CN109140048A - The method that submarine pipeline starting is laid with is carried out using jacket spud leg - Google Patents

The method that submarine pipeline starting is laid with is carried out using jacket spud leg Download PDF

Info

Publication number
CN109140048A
CN109140048A CN201811242093.3A CN201811242093A CN109140048A CN 109140048 A CN109140048 A CN 109140048A CN 201811242093 A CN201811242093 A CN 201811242093A CN 109140048 A CN109140048 A CN 109140048A
Authority
CN
China
Prior art keywords
submarine pipeline
laid
starting
jacket
spud leg
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811242093.3A
Other languages
Chinese (zh)
Inventor
梁超
王圣强
许南
曹德明
陶付文
冷志
李建楠
高庆有
牛强
孟祥伟
甘慧良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Offshore Oil Engineering Co Ltd
Original Assignee
Offshore Oil Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Offshore Oil Engineering Co Ltd filed Critical Offshore Oil Engineering Co Ltd
Priority to CN201811242093.3A priority Critical patent/CN109140048A/en
Publication of CN109140048A publication Critical patent/CN109140048A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/16Laying or reclaiming pipes on or under water on the bottom
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/16Laying or reclaiming pipes on or under water on the bottom
    • F16L1/165Laying or reclaiming pipes on or under water on the bottom by towing the pipe on or near the bottom
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/20Accessories therefor, e.g. floats, weights
    • F16L1/201Anchor rods
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/20Accessories therefor, e.g. floats, weights
    • F16L1/202Accessories therefor, e.g. floats, weights fixed on or to vessels
    • F16L1/205Pipe-laying ships
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L1/00Laying or reclaiming pipes; Repairing or joining pipes on or under water
    • F16L1/12Laying or reclaiming pipes on or under water
    • F16L1/20Accessories therefor, e.g. floats, weights
    • F16L1/225Stingers

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Electric Cable Installation (AREA)

Abstract

A method of submarine pipeline starting is carried out using jacket spud leg and is laid with, with following laying step: one: by operation ship close to jacket;Two: by several wirerope wherein one with submarine pipeline starting end socket connect, then, then by submarine pipeline starting end socket lean out stinger, and make submarine pipeline originate end socket be placed in water;Three: being lauched by diver, remove barriers object;Four: being laid with operation using the starting that jacket spud leg carries out submarine pipeline as anchor point;Five: the connection between several wirerope is completed by diver;Six: moving forward operation ship, submarine pipeline is gradually entered in water by stinger, and final submarine pipeline, which is refined, to be laid on sea bed.The present invention is using jacket as anchor point, under the assistance of diver, the starting end socket of submarine pipeline is linked together with jacket spud leg, the starting for being just able to carry out submarine pipeline is laid with operation, and submarine pipeline starting can not be carried out with starting cable by, which solving the problems, such as, is laid with operation.

Description

The method that submarine pipeline starting is laid with is carried out using jacket spud leg
Technical field
It is laid with the present invention relates to the starting of submarine pipeline more particularly to a kind of carries out submarine pipeline using jacket spud leg The method for beginning to be laid with.Belong to ocean engineering field.
Background technique
Currently, when the starting that shallow waters carry out submarine pipeline is laid with operation, in general, using throw the method for beginning anchor into Row.But due to it sometimes appear that due to submarine pipeline starting point too close to jacket the case where, causing cannot Operation is laid with using the starting that the method for throwing beginning anchor carries out submarine pipeline;And starting has been stopped due to there is also jacket The case where laying routing of anchor, therefore, the starting for leading to not carry out submarine pipeline using the method for throwing beginning anchor is laid with work Industry.
Summary of the invention
It is a primary object of the present invention to overcome disadvantages mentioned above of the existing technology, and provide a kind of using jacket pile Leg carries out the method that submarine pipeline starting is laid with, using jacket as anchor point, under the assistance of diver, by submarine pipeline Starting end socket link together with jacket spud leg, be just able to carry out submarine pipeline starting be laid with operation, solve nothing Method carries out the problem of submarine pipeline starting is laid with operation with starting cable.
The purpose of the present invention is implemented by the following technical solutions:
A method of submarine pipeline starting is carried out using jacket spud leg and is laid with, it is characterised in that: uses following laying Step:
Step 1: by construction operation ship close to jacket;
Step 2: in advance on construction operation ship, several wirerope are hung to scene, and by wherein the one of several wirerope Root is connect with submarine pipeline starting end socket, then, then submarine pipeline is originated end socket and leans out stinger, and originates submarine pipeline End socket is placed in water;
Step 3: being lauched by diver, jacket spud leg periphery is felt, and the object that removes barriers;
Step 4: by diver, suspender belt is wrapped in the bottom of jacket spud leg, also, by suspender belt and several wherein two The connection of root wirerope;Operation is laid with using the starting that jacket spud leg carries out submarine pipeline as anchor point;
Step 5: being moved to construction operation quarter by diver, under the assistance of loop wheel machine, several steel are completed by snap ring Connection between cord;
Step 6: move forward construction operation ship after returning to construction operation ship by diver, with construction operation ship to Preceding movement, submarine pipeline are gradually entered in water by stinger, and final submarine pipeline, which is refined, to be laid on sea bed.
Beneficial effects of the present invention: the present invention is due to the adoption of the above technical scheme, easy to operate, using jacket as fixed The starting end socket of submarine pipeline is linked together with jacket spud leg under the assistance of diver, is just able to carry out sea by site The starting of bottom pipeline is laid with operation, and submarine pipeline starting can not be carried out with starting cable by, which solving the problems, such as, is laid with operation.
Detailed description of the invention
Fig. 1 is the underwater connecting steel wire ropes schematic diagram of diver of the present invention.
Fig. 2 is wirerope and submarine pipeline connection schematic diagram on operation ship of the present invention.
Fig. 3 is that schematic diagram is completed in submarine pipeline of the present invention starting connection.
Fig. 4 is that submarine pipeline of the present invention starting is laid with schematic front view.
Fig. 5 is that submarine pipeline of the present invention starting is laid with mansion view schematic diagram.
Fig. 6 is the wirerope connection schematic diagram on operation ship of the present invention.
Fig. 7 is underwater steel wire rope of the present invention and jacket spud leg connection schematic diagram.
Major Symbol explanation in figure:
1. construction operation ship;2. loop wheel machine;3. stinger;4. diver;5. jacket spud leg;6. the first wirerope;7, Two wirerope;8, third wirerope;9. snap ring;10. submarine pipeline originates end socket;11. suspender belt;12. submarine pipeline.
Specific embodiment
As shown in Fig. 1-Fig. 7, the present invention uses following laying step:
Step 1: by construction operation ship 1 close to jacket 3;
Step 2: as shown in Figure 1, in advance on construction operation ship 1, by loop wheel machine 2 by the first wirerope 6, the second wirerope 7 And third wirerope 8 is hung to scene, and third wirerope 8 is connect with submarine pipeline starting end socket 10, then, then by seabed Pipeline starting end socket 10 leans out stinger 3, and makes submarine pipeline starting envelope 10 to be placed in water;
Step 3: being lauched by diver 4,5 periphery of jacket spud leg is felt, and the object that removes barriers;
Step 4: shown in Fig. 7, by diver 4, suspender belt 11 is wrapped in the bottom of jacket spud leg 5 such as Fig. 3, Fig. 5, and And by snap ring 9, suspender belt 11 is connect with the first wirerope 6 and the second wirerope 7;Using jacket spud leg as anchoring The starting that point carries out submarine pipeline is laid with operation;
Step 5: shown in Fig. 6,1 tail portion of construction operation ship is moved to by diver 4 such as Fig. 2, under the assistance of loop wheel machine 2, The first wirerope 6 is completed by snap ring 9, the connection between the second wirerope 7 and third wirerope 8;
Step 6: construction operation ship 1 is moved forward, with construction operation ship 1 after returning to construction operation ship 1 by diver 4 Forward movement, submarine pipeline 12 by stinger 3 gradually enter water in, final submarine pipeline 12, which is refined, is laid on sea bed On.
The above described is only a preferred embodiment of the present invention, be not intended to limit the present invention in any form, it is all It is any simple modification, equivalent change and modification to the above embodiments according to the technical essence of the invention, still falls within In the range of technical solution of the present invention.

Claims (1)

1. a kind of carry out the method that submarine pipeline starting is laid with using jacket spud leg, it is characterised in that: walked using following laying It is rapid:
Step 1: by construction operation ship close to jacket;
Step 2: in advance on construction operation ship, several wirerope are hung to scene, and by several wirerope wherein one with Submarine pipeline originates end socket connection, then, then submarine pipeline is originated end socket and leans out stinger, and submarine pipeline is made to originate end socket It is placed in water;
Step 3: being lauched by diver, jacket spud leg periphery is felt, and the object that removes barriers;
Step 4: by diver, suspender belt is wrapped in the bottom of jacket spud leg, also, by suspender belt and several wherein two steel Cord connection;Operation is laid with using the starting that jacket spud leg carries out submarine pipeline as anchor point;
Step 5: being moved to construction operation quarter by diver, under the assistance of loop wheel machine, several wirerope are completed by snap ring Between connection;
Step 6: move forward construction operation ship after returning to construction operation ship by diver, as construction operation ship is to Forward Dynamic, submarine pipeline is gradually entered in water by stinger, and final submarine pipeline, which is refined, to be laid on sea bed.
CN201811242093.3A 2018-10-24 2018-10-24 The method that submarine pipeline starting is laid with is carried out using jacket spud leg Pending CN109140048A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811242093.3A CN109140048A (en) 2018-10-24 2018-10-24 The method that submarine pipeline starting is laid with is carried out using jacket spud leg

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811242093.3A CN109140048A (en) 2018-10-24 2018-10-24 The method that submarine pipeline starting is laid with is carried out using jacket spud leg

Publications (1)

Publication Number Publication Date
CN109140048A true CN109140048A (en) 2019-01-04

Family

ID=64809569

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811242093.3A Pending CN109140048A (en) 2018-10-24 2018-10-24 The method that submarine pipeline starting is laid with is carried out using jacket spud leg

Country Status (1)

Country Link
CN (1) CN109140048A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113790311A (en) * 2021-09-02 2021-12-14 海洋石油工程股份有限公司 Submarine pipeline underwater guiding back-dragging initial laying construction method
CN115258094A (en) * 2022-08-11 2022-11-01 交通运输部上海打捞局 Method for threading fishing steel wire based on horizontal directional drilling truss system

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL6807441A (en) * 1967-05-29 1968-12-02
US3517518A (en) * 1968-06-26 1970-06-30 Deep Oil Technology Inc Apparatus and method for terminating a subsea pipeline at a sea surface station
US3872680A (en) * 1973-08-31 1975-03-25 Brown & Root Method and apparatus for laying pipelines
US3977201A (en) * 1975-03-19 1976-08-31 Bittner Robert B Method and apparatus for preventing buckling of pipeline as it is being assembled and laid on the ocean floor
US4297054A (en) * 1979-08-08 1981-10-27 Santa Fe International Corporation Method of laying offshore pipeline from a reel carrying vessel
EP0117038A1 (en) * 1983-01-20 1984-08-29 The British Petroleum Company p.l.c. Plough assembly
US4992001A (en) * 1990-08-17 1991-02-12 Mcdermott International, Inc. Method of deepwater pipelay
EP0251907B1 (en) * 1986-06-25 1993-05-05 Nippon Hume Pipe Co., Ltd. Apparatus for laying cable in a pipe
US5575590A (en) * 1994-03-31 1996-11-19 Allseas Group S.A. Installation for laying a pipeline on a floor located under water, bearing means and terminal
CN101881353B (en) * 2009-09-22 2011-12-07 天津市海王星海上工程技术有限公司 Sea laying method for shallow-sea small-diameter steel strip-plastic composite hose
CN105805415A (en) * 2016-04-26 2016-07-27 中国海洋石油总公司 Deepwater submarine pipeline initial laying method
CN106979382A (en) * 2017-05-26 2017-07-25 海洋石油工程股份有限公司 The starting laying process of deepwater S-shaped submarine pipeline

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL6807441A (en) * 1967-05-29 1968-12-02
US3517518A (en) * 1968-06-26 1970-06-30 Deep Oil Technology Inc Apparatus and method for terminating a subsea pipeline at a sea surface station
US3872680A (en) * 1973-08-31 1975-03-25 Brown & Root Method and apparatus for laying pipelines
US3977201A (en) * 1975-03-19 1976-08-31 Bittner Robert B Method and apparatus for preventing buckling of pipeline as it is being assembled and laid on the ocean floor
US4297054A (en) * 1979-08-08 1981-10-27 Santa Fe International Corporation Method of laying offshore pipeline from a reel carrying vessel
EP0117038A1 (en) * 1983-01-20 1984-08-29 The British Petroleum Company p.l.c. Plough assembly
EP0251907B1 (en) * 1986-06-25 1993-05-05 Nippon Hume Pipe Co., Ltd. Apparatus for laying cable in a pipe
US4992001A (en) * 1990-08-17 1991-02-12 Mcdermott International, Inc. Method of deepwater pipelay
US5575590A (en) * 1994-03-31 1996-11-19 Allseas Group S.A. Installation for laying a pipeline on a floor located under water, bearing means and terminal
CN101881353B (en) * 2009-09-22 2011-12-07 天津市海王星海上工程技术有限公司 Sea laying method for shallow-sea small-diameter steel strip-plastic composite hose
CN105805415A (en) * 2016-04-26 2016-07-27 中国海洋石油总公司 Deepwater submarine pipeline initial laying method
CN106979382A (en) * 2017-05-26 2017-07-25 海洋石油工程股份有限公司 The starting laying process of deepwater S-shaped submarine pipeline

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113790311A (en) * 2021-09-02 2021-12-14 海洋石油工程股份有限公司 Submarine pipeline underwater guiding back-dragging initial laying construction method
CN115258094A (en) * 2022-08-11 2022-11-01 交通运输部上海打捞局 Method for threading fishing steel wire based on horizontal directional drilling truss system
CN115258094B (en) * 2022-08-11 2023-06-30 交通运输部上海打捞局 Method for threading salvaging steel wires based on horizontal directional drilling truss system

Similar Documents

Publication Publication Date Title
CN101280862B (en) Seabed PE pipe rim spreading and imbedding construction method
CN109140048A (en) The method that submarine pipeline starting is laid with is carried out using jacket spud leg
CN103395476A (en) Method for mounting submerged buoy in ultra-deep water
CN101746484B (en) Operation method of anchoring type operating vessel when crossing over submarine facility during anchoring
CN106979382A (en) The starting laying process of deepwater S-shaped submarine pipeline
CN105605314B (en) The S-shaped laying method of double-layer submarine pipeline
CN105805415B (en) The laying method of deep-water subsea pipeline starting
JP2017178253A (en) Underwater robot control system and underwater robot control method
AU2013100495A4 (en) Buoy
CN110848459A (en) Installation and recovery method of submarine pipeline buoy
CN108512134B (en) Shallow water area branch cable laying process
CN106704705B (en) overwater pipeline assembling operation method and system
CN111532380A (en) Pre-laying and tie-back method for mooring deep water polyester cable
CN2900350Y (en) Combined tieing cable for float on sea
CN112937766B (en) Three-anchor buoy laying and recycling system and method
CN109163144A (en) Submarine pipeline terminates the repositioning method of submarine pipeline terminal when being laid with
KR20090118466A (en) Installation method of the pipelines using laying barge with sub-sea anchor block
CN111692427B (en) Underwater positioning method for large-diameter overlong HDPE (high-density polyethylene) pipeline
CN204802028U (en) Spacing protector of anchor cable connection
CN203996790U (en) Cable wire guiding, location sand pump dredger wet excavation system
CN203242966U (en) Guide device for fan base submarine cable protection and laying
CN203905053U (en) Undersea tunnel bridge
Kim Critical Limits of Commercial Diving on the Construction of Tidal Current Power in Jangjuk Channel
CN105655928B (en) Double cables bury technique with ditch
CN112856039A (en) L-shaped shallow sea pipeline laying process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190104

WD01 Invention patent application deemed withdrawn after publication