CN109141153A - A kind of blasting construction method controlling rock slope regularity and stability - Google Patents
A kind of blasting construction method controlling rock slope regularity and stability Download PDFInfo
- Publication number
- CN109141153A CN109141153A CN201811053173.4A CN201811053173A CN109141153A CN 109141153 A CN109141153 A CN 109141153A CN 201811053173 A CN201811053173 A CN 201811053173A CN 109141153 A CN109141153 A CN 109141153A
- Authority
- CN
- China
- Prior art keywords
- blasting
- slope
- stability
- rock
- regularity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D3/00—Particular applications of blasting techniques
- F42D3/04—Particular applications of blasting techniques for rock blasting
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F42—AMMUNITION; BLASTING
- F42D—BLASTING
- F42D1/00—Blasting methods or apparatus, e.g. loading or tamping
Abstract
The invention discloses the blasting construction methods that rock slope related in civil engineering excavates a kind of control rock slope regularity and stability in field.Its work progress are as follows: firstly, the geologic information of exploration construction area, carries out drainage works before construction;Then, first the topsoil excavation of side slope is cleared in work progress, then the rock on pre -arranged layer top is carried out by Blasting Excavation using the method for explosion;Finally, carrying out pre -arranged layer explosion, a pipe pack is filled in blasthole bottom and carries out secondary blasting.It can control the regularity and stability of rock slope using such construction method, reduce to construct as onepull and be destroyed caused by Slope Stability, so that it is guaranteed that the safety of side slope.Unnecessary earthwork evacuation can be reduced to reduce operating expenses simultaneously, and guarantee is provided to the safe handling of road.
Description
Technical field
The present invention relates to a kind of blasting construction methods for controlling rock slope regularity and stability, especially for deep-cutting road
The construction method that moat rock slope is excavated.
Background technique
Rock slope is common side slope type in road construction.Currently, greatly developing with China's road engineering,
The road construction of especially mountainous region in middle and western China is quickly grown, and rock slope is one of most important side slope type of mountain road.Cause
This, the Rational Excavation of rock slope has vital effect for road safety, and the digging mode of rock slope determines stone
The safe handling of matter side slope.
Common rock slope construction technology is to be excavated using onepull side slope, then carries out construction protection.
Defect that there are three the excavation methods: (1) the side slope surface irregularity after excavating;(2) side slope and side slope lower part can be destroyed
The stability of rock, the safety of side slope bring certain hidden danger;(3) work progress is complex, it is difficult to a wide range of to promote
It uses.
Summary of the invention
In order to overcome the defects of above-mentioned rock slope construction technology, the present invention provides a kind of control rock slope ride comfort
With the blasting technique of stability, it is characterized in that pre -arranged layer, carries out secondary blasting later.Construction the following steps are included:
A, geologic information, including native stone boundary, rock stratum weathering thickness and degree of crushing, the construction feature etc. of rock stratum are reconnoitred in detail;
B, intercepting ditch is carried out in top of the slope, intercepts the surface water;
C, the soil layer on side slope surface is excavated and is cleared.
D, detailed design is carried out, explosion bulge test is then carried out, further corrects blasting parameter by testing;
E, Loose Control Blasting is carried out to periphery rock mass position, reaches the requirement of pre -arranged layer position;
F, firstly, the blasting parameter according to determined by explosion bulge test, determines reserved light explosion layer blasting boreholes position and calculate fried
Survival dose, and then configure pack;Then, a pipe pack is filled in blasthole bottom, top connects primacord;It is checked finally, doing check.
G, explosion is attached to primacord.
Beneficial effects of the present invention are mainly: it is quick-fried that light is reserved on the basis of deep hole blasting, photoface exploision and short hole blasting
Layer carries out excavation construction to rock slope using secondary blasting technology.It is easy for construction, it can effectively control safety caused by explosion
Harm;It most has the advantages that the in-place blasting out reduced to cut slope and cutting bedding lower part rock, reduces due to construction pair
In the destruction of rock slope stability, to guarantee the stability of rock slope;The ride comfort of excavation slope is improved, is reduced super deficient
It digs.Therefore, the program can reduce construction volume while guaranteeing rock slope stability.
Detailed description of the invention
Fig. 1 is the distribution of rock slope rock mass and pre -arranged layer position charge constitution schematic diagram;
1. top of the slope intercepting ditch in Fig. 1,2. side slope surface soil layers, 3. peripheral part lithosomes, 4. pre -arranged layer rock mass, 5. explosions
Drilling, 6. packs.
Specific embodiment
With reference to the accompanying drawing 1 and embodiment the present invention is further described.
[embodiment]
Referring to attached drawing 1, in order to overcome in the prior art during rock slope Excavation blasting caused by side slope ride comfort and steady
Qualitative undesirable deficiency, the present invention provides a kind of blasting technique for controlling rock slope regularity and stability, it is characterized in that in advance
The quick-fried layer of light is stayed, secondary blasting is carried out.Construction the following steps are included:
A, geologic information, including native stone boundary, rock stratum weathering thickness and degree of crushing, the construction feature etc. of rock stratum are reconnoitred in detail.
B, top of the slope intercepting ditch 1 is carried out in top of the slope, intercepts the surface water.
C, side slope surface soil layer 2 is excavated and is cleared.
D, it carries out detailed design and carries out explosion bulge test, further correct blasting parameter by testing.
E, Loose Control Blasting is carried out to peripheral part lithosome 3, until meeting wanting for 4 position of pre -arranged layer rock mass
It asks.
F, firstly, the blasting parameter according to determined by explosion bulge test, determines reserved 4 blasting boreholes of light explosion layer, 5 position, meter
Explosive consumption is calculated, and then configures pack 6;Then, a pipe pack 6 is filled in blasthole bottom, top connects primacord;Finally, doing school
Nuclear inspection.
G, explosion is attached to primacord.
Claims (2)
1. controlling the blasting construction method of rock slope regularity and stability, which is characterized in that firstly, carrying out detailed geology
It reconnoitres, carries out top of the slope intercepting ditch (1), and excavate cleaning side slope surface soil layer (2);Then, at using Loose Control Blasting means
It manages peripheral part lithosome (3), the requirement until meeting pre -arranged layer rock mass (4) position;Finally, using secondary blasting technology
Blasting Excavation is carried out to pre -arranged layer rock mass (4).
2. the blasting construction method of control rock slope regularity and stability according to claim 1, which is characterized in that
When carrying out Blasting Excavation to pre -arranged layer rock mass (4) using secondary blasting technology, a pipe medicine is filled in blasting boreholes (5) bottom
It wraps (6), connects primacord on top;Explosion is attached to primacord later.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811053173.4A CN109141153A (en) | 2018-09-10 | 2018-09-10 | A kind of blasting construction method controlling rock slope regularity and stability |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811053173.4A CN109141153A (en) | 2018-09-10 | 2018-09-10 | A kind of blasting construction method controlling rock slope regularity and stability |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109141153A true CN109141153A (en) | 2019-01-04 |
Family
ID=64824397
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811053173.4A Pending CN109141153A (en) | 2018-09-10 | 2018-09-10 | A kind of blasting construction method controlling rock slope regularity and stability |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109141153A (en) |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2319012C1 (en) * | 2006-05-19 | 2008-03-10 | Открытое акционерное общество "Научно-исследовательский институт горной механики и маркшейдерского дела-Межотраслевой научный центр ВНИМИ" | Method for drilling-and-blasting rock preparation in coal pits |
CN102031782A (en) * | 2009-09-29 | 2011-04-27 | 中国二十冶集团有限公司 | Layered inclined hole blast construction method for multilayer complex quicksand foundation |
CN107165636A (en) * | 2017-07-21 | 2017-09-15 | 广西大学 | A kind of method of strip pit exploitation |
CN108360527A (en) * | 2018-03-07 | 2018-08-03 | 中铁十九局集团第七工程有限公司 | A kind of earthwork evacuation construction method |
-
2018
- 2018-09-10 CN CN201811053173.4A patent/CN109141153A/en active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2319012C1 (en) * | 2006-05-19 | 2008-03-10 | Открытое акционерное общество "Научно-исследовательский институт горной механики и маркшейдерского дела-Межотраслевой научный центр ВНИМИ" | Method for drilling-and-blasting rock preparation in coal pits |
CN102031782A (en) * | 2009-09-29 | 2011-04-27 | 中国二十冶集团有限公司 | Layered inclined hole blast construction method for multilayer complex quicksand foundation |
CN107165636A (en) * | 2017-07-21 | 2017-09-15 | 广西大学 | A kind of method of strip pit exploitation |
CN108360527A (en) * | 2018-03-07 | 2018-08-03 | 中铁十九局集团第七工程有限公司 | A kind of earthwork evacuation construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Yang et al. | Optimal coal discharge of hydraulic cutting inside coal seams for stimulating gas production: A case study in Pingmei coalfield | |
CN110132084A (en) | A kind of Tunnel Overbreak & Underbreak control method | |
CN107478114A (en) | A kind of parallel slope buffered hole depth hole side slope pre split blasting construction method | |
CN104674819A (en) | Informatized construction method of high expressway slope | |
Fan et al. | An innovative approach for gob‐side entry retaining in deep coal mines: A case study | |
CN110821501A (en) | Pre-pressure relief construction method for rock burst tunnel | |
CN109162731B (en) | Water inrush grouting treatment method for deep mining of iron mine area | |
CN108999613A (en) | A kind of high-ground stress region underground chamber middle and lower part excavation method | |
CN110439579A (en) | A kind of open type TBM rich water tunnel front pre-grouting method | |
Zhou et al. | Effect of localized water pressure on mountain tunnels crossing fracture zone | |
Aksoy et al. | Comparison of Hoek-Brown and Mohr-Coulomb failure criterion for deep open coal mine slope stability | |
Aydin | Stability of saprolitic slopes: nature and role of field scale heterogeneities | |
Shi et al. | Failure mechanism analysis for tunnel construction crossing the water-rich dense fracture zones: A case study | |
Adachi et al. | Behavior and simulation of soil tunnel with thin cover | |
Li et al. | Study on major construction disasters and controlling technology at the Qingdao Kiaochow Bay subsea tunnel | |
CN105065004A (en) | Shallow-buried large-span rock tunnel portal section weak blasting excavation construction method | |
CN109141153A (en) | A kind of blasting construction method controlling rock slope regularity and stability | |
Hu et al. | Study on evolution characteristics of regenerated roof structure in downward mining of Bifurcated coal seam | |
Sissakian et al. | Defects in Foundation Design Due to Miss-Interpretation of the Geological Data: A Case Study of Mosul Dam | |
Jun et al. | Water-inrush mechanism during construction and determination of safety distance from the water source in a karst tunnel | |
CN105137040A (en) | Goaf treatment scheme selection method for controlling subgrade settlement | |
Bolghonabai et al. | On the selection of an appropriate excavation pattern for urban tunnels with big cross-section: A case study | |
CN108222954A (en) | The construction method of shield crossing sand material back filled region | |
Yun et al. | Geotechnical challenges and strategies at McArthur River operation | |
Huang et al. | Parameter determination and effect evaluation of gob-side entry retaining by directional roof cutting and pressure releasing |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20190104 |