemblies on mounting rack, the set on the 7th transfer roller of the boost assemblies side and below the 7th transfer roller the 8th Transfer roller, the 7th transfer roller are equipped with the second pinch roller;After steel band generates deformation under the action of deformation component, steel band enters fixed In type component, steel band is pushed by boost assemblies help, enables steel band is stable to travel forward, in the 7th transfer roller and eight revolution Under the action of roller, setting treatment is risen to steel band, the steel band after deformation occurs is made to be maintained at the state after deformation, is promoted to steel band Processing effect.
Preferably, the boost assemblies include first connecting rod on first mounting rack, are set to described the Connection frame in one connecting rod, the second installation set on the second driving wheel of the connection frame bottom and on the connection frame Plate, second mounting plate bottom are equipped with briquetting;Second driving wheel is in contact with the side wall of steel band, passes through the second driving wheel and steel The mutual cooperation of band, the movement forward for driving steel band stable increase the stability of steel band movement;Pass through briquetting and steel strip surface It contacts with each other, the second pinch roller of cooperation plays preliminary fixed effect to steel band, convenient for the transmission to steel band.
Preferably, being equipped with the first push plate in first installs case, first cutter is set to first push plate bottom Portion, the first push plate top are equipped with the second push plate, and the piston rod of the first hydraulic cylinder is fixedly connected with second push plate;Institute It states and is equipped with the first movable chamber in the first installs case, the first limit spring, the first limit bullet are equipped in first movable chamber It is fixedly connected at the top of spring with the second push plate;When breaking down in equipment, effect by hydraulic cylinder to the second push plate pushes first Push plate moves down, so that the first cutter of the first push plate bottom is in contact with steel band, cuts steel band under the action of the first cutter It is disconnected, it avoids steel band from continuing into equipment and equipment inside is damaged;Pass through the first limit spring and the first movable chamber It cooperates, the first limit spring cooperation first hydraulic cylinder is made to make the first cutter Rapid reset after by steel strip cutting;Lead to simultaneously The buffer function for crossing the first limit spring avoids the decline of the first cutter is too fast from damaging to the first cutter and the first support plate.
Preferably, first installs case bottom is equipped with the second movable chamber, first push plate is arranged in described second In movable chamber, first push plate be equipped with the first limit plate, first limit plate be equipped with the second connecting rod, described second Connecting rod is equipped with third connecting rod, and third connecting rod bottom is fixed with the first pressing plate, is arranged in second connecting rod There is the second limit spring, first pressing plate is equipped with the through-hole matched with first cutter;When first hydraulic cylinder pushes When first push plate moves down, the first push plate push the first limit plate move down, make the first limit plate push the first pressing plate with First support plate cooperates, and fixed effect is played to steel band in the effect of the first pressing plate and the first support plate, by one of steel band Divide and is fixed on overload protection arrangement;Make the first push plate that the continuation of the first cutter be pushed to transport down under the action of first hydraulic cylinder It is dynamic, by steel strip cutting, steel band is avoided to continue into equipment;Pass through the phase interworking of the second limit spring and the first limit plate It closes, avoids the first push plate excessive descent, shield to the first cutter and the first support plate, extend service life of equipment.
Preferably, the perforating device include third mounting plate, the second hydraulic cylinder on the third mounting plate, The 4th mounting plate below the third mounting plate and the second support plate below the 4th mounting plate;Described Four mounting plates are equipped with pressing plate, and the pressing plate is equipped with sleeve, and second support plate is equipped with and matches with the sleeve Locating rod;By the mutual cooperation of locating rod and sleeve, provides constraints to the position of pressing plate and the second support plate, pressing plate is made to begin The treatment effect to steel band mutually is increased convenient for accurately carrying out punching processing to steel band to it with the second support plate eventually.
Preferably, the locating rod is equipped with third movable chamber, the second limit plate, institute are equipped in the third movable chamber The second limit plate is stated equipped with the 4th connecting rod, the 4th connecting rod is equipped with third limit plate, sets on the sleeve lining There is the loose slot matched with the third limit plate, is arranged with reset spring in the 4th connecting rod;It is limited by third The mutual cooperation of plate and loose slot makes sleeve be also at the state matched with locating rod when rising, avoids pressing plate and second The positional shift of support plate;By the effect of reset spring, pressing plate is worked as a buffer, pressing plate is avoided to push excessively to second Fagging causes excessive pressure, shields to pressing plate and the second support plate, extends the service life of perforating device.
Preferably, the disconnecting device include the 5th mounting plate, the 5th connecting rod on the 5th mounting plate, The 6th mounting plate set on the 5th connecting rod other end and the second installs case on the 6th mounting plate, described It is equipped with the 4th movable chamber in two installs cases, is connected with movable block in the 4th movable chamber, is set in second installs case There is the third hydraulic cylinder for pushing the movable block rotation;After the completion of steel band is processed, steel band is entered in disconnecting device, passes through The mode of third Driven by Hydraulic Cylinder movable block rotation concentrates the stress on steel band, to steel band be fractureed, convenient for doing to steel band Cutoff process, make it is processed after the completion of steel band quickly recycled.
The invention has the following advantages that by protective effect of the overload protection component to process equipment, in process equipment Some part when breaking down, quickly steel band raw material can be cut off, steel band is avoided to continue into equipment in equipment It is stuck, equipment is damaged, the safety for increasing equipment extends service life of equipment.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention one.
Fig. 2 is structural schematic diagram two of the invention.
Fig. 3 is structural schematic diagram three of the invention.
Fig. 4 is structural schematic diagram four of the invention.Fig. 5 is the structural schematic diagram of the 4th transfer roller of the invention.
Fig. 6 is the structural schematic diagram of boost assemblies of the present invention.
Fig. 7 is the structural schematic diagram of overload protection arrangement of the present invention.
Fig. 8 is the structural schematic diagram of the first installs case of the invention.
Fig. 9 is the structural schematic diagram of perforating device of the present invention.
Figure 10 is the cooperation schematic diagram of locating rod of the present invention and sleeve.
Figure 11 is the structural schematic diagram of disconnecting device of the present invention.
Figure 12 is the structural schematic diagram of the second installs case of the invention.
Figure 13 is the structural schematic diagram of support component of the present invention.
Specific embodiment
In order to make those skilled in the art better understand the present invention program, below in conjunction in the embodiment of the present invention Attached drawing, the technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only A part of the embodiments of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people The model that the present invention protects all should belong in member's every other embodiment obtained without making creative work It encloses.
As shown in figures 1-13, a kind of process equipment of AC gold metal plate chassis, including the first mounting rack 1, be set to described first Overload protection arrangement 2 on mounting rack 1, the perforating device 3 on first mounting rack 1 and be set to first mounting rack Disconnecting device 5 on 1, perforating device are multiple groups, can carry out punching processing to steel strip surface as needed, are punched and are filled by multiple groups The effect set makes the hole on steel band become more uniform, promotes the treatment effect to steel band;On first mounting rack 1 also Equipped with deformation component, the deformation component is set between the perforating device 3 and the disconnecting device 5, passes through deformation component pair The processing of steel band makes steel band generate deformation after entering in process equipment, keeps steel band quick under the action of process equipment Processing;The overload protection arrangement 2 include the second mounting rack 21, the first hydraulic cylinder 22 on second mounting rack 21, It the third mounting rack 24 being connected with second mounting rack 21, the first installs case 23 on the third mounting rack 24 and sets The first support plate 26 in first installs case, 23 lower section, is equipped with the first cutter 2321 in first installs case 23, and first Support plate is equipped with the groove matched with the first cutter;Equipment is set to break down when steel band is in processing, it is hydraulic by first The effect of cylinder pushes the first cutter, so that the first cutter is in contact with steel band by steel strip cutting, steel band is avoided to enter equipment It is interior that equipment is damaged, to play a protective role to equipment, extend service life of equipment.
First mounting rack 1 is equipped with the first mounting plate 11, and 11 bottom surface of the first mounting plate is equipped with the first driving wheel 111,11 side of the first mounting plate is equipped with multiple groups to roller 12, described to be set to 2 side of overload protection arrangement to roller 12;The One mounting plate is multiple groups, is uniformly set to the first mounting rack front, and one piece of first mounting plate bottom is set there are two the first driving wheel, Two the first driving wheels are respectively arranged on first mounting plate two sides of the bottom;First driving wheel is equipped with groove, groove and steel band It matches, when steel band, which enters, to be passed through from the first mounting rack on the first mounting rack, the first transmission of the first mounting plate two sides Wheel is in contact with steel band two sides respectively, is processed convenient for more stable the entering in equipment of steel band to steel band;It is equal to roller Even setting, one group includes upper roller and lower roll to roller, and upper roller and the distance of lower roll and the thickness of steel band are identical, and steel band is arranged in upper roller Between lower roll;By the mutual cooperation of upper roller and lower roll, pressing processing is carried out to steel band, makes just to have isolated from steel coil strip Steel band is in horizontality under the action of to roller, convenient for processing to steel band, promotes the processing effect to steel band.
The deformation component includes that the first transfer roller 13, the second transfer roller 15 and the third on first mounting rack 1 turn Roller 18 and the 4th transfer roller 14 matched with first transfer roller 13, the 5th transfer roller 16 matched with second transfer roller 15 and The 6th transfer roller 19 matched with the third transfer roller 18, first transfer roller 13 be equipped with the first pinch roller 131, described 4th turn Roller 14 is equipped with the first umbrella shape wheel 141 matched with first pinch roller 13;Second transfer roller is equipped with third pinch roller 151, the Three transfer rollers are equipped with the 4th pinch roller 181, and the first pinch roller is three groups, and third pinch roller is two groups, and the 4th pinch roller is two groups, the first pressure Wheel, third pinch roller are identical as the structure of the 4th pinch roller, and the 5th transfer roller is equipped with the second umbrella shape wheel matched with third pinch roller, the Umbrella shape wheel on four transfer rollers and the 5th transfer roller is respectively two groups, and the spacing of two groups of umbrella shape wheels on the 4th transfer roller is greater than the 5th transfer roller On two groups of umbrella shape wheels spacing;When steel band is sent at deformed component, the first transfer roller of steel band cured fish and the 4th transfer roller phase Mutually contact, by the effect of the umbrella shape wheel on the first pinch roller and the 4th transfer roller on third transfer roller, is bent upwards steel band two sides Deformation is generated, subsequent steel band enters between the second transfer roller and the 5th transfer roller, under the action of third pinch roller and the second umbrella shape wheel So that steel band is generated further deformation, steel band is processed into required shape;In the mutual cooperation of third transfer roller and the 6th transfer roller Under effect, the deformation of final step is carried out to steel band, the two sides for digging steel band upwards are driven plain under the action of four pinch rollers, To complete the deformation process to steel band;For increase steel band deformation effect, first transfer roller, the second transfer roller, third transfer roller, 4th transfer roller, the 5th transfer roller and the 6th transfer roller can be arranged for multiple groups.
Connecting shaft 17 is additionally provided between second transfer roller and third transfer roller, connecting shaft 17 is equipped with locating piece 171, and locating piece is Two groups, connecting shaft two sides are respectively arranged on, the spacing of locating piece and the width of steel band are corresponding;Pass through the mutual of locating piece and steel band Cooperation, avoids steel band from wandering off during transmission, and the middle part of steel band is made to be directed at pinch roller, plays processing to steel band convenient for deformation component Effect promotes the processing effect to steel band.
Styling components are additionally provided on first mounting rack 1, the styling components include being set on first mounting rack 1 Boost assemblies 4, set on the 7th transfer roller 110 of 4 side of boost assemblies and set on the 8th of 110 lower section of the 7th transfer roller Transfer roller 120, the 7th transfer roller 110 are equipped with the second pinch roller 1101;Second pressure roller structure is identical as the first pressure roller structure;It is described Boost assemblies 4 include the first connecting rod 42 on first mounting rack 1, the connection on the first connecting rod 42 Frame 41, the second mounting plate 43 set on the second driving wheel 44 of 41 bottom of connection frame and on the connection frame 41, institute 43 bottom of the second mounting plate is stated equipped with briquetting 45;First connecting rod is two groups, and the both ends of first connecting rod are respectively fixedly connected in first On mounting rack, first connecting rod is arranged on connection frame, erects fixed function to connection by first connecting rod, connection frame is pacified Loaded on the first mounting rack;Second driving wheel is two groups, is respectively arranged on connection frame two sides of the bottom, the spacing and steel of the second driving wheel The width of band is equal, and when steel band enters in styling components, the second driving wheel is in contact with steel band side wall;Second mounting plate is Multiple groups are uniformly set on connection frame, and when steel band passes through from connection frame, briquetting is in contact with steel strip surface, passes through briquetting Effect to steel band plays pressing styling to steel band, preliminary styling is played to steel band.
After steel band generates deformation under the action of deformation component, the steel band after deformation is transported at styling components, steel band After completing preliminary styling under briquetting effect in boost assemblies, steel band enter the 7th transfer roller and eight revolution roller it Between, by the mating reaction of the 7th transfer roller and eight revolution roller, compacting styling is played to steel band, it is firm after increasing strip deformation Property, Improving The Quality of Products.
When handling steel band, steel coil strip is fixed on runner, then processing is encased in by one of steel band and sets Standby interior, steel band is conveyed into the first mounting rack under the action of force piece, first by carrying out pressing processing to steel band to roller, It is driven plain the steel band separated from steel coil strip under the action of to roller, then steel band is arranged in overload protection arrangement, just In passing through overload protection arrangement when equipment breaks down quickly for steel strip cutting, steel band is avoided to snap onto equipment to equipment It damages;The steel band being pierced by out of overload protection arrangement is by perforating device, to steel strip surface under the action of perforating device Punching processing is carried out, according to the process requirements to steel band, corresponding through-hole is stamped to steel strip surface, improves product quality;Through By perforating device, treated that steel band is delivered to deformation component, under the mutual cooperation effect of multiple transfer rollers, is passing steel band Deformation occurs in defeated process, and steel band is processed into required shape, and subsequent steel band enters in styling components, passes through sizing group Part plays styling to the steel band after deformation, it is ensured that and steel band is processed to required structure, and last steel band passes through disconnecting device, Steel band is cut into segment under the action of disconnecting device, completes the working process to steel band.
The first push plate 232 is equipped in first installs case 23, first cutter 2321 is set to first push plate 232 Bottom, the second push plate 233 is equipped at the top of first push plate 232, and the piston rod of the first hydraulic cylinder 22 is pushed away with described second Plate 233 is fixedly connected with;It is equipped with the first movable chamber 231 in first installs case 23, the first limit is equipped in first movable chamber 231 Position spring 2311,2311 top of the first limit spring are fixedly connected with second push plate 233;First installs case, 23 bottom Portion is equipped with the second movable chamber 234, and first push plate 232 is arranged in second movable chamber 234, first push plate 232 It is equipped with the first limit plate 2322, first limit plate 2322 is equipped with the second connecting rod 2341, second connecting rod 2341 are equipped with third connecting rod 2342, are equipped with cavity in the second connecting rod, and third connecting rod is arranged in cavity, third connection Bar can enter in the second connecting rod along cavity inner wall;2342 bottom of third connecting rod is fixed with the first pressing plate 235, institute It states and is arranged with the second limit spring 2343 in the second connecting rod 2341, second limit spring one end is in contact with the first pressing plate, separately One end is in contact with the first limit plate;First pressing plate 235 is equipped with the through-hole matched with first cutter 2321 2352, the first pressing plate bottom is equipped with fixed pad 2351, and fixed pad is made of rubber.
When steel band processes failure in equipment, the second push plate of first hydraulic cylinder Work Promote moves down, makes the Two push plates drive the first push plate to move down, and under the action of the second limit spring, the first limit plate pushes the first pressing plate down Movement makes the first pressing plate and the first support plate cooperate, by band cramp between the first pressing plate and the first support plate, to steel band Fixed function is played, first hydraulic cylinder pushes piston rod continuation to move down, presses the effect of the pressure of the second limit spring Contracting, moves the first cutter down and is pierced by out of through-hole, steel strip cutting is avoided steel band to the effect just beaten by the first cutter It continues into equipment and equipment is caused further to damage by equipment is stuck;Subsequent Driven by Hydraulic Cylinder piston rod is shunk, and is made Piston rod drives the second push plate up to move, and under the action of the first limit spring and the second limit spring, drives the first push plate It quickly enters in the first installs case, the first cutter is made to disengage with steel band, make overload protection component Rapid reset;Pass through The mutual cooperation of second connecting rod and third connecting rod play the guiding role to the movement of the first pressing plate, avoids the first pressing plate and The dislocation of one support plate is influenced to the dissection of steel band, avoid the first cutter and the first support plate contact with each other to the first cutter and First support plate damages, and shields to equipment, extends service life of equipment.
The perforating device 3 includes third mounting plate 31, the second hydraulic cylinder 33 on the third mounting plate 31, sets The 4th mounting plate 32 in 31 lower section of third mounting plate and the second support plate 34 below the 4th mounting plate 32; 4th mounting plate 32 is equipped with the second pressing plate 35, and second pressing plate 35 is equipped with sleeve 351, second support plate 34 It is equipped with the locating rod 342 matched with the sleeve 351;Second support plate be equipped with lower die 341, the second pressing plate be equipped with The upper mold that lower die matches can replace upper and lower mould according to the different process requirements to steel band, increase the suitable of perforating device Use range;Lower die is equipped with the first support spring 36, and the other end of the first support spring is fixedly connected with the second pressing plate;Pass through first Support spring works as a buffer upper and lower mould, avoids the second platen pressure is excessive from directly bearing against in lower die to being molded as damaging up and down It is bad, extend the die life on perforating device.
The locating rod 342 is equipped with third movable chamber 3421, is equipped with the second limit plate in the third movable chamber 3421 3424, second limit plate 3424 is equipped with the 4th connecting rod 3422, and the 4th connecting rod 3422 is limited equipped with third Plate 3423,351 inner wall of sleeve are equipped with the loose slot 3511 matched with the third limit plate 3423, and the described 4th connects Reset spring 3425 is arranged on extension bar 3422;By the mutual cooperation of third limit plate and loose slot, avoid sleeve from positioning Deviate from bar, sleeve made to be in corresponding position always with locating rod, convenient for by sleeve and locating rod to the second pressing plate and Second support plate plays the role of positioning, and cooperates upper and lower mould more accurately;Pass through the phase of reset spring and the first support spring Mutual mating reaction plays certain support effect to the second pressing plate, the second pressing plate excessive descent is avoided to cause the damage of upper and lower mould, right Upper and lower mould shields, and extends the service life of upper and lower mould.
When steel band enters at perforating device, second hydraulic cylinder drives piston rod to stretch out, and the second pressing plate is in piston rod It is moved down under effect, upper die and lower die is made to cooperate, punching processing is carried out to steel strip surface, pass through locating rod and sleeve It cooperates, increases the fiting effect of upper and lower mould, so that upper and lower mould is preferably cooperated and punching processing is risen to steel band, promote product Quality.
The disconnecting device 5 includes the 5th mounting plate 51, the 5th connecting rod 53 on the 5th mounting plate 51, sets The 6th mounting plate 52 in 53 other end of the 5th connecting rod and the second installs case 54 on the 6th mounting plate 52, It is equipped with the 4th movable chamber 542 in second installs case 54, is connected with movable block 55 in the 4th movable chamber 542, institute It states the second installs case 54 and is equipped with the third hydraulic cylinder 541 for pushing the movable block 55 to rotate;Movable block one end is equipped with link block 543, link block is articulated on the 4th movable cavity wall;The piston cylinder of third hydraulic cylinder is equipped with third push plate 5411, and third pushes away Plate is in contact with the other end of movable block, and movable block can be rotated around hinge joint under the action of third hydraulic cylinder;Activity Block is equipped with cavity 551, and the structure of cavity is identical as the finished form after steel band processing;Cavity inner wall is equipped with the second cutter 552, receiving block is additionally provided in the second installs case, and receiving block is in contact with movable block, and receiving block is equipped with to be matched with cavity Accept chamber.
Movable block bottom is equipped with baffle 553, and the 4th movable chamber bottom is equipped with support component 56, the 4th movable chamber bottom interior wall It is equipped with mounting groove 544, is equipped with the second support spring 545 in mounting groove, the second support spring is in contact with support component;Support Component includes the support base 583 in mounting groove, the 5th movable chamber 567 in support base, is set in the 5th movable chamber Third support spring 568, the 6th connecting rod 564 that is arranged in the 5th movable chamber and the third branch in the 6th connecting rod Fagging 565, the 6th connecting rod bottom are additionally provided with the 4th limit plate 566, and the 4th limit plate is set in the 5th movable chamber, third support Spring is in contact with the 4th limit plate;Support base is equipped with sliding block 561, and the 4th movable cavity wall is equipped with the cunning matched with sliding block Slot 546, sliding slot are set to below mounting groove;Slider bottom is equipped with the 5th limit plate 562, and the 4th movable cavity wall is equipped with and the 5th The limiting slot 547 that limit plate matches, limiting slot are set to below sliding slot;When support component plays a supportive role to movable block, the Three support plate one end are in contact with block.
After the completion of steel band is processed, steel band is entered in disconnecting device, and steel band is arranged in receiving block, a part Steel band is pierced by out of movable block, and when the steel band for meeting length is pierced by movable block, third Driven by Hydraulic Cylinder third push plate is transported down It is dynamic, make third push plate that movable block be pushed to be rotated around hinge joint, movable block makes on cavity inner wall in the course of rotation Second cutter is in contact with steel band, listened the effect of the second cutter make stress on steel band concentrate on one wire, to steel band into Row cutting process;The second support spring and third support spring are in contraction state at this time, and support component is along sliding slot sliding one Set a distance;After disconnecting device completes the cutting process to steel band, along cunning under the action of the second support spring of support component Slot moves to one end of sliding slot, and third push plate up moves under the action of third support spring, makes movable block around hinge joint It turns on horizontal position, cooperates the undertaking chamber on cavity and receiving block on movable block again, convenient for lower disconnected steel band Cutting;Steel band is cut by the method that movable block one end stress rotates movable block, power needed for reducing cutting of steel band, Make movable block that can reduce the energy consumption of equipment preferably by steel strip cutting under the action of the smallest power, be promoted to steel band Cutting effect;By the mutual cooperation of the second cutter and movable block, concentrates the stress on steel band on one wire, make steel band Section become it is more smooth, increase the aesthetics of product.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (10)

1. a kind of process equipment of AC gold metal plate chassis including the first mounting rack (1), is set on first mounting rack (1) Overload protection arrangement (2), be set to first mounting rack (1) on perforating device (3) and be set to first mounting rack (1) on Disconnecting device (5), deformation component is additionally provided on first mounting rack (1), the deformation component is set to the perforating device (3) between the disconnecting device (5), it is characterised in that: the overload protection arrangement (2) includes the second mounting rack (21), sets In the first hydraulic cylinder (22) on second mounting rack (21), the third mounting rack that is connected with second mounting rack (21) (24), for being set to the first installs case (23) on the third mounting rack (24) and being set to below first installs case (23) One support plate (26), first installs case (23) is interior to be equipped with the first cutter (2321).
2. a kind of process equipment of AC gold metal plate chassis described in accordance with the claim 1, it is characterised in that: first mounting rack (1) the first mounting plate (11) are equipped with, the first mounting plate (11) bottom surface is equipped with the first driving wheel (111), first peace Loading board (11) side is equipped with multiple groups to roller (12), described to be set to the overload protection arrangement (2) side to roller (12).
3. a kind of process equipment of AC gold metal plate chassis according to claim 2, it is characterised in that: the deformation component packet Include the first transfer roller (13), the second transfer roller (15) and the third transfer roller (18) being set on first mounting rack (1) and with described the The 4th transfer roller (14) that one transfer roller (13) matches, the 5th transfer roller (16) matched with second transfer roller (15) and with it is described The 6th transfer roller (19) that third transfer roller (18) matches, first transfer roller (13) are equipped with the first pinch roller (131), and the described 4th Transfer roller (14) is equipped with the first umbrella shape wheel (141) matched with first pinch roller (13).
4. a kind of process equipment of AC gold metal plate chassis according to claim 2, it is characterised in that: first mounting rack (1) styling components are additionally provided on, the styling components include the boost assemblies (4) being set on first mounting rack (1), are set to 7th transfer roller (110) of boost assemblies (4) side and the eight revolution roller (120) being set to below the 7th transfer roller (110), 7th transfer roller (110) is equipped with the second pinch roller (1101).
5. a kind of process equipment of AC gold metal plate chassis according to claim 4, it is characterised in that: the boost assemblies It (4) include the first connecting rod (42) on first mounting rack (1), the connection on the first connecting rod (42) Frame (41), the second driving wheel (44) for being set to the connection frame (41) bottom and the second installation being set on the connection frame (41) Plate (43), the second mounting plate (43) bottom are equipped with briquetting (45).
6. a kind of process equipment of AC gold metal plate chassis described in accordance with the claim 1, it is characterised in that: first installs case (23) in be equipped with the first push plate (232), first cutter (2321) be set to the first push plate (232) bottom, described first The second push plate (233) are equipped at the top of push plate (232), the piston rod of the first hydraulic cylinder (22) and second push plate (233) It is fixedly connected with;The first movable chamber (231) are equipped in first installs case (23), first is equipped in first movable chamber (231) Limit spring (2311), the first limit spring (2311) top are fixedly connected with second push plate (233).
7. a kind of process equipment of AC gold metal plate chassis according to claim 6, it is characterised in that: first installs case (23) bottom is equipped with the second movable chamber (234), and first push plate (232) is arranged in second movable chamber (234), described First push plate (232) is equipped with the first limit plate (2322), and first limit plate (2322) is equipped with the second connecting rod (2341), second connecting rod (2341) is equipped with third connecting rod (2342), and third connecting rod (2342) bottom is solid It is connected with the first pressing plate (235), is arranged with the second limit spring (2343) on second connecting rod (2341), first pressing plate (235) it is equipped with the through-hole (2352) matched with first cutter (2321).
8. a kind of process equipment of AC gold metal plate chassis according to claim 2, it is characterised in that: the perforating device (3) include third mounting plate (31), the second hydraulic cylinder (33) being set on the third mounting plate (31), be set to third peace The 4th mounting plate (32) below loading board (31) and the second support plate (34) below the 4th mounting plate (32);It is described 4th mounting plate (32) is equipped with the second pressing plate (35), and second pressing plate (35) is equipped with sleeve (351), second support Plate (34) is equipped with the locating rod (342) matched with the sleeve (351).
9. a kind of process equipment of AC gold metal plate chassis according to claim 8, it is characterised in that: the locating rod (342) third movable chamber (3421) are equipped with, are equipped with the second limit plate (3424) in the third movable chamber (3421), described the Two limit plates (3424) are equipped with the 4th connecting rod (3422), and the 4th connecting rod (3422) is equipped with third limit plate (3423), sleeve (351) inner wall is equipped with the loose slot (3511) matched with the third limit plate (3423), described Reset spring (3425) are arranged in 4th connecting rod (3422).
10. a kind of process equipment of AC gold metal plate chassis according to claim 2, it is characterised in that: the disconnecting device (5) include the 5th mounting plate (51), the 5th connecting rod (53) being set on the 5th mounting plate (51), be set to the 5th company 6th mounting plate (52) of extension bar (53) other end and the second installs case (54) being set on the 6th mounting plate (52), it is described It is equipped with the 4th movable chamber (542) in second installs case (54), is connected with movable block in the 4th movable chamber (542) (55), second installs case (54) is equipped with the third hydraulic cylinder (541) for pushing movable block (55) rotation.
CN201811015688.5A 2018-08-31 2018-08-31 A kind of process equipment of AC gold metal plate chassis Active CN109158505B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811015688.5A CN109158505B (en) 2018-08-31 2018-08-31 A kind of process equipment of AC gold metal plate chassis

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811015688.5A CN109158505B (en) 2018-08-31 2018-08-31 A kind of process equipment of AC gold metal plate chassis

Publications (2)

Publication Number Publication Date
CN109158505A true CN109158505A (en) 2019-01-08
CN109158505B CN109158505B (en) 2019-07-23

Family

ID=64893651

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811015688.5A Active CN109158505B (en) 2018-08-31 2018-08-31 A kind of process equipment of AC gold metal plate chassis

Country Status (1)

Country Link
CN (1) CN109158505B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114871330A (en) * 2022-07-08 2022-08-09 江苏江平新环境科技有限公司 Processing equipment of air conditioner panel beating chassis

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203830534U (en) * 2014-03-14 2014-09-17 安徽伟嘉装备技术有限公司 Automatic refrigerator box frame sheet metal forming line
CN203853448U (en) * 2014-03-14 2014-10-01 安徽伟嘉装备技术有限公司 Automatic forming line for sheet metal of central air-conditioner blower coil unit
KR20150078470A (en) * 2013-12-30 2015-07-08 주식회사 성우하이텍 Running cutter for sheet roll forming system
CN206689288U (en) * 2017-04-14 2017-12-01 佛山市迪赛纳科技有限公司 A kind of mould of panel beating
CN108393354A (en) * 2018-03-21 2018-08-14 安徽艾普智能装备有限公司 Rolling continuous production positions disconnecting device

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20150078470A (en) * 2013-12-30 2015-07-08 주식회사 성우하이텍 Running cutter for sheet roll forming system
CN203830534U (en) * 2014-03-14 2014-09-17 安徽伟嘉装备技术有限公司 Automatic refrigerator box frame sheet metal forming line
CN203853448U (en) * 2014-03-14 2014-10-01 安徽伟嘉装备技术有限公司 Automatic forming line for sheet metal of central air-conditioner blower coil unit
CN206689288U (en) * 2017-04-14 2017-12-01 佛山市迪赛纳科技有限公司 A kind of mould of panel beating
CN108393354A (en) * 2018-03-21 2018-08-14 安徽艾普智能装备有限公司 Rolling continuous production positions disconnecting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114871330A (en) * 2022-07-08 2022-08-09 江苏江平新环境科技有限公司 Processing equipment of air conditioner panel beating chassis
CN114871330B (en) * 2022-07-08 2022-09-30 江苏江平新环境科技有限公司 Processing equipment of air conditioner panel beating chassis

Also Published As

Publication number Publication date
CN109158505B (en) 2019-07-23

Similar Documents

Publication Publication Date Title
CN201154374Y (en) Hole-punching and circle-rolling machine
CN203955921U (en) Pole U-shaped bending die
CN105642748B (en) Riveting equipment
CN109158505B (en) A kind of process equipment of AC gold metal plate chassis
CN102013401A (en) Non-destructive arc moulding mechanism for integrated circuit pin, and method thereof
CN201365394Y (en) Non-destructive arc forming mechanism of integrated circuit pin
CN206838919U (en) Front-axle beam strengthens iron continuous stamping die under a kind of refrigerator
CN104889286A (en) Hinge-leaf shaft-position mold processing machine
CN208033376U (en) One kind being convenient for automatically feed trim press
CN102294417B (en) Equipment for manufacturing steel wire gardening hook
CN201669746U (en) Punching device of non-woven fabrics suspension belt
JP6340139B2 (en) Method and apparatus for forging and forming different materials
CN109732025B (en) Production process of hexagonal frame forging of high-strength wire spacing device
CN208613495U (en) Miniature circuit breaker static contact molding die
KR200461623Y1 (en) Fire door frame mold
CN205702072U (en) Hinge processing mold
CN205949613U (en) Automobile drive axle shock absorber support blanking mould
CN107671225A (en) A kind of moulding process of special-shaped bent axle
CN211265927U (en) Wire stripping that noise is little beats terminal device
CN211758257U (en) A segmentation needle cutting mechanism for staple packing processing
CN206662107U (en) One kind is used for auto parts machinery automatic material connection equipment
CN209736536U (en) wire feeding mechanism for multi-wire spring machine head
CN102582016A (en) Production line punching equipment for automobile braking air plug rubber diaphragm semi-finished product
CN101530871A (en) Production method of shoe heel steel pipe
CN201669325U (en) Copper material vertical trimming part processing device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200103

Address after: 312300 Zhejiang city of Shaoxing province Shangyu city street high road No. 18

Patentee after: Zhejiang state auspicious Limited by Share Ltd

Address before: 312000 Hangzhou Bay Shangyu economic and Technological Development Zone, Zhejiang, Shaoxing

Patentee before: Shaoxing Shangyu Guoheng Refrigeration Parts Co., Ltd.

TR01 Transfer of patent right