CN109137761A - 一种控制既有桥梁与加宽桥梁沉降差的方法 - Google Patents

一种控制既有桥梁与加宽桥梁沉降差的方法 Download PDF

Info

Publication number
CN109137761A
CN109137761A CN201811148237.9A CN201811148237A CN109137761A CN 109137761 A CN109137761 A CN 109137761A CN 201811148237 A CN201811148237 A CN 201811148237A CN 109137761 A CN109137761 A CN 109137761A
Authority
CN
China
Prior art keywords
bridge
widen
foil gauge
construction
widening
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811148237.9A
Other languages
English (en)
Inventor
何连昊
何开伟
蔡钦好
黄钢
肖平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway No 2 Engineering Group Co Ltd
China Railway Erju 4th Engineering Co Ltd
Original Assignee
China Railway Erju Co Ltd
China Railway No 2 Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Erju Co Ltd, China Railway No 2 Engineering Group Co Ltd filed Critical China Railway Erju Co Ltd
Priority to CN201811148237.9A priority Critical patent/CN109137761A/zh
Publication of CN109137761A publication Critical patent/CN109137761A/zh
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D22/00Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

本发明公开了一种控制既有桥梁与加宽桥梁沉降差的方法,包括以下步骤A首先完成新建加宽桥梁下部构造的施工和T梁预制施工;B架设加宽桥梁T梁,并在T梁上设置若干个应变片,测得各个应变片的高程;C在加宽桥梁T梁上设置荷载物品模拟二期恒载进行超载堆载预压,加速加宽桥梁的沉降变化过程;D加宽桥梁沉降稳定后结束预压,测得各个应变片的高程;E根据各个应变片预压前后高程变化来量化加宽桥梁的沉降值,并且根据T梁预压变形后各个应变片的应变值计算验证加宽桥梁的沉降值,真实反映沉降控制的效果;F加宽桥梁的沉降值评估合格后施工加宽桥梁和既有桥梁的横向连接结构。该方法步骤简单,操作方便,效果良好。

Description

一种控制既有桥梁与加宽桥梁沉降差的方法
技术领域
本发明涉及桥梁施工领域,特别涉及一种控制既有桥梁与加宽桥梁沉降差的方法。
背景技术
目前桥梁加宽拼接方案中控制新旧桥梁沉降差的方法主要集中在设计方面,如将新旧桥梁下部结构设计为分离式、上部结构采用简支梁形式,以减小墩顶竖向荷载、新旧桥梁上部结构连接处做补强结构以抵抗横向附加内力等方法。
但是,新桥沉降变化过程缓慢,新旧桥梁上部结构连接后继续产生沉降差,使连接部位产生较大横桥向内力,进而导致上部结构混凝土开裂和桥面铺装开裂,影响后期的行车安全;从设计开始新建桥梁的沉降差控制仅为理论值,实际施工过程中新桥发生的沉降量无具体数据支撑,使得沉降差控制的实际效果不明。
发明内容
本发明的目的在于克服现有技术中所存在的现有控制新旧桥梁沉降差的方法主要集中在设计方面,且仅为理论值,实际施工过程中新桥发生的沉降量无具体数据支撑,使得沉降差控制的实际效果不明,新桥沉降变化过程缓慢,新旧桥梁上部结构连接后继续产生沉降差,使连接部位产生较大横桥向内力,进而导致上部结构混凝土开裂和桥面铺装开裂,影响后期的行车安全的上述不足,提供一种控制既有桥梁与加宽桥梁沉降差的方法。
为了实现上述发明目的,本发明提供了以下技术方案:
一种控制既有桥梁与加宽桥梁沉降差的方法,包括以下步骤:
A、首先完成新建加宽桥梁下部构造的施工和T梁预制施工;
这样能够增加基础沉降变形和桥墩、梁部混凝土结构收缩徐变时间,使得在新建桥梁预制T梁架设时,可不推迟新旧桥梁湿接缝的施工时间,待T梁架设完成后立即施工湿接缝,在减小沉降差的同时,缩短封道时间,降低了既有运营桥梁拼宽施工的安全风险;
B、架设加宽桥梁T梁,并在T梁上设置若干个应变片,测得各个应变片的高程;
C、在加宽桥梁T梁上设置荷载物品模拟二期恒载进行超载堆载预压,加速加宽桥梁的沉降变化过程;
D、加宽桥梁沉降稳定后结束预压,测得各个应变片的高程;
E、根据各个应变片预压前后高程变化来量化加宽桥梁的沉降值,并且根据T梁预压变形后各个应变片的应变值计算验证加宽桥梁的沉降值,真实反映沉降控制的效果;
F、根据加宽桥梁的沉降值评估加宽桥梁的沉降值满足要求后,再施工加宽桥梁和既有桥梁的横向连接结构。
采用本发明所述的一种控制既有桥梁与加宽桥梁沉降差的方法,加宽桥梁T梁提前预制,给T梁的徐变过程提供了充分的反应时间,T梁架设后可立即施工横向连接结构,减少既有运营桥梁的封道时间,减少可能产生的经济损失及安全隐患,桥面堆载荷载物品预压,加速新桥沉降变化过程,避免了未经过桥面堆载荷载物品预压的新桥与旧桥直接连接后,新桥和旧桥由于被堆载荷载物品预压的时间不同,在使用过程中新桥比旧桥沉降更快,导致新桥和旧桥沉降差较大的不足,从而减少了新旧桥梁连接后的沉降差,能够全过程监控新建桥梁沉降变化,将沉降差控制效果数据化,该方法步骤简单,操作方便,效果良好。
优选地,所有所述应变片均匀设置在所述T梁上。
优选地,所有所述应变片设置在所述T梁长度方向的中心线上。
优选地,所述T梁的两端、跨中和1/4长度处分别设置一个所述应变片。
优选地,采用全站仪观测各个所述应变片的高程。
优选地,所述荷载物品为钢材或者沙袋。
优选地,所述横向连接结构包括横隔板和翼板湿接缝。
综上所述,由于采用了上述技术方案,本发明的有益效果是:
运用本发明所述的一种控制既有桥梁与加宽桥梁沉降差的方法,加宽桥梁T梁提前预制,给T梁的徐变过程提供了充分的反应时间,T梁架设后可立即施工横向连接结构,减少既有运营桥梁的封道时间,减少可能产生的经济损失及安全隐患,桥面堆载荷载物品预压,加速新桥沉降变化过程,避免了未经过桥面堆载荷载物品预压的新桥与旧桥直接连接后,新桥和旧桥由于被堆载荷载物品预压的时间不同,在使用过程中新桥比旧桥沉降更快,导致新桥和旧桥沉降差较大的不足,从而减少了新旧桥梁连接后的沉降差,能够全过程监控新建桥梁沉降变化,将沉降差控制效果数据化,该方法步骤简单,操作方便,效果良好。
附图说明
图1为本发明所述的一种控制既有桥梁与加宽桥梁沉降差的方法的流程示意图;
图2为在加宽桥梁T梁上设置荷载物品预压的结构示意图;
图3为在T梁上设置应变片的结构示意图。
图中标记:1-加宽桥梁下部构造,2-T梁,3-应变片,4-荷载物品。
具体实施方式
下面结合试验例及具体实施方式对本发明作进一步的详细描述。但不应将此理解为本发明上述主题的范围仅限于以下的实施例,凡基于本发明内容所实现的技术均属于本发明的范围。
实施例
如图1-3所示,本发明所述的一种控制既有桥梁与加宽桥梁沉降差的方法,包括以下步骤:
A、在施工组织安排中首先完成新建加宽桥梁下部构造1的施工和T梁2预制施工;
B、架设加宽桥梁T梁2,沿T梁2长度方向的中心线设置应变片3,T梁2的两端、跨中和1/4长度处分别设置一个应变片3,采用全站仪测得各个应变片3的高程;
C、在加宽桥梁T梁2上设置荷载物品4模拟二期恒载进行超载堆载预压,加速加宽桥梁的沉降变化过程,优选地荷载物品4为钢材;
D、加宽桥梁沉降稳定后结束预压,采用全站仪测得各个应变片3的高程;
E、根据各个应变片3预压前后高程变化来量化加宽桥梁的沉降值,并且根据T梁2预压变形后各个应变片3的应变值计算验证加宽桥梁的沉降值,真实反映沉降控制的效果;
F、根据加宽桥梁的沉降值评估加宽桥梁的沉降值满足要求后,再施工加宽桥梁和既有桥梁的横隔板和翼板湿接缝等连接结构。
运用本发明所述的一种控制既有桥梁与加宽桥梁沉降差的方法,加宽桥梁T梁2提前预制,给T梁2的徐变过程提供了充分的反应时间,T梁2架设后可立即施工横向连接结构,减少既有运营桥梁的封道时间,减少可能产生的经济损失及安全隐患,桥面堆载荷载物品4预压,加速新桥沉降变化过程,避免了未经过桥面堆载荷载物品4预压的新桥与旧桥直接连接后,新桥和旧桥由于被堆载荷载物品4预压的时间不同,在使用过程中新桥比旧桥沉降更快,导致新桥和旧桥沉降差较大的不足,从而减少了新旧桥梁连接后的沉降差,能够全过程监控新建桥梁沉降变化,将沉降差控制效果数据化,该方法步骤简单,操作方便,效果良好。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。

Claims (7)

1.一种控制既有桥梁与加宽桥梁沉降差的方法,其特征在于,包括以下步骤:
A、首先完成新建加宽桥梁下部构造(1)的施工和T梁(2)预制施工;
B、架设加宽桥梁T梁(2),并在T梁(2)上设置若干个应变片(3),测得各个应变片(3)的高程;
C、在加宽桥梁T梁(2)上设置荷载物品(4)模拟二期恒载进行超载堆载预压,加速加宽桥梁的沉降变化过程;
D、加宽桥梁沉降稳定后结束预压,测得各个应变片(3)的高程;
E、根据各个应变片(3)预压前后高程变化来量化加宽桥梁的沉降值,并且根据T梁(2)预压变形后各个应变片(3)的应变值计算验证加宽桥梁的沉降值;
F、根据加宽桥梁的沉降值评估加宽桥梁的沉降值满足要求后,再施工加宽桥梁和既有桥梁的横向连接结构。
2.根据权利要求1所述的控制既有桥梁与加宽桥梁沉降差的方法,其特征在于,所有所述应变片(3)均匀设置在所述T梁(2)上。
3.根据权利要求1所述的控制既有桥梁与加宽桥梁沉降差的方法,其特征在于,所有所述应变片(3)设置在所述T梁(2)长度方向的中心线上。
4.根据权利要求1所述的控制既有桥梁与加宽桥梁沉降差的方法,其特征在于,所述T梁(2)的两端、跨中和1/4长度处分别设置一个所述应变片(3)。
5.根据权利要求1所述的控制既有桥梁与加宽桥梁沉降差的方法,其特征在于,采用全站仪观测各个所述应变片(3)的高程。
6.根据权利要求1所述的控制既有桥梁与加宽桥梁沉降差的方法,其特征在于,所述荷载物品(4)为钢材或者沙袋。
7.根据权利要求1-6任一项所述的控制既有桥梁与加宽桥梁沉降差的方法,其特征在于,所述横向连接结构包括横隔板和翼板湿接缝。
CN201811148237.9A 2018-09-29 2018-09-29 一种控制既有桥梁与加宽桥梁沉降差的方法 Pending CN109137761A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811148237.9A CN109137761A (zh) 2018-09-29 2018-09-29 一种控制既有桥梁与加宽桥梁沉降差的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811148237.9A CN109137761A (zh) 2018-09-29 2018-09-29 一种控制既有桥梁与加宽桥梁沉降差的方法

Publications (1)

Publication Number Publication Date
CN109137761A true CN109137761A (zh) 2019-01-04

Family

ID=64813579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811148237.9A Pending CN109137761A (zh) 2018-09-29 2018-09-29 一种控制既有桥梁与加宽桥梁沉降差的方法

Country Status (1)

Country Link
CN (1) CN109137761A (zh)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110657777A (zh) * 2019-10-18 2020-01-07 中国建筑第八工程局有限公司 一种风洞洞体堆载预压变形测量工艺
CN110886330A (zh) * 2019-12-17 2020-03-17 中交路桥建设有限公司 新建桥梁基础沉降监测的方法
CN110886183A (zh) * 2019-12-17 2020-03-17 中交路桥建设有限公司 桥梁拼宽基础沉降控制方法
CN112554071A (zh) * 2020-12-16 2021-03-26 中铁十六局集团第三工程有限公司 一种新、老桥预应力拼宽缝的施工方法
CN112982190A (zh) * 2021-02-25 2021-06-18 中冶南方城市建设工程技术有限公司 一种可减小新旧桥梁沉降差的拼宽桥梁施工方法
CN113280786A (zh) * 2021-05-21 2021-08-20 中铁二局集团有限公司 一种通过路面旋转轴获取路面特征点高程的方法
CN114086472A (zh) * 2021-10-27 2022-02-25 中铁第四勘察设计院集团有限公司 一种控制框架桥工后沉降的施工方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704401A (zh) * 2012-05-28 2012-10-03 宁波二十冶建设有限公司 满堂支架分区预压技术
CN103233425A (zh) * 2013-04-20 2013-08-07 中铁十六局集团第四工程有限公司 一种利用反光片的支架现浇梁预压观测方法
CN205138472U (zh) * 2015-11-20 2016-04-06 长安大学 一种桥梁拼宽中新桥预压沉降观测装置
CN106284442A (zh) * 2016-08-31 2017-01-04 中国冶集团有限公司 基于三相变量的点控增压超速沉降法
CN106400849A (zh) * 2016-08-31 2017-02-15 中国冶集团有限公司 基于桩基性状分析的沉降解析法
CN107063175A (zh) * 2016-12-28 2017-08-18 湖南品智工程技术有限公司 一种用于路基沉降自动监测系统
CN207163439U (zh) * 2017-09-15 2018-03-30 浙江海洋大学 桩基础沉降综合监测装置
CN108425384A (zh) * 2018-03-30 2018-08-21 胡仲春 桩基沉降监测装置及桩基沉降监测方法

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102704401A (zh) * 2012-05-28 2012-10-03 宁波二十冶建设有限公司 满堂支架分区预压技术
CN103233425A (zh) * 2013-04-20 2013-08-07 中铁十六局集团第四工程有限公司 一种利用反光片的支架现浇梁预压观测方法
CN205138472U (zh) * 2015-11-20 2016-04-06 长安大学 一种桥梁拼宽中新桥预压沉降观测装置
CN106284442A (zh) * 2016-08-31 2017-01-04 中国冶集团有限公司 基于三相变量的点控增压超速沉降法
CN106400849A (zh) * 2016-08-31 2017-02-15 中国冶集团有限公司 基于桩基性状分析的沉降解析法
CN107063175A (zh) * 2016-12-28 2017-08-18 湖南品智工程技术有限公司 一种用于路基沉降自动监测系统
CN207163439U (zh) * 2017-09-15 2018-03-30 浙江海洋大学 桩基础沉降综合监测装置
CN108425384A (zh) * 2018-03-30 2018-08-21 胡仲春 桩基沉降监测装置及桩基沉降监测方法

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
佟兆宏: "基于软土地基的斜拉桥现浇箱梁满堂支架施工技术探讨", 《北方交通》 *
左卓等: "旧桥整体加宽T梁纵缝连接方案比选", 《公路与汽运》 *
王晓彬: "泉厦漳高速公路扩建工程某T梁桥拼宽设计要点", 《福建交通科技》 *
黄萍: "预应力混凝土T梁变宽拼宽静力特性分析", 《公路交通科技》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110657777A (zh) * 2019-10-18 2020-01-07 中国建筑第八工程局有限公司 一种风洞洞体堆载预压变形测量工艺
CN110886330A (zh) * 2019-12-17 2020-03-17 中交路桥建设有限公司 新建桥梁基础沉降监测的方法
CN110886183A (zh) * 2019-12-17 2020-03-17 中交路桥建设有限公司 桥梁拼宽基础沉降控制方法
CN110886330B (zh) * 2019-12-17 2022-06-03 中交路桥建设有限公司 新建桥梁基础沉降监测的方法
CN112554071A (zh) * 2020-12-16 2021-03-26 中铁十六局集团第三工程有限公司 一种新、老桥预应力拼宽缝的施工方法
CN112554071B (zh) * 2020-12-16 2022-05-20 中铁十六局集团第三工程有限公司 一种新、老桥预应力拼宽缝的施工方法
CN112982190A (zh) * 2021-02-25 2021-06-18 中冶南方城市建设工程技术有限公司 一种可减小新旧桥梁沉降差的拼宽桥梁施工方法
CN113280786A (zh) * 2021-05-21 2021-08-20 中铁二局集团有限公司 一种通过路面旋转轴获取路面特征点高程的方法
CN113280786B (zh) * 2021-05-21 2022-10-21 中铁二局集团有限公司 一种通过路面旋转轴获取路面特征点高程的方法
CN114086472A (zh) * 2021-10-27 2022-02-25 中铁第四勘察设计院集团有限公司 一种控制框架桥工后沉降的施工方法

Similar Documents

Publication Publication Date Title
CN109137761A (zh) 一种控制既有桥梁与加宽桥梁沉降差的方法
CN102587296B (zh) 一种桥梁结构自平衡体外预应力加固法
Ryu et al. Crack control of a steel and concrete composite plate girder with prefabricated slabs under hogging moments
Xu et al. Experimental studies of embedment length of precast bridge pier with socket connection to pile cap
CN204875563U (zh) 基于聚氨酯水泥与预应力钢丝绳的桥梁加固装置
CN106758820A (zh) 一种小半径连续现浇梁预应力束张拉施工方法
CN106126790B (zh) 基于混凝土弹塑性模型轨道层间离缝养护时机的评估方法
Akl et al. Deflection of in-span hinges in prestressed concrete box girder bridges during construction
CN107100092A (zh) 一种不中断交通的快速桥梁拓宽结构及安装方法
CN103924525A (zh) 城市立交桥工业化短线预制拼装施工方法
CN105464008A (zh) 一种大纵梁体系线路加固施工装置和方法
CN110220626A (zh) 一种工字形钢-混凝土组合梁支反力检测方法
CN106351129A (zh) 紧临既有线大跨度连续梁施工方法
CN108252222B (zh) 钢—混凝土组合结构式先简支后连续梁桥方法
CN104452569B (zh) 一种大跨径预应力混凝土梁桥布束方法
Moon et al. Practical crack control during the construction of precast segmental box girder bridges
Jiang et al. Key technologies of whole incremental launching construction control for inclined continuous box girder with steep longitudinal gradient
CN105648911B (zh) 桥梁施工现浇梁、盖梁、系梁混凝土附着式预应力桁架支架
Kim et al. Experimental investigation of double composite twin-girder railway bridges
CN105926454A (zh) 大跨度高桥墩预应力混凝土箱梁连续刚构桥中跨的顶推方法及其装置
Liu et al. Destructive testing of twenty-year-old prestressed concrete bridge beams in freezing-thawing region
Cheng et al. Bearing Repair and Monitoring for Poyanghu Cable‐Stayed Bridge
Pham Evaluation of Redundancy of Twin Steel Box-Girder Bridges
Alghazali et al. Time-dependent prestress loss behavior of girders in Missouri bridge A7957 compared with a US data set of high-performance concrete bridge girders
CN111827140A (zh) 无粘结体外横向预应力加固铰缝开裂破损板梁结构及方法

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant after: China Railway Second Bureau Construction Co.,Ltd.

Applicant after: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Applicant before: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd.

TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190822

Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd.

Applicant after: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd.

Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16

Applicant before: China Railway Second Bureau Construction Co.,Ltd.

Applicant before: CHINA RAILWAY ERJU 4TH ENGINEERING Co.,Ltd.

RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104