CN109138214A - Prefabricated laminated wood wall construction and log cabin structure - Google Patents

Prefabricated laminated wood wall construction and log cabin structure Download PDF

Info

Publication number
CN109138214A
CN109138214A CN201811233269.9A CN201811233269A CN109138214A CN 109138214 A CN109138214 A CN 109138214A CN 201811233269 A CN201811233269 A CN 201811233269A CN 109138214 A CN109138214 A CN 109138214A
Authority
CN
China
Prior art keywords
wall
connection
pipeline
laminated wood
prefabricated laminated
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811233269.9A
Other languages
Chinese (zh)
Other versions
CN109138214B (en
Inventor
李建波
李龙
李洁
王粟旸
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Tianxin Wood Structural Housing Manufacturing Co Ltd
Original Assignee
Hubei Tianxin Wood Structural Housing Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Tianxin Wood Structural Housing Manufacturing Co Ltd filed Critical Hubei Tianxin Wood Structural Housing Manufacturing Co Ltd
Priority to CN201811233269.9A priority Critical patent/CN109138214B/en
Publication of CN109138214A publication Critical patent/CN109138214A/en
Application granted granted Critical
Publication of CN109138214B publication Critical patent/CN109138214B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements
    • E04G21/16Tools or apparatus
    • E04G21/167Tools or apparatus specially adapted for working-up plates, panels or slab shaped building elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Mechanical Engineering (AREA)
  • Load-Bearing And Curtain Walls (AREA)

Abstract

The present invention discloses a kind of prefabricated laminated wood wall construction and log cabin structure, wherein, the prefabricated laminated wood wall construction includes wall, hoisting structure and electrical structure, the hoisting structure is set to the wall, to lift by crane the wall, the electrical structure is set to the wall, and the electrical structure includes being arranged in the wire structure inside the wall and the electrical part set on the wire structure end.While the prefabricated wall, the hoisting structure and the electrical structure are integrated in the wall, when the wall turn sequence, transport, on-site hoisting, it only needs to lift to connect the hoisting structure, the lifting prefabricated wood wall can be realized, when field operation, it does not need to carry out complicated electrical burying work beforehand, it only needs for corresponding node to be attached, completion when most electrical installation is prefabricated in the factory, the Fast Installation at scene may be implemented, improve production, the installation effectiveness of live log cabin structure.

Description

Prefabricated laminated wood wall construction and log cabin structure
Technical field
The present invention relates to construction wall technical field, in particular to a kind of prefabricated laminated wood wall construction and log cabin structure.
Background technique
In the prior art, log cabin structure is all that material is transported to scene, carries out production and assembled, production efficiency pole at the scene It is low, the quality of production is poor.
Wall body structure be log cabin structure component part, in the prior art, not similar prefabricated wood wall construction, be all Field fabrication and assembly, production efficiency is extremely low, the quality of production is poor.
Summary of the invention
The main object of the present invention is to propose a kind of prefabricated laminated wood wall construction and log cabin structure, it is intended to by wall body structure collection It at being formed in wall in advance, only needs to carry out the simple assembly of the wooden wall construction at the scene, improves production efficiency.
To achieve the above object, prefabricated laminated wood wall construction proposed by the present invention, comprising:
Wall;
Hoisting structure is set to the wall, to lift by crane the wall;And
Electrical structure, is set to the wall, the electrical structure include be arranged in wire structure inside the wall, with And the electrical part set on the wire structure end.
Preferably, the wall includes:
Two wallboards, in being oppositely arranged, two wallboards present it is lower be extended, formed between two wallboards One installation space;
Multiple wall columns extended in upward and downward, multiple wall columns are set to institute along the width direction interval of the wallboard It states in installation space;And
Raising-plate, the width direction along the wallboard are extended, and the raising-plate is set to the upper of multiple wall columns End face.
Preferably, the upper surface of the raising-plate has the lifting installing zone being between two adjacent wall columns Domain, in the lifting installation region, the raising-plate has provided the first via hole;
The hoisting structure includes the lifting screw rod that upward and downward extends, and the lifting screw rod, which is removably secured, is installed on institute It states in the first via hole.
Preferably, the hoisting structure further includes the first locking nut set on the lifting screw rod lower end;
The prefabricated laminated wood wall construction further includes nut built-in fitting, and the nut built-in fitting includes the nut of opening upwards Mounting groove, and it is distributed in the fixed ring of nut mounting groove upper end side, the fixed ring is described to be fixed to upwards The lower end surface of raising-plate, is equipped with first locking nut in the nut mounting groove, and the nut mounting groove corresponds to described the The setting of one via hole, and its bottom wall is equipped with relief hole, the relief hole is worn with for the lifting screw rod.
Preferably, the prefabricated laminated wood wall construction further includes reinforcing connector, and the reinforcement connector includes horizontal direction The first segment of extension, upward and downward extend and are divided into below the first segment second segment of two sides and be correspondingly connected with described the Two linkage sections of one section and two second segment, the first segment be fixedly installed in the fixed ring and the raising-plate it Between, two second segments are respectively to be fixedly attached to two wall columns.
Preferably, two wallboards are in upper and lower and control to extended;
The wire structure includes being arranged in the intracorporal installation pipeline of the wall and being set in the installation pipeline inner cavity Conductor wire, the installation pipeline includes along left and right to the first pipeline of extension, and/or vertically to extending and extend upwardly to Second pipeline of the raising-plate;
The first mounting structure is respectively equipped on multiple wall columns, multiple first mounting structures are for first pipe Road installation, first pipeline is fixed on multiple wall columns;
The raising-plate is equipped with the second mounting structure, and second mounting structure is installed for second pipeline, will Second pipeline is fixed on the raising-plate.
Preferably, the left end of the wall is set parallel there are two the wall column, positioned at left side the wall column it is upper End left side has provided a holding tank, and the holding tank extends upward through the upper surface setting of the wall column;
The electrical part includes connector, and the plug or socket of the connector are set in holding tank;
The connector is one of rectangle heavy-duty connector, aviation plug, connecting terminal.
Preferably, the wall column has first mounting surface opposite with the wallboard, and first mounting structure includes The first mounting groove on first mounting surface, first mounting groove is interior to be equipped with first pipeline;And/or
The raising-plate has second mounting surface opposite with the wallboard, and second mounting structure includes set on described The second mounting groove on second mounting surface, second mounting groove is interior to be equipped with second pipeline;
Wherein, the prefabricated laminated wood wall construction further include pressure holding block, the pressure holding block be set to first mounting groove with/ Or second in mounting groove, the limit that there is the pressure holding block relatively described first mounting groove and/or the second mounting groove wall surface to be arranged Plane, the confined planes are equipped with limiting slot, and the limiting slot with first pipeline and/or the second pipeline to be adapted to, institute Pressure holding block is stated to press first pipeline and/or the second pipeline from back to front, with limit first pipeline be placed in it is described In first mounting groove and/or limit second pipeline is placed in second mounting groove.
Preferably, the wall in up and down and front and back to be extended;
The prefabricated laminated wood wall construction further includes the connection structure of wall and basis, the connection knot of the wall and basis Structure includes:
Foundation structure, the base matrix being extended including horizontal direction and the connection on the base matrix upper surface Chock, for the connection chock in front and back to being extended, the upper surface of the connection chock is equipped with the wall;And
Multiple threaded connectors are set on the wall and the connection chock, the wall to be fixedly installed in In the foundation structure.
Preferably, the upper surface of the connection chock is equipped with multiple third mounting grooves, the bottom of each third mounting groove Wall has provided mounting hole;
The connection structure of the wall and basis further include:
Multiple pre embedded bolts are set on the base matrix along front and back to interval, and multiple pre embedded bolts respectively correspond It is arranged in multiple mounting holes;And
Multiple third locking nuts, each corresponding upper end for being sheathed on the pre embedded bolt of the third locking nut, and In the third mounting groove, the third locking nut is locking the connection chock to the base matrix.
Preferably, the wall further includes bottom beam plate, and the bottom beam plate is set to the lower end of two wallboards;
Two wallboards extend downwardly setting, and in the lower end surface setting of the prominent bottom beam plate, so that the wall Lower end formed a groove, the groove and it is described connection chock upper end formed concave-convex fit structure so that the wall limit Position is installed on the connection chock.
Preferably, the prefabricated laminated wood wall construction includes at least two walls, wherein a wall is vertically And left and right, to being extended, another wall is vertically and front and back is to being extended, and passes through wall between two walls Connection structure is fixedly connected;
At least two walls include at least one first wall and at least one second wall, first wall edge Up and down and left and right is to being extended, and the first installation region, second wall are formed on the side surface of first wall Vertically and front and back is to being extended, and is formed with the second installation region on the side surface of second wall;
The connecting structure of wall includes screw connection structure, and the screw connection structure is set to first wall and institute It states between the second wall;
First wall and second wall are mutual at first installation region with second installation region It abuts, and is fixed by the screw connection structure;
The first connection wall column that upward and downward extends is equipped in first wall at correspondence first installation region;
Second wall is in corresponding the second connection wall column for being equipped with upward and downward at second installation region and extending;
The screw connection structure is arranged on the first connection wall column and the second connection wall column.
Preferably, first installation region is formed in the left side of first wall;
Second installation region is formed in second wall right side;
The screw connection structure includes multiple wood screws, and multiple wood screws are vertically arranged to interval, Mei Yisuo The left side for stating wood screw from second wall penetrates, and sequentially passes through the second connection wall column, continues to extend locking To the first connection wall column.
Preferably, first installation region is formed in the left side of first wall;
Second installation region is formed in second wall right side;
The screw connection structure includes multiple screw connecting structures, and multiple screw connecting structures are vertically to interval Setting, each screw connecting structure includes connecting screw and two the second locking screws set on the connecting screw both ends The left side of mother, one end from second wall of the connecting screw penetrate, and sequentially pass through the second connection wall column, The first connection wall column is continued through, two second locking nuts are divided into the both ends of the connecting screw, Respectively to lock the left side of second wall and the right side of the first connection wall column.
Preferably, after second installation region is formed in second wall rear end right side and second wall Side;
The first ash wall body plate being located behind in first wall extends to form to the right a linking arm;
First installation region is also formed into the leading flank of the linking arm;
The first installation region on the linking arm and the second installation on the trailing flank of second wall Region is abutted by the way that screw is fixed.
The present invention also proposes that a kind of log cabin structure, the log cabin structure include prefabricated laminated wood wall construction, the prefabricated collection Include: at the wooden wall construction
Wall;
Hoisting structure is set to the wall, to lift by crane the wall;And
Electrical structure, is set to the wall, the electrical structure include be arranged in wire structure inside the wall, with And the electrical part set on the wire structure end.
In technical solution provided by the invention, while the prefabricated wall, by the hoisting structure and described electrical Structure is integrated in the wall, when the wall turn sequence, transport, on-site hoisting, it is only necessary to be hung described in lifting connection Assembling structure, can be realized the lifting prefabricated wood wall, when field operation, does not need to carry out complicated electrical burying work beforehand, only need Corresponding node is attached, completion when most electrical installation is prefabricated in the factory, the Fast Installation at scene may be implemented, Improve production, the installation effectiveness of live log cabin structure.
Detailed description of the invention
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technical description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention for those of ordinary skill in the art without creative efforts, can be with The structure shown according to these attached drawings obtains other attached drawings.
Fig. 1 is the schematic cross-sectional view of the embodiment of prefabricated laminated wood wall construction provided by the invention;
Fig. 2 is the first embodiment schematic elevation view of hoisting structure in Fig. 1;
Fig. 3 is the enlarged diagram of part A in Fig. 2;
Fig. 4 is the schematic cross-sectional view of nut built-in fitting in Fig. 2;
Fig. 5 is the second embodiment schematic elevation view of hoisting structure in Fig. 1;
Fig. 6 is the enlarged diagram of part B in Fig. 5;
Fig. 7 is the embodiment schematic elevation view of electrical structure in Fig. 1;
Fig. 8 be Fig. 7 in electrical structure first embodiment along C-C to partial schematic sectional view;
Fig. 9 be Fig. 7 in electrical structure second embodiment along C-C to partial schematic sectional view;
Figure 10 be Fig. 7 in electrical structure 3rd embodiment along C-C to partial schematic sectional view;
Figure 11 is the fourth embodiment local overlooking schematic diagram of electrical structure in Fig. 7;
Figure 12 is the 5th embodiment local overlooking schematic diagram of electrical structure in Fig. 7;
Figure 13 is the sixth embodiment local overlooking schematic diagram of electrical structure in Fig. 7;
Figure 14 is containing there are two the sectional perspective schematic diagrams of the wall spelling of electrical structure in Fig. 7;
Figure 15 is the local left view schematic diagram of electrical structure in Fig. 7;
Figure 16 is the first embodiment schematic top plan view of connecting structure of wall in Fig. 1;
Figure 17 is the second embodiment schematic top plan view of connecting structure of wall in Fig. 1;
Figure 18 is the enlarged diagram of part D in Figure 16;
Figure 19 is the enlarged diagram of part E in Figure 17;
Figure 20 is the first embodiment schematic cross-sectional view of the connection structure on wall and basis in Fig. 1;
Figure 21 is the second embodiment schematic cross-sectional view of the connection structure on wall and basis in Fig. 1;
Figure 22 is the schematic elevation view of foundation structure in Figure 20.
Drawing reference numeral explanation:
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiment is only a part of the embodiments of the present invention, instead of all the embodiments.Base Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts it is all its His embodiment, shall fall within the protection scope of the present invention.
It is to be appreciated that directionality instruction is only used for explaining if relating to directionality instruction in the embodiment of the present invention Relative positional relationship, motion conditions under a certain particular pose between each component etc., if the particular pose changes, Directionality instruction also correspondingly changes correspondingly.
In addition, being somebody's turn to do " first ", " second " etc. if relating to the description of " first ", " second " etc. in the embodiment of the present invention Description be used for description purposes only, be not understood to indicate or imply its relative importance or implicitly indicate indicated skill The quantity of art feature." first " is defined as a result, the feature of " second " can explicitly or implicitly include at least one spy Sign.It in addition, the technical solution between each embodiment can be combined with each other, but must be with those of ordinary skill in the art's energy It is enough realize based on, will be understood that the knot of this technical solution when conflicting or cannot achieve when occurs in the combination of technical solution Conjunction is not present, also not the present invention claims protection scope within.
The present invention proposes that a kind of log cabin structure, the log cabin structure include prefabricated laminated wood wall construction, as long as having institute The log cabin structure for stating prefabricated laminated wood wall construction is all contained in the scope of the present invention, and Fig. 1 to Figure 22 is provided by the invention pre- The schematic diagram of the embodiment of laminated wood wall construction processed.
Also referring to Fig. 1, Fig. 2 and Fig. 7, the prefabricated laminated wood wall construction 100 includes wall 1, hoisting structure 2 and electricity Depressed structure 3, wherein the hoisting structure 2 is set to the wall 1, and to lift by crane the wall 1, the electrical structure 3 is set to institute State wall 1, the electrical structure 3 includes being arranged in the wire structure 3a wall 1 inside and set on the wire structure The electrical part 3b of the end 3a.
In technical solution provided by the invention, while prefabricated wall 1, by the hoisting structure 2 and the electricity Depressed structure 3 is integrated in the wall 1, when the wall 1 turn sequence, transport, on-site hoisting, it is only necessary to lifting connection institute Hoisting structure 2 is stated, can be realized the lifting prefabricated wood wall, when field operation, does not need to carry out complicated electrical burying work beforehand, It only needs for corresponding node to be attached, completion when most electrical installation is prefabricated in the factory, the quick of scene may be implemented Installation improves production, the installation effectiveness of live log cabin structure.
In the embodiment of the present invention, the wall 1 is prefabricated molding, can be prefabricated directly in factory, the wall 1 Including two wallboards 11, multiple wall columns 12 and raising-plate 13, wherein two wallboards 11 are in be oppositely arranged, described in two Wallboard 11 is extended in upward and downward, an installation space is formed between two wallboards 11, the wall column 12 is in up and down To being extended, multiple wall columns 12 are set in the installation space along the width direction interval of the wallboard 11, described Raising-plate 13 is extended along the width direction of the wallboard 11, and the raising-plate 13 is set to the upper end of multiple wall columns 12 Face, prefabricated in factory, in-site installation improves production efficiency, has preferable effect.
Referring to Figure 2 together to Fig. 6, the upper surface of the raising-plate 13 have be in two adjacent wall columns 12 it Between lifting installation region, in the lifting installation region, the raising-plate 13 has provided the first via hole 131, the lifting Structure 2 includes the lifting screw rod 21 that upward and downward extends, and the lifting screw rod 21, which is removably secured, is installed on first via hole In 131, the lifting screw rod 21 is fixedly installed in first via hole 131, by the way that the hoisting structure 2 is set to the top On beam slab 13, when the wooden wall in the production process turn sequence, transport, on-site hoisting, it is only necessary to which lifting connects the hoisting structure 2, the lifting prefabricated wood wall can be realized, it is easy to operate, convenient, improve production efficiency.
Bearing structure of the raising-plate 13 as hoisting structure 2, needs preferable structural strength, implementation of the invention In example, the number of the raising-plate 13 is multiple, and vertically multiple raising-plates 13 is arranged, so that institute to being stacked The bearing structure for stating hoisting structure 2 has preferable structural strength, reduces and pays the wooden wall appearance described in occurring in hoisting process in advance The risk of overall deformation has preferable effect.
In the embodiment of the present invention, the hoisting structure 2 further includes the first locking set on lifting 21 head of screw rod Nut 22, the lifting screw rod 21 are worn downwards from the first via hole 131 of the raising-plate 13,22 sets of first locking nut Set on the lower end of the lifting screw rod 21, and it is fixedly installed in the lower end of the raising-plate 13, first locking nut 22 rises To the effect for fastening the tie down screw, before the wall 1 manufacture is completed, first locking nut 22 must first be set in advance It is placed in the precast wall body 1, when lifting, the lifting screw rod 21 is screwed in, after the completion of lifting, the lifting screw rod 21 is revolved Out, easy to operate, convenient.
In embodiment provided by the invention, the prefabricated laminated wood wall construction 100 further includes nut built-in fitting 23, described Nut built-in fitting 23 includes the nut mounting groove 231 of opening upwards, and is distributed in the 231 upper end side of nut mounting groove Fixed ring 232, lower end surface of the fixed ring 232 to be fixed to the raising-plate 13 upwards, in the nut mounting groove 231 Equipped with the locking nut, corresponding first via hole 131 of the nut mounting groove 231 is arranged, and its bottom wall is equipped with relief hole 233, it is worn with for the lifting spiral shell, first locking nut is installed by way of the nut built-in fitting 23 is set 22, the structure of the raising-plate 13 is not impacted, ensure that the structural strength of the raising-plate 13, there is preferable effect Fruit, in addition, it is necessary to explanation, the fixed ring 232 is fixed on the lower end surface of the raising-plate 13 by screw 46.
Improving the connection structure intensity being equipped at the hoisting structure 2 is also the contents of the present invention, specifically, please refers to figure 2 to Fig. 4, the prefabricated laminated wood wall further includes reinforcing connector 24, and the connector 24 of reinforcing includes first be laterally extended Section 241, upward and downward extend and are divided into the second segment 242 of the 241 lower section left and right sides of first segment and be correspondingly connected with described Two linkage sections 243 of first segment 241 and two second segments 242, the first segment 241 are fixed to the raising-plate upwards 13 lower end, for two second segments 242 respectively to be fixedly attached to two wall columns 12, the reinforcement connector 24 can be with It is that plate is formed by bending, is also possible to profile, such as steel drawstring, optimal is by the rigid drawstring and the wall column The angle of 12 setting left and right at 45 °, then the length of the second segment 242 is greater than 200mm, by two strong bone columns and institute State drawing of the raising-plate 13 equipped with one entirety of formation at the position of connection structure, in lifting operation, on the lifting screw rod 21 Power is conducted to two wall columns 12, and the structural strength of 2 junction of hoisting structure is strengthened, and has preferable effect Fruit.
It is, of course, also possible to which a wall column 12 being laterally extended is arranged by the top beam in the lower end of the raising-plate 13 Plate 13 and two wall columns 12 are connected to form a whole, and specifically, please refer to Fig. 5 to Fig. 6, the prefabricated laminated wood wall 100 further include in left and right to extended reinforcement wall column 2512, and the reinforcement wall column 2512 is correspondingly arranged at the installation Between two wall columns 12 below region, the upper surface for reinforcing wall column 2512 corresponds to first via hole 131 Equipped with the second via hole, the head of the lifting screw rod 21 sequentially passes through first via hole 131 and second via hole, and by institute It states the first locking nut 22 and is fixed on the lower end for reinforcing wall column 2512, it should be noted that in such reinforcement structure In embodiment, first locking nut 22 is also pre-buried by the way that groove 56 and limit film is arranged or passes through the setting nut The form of part 23 pre-sets first locking nut 22 in advance.
Can be set a hoisting structure 2 on one precast wall body 1, naturally it is also possible to which multiple lifting knots are set Structure 2, in the present embodiment, the installation region, the first via hole 131 and hoisting structure 2 are multiple in being arranged in a one-to-one correspondence, general to be arranged It is two, is distributed in the symmetrical two sides of 1 center of gravity of precast wall body, the steady movement of the wall 1 during being easy to lift.
For the ease of lifting, in the embodiment of the present invention, the hoisting structure 2 further includes being set on the lifting screw rod 21 The hanging ring at end, when lifting operation, it is only necessary to the i.e. implementable lifting operation of the hanging ring is caught on, it is certainly, described to hang in the present embodiment Assembling structure 2 can choose standard component, such as two kinds of same sizes of lifting bolt 46 and eyenut and the progress of the standard component of model With operation.
The wire structure 3a and electrical part 3b are embedded in the prefabricated wood within the walls in advance, prefabricated wood wall described in on-site consolidation When, it does not need to carry out complicated electrical burying work beforehand, it is only necessary to be attached corresponding node, improve live log cabin structure Production, installation effectiveness, specifically, referring to Figure 7 together to Figure 15, the electrical structure 3 is arranged in the wall 1, in order to It plays preferable fixed function, is to be fixed on the electrical structure 3 on the skeleton of the wall 1, such as wall bone in the present embodiment On column 12 and raising-plate 13, specifically, the wire structure 3a includes that the installation pipeline 31 that is arranged in the wall 1 is (described Installation pipeline 31 is worn to supply lines, and in the present embodiment, the installation pipeline 31 is iron pipe or pipeline) and be set to described Conductor wire 32 in 31 inner cavity of installation pipeline, the installation pipeline 31 include along left and right to extension the first pipeline 311, and/or Vertically to the second pipeline 312 for extending and extending upwardly to the raising-plate 13, it is respectively equipped on multiple wall columns 12 First mounting structure 33, multiple first mounting structures 33 are installed for first pipeline 311, by first pipeline 311 are fixed on multiple wall columns 12, and the raising-plate 13 is equipped with the second mounting structure 34, second mounting structure 34 install for second pipeline 312, second pipeline 312 are fixed on the raising-plate 13, the wall column 12 Mainly the wire structure 3a extended to fixed horizontal direction, the wire structure 3a that horizontal direction extends are mainly used for as main electricity Route, the electric wiring with other walls 1 is attached respectively, is mainly prolonged to the fixation upward and downward on the raising-plate 13 Stretch the wire structure 3a of setting, the extended wire structure 3a of upward and downward mainly to the log cabin structure above raising-plate 13 Electric wiring cooperation, for example, configuration log cabin furred ceiling lamp decoration etc..
The wire structure 3a that the wall column 12 is mainly extended to fixed horizontal direction, referring to Fig. 8, the present embodiment In, the wall column 12 has first mounting surface opposite with the wallboard 11, and first mounting structure 33 includes being set to institute The first mounting groove 331 on the first mounting surface is stated, first pipeline 311 is equipped in first mounting groove 331, by institute It states and first mounting groove 331 is set on wall column 12, first pipeline 311 is arranged in first mounting groove 331, Structure is simple, conveniently, certainly in this embodiment, in order to reduce short circuit to the greatest extent or overload caused by fire risk, in institute It states in the first mounting groove 331 filled with fire proofing material 39, such as fire prevention clay, flame-retarded plastic etc..
Further, in order to limit the installation of first pipeline 311, referring to Fig. 9, in the present embodiment, it is described prefabricated Laminated wood wall construction 100 further includes pressure holding block 35, and the pressure holding block 35 is set in first mounting groove 331, the pressure holding block 35 have the confined planes of relatively described first mounting groove, the 331 wall surface setting, and the confined planes are equipped with limiting slot 351, described Limiting slot 351 with first pipeline 311 to be adapted to, and the pressure holding block 35 to press first pipeline from back to front 311, it is placed in first mounting groove 331 with limiting first pipeline 311, by the limiting slot 351 of the limited block, is made First pipeline 311 is completely fixed and is installed in first mounting groove 331, during transport, lifting, reduce institute It states the first pipeline 311 and the risk shaken occurs, there is preferable effect, in addition, the material of the pressure holding block 35 is also fire proofing wood Matter, for example, using fireproof rubber material etc..
In the fixed another embodiment of first pipeline 311, referring to Fig. 10, in the present embodiment, first peace Assembling structure 33 includes the first mounting hole 36 provided in the right side of the wall column 12, is equipped with institute in first mounting hole 36 The first pipeline 311 is stated, first pipeline 311, the fixation of first pipeline 311 are fixed by way of mounting hole is set More firm, stability is more preferable, in addition, in order to reduce electricity to the greatest extent to the risk of prefabricated wood wall burning, in first pipe Fireproof covering is set between road 311 and first mounting hole 36, on the one hand plays the effect of fixing seal, on the other hand, is played Flameproof effect.
The wire structure 3a being mainly extended to the fixation upward and downward on the raising-plate 13, please refers to Figure 11, In the present embodiment, the raising-plate 13 has second mounting surface opposite with the wallboard 11, and second mounting structure 34 wraps The second mounting groove 341 being set on second mounting surface is included, is equipped with second pipeline 312 in second mounting groove 341, By the way that second mounting groove 341 is arranged on the raising-plate 13, second pipeline 312 is arranged in second installation In slot 341, structure is simple, conveniently, certainly in this embodiment, in order to reduce electricity to the greatest extent to the wind of prefabricated wood wall burning Danger is filled with fire proofing material 39, such as fire prevention clay, flame-retarded plastic etc. in second mounting groove 341.
Further, in order to limit the installation of second pipeline 312, Figure 12 is please referred to, it is described prefabricated in the present embodiment Laminated wood wall construction 100 further includes pressure holding block 35, and the pressure holding block 35 is set in second mounting groove 341, the pressure holding block 35 have the confined planes of relatively described second mounting groove, the 341 wall surface setting, and the confined planes are equipped with limiting slot 351, described Limiting slot 351 with second pipeline 312 to be adapted to, and the pressure holding block 35 to press second pipeline from back to front 312, it is placed in second mounting groove 341 with limiting second pipeline 312, by the limiting slot 351 of the limited block, is made Second pipeline 312 is completely fixed and is installed in second mounting groove 341, during transport, lifting, reduce institute It states the second pipeline 312 and the risk shaken occurs, there is preferable effect, in addition, the material of the pressure holding block 353 is also fire proofing wood Matter, for example, using fireproof rubber material etc..
In the fixed another embodiment of second pipeline 312, Figure 13 is please referred to, in the present embodiment, second peace Assembling structure 34 includes the second mounting hole 37 provided in the upper surface of the raising-plate 13, is equipped with institute in second mounting hole 37 The second pipeline 312 is stated, second pipeline 312, the fixation of second pipeline 312 are fixed by way of mounting hole is set More firm, stability is more preferable, in addition, in order to reduce electricity to the greatest extent to the risk of prefabricated wood wall burning, in second pipe Fireproof covering is set between road 312 and second mounting hole 37, on the one hand plays the effect of fixing seal, on the other hand, is played Flameproof effect.
It should be noted that in order to preferably fix second pipeline 312, second pipeline 312 is neighbouring described Wall column 12 is arranged, and some position limiting structures is arranged on the wall column 12, and as buckled, snap ring is come as described in limiting second Pipeline 312.
Installation pipeline 31 described above is the pipeline for needing to be connected between the electric wiring of other walls 1, in this reality It applies in example, the electrical part 3b includes plug and socket of normal domestic etc., at this time, it may be necessary to from described first be laterally extended Electrical part 3b electric line is drawn in pipeline 311, specifically, the installation pipeline 31 further includes vertically to extension and described in The third pipeline that first pipeline 311 extends downwardly, the third pipeline are fixedly installed on the wall column 12, the third pipe Road is arranged adjacent to the wall column 12, and some position limiting structures are arranged on the wall column 12, such as buckle, snap ring limit The position third pipeline.
It should be noted that not limiting the concrete type of the electrical part 3b in the present invention, the electrical part 3b can be Electric coupler 38, civilian plug, socket, electric light etc., the connector 38 have been mainly between the different walls 1 Route connection, the mounting means of the connector 38 is also the contents of the present invention, specifically, please refers to Figure 14 to Figure 15, described The left end of wall 1 is set parallel there are two the wall column 12, and the upper end left side positioned at the wall column 12 in left side has provided One holding tank 38a, and the holding tank 38a extends upward through the upper surface setting of the wall column 12, the electrical part 3b includes (in the embodiment of the present invention, the connector 38 is rectangle heavy-duty connector, in aviation plug, connecting terminal to connector 38 It is a kind of), the plug or socket of the connector 38 are set in holding tank 38a, in the junction of two walls 1, wherein a wall 1 Setting opens up a holding tank 38a there are two the wall column 12 at outermost wall column 12, to by the connector 38 It hides and is set in the holding tank 38a, convenient for the assembly between two walls 1, there is preferable effect.
Also referring to Figure 16 to Figure 19, the prefabricated laminated wood wall construction 100 includes at least two walls 1, In a wall 1 vertically and left and right to be extended, another wall 1 vertically and front and back to be extended, two It is fixedly connected between the wall 1 by connecting structure of wall 4, by the way that the connecting structure of wall 4 is integrated in the wall 1 It is interior, it is simple, convenient when joint connection in site.
At least two walls 1 include at least one first wall 41 and at least one second wall 42, described first Wall 41 is vertically and left and right is to being extended, and the first installation region 411 is formed on the side surface of first wall 41, Second wall 42 is vertically and front and back is to being extended, and is formed with the second installation on the side surface of second wall 42 Region 421, the connecting structure of wall 4 include screw connection structure 43, and the screw connection structure 43 is set to first wall Between body 41 and second wall 42, first wall 41 and second wall 42 are in first installation region 411 It is mutually abutted at second installation region 421, and fixed by the screw connection structure 43, passes through the threaded connection Structure 43 is well by first wall 41 and second wall 42 in first installation region 411 and second peace Be fixed to each other abutting at dress region 421, and thread connecting mode is simple, firm, and on-site consolidation is high-efficient, with first installing zone Domain 411 and second installation region 421 are positioning datum, and the assembled quality of wall 1 is preferable.
It should be noted that the prefabricated wood wall connecting structure of wall 4 includes a variety of types of attachment, for example, " L " type connects Connect, it is T-shaped connection and it is cross connection etc. connection types, be illustrated below with " L " type connection type, T-shaped connection And the modes such as cross connection are referring to " L " type connection type.
In order to reinforce the stability and fastness of connection, in the embodiment of the present invention, first wall 41 and described the Two walls 42 are designed with wall column 12 in junction, specifically, in correspondence first installation region in first wall 41 The first connection wall column 412 that upward and downward extends is equipped at 411, second wall 42 is corresponding in second installation region The second connection wall column 422 that upward and downward extends is equipped at 421, the screw connection structure 43 is arranged in first connection wall On bone column 412 and the second connection wall column 422, connection structure intensity is guaranteed, stable connection, firm.
When first wall 41 is with the L-shaped connection of second wall 42 or T-shaped connection, corresponding institute It is different to state position of second installation region 421 on second wall 42, specifically, being more in the screw connection structure 43 When a wood screw 43a is attached, Figure 16 and Figure 18 is please referred to, first installation region 411 is formed in first wall 41 left side, second installation region 421 are formed in 42 right side of the second wall, and the screw connection structure 43 wraps Include multiple wood screw 43a, multiple wood screw 43a are vertically arranged to interval, and the head of each wood screw 43a is from institute The left side for stating the second wall 42 penetrates, and sequentially passes through the second connection wall column 422, continues to extend locking to described the One connection wall column 412, the threaded connection of the wood screw 43a, it is simple, convenient to connect, and on-site consolidation high production efficiency has Preferable effect.
When the screw connection structure 43 is multiple screw connecting structure 43b, Figure 17 and Figure 19 is please referred to, described first Installation region 411 is formed in the left side of first wall 41, and second installation region 421 is formed in second wall 42 right sides, the screw connection structure 43 include multiple screw connecting structure 43b, multiple edges the screw connecting structure 43b Upward and downward interval setting, each screw connecting structure 43b include connecting screw 431 and be set to 431 liang of the connecting screw Two second locking nuts 432 at end, the left side of one end from second wall 42 of the connecting screw 431 penetrate, and Sequentially pass through it is described second connection wall column 422, continue through it is described first connection wall column 412, two described second Locking nut 432 is divided into the both ends of the connecting screw 431, respectively to lock left side and the institute of second wall 42 The right side of the first connection wall column 412 is stated, the general manpower handle hole that can be arranged on first wall 41 is to dismount The second locking nut 432 is stated, by the connection function of the screw connecting structure 43b, locking effect is good, it should be noted that Prefabricated first wall 41 and when second wall 42 in factory, has reserved and has made the manpower handle hole, and The prefabricated hole worn for the connecting screw 431 on the first connection wall column 412 and the second connection wall column 412 Hole improves produced on-site, the efficiency of installation as long as scene carries out simple assembled operation.
Further, in the embodiment of first wall 41 and the L-shaped connection type of second wall 42, it is Further reinforce bonding strength, second installation region 421 be formed in the 42 rear end right side of the second wall and The trailing flank of second wall 42,41 plate of the first wall being located behind in first wall 41 extend to form to the right a company Arm 44 is connect, first installation region 411 is also formed into the leading flank of the linking arm 44, and on the linking arm 44 One installation region 411 is supported with the second installation region 421 on the trailing flank for being located at second wall 42 by the fixation of screw 46 It connects, it is fixed by the way that screw 46 is in addition arranged, so that first wall 41 is fixed in two directions with second wall 42, Fixation is more firm, and structural strength is more preferable.
The leakproofness of first wall 41 and second wall 42 in 1 junction of wall is also the contents of the present invention, Specifically, the prefabricated wood wall connecting structure of wall 4 further includes sealing structure 45, and the sealing structure 45 is set to described first Between installation region 411 and second installation region 421, the sealing structure 45 includes multiple rubber strips, multiple rubbers Adhesive tape is fixed by screw 46 or is adhesively fixed, by being set side by side to form the sealing structure by multiple rubber strips 45, and in such a way that screw 46 is fixed or is adhesively fixed, fixed form is simple, and assembly is convenient, and sealing effect is good.
In the embodiment of the present invention, the prefabricated laminated wood wall construction 100 further includes the connection structure 5 of wall and basis, Referring to Figure 2 together 0 to Figure 22, the wall 1 is in up and down and front and back is to being extended, the prefabricated laminated wood wall construction 100 It further include the connection structure 5 of wall and basis, the wall and basic connection structure 5 include foundation structure 51 and multiple screw threads Connector 52, wherein the foundation structure 51 is including the extended base matrix 511 of horizontal direction and is set to the base matrix Connection chock 512 on 511 upper surfaces, the connection chock 512 in front and back to be extended, it is described connection chock 512 it is upper End face is equipped with the wall 1, and multiple threaded connectors 52 are set on the wall 1 and the connection chock 512, to incite somebody to action The wall 1 is fixedly installed in the foundation structure 51, and multiple threaded connectors 52 are set to the wooden wall and the company (when field operation, inclination from top to bottom is placed in the threaded connector 52, and between the two sides of the wooden wall on connection pad wood 512 Every being staggeredly placed in), the wooden wall to be fixedly installed in the foundation structure 51, the installation of the wooden wall 1 is in place simple, just Victory improves production efficiency.
The connection chock 512 is fixed in the foundation structure 51 by built-in fitting, specifically, the connection gasket The upper surface of wood 512 is equipped with multiple third mounting grooves 5121, and the bottom wall of each third mounting groove 5121 has provided third peace Filling hole 5122, the connection structure 5 on the wall and basis further includes multiple pre embedded bolts 53 and multiple third locking nuts 54, In, multiple pre embedded bolts 53 are set on the base matrix 511 along front and back to interval, and multiple pre embedded bolts 53 are distinguished Correspondence is arranged in multiple third mounting holes 5122, and each correspondence of third locking nut 54 is sheathed on the pre-buried spiral shell The upper end of bar 53, and be located in the third mounting groove 5121, the third locking nut 54 is to by the connection chock 512 On locking to the base matrix 511.
Further, in order to make the connection chock 512 play more stable fixed effect, in the embodiment of the present invention, Multiple third mounting grooves 5121 include two groups of third mounting grooves 5121, and third mounting groove 5121 described in every group includes multiple edges Third mounting groove 5121 from front and back to arrangement, wherein third mounting groove 5121 described in one group be set to it is described connection chock 512 the right side Side upper surface, another third mounting groove 5121 are set to the left side upper surface of the connection chock 512, the peace of third described in two groups Tankage 5121 to connect chock 512 in front and back staggeredly interval setting upwards, two groups of third mounting grooves 5121 being staggered Fixed center is located at the geometric center of the connection chock 512, so that the structure of connection is more stable, fixed effect is more preferable.
It should be noted that first the pre-buried pre embedded bolt 53, after pouring concrete, forms an entirety when site operation, have When body is installed, the interval between pre embedded bolt 53 is first measured, and carry out correction process, then extremely by the pre embedded bolt 53 installation It is first pre- one by one to twist the third locking nut 54 in the third mounting hole 5122 of the connection chock 512, to the connection chock After 512 leveling, all third locking nuts 54 are twisted eventually one by one, check all pre embedded bolts 53, exceeds the third Part in 5121 range of mounting groove, excision, that is, complete the connection chock 512 and the fixed of the foundation structure 51 connects It connects.
Water-proofing treatment is carried out by laying water-proof coiled material between the connection chock 512 and the base matrix 511, in order to Further prevent the tide vapour in the foundation structure 51 from entering the wood within the walls, it is specifically, more in the embodiment of the present invention A wall column 12 includes bottom beam plate 5512, and the bottom beam plate 5512 is set to the lower end of described two wallboards 11, described The connection structure 5 on wall and basis further includes sealing structure 45, and the sealing structure 45 is set to the bottom beam plate 5512 and described It connects between chock 512, the moisture-proof and waterproof of the wooden wall is further made by the sealing structure 45, extends institute State the service life of the wooden wall, there is preferable effect, in the present embodiment, the sealing structure 45 include it is multiple in front and back to prolonging The rubber strip stretched, multiple rubber strips are fixed by screw 46 or are adhesively fixed.
For the ease of the wooden wall contraposition with the connection chock 512 during installation, in the embodiment of the present invention, two The wallboard 11 extends downwardly setting, and in the lower end surface setting of the prominent bottom beam plate 5512, so that the lower end of the wood wall A groove 56 is formed, the upper end of the groove 56 and the connection chock 512 forms concave-convex fit structure, so that the wood wall limit Position is installed on the connection chock 512, when the contraposition of the wooden wall and the connection chock 512 is installed, by described recessed Convex fit structure, by the card of the groove 56 of the wooden wall set on the connection chock 512, it is easy for installation simple, fastly Victory, in addition, being sealed in the embodiment being arranged concordant with the connection upper end of chock 512 of the lower end of the wall 1 by setting 58 structure of plate have preferable appearance so that the connection chock is wrapped up.
In order to reinforce the connection structure intensity of the wooden wall and basis, in the embodiment of the present invention, the wood wall and basis Connection structure further include reinforce fixing piece 57, it is described reinforce fixing piece 57 include horizontal direction extend the first fixed section 571, with And upper and lower and preceding the second rearwardly extending fixed section 572, first fixed section 571 are fixedly attached to the base matrix 511 On, second fixed section 572 is fixedly connected on the side surface of the wallboard 11, in the present embodiment, the reinforcement fixing piece 57 Be arranged multiple, and along front and back to being spaced apart, the reinforcement fixing piece 57 is metalwork, first fixed section 571 with it is described Second fixed section 572 is arranged in a mutually vertical manner, on the one hand, the upright wooden wall and 51 profile angle of foundation structure, another party Face strengthens the wooden wall and 51 bonding strength of foundation structure, has preferable effect.
The above description is only a preferred embodiment of the present invention, is not intended to limit the scope of the invention, all at this Under the design of invention, using equivalent structure transformation made by description of the invention and accompanying drawing content, or directly/it is used in it indirectly He is included in scope of patent protection of the invention relevant technical field.

Claims (16)

1. a kind of prefabricated laminated wood wall construction characterized by comprising
Wall;
Hoisting structure is set to the wall, to lift by crane the wall;And
Electrical structure is set to the wall, and the electrical structure includes wire structure, the Yi Jishe being arranged in inside the wall Electrical part in the wire structure end.
2. prefabricated laminated wood wall construction as described in claim 1, which is characterized in that the wall includes:
Two wallboards, in being oppositely arranged, two wallboards present lower extended, one peace of formation between two wallboards Fill space;
Multiple wall columns extended in upward and downward, multiple wall columns are set to the peace along the width direction interval of the wallboard It fills in space;And
Raising-plate, the width direction along the wallboard are extended, and the raising-plate is set to the upper surface of multiple wall columns.
3. prefabricated laminated wood wall construction as claimed in claim 2, which is characterized in that the upper surface of the raising-plate, which has, to be in Lifting installation region between two adjacent wall columns, in the lifting installation region, the raising-plate has provided One via hole;
The hoisting structure includes the lifting screw rod that upward and downward extends, and the lifting screw rod, which is removably secured, is installed on described the In one via hole.
4. prefabricated laminated wood wall construction as claimed in claim 3, which is characterized in that the hoisting structure further includes set on described Lift the first locking nut of screw rod lower end;
The prefabricated laminated wood wall construction further includes nut built-in fitting, and the nut built-in fitting includes the nut installation of opening upwards Slot, and it is distributed in the fixed ring of nut mounting groove upper end side, the fixed ring to be fixed to the top beam upwards The lower end surface of plate, the nut mounting groove is interior to be equipped with first locking nut, and the nut mounting groove corresponds to first mistake Hole setting, and its bottom wall is equipped with relief hole, the relief hole is worn with for the lifting screw rod.
5. prefabricated laminated wood wall construction as claimed in claim 4, which is characterized in that the prefabricated laminated wood wall construction further includes Reinforce connector, the connector of reinforcing includes the first segment of horizontal direction extension, upward and downward extension and is divided into the first segment The second segment of lower section two sides and two linkage sections for being correspondingly connected with the first segment and two second segments, described first Section is fixedly installed between the fixed ring and the raising-plate, and two second segments are respectively to be fixedly attached to two walls Bone column.
6. prefabricated laminated wood wall construction as claimed in claim 2, which is characterized in that two wallboards are in upper and lower and left and right To be extended;
The wire structure includes being arranged in the intracorporal installation pipeline of the wall and leading in the installation pipeline inner cavity Electric wire, the installation pipeline include to the first pipeline of extension, and/or vertically described to extending and extending upwardly to along left and right Second pipeline of raising-plate;
The first mounting structure is respectively equipped on multiple wall columns, multiple first mounting structures are pacified for first pipeline Dress, first pipeline is fixed on multiple wall columns;
The raising-plate is equipped with the second mounting structure, and second mounting structure is installed for second pipeline, will be described Second pipeline is fixed on the raising-plate.
7. prefabricated laminated wood wall construction as claimed in claim 6, which is characterized in that there are two the left end of the wall is set parallel The wall column has provided a holding tank positioned at the upper end left side of the wall column in left side, and the holding tank passes through upwards Wear the upper surface setting of the wall column;
The electrical part includes connector, and the plug or socket of the connector are set in holding tank;
The connector is one of rectangle heavy-duty connector, aviation plug, connecting terminal.
8. prefabricated laminated wood wall construction as claimed in claim 6, which is characterized in that the wall column has and the wallboard phase Pair the first mounting surface, first mounting structure includes the first mounting groove on first mounting surface, described first First pipeline is equipped in mounting groove;And/or
The raising-plate has second mounting surface opposite with the wallboard, and second mounting structure includes being set to described second The second mounting groove on mounting surface, second mounting groove is interior to be equipped with second pipeline;
Wherein, the prefabricated laminated wood wall construction further includes pressure holding block, and the pressure holding block is set on first mounting groove and/or the In two mounting grooves, the confined planes that there is the pressure holding block relatively described first mounting groove and/or the second mounting groove wall surface to be arranged, The confined planes are equipped with limiting slot, and the limiting slot with first pipeline and/or the second pipeline to be adapted to, the pressure holding Block is placed in first peace to press first pipeline and/or the second pipeline from back to front, to limit first pipeline In tankage and/or limit second pipeline is placed in second mounting groove.
9. prefabricated laminated wood wall construction as claimed in claim 2, which is characterized in that the wall is in upper and lower and preceding rearwardly extending Setting;
The prefabricated laminated wood wall construction further includes the connection structure of wall and basis, the connection structure packet of the wall and basis It includes:
Foundation structure, the base matrix and the connection gasket on the base matrix upper surface being extended including horizontal direction Wood, for the connection chock in front and back to being extended, the upper surface of the connection chock is equipped with the wall;And
Multiple threaded connectors are set on the wall and the connection chock, described the wall to be fixedly installed in In foundation structure.
10. prefabricated laminated wood wall construction as claimed in claim 9, which is characterized in that the upper surface of the connection chock is equipped with The bottom wall of multiple third mounting grooves, each third mounting groove has provided mounting hole;
The connection structure of the wall and basis further include:
Multiple pre embedded bolts are set on the base matrix along front and back to interval, and multiple pre embedded bolts, which respectively correspond, to be worn In in multiple mounting holes;And
Multiple third locking nuts, each corresponding upper end for being sheathed on the pre embedded bolt of the third locking nut, and be located at In the third mounting groove, the third locking nut is locking the connection chock to the base matrix.
11. prefabricated laminated wood wall construction as claimed in claim 10, which is characterized in that the wall further includes bottom beam plate, institute State the lower end that bottom beam plate is set to two wallboards;
Two wallboards extend downwardly setting, and in the lower end surface setting of the prominent bottom beam plate, so that under the wall End forms a groove, the upper end formation concave-convex fit structure of the groove and the connection chock, so that wall limit peace Loaded on the connection chock.
12. prefabricated laminated wood wall construction as claimed in claim 2, which is characterized in that the prefabricated laminated wood wall construction includes At least two walls, wherein a wall vertically and left and right to be extended, another wall is vertically and preceding Rearwardly extending setting is fixedly connected between two walls by connecting structure of wall;
At least two walls include at least one first wall and at least one second wall, and first wall is vertically And left and right is formed with the first installation region, second wall is along upper to being extended on the side surface of first wall Lower and front and back is formed with the second installation region on the side surface of second wall to being extended;
The connecting structure of wall includes screw connection structure, and the screw connection structure is set to first wall and described the Between two walls;
First wall and second wall mutually abut at first installation region and second installation region, And it is fixed by the screw connection structure;
The first connection wall column that upward and downward extends is equipped in first wall at correspondence first installation region;
Second wall is in corresponding the second connection wall column for being equipped with upward and downward at second installation region and extending;
The screw connection structure is arranged on the first connection wall column and the second connection wall column.
13. prefabricated laminated wood wall construction as claimed in claim 12, which is characterized in that first installation region is formed in institute State the left side of the first wall;
Second installation region is formed in second wall right side;
The screw connection structure includes multiple wood screws, and multiple wood screws are vertically arranged to interval, each wood The left side of screw from second wall penetrates, and sequentially passes through the second connection wall column, continues to extend locking to institute State the first connection wall column.
14. prefabricated laminated wood wall construction as claimed in claim 13, which is characterized in that first installation region is formed in institute State the left side of the first wall;
Second installation region is formed in second wall right side;
The screw connection structure includes multiple screw connecting structures, and multiple screw connecting structures are vertically set to interval It sets, each screw connecting structure includes connecting screw and two the second locking nuts set on the connecting screw both ends, The left side of one end of the connecting screw from second wall penetrates, and sequentially passes through the second connection wall column, after It reneing and extends through the first connection wall column, two second locking nuts are divided into the both ends of the connecting screw, point Right side not to the left side and the first connection wall column of locking second wall.
15. prefabricated laminated wood wall construction according to claim 13 or 14, which is characterized in that second installation region is formed In second wall rear end right side and the trailing flank of second wall;
The first ash wall body plate being located behind in first wall extends to form to the right a linking arm;
First installation region is also formed into the leading flank of the linking arm;
The first installation region on the linking arm and the second installation region on the trailing flank of second wall It is abutted by the way that screw is fixed.
16. a kind of log cabin structure, which is characterized in that including the prefabricated laminated wood wall as described in claim 1 to 15 any one Structure.
CN201811233269.9A 2018-10-22 2018-10-22 Prefabricated integrated wooden wall structure and wooden house structure Active CN109138214B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811233269.9A CN109138214B (en) 2018-10-22 2018-10-22 Prefabricated integrated wooden wall structure and wooden house structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811233269.9A CN109138214B (en) 2018-10-22 2018-10-22 Prefabricated integrated wooden wall structure and wooden house structure

Publications (2)

Publication Number Publication Date
CN109138214A true CN109138214A (en) 2019-01-04
CN109138214B CN109138214B (en) 2024-04-09

Family

ID=64809369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811233269.9A Active CN109138214B (en) 2018-10-22 2018-10-22 Prefabricated integrated wooden wall structure and wooden house structure

Country Status (1)

Country Link
CN (1) CN109138214B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812074A (en) * 2019-02-21 2019-05-28 北京工业大学 A kind of side within the walls setting pipeline trench is segmented prefabricated assembled hard-cover whole kitchen
CN110093975A (en) * 2019-05-31 2019-08-06 广西理工职业技术学校 A kind of rural area assembled-type house
CN111926955A (en) * 2020-08-18 2020-11-13 李习勇 Environmental protection aerated concrete wall structure

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1193255A (en) * 1997-09-24 1999-04-06 Tanaka Glass Kk Two-piece wall panel, and construction method thereof
JP2008144577A (en) * 2006-11-16 2008-06-26 Kimihiko Kaneko Bearing wall unit and bearing wall construction method
FR2914662A1 (en) * 2007-04-06 2008-10-10 Jean Michel Carlier Dwelling i.e. frame house, has prefabricated modules including inner frame for receiving facing to create service space with thickness equal to that of frame, where space receives pipes or wires of electrical installation
WO2010020108A1 (en) * 2008-08-19 2010-02-25 茂地(上海)建筑工程咨询有限公司 Mainbody frame of assembled house and assembled method thereof
CN203097017U (en) * 2013-03-14 2013-07-31 沈阳建筑大学建筑设计研究院 Connecting structure between prefabricated infilled wall and prefabricated column or prefabricated shear wall
CN204626709U (en) * 2015-03-25 2015-09-09 吉林森工金桥地板集团有限公司 A kind of exterior wall of prefabricated log cabin
CN105178584A (en) * 2015-08-31 2015-12-23 合肥建工集团有限公司 Assembled house out-hung scaffold system and construction method
US20160032587A1 (en) * 2013-03-14 2016-02-04 Blu Homes, Inc. Single and multi-part prefabricated interior finish layer assemblies, building wall assemblies, and methods of manufacturing these assemblies
CN106284754A (en) * 2015-05-30 2017-01-04 湖南天创集成科技实业有限公司 One is used for building integrated log cabin close framed wall structure
CN106592825A (en) * 2016-12-22 2017-04-26 湖北福汉木业有限公司 Assembly type wood frame energy-saving shear wall
CN206722208U (en) * 2017-03-23 2017-12-08 安徽天筑建设(集团)有限公司 A kind of prefabricated external wall panel structure
CN108005286A (en) * 2017-11-23 2018-05-08 安徽同济建设集团有限责任公司 A kind of construction method of the unidirectional overlapping floorboard of assembled architecture
CN207392566U (en) * 2017-07-28 2018-05-22 苏州金螳螂建筑装饰股份有限公司 Prefabricated wood facing installation of ceiling adjustable apparatus
CN207812485U (en) * 2017-07-19 2018-09-04 甘肃第六建设集团股份有限公司 One kind being used for basement boiler side into hanging apparatus
CN209369096U (en) * 2018-10-22 2019-09-10 湖北天欣木结构房制造有限公司 Prefabricated laminated wood wall construction and log cabin structure

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1193255A (en) * 1997-09-24 1999-04-06 Tanaka Glass Kk Two-piece wall panel, and construction method thereof
JP2008144577A (en) * 2006-11-16 2008-06-26 Kimihiko Kaneko Bearing wall unit and bearing wall construction method
FR2914662A1 (en) * 2007-04-06 2008-10-10 Jean Michel Carlier Dwelling i.e. frame house, has prefabricated modules including inner frame for receiving facing to create service space with thickness equal to that of frame, where space receives pipes or wires of electrical installation
WO2010020108A1 (en) * 2008-08-19 2010-02-25 茂地(上海)建筑工程咨询有限公司 Mainbody frame of assembled house and assembled method thereof
CN203097017U (en) * 2013-03-14 2013-07-31 沈阳建筑大学建筑设计研究院 Connecting structure between prefabricated infilled wall and prefabricated column or prefabricated shear wall
US20160032587A1 (en) * 2013-03-14 2016-02-04 Blu Homes, Inc. Single and multi-part prefabricated interior finish layer assemblies, building wall assemblies, and methods of manufacturing these assemblies
CN204626709U (en) * 2015-03-25 2015-09-09 吉林森工金桥地板集团有限公司 A kind of exterior wall of prefabricated log cabin
CN106284754A (en) * 2015-05-30 2017-01-04 湖南天创集成科技实业有限公司 One is used for building integrated log cabin close framed wall structure
CN105178584A (en) * 2015-08-31 2015-12-23 合肥建工集团有限公司 Assembled house out-hung scaffold system and construction method
CN106592825A (en) * 2016-12-22 2017-04-26 湖北福汉木业有限公司 Assembly type wood frame energy-saving shear wall
CN206722208U (en) * 2017-03-23 2017-12-08 安徽天筑建设(集团)有限公司 A kind of prefabricated external wall panel structure
CN207812485U (en) * 2017-07-19 2018-09-04 甘肃第六建设集团股份有限公司 One kind being used for basement boiler side into hanging apparatus
CN207392566U (en) * 2017-07-28 2018-05-22 苏州金螳螂建筑装饰股份有限公司 Prefabricated wood facing installation of ceiling adjustable apparatus
CN108005286A (en) * 2017-11-23 2018-05-08 安徽同济建设集团有限责任公司 A kind of construction method of the unidirectional overlapping floorboard of assembled architecture
CN209369096U (en) * 2018-10-22 2019-09-10 湖北天欣木结构房制造有限公司 Prefabricated laminated wood wall construction and log cabin structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109812074A (en) * 2019-02-21 2019-05-28 北京工业大学 A kind of side within the walls setting pipeline trench is segmented prefabricated assembled hard-cover whole kitchen
CN110093975A (en) * 2019-05-31 2019-08-06 广西理工职业技术学校 A kind of rural area assembled-type house
CN111926955A (en) * 2020-08-18 2020-11-13 李习勇 Environmental protection aerated concrete wall structure

Also Published As

Publication number Publication date
CN109138214B (en) 2024-04-09

Similar Documents

Publication Publication Date Title
CN109138214A (en) Prefabricated laminated wood wall construction and log cabin structure
CN104563288A (en) Reinforced concrete frame gridding slab prefabricated energy-saving house
CN104389349B (en) The novel house can quickly remove, assembled and assemble method
CN205314355U (en) A assemble board and assemble prefabricated house for assembling prefabricated house
CN207484672U (en) Prefabricated steel framework frame module room
CN207672806U (en) A kind of hollow assembled board wall system
WO2017016183A1 (en) Basement structure connected by using fender posts
CN206144018U (en) Be suitable for opening type building bottom plate and building element of hoist and mount pendant
CN205063202U (en) Be located eave decorative board on outer wall
CN207110308U (en) A kind of external corner structure
CN108018967B (en) Novel building partition wall assembly connecting structure and construction method thereof
CN209369096U (en) Prefabricated laminated wood wall construction and log cabin structure
CN211622031U (en) Novel prefabricated building node connection structure
CN211341295U (en) Connecting joint of external wall board and beam
CN210640557U (en) Safe and reliable's integrated block terminal
CN108999318B (en) Unit curtain wall side buried single pendant structure, unit body with side buried single pendant and unit curtain wall mounting method
CN207453119U (en) Wallboard and beam connection component and walling system
CN2545279Y (en) Color steel sandwich plate movable dwellings
CN220521761U (en) Anti-seismic connecting device for assembled upper and lower cement houses
CN2324206Y (en) Fast wall construction structure
CN2813756Y (en) Assembling safety net column guard-rail
CN206504285U (en) Lamp-mounting structure and Novel inserting connection type building body suitable for novel building
CN210827812U (en) Factory-prefabricated standardized bay window structure
CN205557829U (en) A assemble board and assemble prefabricated house for assembling prefabricated house
CN215406748U (en) Composite construction low wall

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant