CN109144547A - A kind of electric energy meter legality measurement program and non-legal system function program separation method - Google Patents

A kind of electric energy meter legality measurement program and non-legal system function program separation method Download PDF

Info

Publication number
CN109144547A
CN109144547A CN201810950613.XA CN201810950613A CN109144547A CN 109144547 A CN109144547 A CN 109144547A CN 201810950613 A CN201810950613 A CN 201810950613A CN 109144547 A CN109144547 A CN 109144547A
Authority
CN
China
Prior art keywords
program
core
electric energy
energy meter
metering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810950613.XA
Other languages
Chinese (zh)
Inventor
张秋雁
丛中笑
李鹏程
张俊玮
丁超
岑远洪
邵峥
文秀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Power Grid Co Ltd
Original Assignee
Guizhou Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Power Grid Co Ltd filed Critical Guizhou Power Grid Co Ltd
Priority to CN201810950613.XA priority Critical patent/CN109144547A/en
Publication of CN109144547A publication Critical patent/CN109144547A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/60Software deployment
    • G06F8/65Updates
    • G06F8/654Updates using techniques specially adapted for alterable solid state memories, e.g. for EEPROM or flash memories
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F11/00Error detection; Error correction; Monitoring
    • G06F11/07Responding to the occurrence of a fault, e.g. fault tolerance
    • G06F11/14Error detection or correction of the data by redundancy in operation
    • G06F11/1402Saving, restoring, recovering or retrying
    • G06F11/1446Point-in-time backing up or restoration of persistent data
    • G06F11/1458Management of the backup or restore process
    • G06F11/1469Backup restoration techniques

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Security & Cryptography (AREA)
  • Quality & Reliability (AREA)
  • Stored Programmes (AREA)

Abstract

The invention discloses a kind of electric energy meter legality measurement programs and non-legal system function program separation method, it includes the following steps: (1) that electric energy meter hardware structure is designed as metering core and management core twin-core structure;Metering core and management core are divided into podium level and component layer;Step 2, the podium level configuration metering MCU in metering core, manage the podium level configuration management MCU of core, metering MCU and management MCU and are carried out data transmission by SPI interface circuitry;Step 3 installs legal system accounting procedure in metering MCU;Non- legal system function program is installed in management MCU;The electric energy meter for solving the prior art will measure and other function integrated design, and the change of funtion part is easy to influence function of measuring, and damage or failure are easy to cause the damage or failure of metering section;The upgrading of follow-up management core software program is easy to influence the legality measurement function of metering core, causes the technical problems such as metering misalignment event.

Description

A kind of electric energy meter legality measurement program and non-legal system function program separation method
Technical field
The invention belongs to Electric Energy Metering Technology field more particularly to a kind of electric energy meter legality measurement programs and non-legal system function Program separation method.
Background technique:
Existing operation electric energy meter will measure and the design of other function integrations, considers manufacturing process and cost, legality measurement and In the same single-chip microcontroller, the change of funtion part is easy to influence function of measuring, damage or mistake non-legal system function program Effect is easy to cause the damage or failure of metering section;Consider manufacturing process and cost, legality measurement and non-legal system function program are still In the same single-chip microcontroller, if separating without program, the upgrading of follow-up management core software program is easy to influence metering core Legality measurement function causes metering misalignment event.
Summary of the invention:
The technical problem to be solved in the present invention: a kind of electric energy meter legality measurement program and non-legal system function program separation side are provided Method, to solve, the electric energy meter of the prior art will be measured and other function integrated design, the change of funtion part are easy to influence To function of measuring, damage or fail being easy to cause the damage or failure of metering section;Legality measurement and non-legal system function program Still in the same single-chip microcontroller, if separating without program, the upgrading of follow-up management core software program is easy to influence metering core Legality measurement function, cause the metering technical problems such as misalignment event.
Technical solution of the present invention:
A kind of electric energy meter legality measurement program and non-legal system function program separation method, it includes:
Electric energy meter hardware structure is designed as metering core and management core twin-core structure by step 1;Metering core and management core are drawn respectively It is divided into podium level and component layer;
Step 2, the podium level configuration metering MCU in metering core, manage the podium level configuration management MCU of core, measure MCU and management MCU is carried out data transmission by SPI interface circuitry;
Step 3 installs legal system accounting procedure in metering MCU;Non- legal system function program is installed in management MCU;Legality measurement program " twin-core " realization is based on non-legal system function program to be completely separated.
The program structure on MCU and management MCU is measured according to Hierarchical Design, contains driving layer, interface layer and application respectively Layer.
The management core is divided to two program sectionings, bootstrap area and the program area APP, stores original APP journey with external FLASH Sequence and APP program to be upgraded;The purpose of storage original APP program is standby before restoring when upgrading being prevented unsuccessfully to be unable to operate normally Part program.
The upgrading of program on management core, which uses, first stores upgrade mode again.
APP program is to collect upgrading data by port and be put into external FLASH, when detecting that upgrade procedure collected After whole, application layer data is saved with to be restored, and closing is all interrupted, and is set and is upgraded mark, and execution warm reset executes software from liter Grade.
The method of the upgrading APP program are as follows:
Step 6.1,00H remove transmission file, empty the file content upgraded in the past;
Step 6.2 issues upgrade file, starting, intermediate frame to electric energy meter transmission 01H;
Step 6.3 issues upgrade file, end frame to electric energy meter transmission 11H;
Step 6.4, electric energy meter carry out CRC check to the message received, and verification is updated by rear startup program;
Step 6.5 is updated and is completed, self refresh unused portion FLASH;
Step 6.6, electric energy list procedure are restarted automatically;
Step 6.7 passes through transparent electric energy meter software version number, reaffirms whether electric energy meter upgrades successfully.
Beneficial effects of the present invention:
The present invention is by legality measurement program and non-legal system function program from physically separating;Between pass through SPI interface Carry out information exchange;When non-legal system function program needs to upgrade, can be used for realizing remote software online upgrading, upgrading not at Function can also restore the Stability and veracity that will not influence legality measurement part to version before, solve prior art function Can property software program upgrading or BUG caused by confusion may result in legality measurement function damage or failure the problem of.To user For new function can be increased by software upgrading, meet user and customize demand;It can not influenced for power supply company Software vulnerability is solved by remote software upgrade on the basis of function of measuring, improves reliable, the independence, personalization of program upgrading, Electric energy meter Life cycle maintenance cost is reduced, product reuse rate is improved, reduces the wasting of resources caused by product frequently upgrades, section Cost-saving, it is with good economic efficiency.
Specific embodiment:
A kind of electric energy meter legality measurement program and non-legal system function program separation method, it include: 1) hardware structure setting, 2) it is soft The setting of part framework, 3) management core software upgrading three parts.
Electric energy meter is divided into metering core and management core by the setting of hardware structure;Metering core and management core respectively include platform Layer, component layer (extension layer), podium level are divided into management MCU and metering MCU two parts, carry out data biography by SPI interface circuitry It is defeated, it is mutually indepedent on respective component layer (extension layer) hardware.Metering core is as base table, main cumulative basis energy data, simultaneously Have the functions such as data storage, pulse instruction, full decompression, abnormity of power supply event detection, data are handed over by 698 agreements and management core Mutually, so that outside display, communication, logout, the independent RS485 interface of metering core can only be read, any setting is not supported to operate, For tracing to the source for legal system data.Core is managed as functional module, mainly undertakes the management role of whole table, including takes control and shows, is right The tasks such as outer communication, logout, data-frozen, load control system, to metering core clock setting order by 698 clear-text ways into Row, when remotely carrying out clock setting, it is necessary to first pass around management MCU, management core MCU can pass through ESAM after receiving setting command Safety verification is carried out, guarantees the safety of significant data with this.Core function is managed with decontroling electrity market, there are diversified management Demand can be managed core function upgrading by way of remote upgrade program.Management core is related to the function of charge, can pass through meter Freeze electric energy and checked in amount core basis.
Metering core and management core communication interface use hypotactic SPI communication mode, manage core as main website and master SPI, as slave station and from SPI, the foundation of communication link is controlled with releasing by main website metering core.
To timely respond to the SPI communication request that main website manages core, metering core notifies management core by the way of busy mark, i.e., Core main SPI is when issuing communication data for management, before getting out reply data from SPI metering core, to management main SPI mono-, core busy mark (fixed to use 16H).
Transmission frame format uses DL/T698.45.Traffic rate is not less than 100k/bps.
Software architecture includes metering MCU platform and management MCU platform.Measuring the part MCU is base table program, i.e. legality measurement Program, the part management MCU is non-legal system functional application.Legality measurement program and non-legal system function program be based on " twin-core " and The realization of software layer sub-module is completely separated.
MCU and the part management MCU are measured according to Hierarchical Design, the layer containing driving, interface layer and application layer, general to produce respectively The variation of product functionality, need to only change application layer module.
Manage core component software can online upgrading, do not influence the Stability and veracity of metering section, upgrade it is unsuccessful can Version before return decides whether to upgrade management core by distinguishing the demand of ammeter program.
Management core software upgrading includes software upgrading type classification, software upgrading application class, the classification of software upgrading scale, Software upgrading pattern classification.
The software upgrading type includes software function upgrading and database (data structure) upgrading.Software function upgrade package It includes and increases software function and former function is improved.When increasing software function, the corresponding program segment of the function is increased to it In his similar functional module or individually increase a functional module;It is corresponding to this function when being improved to former function Module is modified, and original functional module is then replaced.There is no database inside " twin-core " electric energy table entry, but contains number According to structure, it is consequently belonging to software function upgrading, and compatible legacy data structure.
The software upgrading is applied including operating system update, application software upgrade, drive software upgrading, according to using need Different upgrade functions is taken, " twin-core " electric energy meter though software is divided into multilayer, for example drives due to being limited by hardware resource Layer, interface layer and application layer, application software and drive software need to upgrade together, for HardwareUpgring of looking ahead, so rising It needs to consider hardware version when grade.The upgrading of " twin-core " electric energy meter belongs to application software and drive software mixing upgrading.
The software upgrading scale includes all upgradings, part upgrading (upgrade patch upgrading)." twin-core " electric energy meter considers The integrality and trackability of software upgrading, using unified whole upgrading modes, i.e. management core program all upgrades, software liter It needs to trace the software version before upgrading when grade.
The software upgrading mode upgrades again including directly upgrading, first storing.Direct upgrade mode is not take up very big storage Space often receives one section of upgrading message, direct refurbishing procedure space after the validity of judgment frame.System requirements has resident guidance journey Sequence such as should at least support communication, on line refreshable application program, reboot at the functions.Direct upgrade mode is straight after starting upgrading Refreshing application program is connect, original application program can stop running immediately in escalation process;First store again upgrade mode occupancy Larger memory space often receives one section of upgrading message, is first stored in DATAFLASH after the validity of judgment frame, when whole reports Text carries out secondary verification after receiving, starting application program refreshes after verification passes through, and finally just reboots program.System can With whole upgradings, it is not required to resident bootstrap;It such as needs resident bootstrap to require to be relatively low, that is, does not need to support communication Function only need to support on line refreshable application program, reboot etc. functions." twin-core " electric energy meter uses first to store upgrades mould again Formula.
" twin-core " electric energy meter software is divided into the not scm software of tape operation system and tape operation system scm software, area Divide the not application upgrade of tape operation system, the application upgrade with small-scale operating system (such as FreeRTOS, i^COS), the large-scale behaviour of band Make the application upgrade of system (such as LINUX).
The application apparatus general procedure design capacity of tape operation system is not smaller, and program is stored in the storage of CPU internal processes Qu Zhong, upgrading need CPU to support IAP(In-Application Programming, in-service units) function, user is by answering The embedded execution program of update is reprogramed with software itself.It operates normally program and IAP function program is general independent in the area Liang Ge In block, interrupt function must be closed when executing IAP process, prevents the illegal calling of interrupt routine during program updating.
Application apparatus general procedure design capacity with small-scale operating system (such as FreeRTOS, i^COS) is medium and usual It is stored in the internal storage region CPU, supports remote online upgrade function using the mode for updating entire application file, when operation needs The RAM wanted is than the general increase 4KB or so without system, therefore the cpu resource selected and not tape operation system is essentially identical.
As ST Cortex-M3 family chip not only supports IAP function, and interrupt vector table is supported to map, program storage Device can divide multiple blocks to be programmed, and 1 block runs resident program, execute the update to other blocks.
The application apparatus general procedure design capacity of large operation system (such as LINUX) is larger, and program is stored in outside CPU In memory block, solution is run into SDRAM and (is similar to PC machine) when normal, and remote online upgrade function is supported generally to use text Part renewal model, therefore the CPU selected needs dominant frequency higher position reason ability stronger, plug-in memory capacity is bigger.
In view of the design requirement of electric energy meter low-power consumption, program capacity demand is not very big, at the same consider electric energy meter technology at The many factors such as ripe degree, scheme resource, product cost, therefore the general hsrdware requirements design for selecting not tape operation system.
A kind of electric energy meter legality measurement program and non-legal system function program separation method, " twin-core " electric energy meter is not using Tape operation system design, software upgrading are used using height-rise grade, updating and management core functional software first stores upgrade mode again.
It manages core and uses two program sectionings, bootstrap area and the program area APP, store original APP program with external FLASH With APP program to be upgraded.The purpose of storage original APP program has been backed up before restoring when upgrading being prevented unsuccessfully to be unable to operate normally Program.
It manages core MCU and uses multi-functional, high-performance, the dedicated 256KMCU chip of low-power consumption electric energy meter, programming is divided into two Part, first part are system resident program, storage address 0x0,000 0000-0x000 07FFF, size 0x8000 (32Kbytes);Second part is APP application program, storage address 0x0000 8000-0x0004 0000, size 0x38000 (224Kbytes).
The management core software upgrading of a kind of electric energy meter legality measurement program and non-legal system function program separation method, it is wrapped It includes: 1) software upgrading communication mechanism, 2) software upgrading committed step, 3) software upgrading security protection, 4) based on management core design Program sectioning, 5) metering core access mode.
The software upgrading communication mechanism refers to transmission information of upgrade file, to verify product software and file to be upgraded Matching.
Information of upgrade file is 128 bytes, is identified and is transmitted using growth data;
Upgrade file size is 4 bytes, and judgment basis is wiped in advance and completely received to upgrade file memory space;
Every frame transmission size is 1 byte, for judging whether communication buffer size meets subsequent upgrade requirement, except most when transmission The latter inconsistent outer other frames of frame length press this size, are the foundations of upgrade file splicing calculations of offset;
Compression mark is 1 byte, and whether upgrade file, which needs, decompresses, and compression can save transmission communication flow and improve efficiency, this Invention uses uncompressed carry out upgrade design;
It is 64 bytes that upgrade file, which is applicable in version, and version number of manufacturer software (ASCII) is 32 bytes, producer's hardware version numbers (ASCII character) is 32 bytes, avoids mismatch software from rising up into, improves the safety of software;
FileVersion is 32 bytes after upgrading, and version number of manufacturer software (ASCII) is 32 bytes, can the copy reading number after upgrading successfully According to the secondary judgement of progress;
Check code is 2 bytes, and integrality Rule of judgment can be using a variety of verification modes such as radix-minus-one complement verification, CRC, cryptographic Hash, this Invention uses CRC check, avoids upgrading software transmission process error;
Reserved byte is 24 bytes, the subsequent expansion for software upgrading.
RS485, infrared or carrier communication interface mode can be used in information of upgrade file transmission, it then follows DL/T 645- 2007 multifunctional electric energy meter communication protocols realize that software upgrading communication is using broadcast and actual communication by 4 byte datas of extension Address two ways.
File identification: 00H removes transmission file, disposably removes upgrade file;01H issues upgrade file, starting, centre Frame;11H issues upgrade file, end frame.
Total number of segment: it is calculated according to program size;
N-th segment identification (n-1 of i=0): in addition to final stage, remaining length is fixed.
File data: being file content when message mode is transmitted, and removing transmission file is then empty, data length of the present invention Using 128 byte, one frame data.
The software upgrading committed step, it includes:
Step 1,00H remove transmission file, empty the file content upgraded in the past;
Step 2 issues upgrade file, starting, intermediate frame to electric energy meter transmission 01H;
Step 3 issues upgrade file, end frame to electric energy meter transmission 11H;
Step 4, electric energy meter carry out CRC check to the message received, and verification is updated by rear startup program;
Step 5 is updated and is completed, self refresh unused portion FLASH;
Step 6, electric energy list procedure are restarted automatically;
Step 7 passes through transparent electric energy meter software version number, reaffirms whether electric energy meter upgrades successfully.
It is worth mentioning that considering that subsequent software compares and program security, the program that do not use to this upgrading use Erasing operation prevents software from comparing unqualified or program and is strayed into.
The software upgrading security protection includes authentication and Version Control.It is transmitted between test main website and electric energy meter Data demand is referring to " Q/G DW1365-2013 intelligent electric energy meter information exchange secure authentication technology specification ".Escalation process needs elder generation Authentication is carried out, the mode of specified table number or broadcast address can be used, certification uses frame check+CRC check side after passing through Formula carries out data transmission.
The program sectioning based on management core design includes bootstrap area and the area APP;Design external FLASH, storage Former APP program and APP program to be upgraded realize that the non-legal system function of electric energy meter remotely exists while not influencing legality measurement function Line upgrading, if upgrading is unsuccessful to restore preceding program.
The bootstrap is mainly used for realizing the heavy duty of upgrade code, first carries out school to the complete upgrade code received It tests, verifies by code update to main program area after passing through, if verification is not by then jumping to main program area without code update It brings into operation.
The APP program mainly collects upgrading data by port and is put into external FLASH, when detecting upgrading journey After sequence is collected completely, application layer data is saved with to be restored, and closing is all interrupted, and is set and is upgraded mark, and execution warm reset executes soft Part is from upgrade function.

Claims (6)

1. a kind of electric energy meter legality measurement program and non-legal system function program separation method, it includes:
Electric energy meter hardware structure is designed as metering core and management core twin-core structure by step 1;Metering core and management core are drawn respectively It is divided into podium level and component layer;
Step 2, the podium level configuration metering MCU in metering core, manage the podium level configuration management MCU of core, measure MCU and management MCU is carried out data transmission by SPI interface circuitry;
Step 3 installs legal system accounting procedure in metering MCU;Non- legal system function program is installed in management MCU;Legality measurement program " twin-core " realization is based on non-legal system function program to be completely separated.
2. a kind of electric energy meter legality measurement program according to claim 1 and non-legal system function program separation method, special Sign is: the program structure on metering MCU and management MCU is according to Hierarchical Design, the layer containing driving, interface layer and application respectively Layer.
3. a kind of electric energy meter legality measurement program according to claim 1 and non-legal system function program separation method, special Sign is: the management core is divided to two program sectionings, bootstrap area and the program area APP, stores original APP journey with external FLASH Sequence and APP program to be upgraded;The purpose of storage original APP program is standby before restoring when upgrading being prevented unsuccessfully to be unable to operate normally Part program.
4. a kind of electric energy meter legality measurement program according to claim 3 and non-legal system function program separation method, special Sign is: the upgrading of the program on management core, which uses, first stores upgrade mode again.
5. a kind of electric energy meter legality measurement program according to claim 3 and non-legal system function program separation method, special Sign is: APP program is to collect upgrading data by port and be put into external FLASH, when detecting that upgrade procedure collected After whole, application layer data is saved with to be restored, and closing is all interrupted, and is set and is upgraded mark, and execution warm reset executes software from liter Grade.
6. a kind of electric energy meter legality measurement program according to claim 3 and non-legal system function program separation method, special Sign is: the method for the upgrading APP program are as follows:
Step 6.1,00H remove transmission file, empty the file content upgraded in the past;
Step 6.2 issues upgrade file, starting, intermediate frame to electric energy meter transmission 01H;
Step 6.3 issues upgrade file, end frame to electric energy meter transmission 11H;
Step 6.4, electric energy meter carry out CRC check to the message received, and verification is updated by rear startup program;
Step 6.5 is updated and is completed, self refresh unused portion FLASH;
Step 6.6, electric energy list procedure are restarted automatically;
Step 6.7 passes through transparent electric energy meter software version number, reaffirms whether electric energy meter upgrades successfully.
CN201810950613.XA 2018-08-20 2018-08-20 A kind of electric energy meter legality measurement program and non-legal system function program separation method Pending CN109144547A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810950613.XA CN109144547A (en) 2018-08-20 2018-08-20 A kind of electric energy meter legality measurement program and non-legal system function program separation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810950613.XA CN109144547A (en) 2018-08-20 2018-08-20 A kind of electric energy meter legality measurement program and non-legal system function program separation method

Publications (1)

Publication Number Publication Date
CN109144547A true CN109144547A (en) 2019-01-04

Family

ID=64790221

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810950613.XA Pending CN109144547A (en) 2018-08-20 2018-08-20 A kind of electric energy meter legality measurement program and non-legal system function program separation method

Country Status (1)

Country Link
CN (1) CN109144547A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110333387A (en) * 2019-06-13 2019-10-15 宁波三星医疗电气股份有限公司 A kind of electric quantity metering method of electric energy meter
CN110928817A (en) * 2019-12-27 2020-03-27 广东电科院能源技术有限责任公司 Communication method, device and storage medium for double-core electric energy meter
CN111562436A (en) * 2020-07-15 2020-08-21 南方电网数字电网研究院有限公司 Equipment driving method and device of double-core intelligent electric meter
CN111583622A (en) * 2020-04-28 2020-08-25 南方电网数字电网研究院有限公司 Metering information distribution processing system and method of double-core intelligent ammeter management unit
CN111857777A (en) * 2020-07-16 2020-10-30 南方电网数字电网研究院有限公司 System updating method and device based on double-core intelligent electric meter and computer equipment
CN113312078A (en) * 2021-05-07 2021-08-27 南方电网数字电网研究院有限公司 Electric energy meter software modularization difference upgrading method and electric energy meter system
CN113835725A (en) * 2020-06-24 2021-12-24 宁波三星医疗电气股份有限公司 Software upgrading method for double-core electric energy meter and storage medium
CN114138201A (en) * 2021-12-02 2022-03-04 国网山东省电力公司营销服务中心(计量中心) Electric energy meter built-in memory data storage monitoring method and system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104348580A (en) * 2013-08-06 2015-02-11 夏普株式会社 Downlink physical channel transmitting and receiving methods, base station and user equipment
CN204990657U (en) * 2015-07-02 2016-01-20 成都市凯胜科技有限公司 Remote meter reading system
CN106571887A (en) * 2016-10-17 2017-04-19 国家电网公司 Management core and metering core clock synchronization processing method and device for dual-core intelligent electric energy meter
US20180173182A1 (en) * 2016-12-16 2018-06-21 General Electric Company Uninterruptable verification and control upgrade for real-time control system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104348580A (en) * 2013-08-06 2015-02-11 夏普株式会社 Downlink physical channel transmitting and receiving methods, base station and user equipment
CN204990657U (en) * 2015-07-02 2016-01-20 成都市凯胜科技有限公司 Remote meter reading system
CN106571887A (en) * 2016-10-17 2017-04-19 国家电网公司 Management core and metering core clock synchronization processing method and device for dual-core intelligent electric energy meter
US20180173182A1 (en) * 2016-12-16 2018-06-21 General Electric Company Uninterruptable verification and control upgrade for real-time control system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王立州等: ""基于IR46 标准的新型智能双芯电表设计"", 《自动化仪表》 *

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110333387B (en) * 2019-06-13 2021-08-31 宁波三星医疗电气股份有限公司 Electric energy metering method of electric energy meter
CN110333387A (en) * 2019-06-13 2019-10-15 宁波三星医疗电气股份有限公司 A kind of electric quantity metering method of electric energy meter
CN110928817B (en) * 2019-12-27 2021-06-08 南方电网电力科技股份有限公司 Communication method, device and storage medium for double-core electric energy meter
CN110928817A (en) * 2019-12-27 2020-03-27 广东电科院能源技术有限责任公司 Communication method, device and storage medium for double-core electric energy meter
CN111583622A (en) * 2020-04-28 2020-08-25 南方电网数字电网研究院有限公司 Metering information distribution processing system and method of double-core intelligent ammeter management unit
CN111583622B (en) * 2020-04-28 2021-01-22 南方电网数字电网研究院有限公司 Metering information distribution processing system and method of double-core intelligent ammeter management unit
CN113835725A (en) * 2020-06-24 2021-12-24 宁波三星医疗电气股份有限公司 Software upgrading method for double-core electric energy meter and storage medium
CN113835725B (en) * 2020-06-24 2023-06-02 宁波三星医疗电气股份有限公司 Dual-core electric energy meter software upgrading method, electric energy meter and storage medium
CN111562436A (en) * 2020-07-15 2020-08-21 南方电网数字电网研究院有限公司 Equipment driving method and device of double-core intelligent electric meter
CN111857777A (en) * 2020-07-16 2020-10-30 南方电网数字电网研究院有限公司 System updating method and device based on double-core intelligent electric meter and computer equipment
CN111857777B (en) * 2020-07-16 2024-02-27 南方电网数字电网科技(广东)有限公司 System updating method and device based on double-core intelligent ammeter and computer equipment
CN113312078A (en) * 2021-05-07 2021-08-27 南方电网数字电网研究院有限公司 Electric energy meter software modularization difference upgrading method and electric energy meter system
CN114138201A (en) * 2021-12-02 2022-03-04 国网山东省电力公司营销服务中心(计量中心) Electric energy meter built-in memory data storage monitoring method and system

Similar Documents

Publication Publication Date Title
CN109144547A (en) A kind of electric energy meter legality measurement program and non-legal system function program separation method
CN103207797B (en) Capsule type custom-made updating method based on unified extensible firmware interface firmware system
CN104090796B (en) A kind of embedded device method for updating program and system
CN106528106B (en) A kind of embedded system start method of adaptive various different Flash chip types
CN103777983B (en) A kind of On-board software is safeguarded and upgrade method in-orbit
CN106095480B (en) A kind of method and device of optical module firmware upgrading
CN102622253B (en) A kind of method of single-chip microcomputer and online upgrading thereof
US20140066040A1 (en) Over-the-air update method for continuous delta of android handheld device
CN105117253A (en) BootLoader based remote upgrade method for UV LED (Ultraviolet Light Emitting Diode) curing system
CN109313473A (en) The thermal control based on voltage of processing equipment
CN104662530A (en) Tuning for distributed data storage and processing systems
CN103577201B (en) The update method and system of Embedded Double system
CN105579953A (en) Flexible bootstrap code architecture
CN104090788B (en) A kind of On-board software configuration and operation method and system based on load
CN101706860B (en) Card reader and intelligent card
CN106201608A (en) Computer UEFI firmware update
EP4390673A1 (en) Ecu upgrade method and device, and readable storage medium
CN102004656A (en) Redundancy backup and security updating technology of vehicle integration information liquid crystal display and control platform
CN103092659A (en) Digital signal processor (DSP) software upgrading system and upgrading method separated from support environment of emulator
CN103425505A (en) IC card electric energy meter on-line upgrading method and system
CN105468390A (en) BOOT online upgrade apparatus and method
CN109032678A (en) The method for controlling the method, apparatus of BIOS type information amount, medium and type information
CN103455750A (en) High-security verification method and high-security verification system for embedded devices
CN102955701B (en) Use the application program update method of Bootloader program
CN111080816A (en) Desktop line issuing device for ETC terminal and card

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Zhang Qiuyan

Inventor after: Li Shihua

Inventor after: Laugh in the bush

Inventor after: Li Pengcheng

Inventor after: Zhang Junwei

Inventor after: Ding Chao

Inventor after: Cen Yuanhong

Inventor after: Shao Zheng

Inventor after: Wen Xiu

Inventor after: Wang Duorun

Inventor before: Zhang Qiuyan

Inventor before: Laugh in the bush

Inventor before: Li Pengcheng

Inventor before: Zhang Junwei

Inventor before: Ding Chao

Inventor before: Cen Yuanhong

Inventor before: Shao Zheng

Inventor before: Wen Xiu

CB03 Change of inventor or designer information
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104

RJ01 Rejection of invention patent application after publication