CN109137899A - A kind of compound tube pile construction engineering method of soil cement - Google Patents

A kind of compound tube pile construction engineering method of soil cement Download PDF

Info

Publication number
CN109137899A
CN109137899A CN201810994067.XA CN201810994067A CN109137899A CN 109137899 A CN109137899 A CN 109137899A CN 201810994067 A CN201810994067 A CN 201810994067A CN 109137899 A CN109137899 A CN 109137899A
Authority
CN
China
Prior art keywords
cement
soil
pile
tubular pole
forming
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810994067.XA
Other languages
Chinese (zh)
Inventor
何学礼
刘世恩
李斌
周朝晖
王庆华
王丹青
许星
何超
何学锥
蔡东升
李红玉
陈朋
杜峰梅
张崇浩
何建朝
孟学哲
孟祥永
高羽海
吴建涛
朱西鹏
贾春艳
王留雍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hengshui Jingkun Geotechnical Engineering Co Ltd
Original Assignee
Hengshui Jingkun Geotechnical Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hengshui Jingkun Geotechnical Engineering Co Ltd filed Critical Hengshui Jingkun Geotechnical Engineering Co Ltd
Priority to CN201810994067.XA priority Critical patent/CN109137899A/en
Publication of CN109137899A publication Critical patent/CN109137899A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/50Piles comprising both precast concrete portions and concrete portions cast in situ
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/46Concrete or concrete-like piles cast in position ; Apparatus for making same making in situ by forcing bonding agents into gravel fillings or the soil

Abstract

The invention belongs to building lots and foundation construction technical field, concretely disclose a kind of compound tube pile construction engineering method of soil cement.It constitutes the main technical schemes of the sealing element: will be arranged using drilling machine and complete to take soil at concrete stake, realize concrete stake pore-forming;It is described that soil is taken to form cement injection soil paste with cement mixing while completing the cement stake holes pore-forming;The soil cement slurry is perfused into the concrete stake pore-forming, cement-soil composite pile is formed;By in the tubular pole indentation cement-soil composite pile, the compound tubular pole that inner core is tubular pole, outer core is cement earth pile is formed.The compound tube pile construction engineering method short construction period of the soil cement, without waste and the free of contamination feature in construction site.

Description

A kind of compound tube pile construction engineering method of soil cement
Technical field
The invention belongs to building lots and foundation construction technical field, are concretely related to a kind of compound tubular pole of soil cement and apply Work engineering method.
Background technique
The compound tubular pole of soil cement: by what the compound construction of soil cement and prestressed concrete pipe pile was formed there is complementary enhancing to make Pile body.Inner core is prestressed concrete pipe pile;Outer core is cement earth pile.
Currently, in the compound tube pile construction of soil cement there are two types of the formation of cement earth pile: first is that realized with Pressure Revolving Blast-Grout, Its principle is the height from the nozzle of slip casting tube edge after prefabricated slurries make liquid stream obtain huge energy by high pressure emitter Speed ejects, and forms the liquid stream of one energy height concentration, directly the destruction soil body, and in course of injection, drilling rod is mentioned in rotation It rises, is thoroughly mixed slurries with the soil body, form the column induration of certain diameter in soil.Its disadvantage: 1, cement slurry wave Take seriously, because cement slurry is injected always, finally has a large amount of cement slurries and overflow ground, therefore cost greatly improves.2, due to ground The a large amount of mud in face, cause ground largely to pollute.Second is that Soil-cement piling method forms cement earth pile, principle is to utilize cement As curing agent, by special Mixing Machine, in ground depths by weak soil and curing agent action of forced stirring, curing agent and soft is utilized Generated a series of physical chemical reaction between soil makes the hard solution of weak soil at globality, water stability and some strength it is excellent Matter soil cement.Its disadvantage such as pile quality lacks monitoring device, and stifled soil pile breaking phenomenon need to be monitored manually, the skill of operator Art is horizontal and operation is half-hearted, therefore soil cement uniform quality cannot be completely secured.
Summary of the invention
It is an object of the invention to provide a kind of short construction period, without waste, without construction site pollution soil cement it is compound Tube pile construction engineering method.
To achieve the above object, technical solution provided by the invention are as follows:
A kind of compound tube pile construction engineering method of soil cement, step include:
Concrete stake pore-forming: it completes to take soil at stake position using drilling machine, realizes concrete stake pore-forming;
Soil-cement: described that soil is taken to form soil cement slurry with cement mixing while completing the concrete stake pore-forming;
Cement earth pile casting: the soil cement slurry is perfused into the cement stake holes, forms cement earth pile;
Compound tubular pole is formed: in the tubular pole indentation cement earth pile, will form that inner core is tubular pole, outer core is answering for cement earth pile Close tubular pole.
In above-mentioned construction,
--- the tubular pole for constituting the inner core is steel tubular pole or prestressed concrete pipe pile.
The present invention compared with prior art, i.e., is poured by pre- stirring concrete earth in institute using long-spiral drilling machine construction method In the stake holes of formation, the formation of cement earth pile is realized, then replant into tubular pole, i.e. the completion compound tubular pole of soil cement;The soil cement Compound tube pile construction engineering method has the following characteristics that first, have the characteristics that short construction period, saves more than half compared with bored concrete pile Duration saves a quarter duration compared with composite foundation;Second, stirring because of soil cement and being perfused by long spire in advance, therefore do not deposit In any waste of cement and composite soil;Third, that is, drilling cements out since there is no the races of cement slurry to emit for construction ground Native most undergrounds that poured into the form of soil cement again form cement earth pile, therefore construction ground is neatly clean.
Detailed description of the invention
Fig. 1 is the compound tube pile construction engineering method flow diagram of soil cement provided by the invention.
Specific embodiment
The compound tube pile construction engineering method process principle of soil cement provided by the invention is done further in detail with reference to the accompanying drawing Explanation.
As shown in Figure 1, the compound tube pile construction engineering method flow diagram of soil cement provided by the invention.That is soil cement multiple tube The construction of tubular pole are as follows: complete that soil is taken to realize concrete stake pore-forming 2 at stake position 1 first with long-spiral drilling machine;In completion While stating cement stake holes pore-forming, the soil taken is delivered to mixing plant and cement mixing forms soil cement slurry 3;By above-mentioned cement Soil paste pumps the top for being delivered to long-spiral drilling machine by pumping mechanism 4, by hollow auger stem by lower and upper perfusion to institute It states in concrete stake pore-forming 5 and forms cement earth pile;Before being formed by cement earth pile solidification, tubular pole is pressed by static pressure mechanism 6 Wherein, the compound tubular pole 7 that inner core is tubular pole, outer core is cement earth pile is formed.Wherein the tubular pole of above-mentioned inner core be steel tubular pole or Prestressed concrete pipe pile.
Due in above-mentioned construction, by the soil in the cement stake holes taken out, almost or greatly portion is used for and cement mixing Form the soil cement slurry of pumping, compared with the existing technology in Soil-cement piling method form cement earth pile, can be according to requiring It realizes that cement mixes in proportion with native, the dirt ratio for being formed by cement earth pile, the matter of effective monitoring pile can be controlled Amount;Mesohigh rotary spraying grouting method forms cement earth pile compared with the existing technology, not only can effectively avoid mud and overflows and causes to waste, And have technique relatively easy and can equally control the uniformity of cement content, be conducive to the control of pile quality.

Claims (2)

1. a kind of compound tube pile construction engineering method of soil cement, step include:
Concrete stake pore-forming: it completes to take soil at stake position using drilling machine, realizes concrete stake pore-forming;
Soil-cement: described that soil is taken to form soil cement slurry with cement mixing while completing the concrete stake pore-forming;
Cement earth pile casting: the soil cement slurry is perfused into the cement stake holes, forms cement earth pile;
Compound tubular pole is formed: in the tubular pole indentation cement earth pile, will form that inner core is tubular pole, outer core is answering for cement earth pile Close tubular pole.
2. a kind of compound tube pile construction engineering method of soil cement as described in claim 1, it is characterised in that: constitute the pipe of the inner core Stake is steel tubular pole or prestressed concrete pipe pile.
CN201810994067.XA 2018-08-29 2018-08-29 A kind of compound tube pile construction engineering method of soil cement Pending CN109137899A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810994067.XA CN109137899A (en) 2018-08-29 2018-08-29 A kind of compound tube pile construction engineering method of soil cement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810994067.XA CN109137899A (en) 2018-08-29 2018-08-29 A kind of compound tube pile construction engineering method of soil cement

Publications (1)

Publication Number Publication Date
CN109137899A true CN109137899A (en) 2019-01-04

Family

ID=64828882

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810994067.XA Pending CN109137899A (en) 2018-08-29 2018-08-29 A kind of compound tube pile construction engineering method of soil cement

Country Status (1)

Country Link
CN (1) CN109137899A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2224068C1 (en) * 2002-07-29 2004-02-20 Голованов Александр Михайлович Method of cement-soil pile forming
CN1641111A (en) * 2004-11-26 2005-07-20 王平 High-property cement earth pile construction method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2224068C1 (en) * 2002-07-29 2004-02-20 Голованов Александр Михайлович Method of cement-soil pile forming
CN1641111A (en) * 2004-11-26 2005-07-20 王平 High-property cement earth pile construction method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴立等: "《岩土加固技术与方法》", 30 June 2015, 武汉大学出版社 *

Similar Documents

Publication Publication Date Title
CN106996105B (en) Down-the-hole impact jet grouting stirring pile construction technology and equipment
CN205714026U (en) A kind of water injection type drilling machine drilling rod
CN106368214B (en) A kind of casing formula cement mixing method at pile operation method
CN104929114A (en) High pressure jet grouting pile waterproof curtain construction device and method
CN103485349B (en) Lime nail composite frame prestressed anchor tube structure and construction method for reinforcing weak slope
CN106759297A (en) A kind of construction method of support pile and three pipe high-pressure rotary jet grouting pile deep basal pits
CN204753574U (en) High pressure jet grouting pile stagnant water curtain construction equipment
CN105113498A (en) Method for constructing high-strength core composite piles
CN103806479A (en) Pile foundation combined grouting reinforcement construction method combining waterproof curtain
CN107964946A (en) The construction method of stiff composite pile based on pump drainage water precipitation
CN105040695A (en) Anchor rod structure capable of integrally working and construction method
CN207260138U (en) High-pressure rotary-spray stirs the drilling rod of bearing pile and has its device
CN112281828A (en) Novel composite pile structure and construction method
CN104005416A (en) Method for processing major-diameter hole pile collapsed holes under high and steep slope plain fill back-pressing condition
CN109137899A (en) A kind of compound tube pile construction engineering method of soil cement
CN208563316U (en) A kind of large-section in-situ concrete pile pile-end sediment sediment processing unit
CN100374657C (en) Construction method employing threaded stirring shaft to decrease ambient foundation deformation
CN101514549B (en) Method using intermediate mixing piles for treating three-layer soft foundation
CN100465383C (en) Multiple head small diameter long screw drilling wall forming machine
CN203878590U (en) Post-reinforcement structure for cast-in-place piles
CN203891012U (en) Novel filling pile with prearranged clay pile
CN206815410U (en) A kind of experimental rig of indoor full automatic simulation cement mixing method
CN106245641A (en) PHC pile tube post grouting construction technique and PHC pile tube composite pile
CN100363562C (en) Preventing plate with spreading and deep layer rotating spraying mixture head with diffusion preventing plate and guniting mouth
CN202430728U (en) Water blocking equipment for water bursting control

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104