CN109139110B - Underground rock salt energy storage cavern is water-soluble to make chamber breakage-proof tubular column system - Google Patents

Underground rock salt energy storage cavern is water-soluble to make chamber breakage-proof tubular column system Download PDF

Info

Publication number
CN109139110B
CN109139110B CN201811030491.9A CN201811030491A CN109139110B CN 109139110 B CN109139110 B CN 109139110B CN 201811030491 A CN201811030491 A CN 201811030491A CN 109139110 B CN109139110 B CN 109139110B
Authority
CN
China
Prior art keywords
breakage
making
rock salt
storage cavern
soluble
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201811030491.9A
Other languages
Chinese (zh)
Other versions
CN109139110A (en
Inventor
李银平
葛鑫博
施锡林
陈祥胜
杨春和
马洪岭
刘元玺
张楠
尹洪武
薛天富
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Institute of Rock and Soil Mechanics of CAS
Original Assignee
Wuhan Institute of Rock and Soil Mechanics of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Institute of Rock and Soil Mechanics of CAS filed Critical Wuhan Institute of Rock and Soil Mechanics of CAS
Priority to CN201811030491.9A priority Critical patent/CN109139110B/en
Publication of CN109139110A publication Critical patent/CN109139110A/en
Application granted granted Critical
Publication of CN109139110B publication Critical patent/CN109139110B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F17/00Methods or devices for use in mines or tunnels, not covered elsewhere
    • E21F17/16Modification of mine passages or chambers for storage purposes, especially for liquids or gases
    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21BEARTH DRILLING, e.g. DEEP DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B17/00Drilling rods or pipes; Flexible drill strings; Kellies; Drill collars; Sucker rods; Cables; Casings; Tubings
    • E21B17/10Wear protectors; Centralising devices, e.g. stabilisers
    • E21B17/1078Stabilisers or centralisers for casing, tubing or drill pipes

Abstract

Chamber breakage-proof tubular column system is made the present invention relates to a kind of underground rock salt energy storage cavern is water-soluble, system include coaxially and from inside to outside set gradually make intracavitary pipe, make chamber outer tube and production casing, the upper end for making intracavitary pipe and the upper end for making chamber outer tube are fixed and expose earth's surface, in the rock salt storage cavern for the lower section that lubricating pad is arranged in the lower end for making intracavitary pipe, multiple sieve pores are provided on the tube wall of screen casing, the lower end for making chamber outer tube is sequentially coaxially arranged in screen casing and extension, to form breakage-proof tubing string, centralizer is arranged between the lower end of breakage-proof tubing string and the lower end for making intracavitary pipe.The rigidity made chamber outer tube and make intracavitary pipe not only can be improved in the present invention, improve the globality of tubular column system, it can also protect intracavitary pipe is made, enhancing is by making chamber outer tube and that makes that intracavitary pipe forms makes lumen column self power stability, in the case that liquid caused by self-excited vibration couples dynamic buckling admittedly in restricted clearance to preventing to make lumen column, the unstabilitys accident such as severe bends or breakage occurs.

Description

Underground rock salt energy storage cavern is water-soluble to make chamber breakage-proof tubular column system
Technical field
The invention belongs to energy extraction technical field more particularly to a kind of underground rock salt energy storage cavern is water-soluble makes chamber breakage-proof Tubular column system.
Background technique
On our times, using rock salt cavern carry out energy underground storage using increasing, China pushes greatly Community of Jin Tan County underground rock salt gas storage demonstration project is successfully built and has been runed in the rock salt strategic reserves of energy plan of row underground.
It is generally used in the construction of China's rock salt storage cavern and salt well accident in water soluble method technique, the especially construction of rock salt storage cavern, Chamber technique is made frequently with individual well lubricating pad method is water-soluble, during making chamber, often will appear and make the engineering problems such as lumen column failure in bending, Lumen column will normally be made by, which leading to not, proposes to ground, when serious, take pipe cutting measure that will make lumen column and gives up in intracavitary.Make chamber The engineering problems such as drilling pipe bending breakage not only increase rock salt storage cavern and make chamber cost, and seriously affect and make chamber progress and cavity Form control.
The water-soluble chamber of making of rock salt is a dynamic fluid structurecoupling process, is made between lumen column and its fresh water and brine for conveying Interaction, shows that making lumen column liquid caused by self-excited vibration in restricted clearance to couple dynamic buckling admittedly is to lure after study The main reason for severe bends or breakage, occurs for conductor string, it is therefore necessary to take breakage-proof to make lumen column system, with enhancing Tubing string self power character constancy, bend to preventing to make lumen column in practical process of construction the unstabilitys thing such as breakage Therefore.
Summary of the invention
In view of the above existing problems in the prior art, the present invention provides a kind of water-soluble chambers of making of underground rock salt energy storage cavern to prevent breaking Tubular column system is damaged, lumen column engineering accident is made for underground rock salt energy storage cavern and a kind of risk prevention instruments is provided.
The present invention through the following technical solutions to achieve the above objectives:
A kind of underground rock salt energy storage cavern is water-soluble to make chamber breakage-proof tubular column system, and the system comprises coaxially and from inside to outside What is set gradually makes intracavitary pipe, makes chamber outer tube and production casing, the upper end for making intracavitary pipe and the upper end for making chamber outer tube Fix and expose earth's surface, the lower end for making intracavitary pipe is arranged in the rock salt storage cavern of the lower section of lubricating pad, it is described make chamber outer tube and The lower end of the production casing is located at the top of the lubricating pad, is formed between the lower end of the production casing and the lubricating pad naked Well, which is characterized in that
The system also includes screen casing, extension and centralizer, multiple sieve pores, institute are provided on the tube wall of the screen casing It states screen casing and the lower end for making chamber outer tube is sequentially coaxially arranged in the extension, it is described anti-to form breakage-proof tubing string Damaged tubing string passes through the lubricating pad, and enters in the rock salt storage cavern, and the lower end of the breakage-proof tubing string is made not less than described The lower end of intracavitary pipe, the centralizer are arranged between the lower end of the breakage-proof tubing string and the lower end for making intracavitary pipe.
Preferably, the length of the screen casing be positioned at made described in the lower section of the lubricating pad intracavitary length of tube five/ One.
Preferably, the sieve pore distributes as net shape on the tube wall of the screen casing 5.
Preferably, the shape of the sieve pore is round, ellipse and rectangular one kind or combination.
Further, the first screw thread, the upper end setting of the screen casing are provided on the outer wall of the lower end for making chamber outer tube There is first sleeve, the lower end for making chamber outer tube is connected to institute by the matching thread of first screw thread and the first sleeve State the upper end of screen casing.
Further, the second screw thread is provided on the outer wall of the lower end of the screen casing, the upper end of the extension is provided with The lower end of second sleeve, the screen casing is connected to the extension by the matching thread of second screw thread and the second sleeve The upper end of pipe.
Optionally, it the lower end of the extension and described make intracavitary pipe lower end and flushes setting.
Optionally, the lower end of the extension is higher than the lower end for making intracavitary pipe, the lower end of the extension and described The difference in height for making the lower end of intracavitary pipe is 20cm to 30cm.
Further, the centralizer is provided with multiple, and multiple centralizers make the axially spaced-apart of intracavitary pipe described in It is arranged between the lower end of the extension and the lower end for making intracavitary pipe.
Further, the centralizer includes the first hoop, the second hoop and multiple elastic strips, wherein described the One hoop and second hoop interval are made on intracavitary pipe described in being fixed at, and first hoop and second hoop It is connected by multiple elastic strips, each elastic strip at least has an arc convex, and the arc convex top is located at institute It states on the inner wall of extension.
The beneficial effects of the present invention are:
A kind of underground rock salt energy storage cavern of the invention is water-soluble to make chamber breakage-proof tubular column system, due to screen casing and extension The lower end for making chamber outer tube is sequentially coaxially set, and to form breakage-proof tubing string, and breakage-proof tubing string passes through lubricating pad, and enters salt In rock storage cavern, the lower end of breakage-proof tubing string is not less than the lower end for making intracavitary pipe, centralizer be arranged in breakage-proof tubing string lower end and Between the lower end for making intracavitary pipe, the rigidity made chamber outer tube He make intracavitary pipe not only can be improved, the whole of tubular column system is improved Body can also be protected intracavitary pipe is made, and enhancing is by making chamber outer tube and that makes that intracavitary pipe forms makes lumen column self power The case where character constancy, liquid caused by self-excited vibration couples dynamic buckling admittedly in restricted clearance to preventing to make lumen column Under, the unstabilitys accident such as severe bends or breakage occurs.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described, it should be apparent that, drawings in the following description are only some embodiments of the invention, for For those of ordinary skill in the art, without creative efforts, it can also be obtained according to these attached drawings other Attached drawing.
Fig. 1 is that a kind of water-soluble result for making chamber breakage-proof tubular column system of underground rock salt energy storage cavern of the embodiment of the present invention is shown It is intended to;
Fig. 2 is the structural schematic diagram of the screen casing in the embodiment of the present invention;
Fig. 3 is the structural schematic diagram of the centralizer in the embodiment of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1 is that a kind of water-soluble result for making chamber breakage-proof tubular column system of underground rock salt energy storage cavern of the embodiment of the present invention is shown Be intended to, referring to Fig. 1, the system include coaxially and from inside to outside set gradually make intracavitary pipe 2, make chamber outer tube 1 and production casing 3, earth's surface is fixed and exposed in the upper end for making intracavitary pipe 2 and the upper end for making chamber outer tube 1, and lubricating pad 6 is arranged in the lower end for making intracavitary pipe 2 In the rock salt storage cavern 9 of lower section, the lower end for making chamber outer tube 1 and production casing 3 is located at the top of lubricating pad 6, the lower end of production casing 3 and Open hole 4 is formed between lubricating pad 6.
Fig. 2 be the embodiment of the present invention in screen casing structural schematic diagram, in conjunction with Fig. 1 and Fig. 2, the system further include screen casing 5, Extension 8 and centralizer 7 are provided with multiple sieve pores 10 on the tube wall of screen casing 5, and screen casing 5 and extension 8 are sequentially coaxially arranged In the lower end for making chamber outer tube 1, to form breakage-proof tubing string, breakage-proof tubing string passes through lubricating pad 6, and enters in rock salt storage cavern 9, prevents The lower end of damaged tubing string is not less than the lower end for making intracavitary pipe 2, and centralizer 7 is arranged in the lower end of breakage-proof tubing string and makes intracavitary pipe 2 Lower end between.
A kind of underground rock salt energy storage cavern of the embodiment of the present invention is water-soluble to make chamber breakage-proof tubular column system, due to screen casing and The lower end for making chamber outer tube is sequentially coaxially arranged in extension, and to form breakage-proof tubing string, and breakage-proof tubing string passes through lubricating pad, goes forward side by side Enter into rock salt storage cavern, the lower end of breakage-proof tubing string is not less than the lower end for making intracavitary pipe, and breakage-proof tubing string is arranged in centralizer Between lower end and the lower end for making intracavitary pipe, the rigidity made chamber outer tube He make intracavitary pipe not only can be improved, improves tubing string system The globality of system can also be protected intracavitary pipe is made, enhancing by make chamber outer tube and make that intracavitary pipe forms make lumen column from Body dynamic characteristics stability couples dynamic buckling to prevent to make lumen column liquid caused by self-excited vibration in restricted clearance admittedly In the case of, the unstabilitys accident such as severe bends or breakage occurs.
In the embodiment of the present invention, the lower end of production casing 3 need to be located under earth's surface at certain depth, the buried depth of production casing 3 Meet manufacturing requirements, the lower end for making chamber outer tube 1 need to be located at a certain distance from the top of lubricating pad 6, to prevent lubricating pad 6 from making chamber It is overflowed inside outer tube 1.
In the embodiment of the present invention, screen casing 5 can be identical with model with the tubing made chamber outer tube 1 with make intracavitary pipe 2, with convenient Materials processing and manufacturing.
In the embodiment of the present invention, the length of screen casing 5 is make intracavitary 2 length of pipe 1/5th positioned at the lower section of lubricating pad 6 Left and right, preferably 1/5th, the water outlet speed conditions that specific length can make chamber scene according to rock salt storage cavern are adjusted.
In conjunction with Fig. 2, in the embodiment of the present invention, on the grid-shaped tube wall for being evenly distributed on screen casing 5 of sieve pore 10, and sieve pore 10 Shape be round, ellipse and rectangular one kind or combination, in this way, the object entered in breakage-proof tubing string can be filled into, The solid blockade for preventing volume excessive is being made between intracavitary outer tube.
When the shape of sieve pore 10 is round, size can be the 1%-2% of screen casing diameter, when sieve pore 10 is other shapes When shape, size is similar with the size of circular sieve pore 10, the embodiment of the present invention to this with no restriction.
In the embodiment of the present invention, the distribution density of sieve pore 10 be should not be too large, to ensure the overall stiffness of screen casing 5.
Further, it makes and is provided with the first screw thread on the outer wall of the lower end of chamber outer tube 1, the upper end of screen casing 5 is provided with first Sleeve, the lower end for making chamber outer tube 1 are connected to the upper end of screen casing 5 by the matching thread of the first screw thread and first sleeve, to realize The connection of chamber outer tube 1 and screen casing 5 is made, the embodiment of the present invention, will not since screen casing 5 to be arranged near the nozzle for making chamber outer tube 1 It makes chamber flow field to rock salt storage cavern to have an impact, to guarantee this underground rock salt energy storage cavern is water-soluble to make chamber breakage-proof tubular column system not Can have an impact other Recessive elementSs for making chamber effect.
In the embodiment of the present invention, extension 8 can also be identical with model with the tubing made chamber outer tube 1 with make intracavitary pipe 2, with Materials are facilitated to fabricate.
Further, in the embodiment of the present invention, be provided with the second screw thread on the outer wall of the lower end of screen casing 5, extension 8 it is upper End is provided with second sleeve, and the lower end of screen casing 5 is connected to the upper of extension 8 by the matching thread of the second screw thread and second sleeve End, to realize the connection of extension 8 and screen casing 5.
In the embodiment of the present invention, extension 8 can be spliced by multiple pipelines by above-mentioned connection type, with convenient Construction.
In the embodiment of the present invention, the lower end of extension 8 and makes intracavitary 2 lower end of pipe and can flush setting, or, extension 8 Lower end is higher than the lower end for making intracavitary pipe 2, and the lower end of extension 8 and the difference in height for making the lower end of intracavitary pipe 2 are 20cm to 30cm.
In conjunction with Fig. 1, in the embodiment of the present invention, centralizer 7 can be set multiple, and multiple centralizers 7 are along making intracavitary pipe 2 It is arranged at axially spaced intervals between the lower end of extension 8 and the lower end for making intracavitary pipe 2.
Fig. 3 is the structural schematic diagram of the centralizer in the embodiment of the present invention, in conjunction with Fig. 3, in the embodiment of the present invention, and centralizer 7 may include the first hoop 7.1, the second hoop 7.2 and multiple elastic strips 7.3, wherein the first hoop 7.1 and the second hoop 7.2 intervals, which are fixed at, makes on intracavitary pipe 2, and the first hoop 7.1 and the second hoop 7.2 are connected by multiple elastic strips 7.3, Each elastic strip 7.3 at least has an arc convex, and arc convex top is located on the inner wall of extension 8.
It is fixed due to making intracavitary pipe and making chamber outer tube upper end in the embodiment of the present invention, and makes intracavitary pipe lower end and prolong It stretches and is provided with centralizer between pipe, make to make between intracavitary pipe and extension and form Elastic Contact, not only increase tubular column system Globality, the rigidity for making intracavitary outer tube can also be increased so that in the presence of liquid couples the self-excited vibration of induction admittedly, Vibration by a relatively large margin occurs for extension elasticity of compression item, the anti-intracavitary pipe of major structure, but when liquid couples the self-excited vibration of induction admittedly After situation removal, elastic strip return restores to make to make intracavitary pipe to normal station.
In the embodiment of the present invention, the first hoop 7.1 and the second hoop 7.2 can be bolted on and make on intracavitary pipe 2, Or made on intracavitary pipe 2 by the way that end is self-locking to realize to be fixed on, the embodiment of the present invention to this with no restriction.
The centralizer 7 of the embodiment of the present invention will not cause to wear to lumen column material is made, and intracavitary pipe is being made in the addition of centralizer 7 Between 2 and extension 8, rock salt storage cavern is not influenced and makes chamber flow field, so that guaranteeing that underground rock salt energy storage cavern is water-soluble makes chamber breakage-proof Tubular column system will not have an impact other Recessive elementSs for making chamber effect.
When implementing, first in salt mine underground solution mining or the construction of rock salt storage cavern, bunged down first to target elevation, Then well cementation forms production casing 3, still can remain with one section of open hole 4, will make chamber outer tube 1 and makes intracavitary pipe 2 and be arranged in production In casing 3, screen casing 5 is connect with chamber outer tube 1 is made, is then sequentially connected extension 8, in extension 8 and made between intracavitary pipe 2 Annular space installs centralizer 7.
Flow into fresh water by making intracavitary pipe 2, make chamber outer tube 1, screen casing 5 and extension 8 export brine, or make chamber outer tube 1, Screen casing 5 and extension 8 flow into fresh water, make intracavitary pipe 2 and export brine, are dissolved upwards using the limitation rock salt of lubricating pad 6 to control cavity Form ultimately forms rock salt storage cavern 9.
Embodiment provided above is better embodiment of the invention, only is used to facilitate to illustrate the present invention, not to this hair It is bright to make any form of restriction, have usually intellectual in any technical field, if not departing from the proposed skill of the present invention In the range of art feature, using the equivalent embodiment for locally changing or modifying made by disclosed technology contents, and Without departing from technical feature content of the invention, in the range of still falling within the technology of the present invention feature.

Claims (10)

1. a kind of underground rock salt energy storage cavern is water-soluble to make chamber breakage-proof tubular column system, the system comprises it is coaxial and from inside to outside according to Secondary setting makes intracavitary pipe (2), makes chamber outer tube (1) and production casing (3), the upper end for making intracavitary pipe (2) and described makes chamber Earth's surface is fixed and exposed in the upper end of outer tube (1), and rock salt of the lower end setting for making intracavitary pipe (2) in the lower section of lubricating pad (6) stores up In library (9), the lower end for making chamber outer tube (1) and the production casing (3) is located at the top of the lubricating pad (6), the production Open hole (4) are formed between the lower end and the lubricating pad (6) of casing (3), which is characterized in that
The system also includes screen casing (5), extension (8) and centralizer (7), it is provided on the tube wall of the screen casing (5) more A sieve pore (10), the screen casing (5) and the extension (8) are sequentially coaxially arranged in the lower end for making chamber outer tube (1), with Breakage-proof tubing string is formed, the breakage-proof tubing string passes through the lubricating pad (6), and enters in the rock salt storage cavern (9), described anti- The breakage-proof tubing string is arranged in not less than the lower end for making intracavitary pipe (2), the centralizer (7) in the lower end of damaged tubing string Between lower end and the lower end for making intracavitary pipe (2).
2. rock salt energy storage cavern in underground according to claim 1 is water-soluble to make chamber breakage-proof tubular column system, which is characterized in that institute The length for stating screen casing (5) is to make 1/5th of intracavitary pipe (2) length positioned at the described of the lower section of the lubricating pad (6).
3. rock salt energy storage cavern in underground according to claim 2 is water-soluble to make chamber breakage-proof tubular column system, which is characterized in that institute Sieve pore (10) is stated to distribute as net shape on the tube wall of the screen casing (5).
4. rock salt energy storage cavern in underground according to claim 3 is water-soluble to make chamber breakage-proof tubular column system, which is characterized in that institute The shape of sieve pore (10) is stated as round, ellipse and rectangular one kind or combination.
5. rock salt energy storage cavern in underground according to claim 1 is water-soluble to make chamber breakage-proof tubular column system, which is characterized in that institute It states and is provided with the first screw thread on the outer wall for making the lower end of chamber outer tube (1), the upper end of the screen casing (5) is provided with first sleeve, institute It states and makes the lower end of chamber outer tube (1) screen casing (5) are connected to by the matching thread of first screw thread and the first sleeve Upper end.
6. rock salt energy storage cavern in underground according to claim 1-5 is water-soluble to make chamber breakage-proof tubular column system, spy Sign is, the second screw thread is provided on the outer wall of the lower end of the screen casing (5), and the upper end of the extension (8) is provided with second The lower end of sleeve, the screen casing (5) is connected to the extension by the matching thread of second screw thread and the second sleeve Manage the upper end of (8).
7. rock salt energy storage cavern in underground according to claim 1-5 is water-soluble to make chamber breakage-proof tubular column system, spy Sign is that the lower end of the extension (8) and described intracavitary pipe (2) lower end of making flush setting.
8. rock salt energy storage cavern in underground according to claim 1-5 is water-soluble to make chamber breakage-proof tubular column system, spy Sign is, the lower end of the extension (8) is higher than the lower end for making intracavitary pipe (2), the lower end of the extension (8) and described The difference in height for making the lower end of intracavitary pipe (2) is 20cm to 30cm.
9. rock salt energy storage cavern in underground according to claim 1-5 is water-soluble to make chamber breakage-proof tubular column system, spy Sign is, the centralizer (7) is provided with multiple, and multiple centralizers (7) set along the axially spaced-apart for making intracavitary pipe (2) It sets between the lower end and the lower end for making intracavitary pipe (2) of the extension (8).
10. rock salt energy storage cavern in underground according to claim 9 is water-soluble to make chamber breakage-proof tubular column system, which is characterized in that The centralizer (7) includes the first hoop (7.1), the second hoop (7.2) and multiple elastic strips (7.3), wherein described first Hoop (7.1) and second hoop (7.2) interval are made on intracavitary pipe (2) described in being fixed at, and first hoop (7.1) it is connected with second hoop (7.2) by multiple elastic strips (7.3), each elastic strip (7.3) at least has One arc convex, the arc convex top are located on the inner wall of the extension (8).
CN201811030491.9A 2018-09-05 2018-09-05 Underground rock salt energy storage cavern is water-soluble to make chamber breakage-proof tubular column system Active CN109139110B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811030491.9A CN109139110B (en) 2018-09-05 2018-09-05 Underground rock salt energy storage cavern is water-soluble to make chamber breakage-proof tubular column system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811030491.9A CN109139110B (en) 2018-09-05 2018-09-05 Underground rock salt energy storage cavern is water-soluble to make chamber breakage-proof tubular column system

Publications (2)

Publication Number Publication Date
CN109139110A CN109139110A (en) 2019-01-04
CN109139110B true CN109139110B (en) 2019-08-20

Family

ID=64827037

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811030491.9A Active CN109139110B (en) 2018-09-05 2018-09-05 Underground rock salt energy storage cavern is water-soluble to make chamber breakage-proof tubular column system

Country Status (1)

Country Link
CN (1) CN109139110B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111790703B (en) * 2020-06-30 2022-03-25 中国石油大学(北京) Cleaning tool and cleaning method for insoluble substances at bottom of salt cavern gas storage cavity

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2460550A (en) * 2008-06-06 2009-12-09 Portland Gas Plc Gas storage in salt caverns
RU2529197C1 (en) * 2013-05-27 2014-09-27 Алексей Львович Сильвестров Drilling wastes underground burial
CN204041044U (en) * 2014-09-01 2014-12-24 中国石油化工股份有限公司 It is a kind of that rock salt underground natural gas storage tank is water-soluble makes lumen post waterpower stabilization control device
CN104675433A (en) * 2015-01-27 2015-06-03 太原理工大学 Method for constructing horizontal salt rock dissolving cavity reservoirs
CN206655667U (en) * 2017-04-18 2017-11-21 天津山远石油工具有限公司 A kind of novel weaved formula elastic centralizer
CN107939444A (en) * 2017-12-11 2018-04-20 中盐金坛盐化有限责任公司 A kind of casing programme and installation and application that chamber is made for salt hole air reserved storeroom

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2460550A (en) * 2008-06-06 2009-12-09 Portland Gas Plc Gas storage in salt caverns
RU2529197C1 (en) * 2013-05-27 2014-09-27 Алексей Львович Сильвестров Drilling wastes underground burial
CN204041044U (en) * 2014-09-01 2014-12-24 中国石油化工股份有限公司 It is a kind of that rock salt underground natural gas storage tank is water-soluble makes lumen post waterpower stabilization control device
CN104675433A (en) * 2015-01-27 2015-06-03 太原理工大学 Method for constructing horizontal salt rock dissolving cavity reservoirs
CN206655667U (en) * 2017-04-18 2017-11-21 天津山远石油工具有限公司 A kind of novel weaved formula elastic centralizer
CN107939444A (en) * 2017-12-11 2018-04-20 中盐金坛盐化有限责任公司 A kind of casing programme and installation and application that chamber is made for salt hole air reserved storeroom

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
盐穴储油(气)库水溶造腔管柱动力特性初探;李银平等;《岩土力学》;20120331;第33卷(第3期);第681-686页 *
盐穴地下储气库水溶造腔管柱的动力稳定性试验研究;李银平等;《集输与加工》;20160731;第36卷(第7期);第81-87页 *

Also Published As

Publication number Publication date
CN109139110A (en) 2019-01-04

Similar Documents

Publication Publication Date Title
CN103061684B (en) Open-hole horizontal well segmentation many bunches of homogeneous acidification tubing strings and acidization tool thereof
CN111271064B (en) Excavation construction method for water-rich stratum tunnel stabilization tunnel face
CN112412475A (en) Method for reinforcing and excavating surrounding rock of ice water accumulation body tunnel under influence of seasonal rainfall and surrounding rock support
CN108756881A (en) A kind of bump preventing control method in solid coal column pressure coal region
CN109139110B (en) Underground rock salt energy storage cavern is water-soluble to make chamber breakage-proof tubular column system
AU2021447461A1 (en) Extra-thick coal seam upper layer old goaf roof reconstruction method and construction method
CN106523006A (en) Glass fiber anchor rod and construction method
CN109854285B (en) Deep vertical shaft supporting structure and construction method
CN107100673A (en) A kind of salt hole air reserved storeroom well makes cavity method
CN110410053A (en) Coal mine roof plate pressure relief method based on eyelet supporting
CN207513614U (en) Shallow tunnel subsurface excavation method advance support structure and combined type advanced tubule
CN108331558B (en) Horizontal well for gas layer and drilling and fracturing method of horizontal well
CN203035102U (en) Open hole horizontal well segmentation multi-cluster even acidification tubular column
CN109812277B (en) Active protection double-layer pipe shed safety hole-exiting method for high-fall vertical suspended rock tunnel
CN107605485B (en) Directional well and submersible electric pump combined salt production method
CN207795212U (en) Fracturing sand control tubing string
CN207484536U (en) Deviational survey protection of pipe structure
CN107270793B (en) It is a kind of for improving the beehive-shaped charge method of tunnel Smooth Blasting Effects
CN211038641U (en) Tunnel segment earth surface reinforcing structure at junction of upper soft and lower hard stratum shield method and mine method
CN113187512A (en) Grouting and drainage construction method for large-scale water burst and mud outburst of karst tunnel
CN103541711B (en) Xuan Ding small-bore, coal-face termination hydraulic fracture control method
CN207377524U (en) Bore hole deep-well gravel fishing tool
CN209144816U (en) A kind of bottom grouting system being applicable in deep well grounding electrode feed rod
CN208072457U (en) A kind of piping lane with stability against floating structure
CN207362864U (en) A kind of basis for electric power pylon

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant