CN109141153A - A kind of blasting construction method controlling rock slope regularity and stability - Google Patents

A kind of blasting construction method controlling rock slope regularity and stability Download PDF

Info

Publication number
CN109141153A
CN109141153A CN201811053173.4A CN201811053173A CN109141153A CN 109141153 A CN109141153 A CN 109141153A CN 201811053173 A CN201811053173 A CN 201811053173A CN 109141153 A CN109141153 A CN 109141153A
Authority
CN
China
Prior art keywords
blasting
slope
stability
rock
regularity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811053173.4A
Other languages
Chinese (zh)
Inventor
徐志军
韩星
刘军
张健
原方
张冉冉
刘婷婷
郭兆翔
程远浩
杜乾
刘海林
姜学佳
庞照昆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201811053173.4A priority Critical patent/CN109141153A/en
Publication of CN109141153A publication Critical patent/CN109141153A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D3/00Particular applications of blasting techniques
    • F42D3/04Particular applications of blasting techniques for rock blasting
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping

Abstract

The invention discloses the blasting construction methods that rock slope related in civil engineering excavates a kind of control rock slope regularity and stability in field.Its work progress are as follows: firstly, the geologic information of exploration construction area, carries out drainage works before construction;Then, first the topsoil excavation of side slope is cleared in work progress, then the rock on pre -arranged layer top is carried out by Blasting Excavation using the method for explosion;Finally, carrying out pre -arranged layer explosion, a pipe pack is filled in blasthole bottom and carries out secondary blasting.It can control the regularity and stability of rock slope using such construction method, reduce to construct as onepull and be destroyed caused by Slope Stability, so that it is guaranteed that the safety of side slope.Unnecessary earthwork evacuation can be reduced to reduce operating expenses simultaneously, and guarantee is provided to the safe handling of road.

Description

A kind of blasting construction method controlling rock slope regularity and stability
Technical field
The present invention relates to a kind of blasting construction methods for controlling rock slope regularity and stability, especially for deep-cutting road The construction method that moat rock slope is excavated.
Background technique
Rock slope is common side slope type in road construction.Currently, greatly developing with China's road engineering, The road construction of especially mountainous region in middle and western China is quickly grown, and rock slope is one of most important side slope type of mountain road.Cause This, the Rational Excavation of rock slope has vital effect for road safety, and the digging mode of rock slope determines stone The safe handling of matter side slope.
Common rock slope construction technology is to be excavated using onepull side slope, then carries out construction protection. Defect that there are three the excavation methods: (1) the side slope surface irregularity after excavating;(2) side slope and side slope lower part can be destroyed The stability of rock, the safety of side slope bring certain hidden danger;(3) work progress is complex, it is difficult to a wide range of to promote It uses.
Summary of the invention
In order to overcome the defects of above-mentioned rock slope construction technology, the present invention provides a kind of control rock slope ride comfort With the blasting technique of stability, it is characterized in that pre -arranged layer, carries out secondary blasting later.Construction the following steps are included:
A, geologic information, including native stone boundary, rock stratum weathering thickness and degree of crushing, the construction feature etc. of rock stratum are reconnoitred in detail;
B, intercepting ditch is carried out in top of the slope, intercepts the surface water;
C, the soil layer on side slope surface is excavated and is cleared.
D, detailed design is carried out, explosion bulge test is then carried out, further corrects blasting parameter by testing;
E, Loose Control Blasting is carried out to periphery rock mass position, reaches the requirement of pre -arranged layer position;
F, firstly, the blasting parameter according to determined by explosion bulge test, determines reserved light explosion layer blasting boreholes position and calculate fried Survival dose, and then configure pack;Then, a pipe pack is filled in blasthole bottom, top connects primacord;It is checked finally, doing check.
G, explosion is attached to primacord.
Beneficial effects of the present invention are mainly: it is quick-fried that light is reserved on the basis of deep hole blasting, photoface exploision and short hole blasting Layer carries out excavation construction to rock slope using secondary blasting technology.It is easy for construction, it can effectively control safety caused by explosion Harm;It most has the advantages that the in-place blasting out reduced to cut slope and cutting bedding lower part rock, reduces due to construction pair In the destruction of rock slope stability, to guarantee the stability of rock slope;The ride comfort of excavation slope is improved, is reduced super deficient It digs.Therefore, the program can reduce construction volume while guaranteeing rock slope stability.
Detailed description of the invention
Fig. 1 is the distribution of rock slope rock mass and pre -arranged layer position charge constitution schematic diagram;
1. top of the slope intercepting ditch in Fig. 1,2. side slope surface soil layers, 3. peripheral part lithosomes, 4. pre -arranged layer rock mass, 5. explosions Drilling, 6. packs.
Specific embodiment
With reference to the accompanying drawing 1 and embodiment the present invention is further described.
[embodiment]
Referring to attached drawing 1, in order to overcome in the prior art during rock slope Excavation blasting caused by side slope ride comfort and steady Qualitative undesirable deficiency, the present invention provides a kind of blasting technique for controlling rock slope regularity and stability, it is characterized in that in advance The quick-fried layer of light is stayed, secondary blasting is carried out.Construction the following steps are included:
A, geologic information, including native stone boundary, rock stratum weathering thickness and degree of crushing, the construction feature etc. of rock stratum are reconnoitred in detail.
B, top of the slope intercepting ditch 1 is carried out in top of the slope, intercepts the surface water.
C, side slope surface soil layer 2 is excavated and is cleared.
D, it carries out detailed design and carries out explosion bulge test, further correct blasting parameter by testing.
E, Loose Control Blasting is carried out to peripheral part lithosome 3, until meeting wanting for 4 position of pre -arranged layer rock mass It asks.
F, firstly, the blasting parameter according to determined by explosion bulge test, determines reserved 4 blasting boreholes of light explosion layer, 5 position, meter Explosive consumption is calculated, and then configures pack 6;Then, a pipe pack 6 is filled in blasthole bottom, top connects primacord;Finally, doing school Nuclear inspection.
G, explosion is attached to primacord.

Claims (2)

1. controlling the blasting construction method of rock slope regularity and stability, which is characterized in that firstly, carrying out detailed geology It reconnoitres, carries out top of the slope intercepting ditch (1), and excavate cleaning side slope surface soil layer (2);Then, at using Loose Control Blasting means It manages peripheral part lithosome (3), the requirement until meeting pre -arranged layer rock mass (4) position;Finally, using secondary blasting technology Blasting Excavation is carried out to pre -arranged layer rock mass (4).
2. the blasting construction method of control rock slope regularity and stability according to claim 1, which is characterized in that When carrying out Blasting Excavation to pre -arranged layer rock mass (4) using secondary blasting technology, a pipe medicine is filled in blasting boreholes (5) bottom It wraps (6), connects primacord on top;Explosion is attached to primacord later.
CN201811053173.4A 2018-09-10 2018-09-10 A kind of blasting construction method controlling rock slope regularity and stability Pending CN109141153A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811053173.4A CN109141153A (en) 2018-09-10 2018-09-10 A kind of blasting construction method controlling rock slope regularity and stability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811053173.4A CN109141153A (en) 2018-09-10 2018-09-10 A kind of blasting construction method controlling rock slope regularity and stability

Publications (1)

Publication Number Publication Date
CN109141153A true CN109141153A (en) 2019-01-04

Family

ID=64824397

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811053173.4A Pending CN109141153A (en) 2018-09-10 2018-09-10 A kind of blasting construction method controlling rock slope regularity and stability

Country Status (1)

Country Link
CN (1) CN109141153A (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2319012C1 (en) * 2006-05-19 2008-03-10 Открытое акционерное общество "Научно-исследовательский институт горной механики и маркшейдерского дела-Межотраслевой научный центр ВНИМИ" Method for drilling-and-blasting rock preparation in coal pits
CN102031782A (en) * 2009-09-29 2011-04-27 中国二十冶集团有限公司 Layered inclined hole blast construction method for multilayer complex quicksand foundation
CN107165636A (en) * 2017-07-21 2017-09-15 广西大学 A kind of method of strip pit exploitation
CN108360527A (en) * 2018-03-07 2018-08-03 中铁十九局集团第七工程有限公司 A kind of earthwork evacuation construction method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2319012C1 (en) * 2006-05-19 2008-03-10 Открытое акционерное общество "Научно-исследовательский институт горной механики и маркшейдерского дела-Межотраслевой научный центр ВНИМИ" Method for drilling-and-blasting rock preparation in coal pits
CN102031782A (en) * 2009-09-29 2011-04-27 中国二十冶集团有限公司 Layered inclined hole blast construction method for multilayer complex quicksand foundation
CN107165636A (en) * 2017-07-21 2017-09-15 广西大学 A kind of method of strip pit exploitation
CN108360527A (en) * 2018-03-07 2018-08-03 中铁十九局集团第七工程有限公司 A kind of earthwork evacuation construction method

Similar Documents

Publication Publication Date Title
Yang et al. Optimal coal discharge of hydraulic cutting inside coal seams for stimulating gas production: A case study in Pingmei coalfield
CN110132084A (en) A kind of Tunnel Overbreak & Underbreak control method
CN107478114A (en) A kind of parallel slope buffered hole depth hole side slope pre split blasting construction method
CN104674819A (en) Informatized construction method of high expressway slope
Fan et al. An innovative approach for gob‐side entry retaining in deep coal mines: A case study
CN110821501A (en) Pre-pressure relief construction method for rock burst tunnel
CN109162731B (en) Water inrush grouting treatment method for deep mining of iron mine area
CN108999613A (en) A kind of high-ground stress region underground chamber middle and lower part excavation method
CN110439579A (en) A kind of open type TBM rich water tunnel front pre-grouting method
Zhou et al. Effect of localized water pressure on mountain tunnels crossing fracture zone
Aksoy et al. Comparison of Hoek-Brown and Mohr-Coulomb failure criterion for deep open coal mine slope stability
Aydin Stability of saprolitic slopes: nature and role of field scale heterogeneities
Shi et al. Failure mechanism analysis for tunnel construction crossing the water-rich dense fracture zones: A case study
Adachi et al. Behavior and simulation of soil tunnel with thin cover
Li et al. Study on major construction disasters and controlling technology at the Qingdao Kiaochow Bay subsea tunnel
CN105065004A (en) Shallow-buried large-span rock tunnel portal section weak blasting excavation construction method
CN109141153A (en) A kind of blasting construction method controlling rock slope regularity and stability
Hu et al. Study on evolution characteristics of regenerated roof structure in downward mining of Bifurcated coal seam
Sissakian et al. Defects in Foundation Design Due to Miss-Interpretation of the Geological Data: A Case Study of Mosul Dam
Jun et al. Water-inrush mechanism during construction and determination of safety distance from the water source in a karst tunnel
CN105137040A (en) Goaf treatment scheme selection method for controlling subgrade settlement
Bolghonabai et al. On the selection of an appropriate excavation pattern for urban tunnels with big cross-section: A case study
CN108222954A (en) The construction method of shield crossing sand material back filled region
Yun et al. Geotechnical challenges and strategies at McArthur River operation
Huang et al. Parameter determination and effect evaluation of gob-side entry retaining by directional roof cutting and pressure releasing

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190104