CN109132279A - A kind of underground garbage storage - Google Patents

A kind of underground garbage storage Download PDF

Info

Publication number
CN109132279A
CN109132279A CN201811094671.3A CN201811094671A CN109132279A CN 109132279 A CN109132279 A CN 109132279A CN 201811094671 A CN201811094671 A CN 201811094671A CN 109132279 A CN109132279 A CN 109132279A
Authority
CN
China
Prior art keywords
cabinet
cross bar
hydraulic cylinder
melt pit
garbage storage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811094671.3A
Other languages
Chinese (zh)
Other versions
CN109132279B (en
Inventor
李文才
赵龙强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Shengrong Public Facilities Co Ltd
Original Assignee
Chengdu Shengrong Public Facilities Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Shengrong Public Facilities Co Ltd filed Critical Chengdu Shengrong Public Facilities Co Ltd
Priority to CN201811094671.3A priority Critical patent/CN109132279B/en
Publication of CN109132279A publication Critical patent/CN109132279A/en
Application granted granted Critical
Publication of CN109132279B publication Critical patent/CN109132279B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B65CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
    • B65FGATHERING OR REMOVAL OF DOMESTIC OR LIKE REFUSE
    • B65F1/00Refuse receptacles; Accessories therefor
    • B65F1/14Other constructional features; Accessories
    • B65F1/1452Lifting, hoisting, elevating mechanisms or the like for refuse receptacles
    • B65F1/1457Lifting, hoisting, elevating mechanisms or the like for refuse receptacles for refuse receptacles located underground

Abstract

A kind of underground garbage storage, including waste deposit component and control assembly, the waste deposit component includes melt pit, the cabinet in melt pit and the lifting support below cabinet, the top of the box is equipped with cover board, the upper side wall of the cover board is equipped with the channel that feeds intake, and the cabinet is equipped with discharge gate perpendicular to the side wall of cover board, is hinged with discharge door on the discharge gate, the control assembly includes the hydraulic power control cabinet for controlling first hydraulic cylinder, and the hydraulic power control cabinet is built-in with hydraulic station.The underground garbage storage is easy to use, and saves manpower, and amount of storage is big, can slow down influence of the peculiar smell to environment.

Description

A kind of underground garbage storage
Technical field
The invention belongs to the technical fields of garbage disposal, and in particular to a kind of underground garbage storage.
Background technique
With making constant progress for modern society, requirement of the people to quality of life is also higher and higher, existing rubbish Case is usually to be set on ground, and in order to meet the amount of load garbage, the ladle body of dustbin is higher, the process thrown away rubbish in this way to people Inconvenience is caused, causes groups of people that directly rubbish is thrown into outside dustbin during throwing away rubbish, causes the different of rubbish Taste drifts, and seriously affects the living environment of people, reduces quality of life, if too low, the ladle body that the ladle body of dustbin is arranged It is small in size, it needs to clear the dustbin at any time, excessive manpower and material resources can be expended in this way, increase the cost of rubbish cleaning;With people Environmental consciousness and aesthetic level generally raising, the type and quantity of dustbin are also constantly updating and are increasing, and people are more Focus on its beauty and practicability, so this beautiful and practical rubbish storage equipment of buried dustbin is come into being, And existing buried dustbin mostly passes through and manually controls, it is more inconvenient to use, and spends human and material resources.
Summary of the invention
For deficiency above-mentioned in the prior art, the present invention provides a kind of underground garbage storage.The underground garbage storage is convenient for It uses, saves manpower, and amount of storage is big, can slow down influence of the peculiar smell to environment.
In order to achieve the above object, the solution that the present invention uses is: a kind of underground garbage storage, including waste deposit group Part and control assembly, the waste deposit component include melt pit, the cabinet in melt pit and the lifting branch below cabinet Frame, the top of the box are equipped with cover board, and the upper side wall of the cover board is equipped with the channel that feeds intake, side wall of the cabinet perpendicular to cover board It is equipped with discharge gate, is hinged with discharge door on the discharge gate, the lifting support includes first hydraulic cylinder, the first strut, the Two struts, sliding rail and load-bearing panel, the middle part of first strut and the middle part of the second strut are hinged, under first strut End is hinged with the piston end of hydraulic cylinder, and the lower end of second strut and the fixing end of hydraulic cylinder are hinged, and the sliding rail is flat Row in first hydraulic cylinder and is fixed below load-bearing panel on plate, the upper end of first strut and the second strut respectively with cunning Rail pivot bush unit, the control assembly include the hydraulic power control cabinet for controlling first hydraulic cylinder, the hydraulic power control cabinet It is built-in with hydraulic station.
Further, the control assembly further includes data control cabinet and data controlling terminal, in the data control cabinet It is equipped with controller and battery, the front side wall top of the data control cabinet is additionally provided with signal projector and signal receiver;Institute Controller and battery electrical connection are stated, the controller is also electrically connected with hydraulic station, signal projector and signal receiver respectively, The controller is communicated to connect by signal projector and signal receiver and data controlling terminal.
Further, the melt pit bottom is equipped with liquid level detector and draining in the liquid-accumulating trough to liquid-accumulating trough is had Pump, the liquid level detector, draining pump are electrically connected with the controller in data control cabinet respectively.
Further, the front side wall of the data control cabinet is equipped with display screen, and the display screen is electrically connected with the controller, The controller is built-in with screen decoder.
Further, the front side wall top of the data control cabinet be equipped with for monitoring camera, the camera with Controller electrical connection, the controller are built-in with storage chip.
Further, the front side wall top of the data control cabinet is equipped with a LED light or multiple LED light, the LED Lamp is electrically connected with the controller.
Further, the LED light is connect by self-contained cardan joint component with data control cabinet.
Further, the front side wall top of the data control cabinet is equipped with speech player, the speech player and control Device electrical connection processed, the controller are built-in with Voice decoder.
Further, hydraulic hand-pump is also built-in in the hydraulic power control cabinet.
Further, the cabinet is equipped with pull ring perpendicular to the side wall of cover board, and the bottom of box is equipped with pulley, The cabinet is equipped with gravity sensor by pulley and load-bearing plate contact between the pulley and the bottom of box.
Further, bottom is equipped with relative to the inclined panel of cabinet inner bottom surface in the cabinet, and the panel is with respect to two The inner bottom surface of cabinet is fixed in side in side, and the discharge gate of cabinet is fixed in the other side in the panel opposite sides.
Further, the sliding rail includes the first side plate and the second side plate disposed in parallel, the sealing two ends of the sliding rail, It is equipped with strip groove on the first side plate and the second side plate of the sliding rail, the upper end of first strut and the second strut is equipped with The fixture block engaged respectively with the strip groove on the first side plate and the second side plate.
Further, the channel roof that feeds intake is set between the feeding cover and the channel roof that feeds intake equipped with feeding cover There is sealing ring.
Further, hinged by hinge between the feeding cover and the channel that feeds intake.
Further, the channel that feeds intake is opened the door perpendicular to side is equipped on the side wall of cover board.
Further, volume detector is equipped in the channel that feeds intake.
Further, bottom is equipped with the receiver and battery of wireless charging in the cabinet, sets on the melt pit side wall The charger of the wireless charging of the receiver cooperation of being and not being line charge electricity, the battery are examined with gravity sensor, volume respectively Survey the receiver electrical connection of device, wireless charging.
Further, the bottom outside the cabinet is equipped with waterproof plug, and the box house is equipped with battery, describedly Hole side wall is equipped with the waterproof socket cooperated with waterproof plug, the battery and gravity sensor, volume detector, anti-water cutting Head electrical connection.
Further, the upper side wall of the cover board is equipped with several channels that feed intake.
Further, the waste deposit component further includes that rubbish is bulldozed mechanism, the rubbish be bulldozed mechanism include cross bar, Second hydraulic cylinder and third hydraulic cylinder are opposite on the front side wall and rear wall of the cabinet to set that there are two strip through-hole, the cross The both ends of bar are each passed through a strip through-hole, and the first hydraulic cylinder and second hydraulic cylinder are each attached on the side wall of melt pit, The movable end end of the second hydraulic cylinder and third hydraulic cylinder is respectively provided with the handgrip of the U-typed of an opening upwards, the cross The both ends that bar stretches out cabinet are fastened on respectively in a handgrip.
Further, it further includes being bulldozed plate that the rubbish, which is bulldozed mechanism, and the plate that is bulldozed is located in the box body portion, described to be bulldozed A side of plate is radially fixed on cross bar along cross bar.
Further, the cross bar is equipped with the convex block for preventing cross bar from horizontally slipping, the side of two strip gabs Edge is respectively provided with the sliding slot of one with convex block cooperation.
Further, it further includes first crossbar positioning component that the rubbish, which is bulldozed mechanism, the first crossbar positioning component Including the first limited block, the first positive stop hook, the first spring, the first fixed block and the first briquetting, first limited block is set to The side of strip gab end is simultaneously fixed on cabinet lateral wall along the length direction of strip gab, and first positive stop hook is set to The inside of first limited block, the inside of first limited block are equipped with the first slideway for the sliding of the first positive stop hook, and described the One positive stop hook includes the straight portion for the hook portion of fixed transverse rod and for connecting the first spring one end, and the hook portion is located at straight portion Top, the other end of first spring connect the first fixed block, and first fixed block is set to below the first positive stop hook and solid Due on cabinet lateral wall, first briquetting is set to below strip gab and is fixed on the inner sidewall of melt pit, and described the The straight subordinate portion of one positive stop hook is equipped with the first block being engaged with the first briquetting.
Further, it includes two first crossbar positioning components that the rubbish, which is bulldozed mechanism, and two first crossbars are fixed Hyte part is oppositely arranged and is located at the side of two strip gab ends.
Further, it further includes second crossbar positioning component that the rubbish, which is bulldozed mechanism, the second crossbar positioning component Including the second fixed block, second spring and card ball, second fixed block is set to above strip gab and is fixed on the outer of cabinet The article putting groove for placing second spring and card ball is equipped on side wall, in second fixed block, Open Side Down for the article putting groove, The top of article putting groove is fixed in one end of the second spring, and the other end of the second spring is fixedly connected with card ball, described The end of cross bar is equipped with the card slot cooperated with card ball.
Further, it includes two second crossbar positioning components that the rubbish, which is bulldozed mechanism, and two second crossbars are fixed Hyte part is oppositely arranged and is located at the upside of two strip gabs.
Further, it further includes third cross bar positioning component, the third cross bar positioning component that the rubbish, which is bulldozed mechanism, Including the second limited block, the second positive stop hook and the second briquetting, second limited block is set to the side of strip gab end simultaneously Length direction along strip gab is fixed on cabinet lateral wall, and second positive stop hook is set to the inside of the second limited block, institute The inside for stating the second limited block is equipped with the second slideway slided for the second positive stop hook, and second positive stop hook includes second straight portion With the second hook portion, the second straight portion is located at below second hook portion, and second briquetting is fixed on the inner sidewall of melt pit, institute State cabinet and be put into the second briquetting after melt pit and be located above strip gab, the second hook portion top of second positive stop hook be equipped with The second block that second briquetting is engaged.
Further, it includes two third cross bar positioning components that the rubbish, which is bulldozed mechanism, and two third cross bars are fixed Hyte part is oppositely arranged and is located at the side of two strip gab ends.
Further, the side edge thereof is equipped at the top of the melt pit to extending outside cabinet and side edge thereof meets water The water-swellable sealing strip of sealing, the water-swellable sealing strip are set to below side edge thereof.
Further, the rubber ring for sealing is equipped between the discharge door and discharge gate.
The beneficial effects of the present invention are:
Because top of the box is equipped with cover board, cover board upper side wall is equipped with the channel that feeds intake, and garbage warehouse entire in this way is for storing rubbish The cabinet of rubbish locates below ground level, and can store rubbish into the cabinet of dustbin by the channel that feeds intake on ground, feed intake logical Road can according to human body self-condition, be arranged to be most suitable for Human Height height so that people when throwing away rubbish more It is convenient;Because being equipped with lifting support below cabinet, when the intracorporal rubbish of case, which is filled with, to be needed to clear up, lifting branch can be passed through Cabinet is raised to ground from underground by frame, and then staff removes the cabinet for being filled with rubbish from lifting support, then will be without The dustbin for having rubbish clean is put on lifting support, is dropped to clean cabinet in melt pit by liter valence bracket, and work people Member clears up the cabinet for being filled with rubbish from transporting to nearest garbage disposal site, clear up it is good after transport to and need replacing cabinet Melt pit, replacement fills the cabinet of rubbish;Because lifting support include first hydraulic cylinder, the first strut, the second strut, sliding rail and Load-bearing panel, the middle part of the first strut and the middle part of the second strut are hinged, the lower end of the first strut and the piston end of hydraulic cylinder Hingedly, the lower end of the second strut and the fixing end of hydraulic cylinder are hinged, and sliding rail is parallel to first hydraulic cylinder and is fixed on weight-bearing surface Below plate on plate, the upper end of the first strut and the second strut respectively with sliding rail pivot bush unit, by controlling the first hydraulic cylinder Stretch adjustable first strut and the second strut upper end and the first strut and the second strut lower end vertical range, thus real The lifting of existing lifting support, it can realize the movement of control cabinet lifting, such elevating mechanism structure is simple, and uses First hydraulic cylinder can guarantee there are enough support forces in cabinet lifting process, guarantee steady in cabinet lifting process;Cause It include the hydraulic power control cabinet for controlling the first hydraulic cylinder for control assembly, hydraulic power control cabinet is built-in with hydraulic station, leads to Crossing hydraulic power control cabinet can be realized control lifting support, easy to operate, easy to use, time saving and energy saving.
Detailed description of the invention
Fig. 1 is a kind of overall structure diagram of embodiment of underground garbage storage;
Fig. 2 is the overall structure diagram of the another embodiment of underground garbage storage;
Fig. 3 is a kind of overall structure diagram of embodiment of underground garbage storage;
Fig. 4 is the structural schematic diagram of hydraulic power control cabinet and data control cabinet;
Fig. 5 is the intelligent control schematic diagram of underground garbage storage;
Fig. 6 is the connecting structure schematic diagram of sliding rail and the first strut, the second strut;
Fig. 7 uses schematic diagram for first crossbar positioning component;
Fig. 8 uses schematic diagram for second crossbar positioning component;
Fig. 9 is a kind of overall structure diagram of embodiment of underground garbage storage;
Figure 10 uses schematic diagram for third cross bar positioning component;
Figure 11 is the partial structure diagram that rubbish is bulldozed mechanism;
Figure 12 is structural schematic diagram of the cross bar in conjunction with cabinet;
In attached drawing: 1- melt pit, 2- cabinet, 3- lifting support, 4- cover board, 5- feed intake channel, 6- discharge gate, 7- discharge door, 8- first hydraulic cylinder, the first strut of 9-, the second strut of 10-, 11- sliding rail, 12- load-bearing panel, 13- hydraulic power control cabinet, 14- Data control cabinet, 15- signal projector, 16- signal receiver, 17- liquid-accumulating trough, 18- liquid level detector, 19- draining pump, 20- Display screen, 21- camera, 22-LED lamp, 23- speech player, 24- pull ring, 25- pulley, the first side plate of 26-, 27- bar shaped Slot, 28- fixture block, 29- feeding cover, 30- sealing ring, the side 31- are opened the door, 32- receiver, 33- charger, 34- waterproof plug, 35- Waterproof socket, 36- cross bar, 37- second hydraulic cylinder, 38- third hydraulic cylinder, 39- strip through-hole, 40- handgrip, 41- are bulldozed plate, 42- convex block, 43- sliding slot, the first limited block of 44-, the first positive stop hook of 45-, the first spring of 46-, the first fixed block of 47-, 48- first Briquetting, 49- slideway, the first hook portion of 50-, the straight portion 51- first, the first block of 52-, the second fixed block of 53-, 54- second spring, 55- card ball, 60- article putting groove, 61- card slot, 62- water-swellable sealing strip, 63- rubber ring, 64- panel, the second limited block of 65-, The second positive stop hook of 66-, the second briquetting of 67-, the second slideway of 68-, 69- second straight portion, the second hook portion of 70-, the second block of 71-.
Specific embodiment
Below in conjunction with attached drawing, the invention will be further described:
Embodiment 1:
As shown in attached drawing 1-12, a kind of underground garbage storage, including waste deposit component and control assembly, the waste deposit Component includes melt pit 1, the cabinet 2 in melt pit 1 and the lifting support 3 set on 2 lower section of cabinet, is equipped at the top of the cabinet 2 Cover board 4, the upper side wall of the cover board 4 are equipped with the channel 5 that feeds intake, and the cabinet 2 is equipped with discharge gate 6 perpendicular to the side wall of cover board 4, Be hinged with discharge door 7 on the discharge gate 6, the lifting support 3 include first hydraulic cylinder 8, the first strut 9, the second strut 10, Sliding rail 11 and load-bearing panel 12, the middle part of first strut 9 and the middle part of the second strut 10 are hinged, first strut 9 The piston end of lower end and hydraulic cylinder is hinged, and the lower end of second strut 10 and the fixing end of hydraulic cylinder are hinged, the cunning Rail 11 is parallel to first hydraulic cylinder 8 and is fixed below load-bearing panel 12 on plate, first strut 9 and the second strut 10 Respectively with 11 pivot bush unit of sliding rail, the control assembly includes the hydraulic power control cabinet 13 for controlling first hydraulic cylinder 8, institute for upper end It states hydraulic power control cabinet 13 and is built-in with hydraulic station.Because being equipped with cover board 4 at the top of cabinet 2,4 upper side wall of cover board is equipped with the channel that feeds intake 5, the cabinet 2 that garbage warehouse entire in this way is used to store rubbish locates below ground level, can be toward rubbish by the channel 5 that feeds intake on ground Rubbish is stored in the cabinet 2 of rubbish case, the channel 5 that feeds intake can be arranged to be most suitable for the height of Human Height according to human body self-condition Degree, so that people are more convenient when throwing away rubbish;Because being equipped with lifting support 3, the rubbish in cabinet 2 below cabinet 2 It is filled with when need to clear up, cabinet 2 can be raised to ground from underground by lifting support 3, then staff will be filled with The cabinet 2 of rubbish is removed from lifting support 3, then will be not charged with the clean dustbin of rubbish and be put on lifting support 3, and liter is passed through Valence bracket drops to clean cabinet 2 in melt pit 1, and staff is by the cabinet 2 for being filled with rubbish from transporting nearest rubbish Treatment stations are cleared up, and transport the melt pit 1 for needing replacing cabinet 2 after clearing up well to, and the cabinet 2 of rubbish is filled in replacement;Because rising Descending branch frame 3 includes first hydraulic cylinder 8, the first strut 9, the second strut 10, sliding rail 11 and load-bearing panel 12, in the first strut 9 Portion and the middle part of the second strut 10 are hinged, and the lower end of the first strut 9 and the piston end of hydraulic cylinder are hinged, under the second strut 10 End is hinged with the fixing end of hydraulic cylinder, and sliding rail 11 is parallel to first hydraulic cylinder 8 and is fixed below load-bearing panel 12 on plate, Respectively with 11 pivot bush unit of sliding rail, flexible by the first hydraulic cylinder of control can for the upper end of first strut 9 and the second strut 10 To adjust the vertical range of the first strut 9 and 10 upper end of the second strut and 10 lower end of the first strut 9 and the second strut, to realize The lifting of lifting support 3, it can realize the movement that control cabinet 2 is gone up and down, such elevating mechanism structure is simple, and uses First hydraulic cylinder can guarantee there are enough support forces in 2 lifting process of cabinet, guarantee steady in 2 lifting process of cabinet; Because control assembly includes the hydraulic power control cabinet 13 for controlling the first hydraulic cylinder, hydraulic power control cabinet 13 is built-in with hydraulic It stands, control lifting support 3 can be realized by hydraulic power control cabinet 13, it is easy to operate, it is easy to use, it is time saving and energy saving.
As shown in attached drawing 4,5, the control assembly further includes data control cabinet 14 and data controlling terminal, the data control Cabinet 14 processed is built-in with controller and battery, and the front side wall top of the data control cabinet 14 is additionally provided with signal projector 15 and letter Number receiver 16;The controller and battery electrical connection, the controller also respectively with hydraulic station, signal projector 15 and letter Number receiver 16 is electrically connected, and the controller passes through signal projector 15 and signal receiver 16 and data controlling terminal communication link It connects.When use, data controlling terminal issues control signal, and signal receiver 16 receives control signal and sends control to Device, the controller identify the control signal received, after controller identifies control signal, are believed according to control Number control object and movement be transferred to corresponding component, corresponding component is started to work after receiving control signal, example Such as when data controlling terminal issues the control signal of hydraulic station, signal receiver 16 will control signal after receiving and send control to Device, the controller identification control signal are transferred to hydraulic station later, and hydraulic station is started to work, at the same time, hydraulic station work The status signal of process sends controller to, and controller encode to status signal and sends number to by signal projector 15 According to controlling terminal, the real time monitoring that data controlling terminal works to component is realized.Dustbin so that buried is set in this way Can be to Intelligent control be realized, staff only needs to can be realized simply by data controlling terminal to underground dustbin Control, it is simple to operate, and use manpower and material resources sparingly.
As illustrated in the accompanying drawings from 1 to 3,1 bottom of melt pit is equipped with liquid level in the liquid-accumulating trough 17 and examines to liquid-accumulating trough 17 is had It surveys device 18 and draining pump 19, the liquid level detector 18, draining pump 19 is electrically connected with the controller in data control cabinet 14 respectively. Because liquid level detector 18 and draining pump 19 are equipped in liquid-accumulating trough 17, by penetrating into ground in the pit-hole mouth or cabinet 2 of melt pit 1 Liquid in hole 1 can assemble in liquid-accumulating trough 17, can detecte the height of sewage in liquid-accumulating trough 17 by liquid level detector 18 Degree, liquid level detector 18 can send the detected signal to controller, and controller passes through signal projector 15 again and sends to Data controlling terminal, the worker for being responsible for garbage disposal can be issued control signal by data controlling terminal and send signal receiver to 16, signal receiver 16 will control signal and be transferred to controller, and controller sends draining pump 19 to after receiving control information, arranges Water pump 19 issues signal according to controller and makes corresponding movement, in this way can be by the sewage in liquid-accumulating trough 17 by draining pump 19 It pumps out, sewage fermentation is avoided to generate the substance or peculiar smell of other pollution environment.
As shown in attached drawing 1-4, the front side wall of the data control cabinet 14 is equipped with display screen 20, the display screen 20 and control Device electrical connection processed, the controller are built-in with screen decoder.Display screen 20 is set on 14 front side wall of data control cabinet, works as number When issuing vision signal according to controlling terminal, signal receiver 16 receives vision signal, and sends vision signal to controller, Controller is decoded video with built-in Video Decoder, and is played out by display screen 20, in this way can be by aobvious Display screen 20 plays advertisement, increases the use value of dustbin control device, additional income, while can also play by display Public service ads, so that the practicability of dustbin control device is stronger.
As shown in attached drawing 4,5, the front side wall top of the data control cabinet 14 is equipped with the camera 21 for monitoring, described Camera 21 is electrically connected with the controller, and the controller is built-in with storage chip.The model of the storage chip are as follows: AT29C010FLASH EPROM 128Kx8.The case where setting can acquire dustbin periphery by camera 21 in this way, which is formed, to be regarded Frequency information, video information send controller to and are stored in storage chip, while can also be solved by Video Decoder It is played after code by display screen 20, can see the movement of oneself by display screen 20 when someone is to throw away rubbish in this way, it can To remind the people thrown away rubbish correctly to throw away rubbish into dustbin, rather than the side of dustbin is abandoned carelessly.
As shown in attached drawing 4,5, the front side wall top of the data control cabinet 14 is equipped with a LED light or multiple LED light, The LED light is electrically connected with the controller.The case where dustbin periphery can be illuminated by LED light, convenient for throwing away rubbish when evening Multiple LED light are arranged in rubbish or garbage disposal, in this way when night or obscure weather, can make around dustbin more Add bright, is easy to use, also avoids in the case where not seeing Chu, people throw away rubbish on dustbin periphery, pollute environment.
As shown in Fig. 1, the LED light is connect by self-contained cardan joint component with data control cabinet 14.Using ball-and-socket ten thousand LED light is mounted on data control cabinet 14 to section component, the direction of light irradiation can be adjusted according to the position of dustbin in this way, It is more convenient to use.
As shown in Fig. 4, the front side wall top of the data control cabinet 14 is equipped with speech player 23, and the voice plays Device 23 is electrically connected with the controller, and the controller is built-in with Voice decoder.Sound can be transmitted by data controlling terminal in this way Happy, broadcast voice signals, the signal receiver 16 such as correctly throws away rubbish and to controller, leads to the transmitting voice signal received It crosses the Voice decoder built in controller to be decoded, and is played out by speech player 23, can further be allowed in this way So that underground garbage bin control device practicability is higher, performance is stronger, and entertainment is strong.
As shown in Fig. 1, hydraulic hand-pump is also built-in in the hydraulic power control cabinet 13.It is when having a power failure or controlling When failure of uniting or hydraulic station failure, staff can carry out basic operation to dustbin by hydraulic hand-pump, Dustbin is taken out by hydraulic hand-pump, after clearing up rubbish, breakdown maintenance is carried out to underground garbage bin, so that The insurance more convenient to use of underground garbage bin.
As illustrated in the accompanying drawings from 1 to 3, the cabinet 2 is equipped with pull ring 24,2 bottom of cabinet perpendicular to the side wall of cover board 4 Portion is equipped with pulley 25, and the cabinet 2 is contacted by pulley 25 with load-bearing panel 12, and the pulley 25 and cabinet are set between 2 bottom There is gravity sensor.Pull ring 24 is set on side wall of the cabinet 2 perpendicular to cover board 4, and 2 bottom of cabinet is arranged pulley 25, sets in this way It sets so that cabinet 2 fills rubbish, after being raised on ground by lifting support 3, worker is with being held by knob, it can by cabinet 2 pull out from load-bearing panel 12, and cabinet 2 is pulled on garbage truck, so that the carrying of cabinet 2 is more convenient;Pulley 25 with Gravity sensor is arranged between 2 bottom in cabinet, can detect the weight of cabinet 2 at any time, and can sentence by the weight of cabinet 2 Whether disconnected cabinet 2 needs to clear up.
As illustrated in the accompanying drawings from 1 to 3, bottom is equipped with relative to the inclined panel 64 of 2 inner bottom surface of cabinet, the face in the cabinet 2 The inner bottom surface of cabinet 2 is fixed in side in 64 opposite sides of plate, and case is fixed in the other side in 64 opposite sides of panel The discharge gate 6 of body 2.The sewage that setting can further avoid that rubbish fermentation generates in cabinet 2 in this way drains to ground by discharge gate 6 1 stink difficulty of melt pit is caused to be cleared up in hole 1.
As shown in Fig. 6, the sliding rail 11 includes the first side plate 26 disposed in parallel and the second side plate, the sliding rail 11 Sealing two ends are equipped with strip groove 27, first strut 9 and second on the first side plate 26 of the sliding rail 11 and the second side plate The upper end of strut 10 is equipped with the fixture block 28 engaged respectively with the strip groove 27 on the first side plate 26 and the second side plate.In this way by The upper end of one strut 9 and the second strut 10 covers between the first side plate 26 and the second side plate, and by the first strut 9 and second The fixture block 28 of the upper end of bar 10 is fastened in the strip groove 27 on the first side plate 26 and the second side plate, so that lifting support 3 The first strut 9 and the second strut 10 can be more stable during lifting, and the operation of entire mechanism is more stable.
As illustrated in the accompanying drawings from 1 to 3, feeding cover 29, the feeding cover 29 and the channel 5 that feeds intake are equipped at the top of the channel 5 that feeds intake Sealing ring 30 is equipped between top.Design can be with seal case 2 in this way, and avoiding the peculiar smell of rubbish in cabinet 2 from shedding reduces environment Quality.
As illustrated in the accompanying drawings from 1 to 3, hinged by hinge between the feeding cover 29 and the channel 5 that feeds intake.It is arranged so more Facilitate folding, is easy to use.
As shown in attached drawing 1,2,3,7, the described channel 5 that feeds intake opens the door 31 perpendicular to being equipped with side on the side wall of cover board 4.Such as Fruit needs to be thrown into daily life a large amount of rubbish, and people are logical to feeding intake for cabinet 2 by the carrying rubbish such as tricycle, cart Road 5 is equipped with the side of side enabling 31, and rubbish can be poured into the cabinet 2 of storage rubbish, no longer needed to rubbish by opening side enabling 31 Rubbish is lifted by toppling at the top of the channel 5 that feeds intake, simpler laborsaving.
As shown in Fig. 5, volume detector is equipped in the channel 5 that feeds intake.It can detecte by volume detector The amount of rubbish in cabinet 2, and the signal that will test is transferred to data controlling terminal by wireless device, staff passes through Data controlling terminal receives signal and can carry out clearly to corresponding cabinet 2 when the garbage bulk in cabinet 2 reaches a certain amount of Reason.
As shown in attached drawing 1,2, the upper side wall of the cover board 4 is equipped with several channels 5 that feed intake.Setting can be kept away in this way Exempt to cause the rubbish inside cabinet 2 to accumulate in " mountain " type by a material-passing passage garbage throwing, improves 22 internal volume of cabinet Utilization rate.
As illustrated in the accompanying drawings from 1 to 3,4 edge of cover board is to extending outside cabinet 2, is equipped at the top of the melt pit 1 and cover board 4 The water-swellable sealing strip 62 of water-stop is met at edge, and the water-swellable sealing strip 62 is set to below 4 edge of cover board.Because of cover board 4 edges are equipped with the water-swellable sealing strip 62 that water-stop is met with 4 edge of cover board, in this way to extending outside cabinet 2 at the top of melt pit 1 When having water around rainy or melt pit 1, water-swellable sealing strip 62 seals entire melt pit 1 after absorbing water, and avoids water suitable 1 periphery of melt pit flow to inside melt pit 1, damage the cabinet 2 or lifting support 3 in melt pit 1, while water also being avoided to enter melt pit 1 The interior fermentation together with rubbish generates peculiar smell.
As illustrated in the accompanying drawings from 1 to 3, the rubber ring 63 for sealing is equipped between the discharge door 7 and discharge gate 6.In this way may be used 1 submerged fermentation of melt pit is drained to avoid the liquid refuse in cabinet 2 and generates the peculiar smell impurity for being difficult to clear up, while avoiding liquid rubbish Rubbish corrodes lifting support 3.
As shown in attached drawing 1,2,3,7,8,9,10,11,12, the waste deposit component further includes that rubbish is bulldozed mechanism, institute Stating rubbish and being bulldozed mechanism includes cross bar 36, second hydraulic cylinder 37 and third hydraulic cylinder 38, the front side wall and rear wall of the cabinet 2 Upper to be set relatively there are two strip through-hole 39, the both ends of the cross bar 36 are each passed through a strip through-hole 39, and described second is hydraulic Cylinder 37 and third hydraulic cylinder 38 are each attached on the side wall of melt pit 1, the activity of the second hydraulic cylinder 37 and third hydraulic cylinder 38 End end is respectively provided with the handgrip 40 of the U-typed of an opening upwards, and the both ends that the cross bar 36 stretches out cabinet 2 are fastened on one respectively In a handgrip 40.Such rubbish is bulldozed mechanism and passes through control second hydraulic cylinder 37 and third hydraulic cylinder 38 when in use The flexible handgrip 40 for driving U-typed of movable end is flexible, because the both ends that cross bar 36 stretches out cabinet 2 are fastened on a handgrip 40 respectively In, so cross bar 36 moves back and forth in strip through-hole 39 under the drive of handgrip 40, so that the rubbish in cabinet 2 is bulldozed, It avoids the rubbish in dustbin from accumulating in " mountain " type, influences the utilization rate of 2 inner space of cabinet, improve the space storage of cabinet 2 Rate;Handgrip 40 is arranged to the U-typed of opening upwards, it can be to taking without having to worry about handgrip 40 when such cabinet 2 takes out from melt pit 1 Cabinet 2 causes obstacle out, then without by manually linking handgrip 40 and cross bar 36 when cabinet 2 is put into melt pit 1, this Sample cleanup crew operates simpler convenience.
As shown in Fig. 11, it further includes being bulldozed plate 41 that the rubbish, which is bulldozed mechanism, and the plate 41 that is bulldozed is located in cabinet 2 Portion, described a side for being bulldozed plate 41 are radially fixed on cross bar 36 along cross bar 36.It is such that the rubbish so that in cabinet 2 is set It easily facilitates and is bulldozed, improve the service efficiency that rubbish is bulldozed component.
As shown in attached drawing 11-12, the cross bar 36 is equipped with the convex block 42 for preventing cross bar 36 from horizontally slipping, described in two The edge of strip gab is respectively provided with the sliding slot 43 cooperated with convex block 42.Setting so that be arranged cross bar 36 in bar shaped so in this way Can not be rolled during being moved back and forth in through-hole 39, during avoiding cross bar 36 from moving back and forth in strip through-hole 39 because By garbage blocking power and roll, be bulldozed the efficiency of rubbish in cabinet 2 to reduce.
Embodiment 2:
On the basis of embodiment 1, the present invention is further:
As shown in attached drawing 3,7, it further includes 36 positioning component of first crossbar, the first crossbar 36 that the rubbish, which is bulldozed mechanism, Positioning component includes the first limited block 44, the first positive stop hook 45, the first spring 46, the first fixed block 47 and the first briquetting 48, First limited block 44 is set to the side of strip gab end and is fixed on 2 lateral wall of cabinet along the length direction of strip gab On, first positive stop hook 45 is set to the inside of the first limited block 44, and the inside of first limited block 44, which is equipped with, is used for first The the one the first slideways 49 that positive stop hook 45 slides, first positive stop hook 45 includes 50 He of the first hook portion for fixed transverse rod 36 The first straight portion 51 for connecting 46 one end of the first spring, first hook portion 50 are located at the top in the first straight portion 51, and described The other end of one spring 46 connects the first fixed block 47, and first fixed block 47 is set to 45 lower section of the first positive stop hook and is fixed on On 2 lateral wall of cabinet, first briquetting 48 is set to below strip gab and is fixed on the inner sidewall of melt pit 1, and described the 51 lower part of straight portion of one positive stop hook 45 is equipped with the first block 52 being engaged with the first briquetting 48.It is fixed to design first crossbar 36 Hyte part can position the cross bar 36 in the cabinet 2 for not being put into melt pit 1 completely, so that not being put into 1 raising middle flask of melt pit completely Cross bar 36 on body 2 cross bar 36 during being put into melt pit 1 can be precisely directed to second hydraulic cylinder 37 and third in melt pit 1 The handgrip 40 of the U-typed of 38 movable end end of hydraulic cylinder, so that entire garbage warehouse is more smart during assembling use It is quasi-.When in use, when cabinet 2 is not put into melt pit 1 completely, the first fixed block 47 is fixedly connected with to 36 positioning component of first crossbar One end of one spring 46, the other end of the first spring 46 are fixedly connected with the first straight 51 lower end of portion of the first positive stop hook 45, the first bullet Spring 46 is in shorter elongation state, the past drop-down of the first positive stop hook 45 being located in 44 first slideway 49 of the first limited block, this When the first positive stop hook 45 the first hook portion 50 cross bar 36 is hooked in the first hook portion 50, thus the position of fixed transverse rod 36, works as case Body 2 is during slowly decline is put into melt pit 1, the first block 52 of straight 51 lower part of the portion setting of the first positive stop hook 45 first be set to The first briquetting 48 contact on 1 inner side edge of melt pit, cross bar 36, the first limited block 44 and the first fixed block 47 are appointed with cabinet at this time 2 slowly declines, and the first positive stop hook 45 is not declining after the first block 52 contacts the first briquetting 48 then, the first spring 46 In longer elongation state, the first positive stop hook 45 at this time is in the first slideway 49 in the first limited block 44 relative to first Limited block 44 moves up, and the hook portion 50 and cross bar 36 of the first positive stop hook 45 are slowly detached from, and cross bar 36 falls into the handgrip 40 of U-typed In, the perfect combination of cross bar 36 Yu handgrip 40 is completed with this, after cabinet 2 fills rubbish, need to only pass through 37 He of second hydraulic cylinder Cross bar 36 is pushed into 45 lower section of the first positive stop hook by third hydraulic cylinder 38 can position cross bar 36 by cabinet 2 toward moving up.
As shown in attached drawing 3,7, the rubbish be bulldozed mechanism include two 36 positioning components of first crossbar, two described first 36 positioning component of cross bar is oppositely arranged and is located at the side of two strip gab ends.It is each in the two side walls of cabinet 2 Be arranged 36 positioning component of first crossbar can make the both ends of the cross bar 36 when cabinet 2 is not put into melt pit 1 completely all by It fixes, so that the positioning of cross bar 36 is more firm, so that cross bar 36 can be more accurately when cabinet 2 is put into melt pit 1 Put handgrip 40 into.
As shown in attached drawing 1,3, bottom is equipped with the receiver 32 and battery of wireless charging, the melt pit 1 in the cabinet 2 Side wall is equipped with the charger 33 of the wireless charging cooperated with the receiver 32 of wireless charging, and the battery is passed with gravity respectively The electrical connection of receiver 32 of sensor, volume detector, wireless charging.It is gravity sensor and body that battery is arranged in cabinet 2 Product detector power supply, the receiver 32 of bottom setting wireless charging, is equipped with and wireless charging on 1 side wall of melt pit in cabinet 2 The charger 33 of wireless charging that cooperates of receiver 32, avoided using wireless charging multiple using the line construction of wired charging It is miscellaneous, and avoid track replacement when replacing cabinet 2, so that the replacement of cabinet 2 is simpler, conveniently;In load-bearing panel 12 The hole that the charger 33 of upper setting and wireless charging cooperates, so that the load-bearing panel 12 in lifting process of lifting support 3 will not be beaten Bad charger 33.
Embodiment 3:
On the basis of embodiment 1, the present invention is further:
As shown in attached drawing 3,7, it further includes 36 positioning component of first crossbar, the first crossbar 36 that the rubbish, which is bulldozed mechanism, Positioning component includes the first limited block 44, the first positive stop hook 45, the first spring 46, the first fixed block 47 and the first briquetting 48, First limited block 44 is set to the side of strip gab end and is fixed on 2 lateral wall of cabinet along the length direction of strip gab On, first positive stop hook 45 is set to the inside of the first limited block 44, and the inside of first limited block 44, which is equipped with, is used for first The first slideway 49 that positive stop hook 45 slides, first positive stop hook 45 include the first hook portion 50 for fixed transverse rod 36 and are used for The first straight portion 51 of 46 one end of the first spring is connected, first hook portion 50 is located at the top in the first straight portion 51, first bullet The other end of spring 46 connects the first fixed block 47, and first fixed block 47 is set to 45 lower section of the first positive stop hook and is fixed on cabinet On 2 lateral walls, first briquetting 48 is set to below strip gab and is fixed on the inner sidewall of melt pit 1, first limit 51 lower part of straight portion of position hook 45 is equipped with the first block 52 being engaged with the first briquetting 48.Design 36 positioning group of first crossbar Part can position the cross bar 36 in the cabinet 2 for not being put into melt pit 1 completely, so that not being put into completely in melt pit 1 on cabinet 2 Cross bar 36 can be precisely directed to second hydraulic cylinder 37 and third in melt pit 1 hydraulic for cross bar 36 during being put into melt pit 1 The handgrip 40 of the U-typed of 38 movable end end of cylinder, so that entire garbage warehouse is more accurate during assembling use.The When in use, when cabinet 2 is not put into melt pit 1 completely, the first fixed block 47 is fixedly connected with the first bullet to one cross bar, 36 positioning component One end of spring 46, the other end of the first spring 46 are fixedly connected with the first straight 51 lower end of portion of the first positive stop hook 45, the first spring 46 In shorter elongation state, by the first positive stop hook 45 being located in 44 first slideway 49 of the first limited block toward drop-down, at this time the Cross bar 36 is hooked in the first hook portion 50 by the first hook portion 50 of one positive stop hook 45, thus the position of fixed transverse rod 36, when cabinet 2 is slow During slow decline is put into melt pit 1, the first block 52 and be set to melt pit 1 that straight 51 lower part of portion of the first positive stop hook 45 first is arranged The first briquetting 48 contact on inner side edge, cross bar 36, the first limited block 44 and the first fixed block 47 are appointed slow with cabinet 2 at this time Decline, and the first positive stop hook 45 is not declining after the first block 52 contacts the first briquetting 48 then, the first spring 46 is in Longer elongation state, the first positive stop hook 45 at this time is in the first slideway 49 in the first limited block 44 relative to the first limit Block 44 moves up, and the hook portion 50 and cross bar 36 of the first positive stop hook 45 are slowly detached from, and cross bar 36 is fallen into the handgrip 40 of U-typed, with This completes the perfect combination of cross bar 36 and handgrip 40, after cabinet 2 fills rubbish, need to only pass through second hydraulic cylinder 37 and third liquid Cross bar 36 is pushed into 45 lower section of the first positive stop hook by cylinder pressure 38 can position cross bar 36 by cabinet 2 toward moving up.
As shown in attached drawing 3,7, the rubbish be bulldozed mechanism include two 36 positioning components of first crossbar, two described first 36 positioning component of cross bar is oppositely arranged and is located at the side of two strip gab ends.It is each in the two side walls of cabinet 2 Be arranged 36 positioning component of first crossbar can make the both ends of the cross bar 36 when cabinet 2 is not put into melt pit 1 completely all by It fixes, so that the positioning of cross bar 36 is more firm, so that cross bar 36 can be more accurately when cabinet 2 is put into melt pit 1 Put handgrip 40 into.
As shown in Fig. 2, the bottom outside the cabinet 2 is equipped with waterproof plug 34, is equipped with electric power storage inside the cabinet 2 Pond, 1 side wall of melt pit are equipped with the waterproof socket 35 cooperated with waterproof plug 34, the battery and gravity sensor, body Product detector, waterproof plug 34 are electrically connected.It is that gravity sensor and volume detector are powered that battery is arranged in cabinet 2, Bottom outside cabinet 2 is equipped with waterproof plug 34, and the waterproof socket 35 cooperated with waterproof plug 34 is equipped on 1 side wall of melt pit, When wanting cleanup crew that cabinet 2 is put into melt pit 1, because battery is electrically connected with waterproof plug 34, first plug and socket are connected It connects, as storage battery power supply, gravity sensor and volume detector is constantly operated normally, using waterproof plug 34 and waterproof socket 35 make whole equipment use it is safer and durable.
Embodiment 4:
On the basis of embodiment 1, the present invention is further:
As shown in Fig. 8, it further includes 36 positioning component of second crossbar that the rubbish, which is bulldozed mechanism, and the second crossbar 36 is fixed Hyte part includes the second fixed block 53, second spring 54 and card ball 55, and second fixed block 53 is set to above strip gab simultaneously It is fixed on the lateral wall of cabinet 2, the glove for placing second spring 54 and card ball 55 is equipped in second fixed block 53 Slot 60, Open Side Down for the article putting groove 60, and the top of article putting groove 60, second bullet are fixed in one end of the second spring 54 The other end of spring 54 is fixedly connected with card ball 55, and the end of the cross bar 36 is equipped with the card slot 61 cooperated with card ball 55.Design the Two cross bars, 36 positioning component can position the cross bar 36 in the cabinet 2 for not being put into melt pit 1 completely, so that not being put into completely It is hydraulic that cross bar 36 in melt pit 1 on cabinet 2 cross bar 36 during being put into melt pit 1 can be precisely directed in melt pit 1 second The handgrip 40 of the U-typed of 38 movable end end of cylinder 37 and third hydraulic cylinder, so that the mistake that entire garbage warehouse is used in assembling It is more accurate in journey.36 positioning component of second crossbar when in use, when cabinet 2 is not put into melt pit 1 completely, second spring Fixed at the top of 54 one end and article putting groove 60, the other end of second spring 54 is fixedly connected with card ball 55, and 55 part of card ball is fallen into In the card slot 61 of 36 end of cross bar, 54 contraction state of second spring in the second fixed block 53, the elastic force of second spring 54 makes Card ball 55 is subject to downward force in card slot 61, so that 36 end of cross bar is subject to downward force, avoids cross bar 36 in bar shaped It is arbitrarily slided in opening, realizes the positioning of cross bar 36, during slowly decline is put into melt pit 1 when cabinet 2, cross bar 36 is determined Position, thus cross bar 36 is fallen into the handgrip 40 of U-typed, and the perfect combination of cross bar 36 Yu handgrip 40 is completed with this, when cross bar 36 and After handgrip 40 is combined, cross bar 36 is made card ball 55 from card slot 61 by the power of second hydraulic cylinder 37 and third hydraulic cylinder 38 Be detached from, moved back and forth in strip gab, the rubbish being bulldozed in cabinet 2, when in cabinet 2 rubbish fill need replacing when only Cross bar 36 need to be pushed back to below 36 positioning component of second crossbar by second hydraulic cylinder 37 and third hydraulic cylinder 38, so that cross bar Card slot 61 and card ball 55 on 36 cooperate, and can reposition cross bar 36.
As shown in Fig. 8, it includes two 36 positioning components of second crossbar, two second cross that the rubbish, which is bulldozed mechanism, 36 positioning component of bar is oppositely arranged and is located at the upside of two strip gabs.Respectively it is arranged one in the two side walls of cabinet 2 A 36 positioning component of second crossbar can make the both ends of the cross bar 36 when cabinet 2 is not put into melt pit 1 completely all be fixed, So that the positioning of cross bar 36 is more firm, so that cross bar 36 can more accurately put handgrip into when cabinet 2 is put into melt pit 1 In 40.
As shown in attached drawing 1,3, bottom is equipped with the receiver 32 and battery of wireless charging, the melt pit 1 in the cabinet 2 Side wall is equipped with the charger 33 of the wireless charging cooperated with the receiver 32 of wireless charging, and the battery is passed with gravity respectively The electrical connection of receiver 32 of sensor, volume detector, wireless charging.It is gravity sensor and body that battery is arranged in cabinet 2 Product detector power supply, the receiver 32 of bottom setting wireless charging, is equipped with and wireless charging on 1 side wall of melt pit in cabinet 2 The charger 33 of wireless charging that cooperates of receiver 32, avoided using wireless charging multiple using the line construction of wired charging It is miscellaneous, and avoid track replacement when replacing cabinet 2, so that the replacement of cabinet 2 is simpler, conveniently;In load-bearing panel 12 The hole that the charger 33 of upper setting and wireless charging cooperates, so that the load-bearing panel 12 in lifting process of lifting support 3 will not be beaten Bad charger 33.
Embodiment 5:
On the basis of embodiment 1, the present invention is further:
As shown in Fig. 8, it further includes 36 positioning component of second crossbar that the rubbish, which is bulldozed mechanism, and the second crossbar 36 is fixed Hyte part includes the second fixed block 53, second spring 54 and card ball 55, and second fixed block 53 is set to above strip gab simultaneously It is fixed on the lateral wall of cabinet 2, the glove for placing second spring 54 and card ball 55 is equipped in second fixed block 53 Slot 60, Open Side Down for the article putting groove 60, and the top of article putting groove 60, second bullet are fixed in one end of the second spring 54 The other end of spring 54 is fixedly connected with card ball 55, and the end of the cross bar 36 is equipped with the card slot 61 cooperated with card ball 55.Design the Two cross bars, 36 positioning component can position the cross bar 36 in the cabinet 2 for not being put into melt pit 1 completely, so that not being put into completely It is hydraulic that cross bar 36 in melt pit 1 on cabinet 2 cross bar 36 during being put into melt pit 1 can be precisely directed in melt pit 1 second The handgrip 40 of the U-typed of 38 movable end end of cylinder 37 and third hydraulic cylinder, so that the mistake that entire garbage warehouse is used in assembling It is more accurate in journey.36 positioning component of second crossbar when in use, when cabinet 2 is not put into melt pit 1 completely, second spring Fixed at the top of 54 one end and article putting groove 60, the other end of second spring 54 is fixedly connected with card ball 55, and 55 part of card ball is fallen into In the card slot 61 of 36 end of cross bar, 54 contraction state of second spring in the second fixed block 53, the elastic force of second spring 54 makes Card ball 55 is subject to downward force in card slot 61, so that 36 end of cross bar is subject to downward force, avoids cross bar 36 in bar shaped It is arbitrarily slided in opening, realizes the positioning of cross bar 36, during slowly decline is put into melt pit 1 when cabinet 2, cross bar 36 is determined Position, thus cross bar 36 is fallen into the handgrip 40 of U-typed, and the perfect combination of cross bar 36 Yu handgrip 40 is completed with this, when cross bar 36 and After handgrip 40 is combined, cross bar 36 is made card ball 55 from card slot 61 by the power of second hydraulic cylinder 37 and third hydraulic cylinder 38 Be detached from, moved back and forth in strip gab, the rubbish being bulldozed in cabinet 2, when in cabinet 2 rubbish fill need replacing when only Cross bar 36 need to be pushed back to below 36 positioning component of second crossbar by second hydraulic cylinder 37 and third hydraulic cylinder 38, so that cross bar Card slot 61 and card ball 55 on 36 cooperate, and can reposition cross bar 36.
As shown in Fig. 8, it includes two 36 positioning components of second crossbar, two second cross that the rubbish, which is bulldozed mechanism, 36 positioning component of bar is oppositely arranged and is located at the upside of two strip gabs.Respectively it is arranged one in the two side walls of cabinet 2 A 36 positioning component of second crossbar can make the both ends of the cross bar 36 when cabinet 2 is not put into melt pit 1 completely all be fixed, So that the positioning of cross bar 36 is more firm, so that cross bar 36 can more accurately put handgrip into when cabinet 2 is put into melt pit 1 In 40.
As shown in Fig. 2, the bottom outside the cabinet 2 is equipped with waterproof plug 34, is equipped with electric power storage inside the cabinet 2 Pond, 1 side wall of melt pit are equipped with the waterproof socket 35 cooperated with waterproof plug 34, the battery and gravity sensor, body Product detector, waterproof plug 34 are electrically connected.It is that gravity sensor and volume detector are powered that battery is arranged in cabinet 2, Bottom outside cabinet 2 is equipped with waterproof plug 34, and the waterproof socket 35 cooperated with waterproof plug 34 is equipped on 1 side wall of melt pit, When wanting cleanup crew that cabinet 2 is put into melt pit 1, because battery is electrically connected with waterproof plug 34, first plug and socket are connected It connects, as storage battery power supply, gravity sensor and volume detector is constantly operated normally, using waterproof plug 34 and waterproof socket 35 make whole equipment use it is safer and durable.
Embodiment 6:
On the basis of embodiment 1, the present invention is further:
As shown in attached drawing 9,10, it further includes 36 positioning component of third cross bar, the third cross bar that the rubbish, which is bulldozed mechanism, 36 positioning components include the second limited block 65, the second positive stop hook 66 and the second briquetting 67, and second limited block 65 is set to item The side of shape open end is simultaneously fixed on 2 lateral wall of cabinet along the length direction of strip gab, and second positive stop hook 66 is set In the inside of the second limited block 65, the inside of second limited block 65 is equipped with the second slideway for the sliding of the second positive stop hook 66 6849, second positive stop hook 66 includes second straight portion 69 and the second hook portion 70, and the second straight portion 69 is located at the second hook portion 70 Lower section, second briquetting 67 are fixed on the inner sidewall of melt pit 1, and the cabinet 2 is put into the second briquetting 67 after melt pit 1 Above strip gab, the to be engaged with the second briquetting 67 is equipped at the top of the second hook portion 70 of second positive stop hook 66 Two blocks 71.Design 36 positioning component of third cross bar can be determined the cross bar 36 in the cabinet 2 for not being put into melt pit 1 completely Position, such that not to be put into cross bar 36 in melt pit 1 on cabinet 2 cross bar 36 during being put into melt pit 1 completely accurately right The handgrip 40 of the U-typed of 38 movable end end of second hydraulic cylinder 37 and third hydraulic cylinder in quasi- melt pit 1, so that entire rubbish Library is more accurate during assembling use.36 positioning component of third cross bar when in use, when cabinet 2 is not put into melt pit completely When 1, the second positive stop hook 66 is located at the extreme lower position in the second slideway 6849 of the second limited block 65 under gravity, at this time Cross bar 36 is hooked in the second hook portion 70 by the second hook portion 70 of the second positive stop hook 66, thus the position of fixed transverse rod 36, works as case During the slow decline of body 2 is put into melt pit 1, second block 71 at 70 top of the second hook portion of the second positive stop hook 66 is pressed with second Briquetting 67 is engaged, and the second positive stop hook 66 is fixed on certain height and is not being declined, and cabinet 2 continues to decline at this time, and second Positive stop hook 66 moves up in the second slideway 6849 in the second limited block 65 relative to the second limited block 65, the second positive stop hook 66 Two hook portion and cross bar 36 is slowly detached from, and cross bar 36 is fallen into the handgrip 40 of U-typed, completes cross bar 36 and handgrip 40 with this Cross bar 36 only need to be pushed into second by second hydraulic cylinder 37 and third hydraulic cylinder 38 after cabinet 2 fills rubbish by perfect combination 66 lower section of positive stop hook, by cabinet 2 toward moving up, cross bar 36 cooperates with the second hook of the second positive stop hook 66 again realizes determining for cross bar 36 Position.
As shown in attached drawing 9,10, it includes two 36 positioning components of third cross bar that the rubbish, which is bulldozed mechanism, and two described the Three cross bars, 36 positioning component is oppositely arranged and is located at the side of two strip gab ends.In the two side walls of cabinet 2 Respectively one 36 positioning component of third cross bar of setting can make the both ends of the cross bar 36 when cabinet 2 is not put into melt pit 1 completely all It is fixed, so that the positioning of cross bar 36 is more firm, so that cross bar 36 can be more accurate when cabinet 2 is put into melt pit 1 Put handgrip 40 into ground.
As shown in attached drawing 1,3, bottom is equipped with the receiver 32 and battery of wireless charging, the melt pit 1 in the cabinet 2 Side wall is equipped with the charger 33 of the wireless charging cooperated with the receiver 32 of wireless charging, and the battery is passed with gravity respectively The electrical connection of receiver 32 of sensor, volume detector, wireless charging.It is gravity sensor and body that battery is arranged in cabinet 2 Product detector power supply, the receiver 32 of bottom setting wireless charging, is equipped with and wireless charging on 1 side wall of melt pit in cabinet 2 The charger 33 of wireless charging that cooperates of receiver 32, avoided using wireless charging multiple using the line construction of wired charging It is miscellaneous, and avoid track replacement when replacing cabinet 2, so that the replacement of cabinet 2 is simpler, conveniently;In load-bearing panel 12 The hole that the charger 33 of upper setting and wireless charging cooperates, so that the load-bearing panel 12 in lifting process of lifting support 3 will not be beaten Bad charger 33.
Embodiment 7:
On the basis of embodiment 1, the present invention is further:
As shown in attached drawing 9,10, it further includes 36 positioning component of third cross bar, the third cross bar that the rubbish, which is bulldozed mechanism, 36 positioning components include the second limited block 65, the second positive stop hook 66 and the second briquetting 67, and second limited block 65 is set to item The side of shape open end is simultaneously fixed on 2 lateral wall of cabinet along the length direction of strip gab, and second positive stop hook 66 is set In the inside of the second limited block 65, the inside of second limited block 65 is equipped with the second slideway for the sliding of the second positive stop hook 66 6849, second positive stop hook 66 includes second straight portion 69 and the second hook portion 70, and the second straight portion 69 is located at the second hook portion 70 Lower section, second briquetting 67 are fixed on the inner sidewall of melt pit 1, and the cabinet 2 is put into the second briquetting 67 after melt pit 1 Above strip gab, the to be engaged with the second briquetting 67 is equipped at the top of the second hook portion 70 of second positive stop hook 66 Two blocks 71.Design 36 positioning component of third cross bar can be determined the cross bar 36 in the cabinet 2 for not being put into melt pit 1 completely Position, such that not to be put into cross bar 36 in melt pit 1 on cabinet 2 cross bar 36 during being put into melt pit 1 completely accurately right The handgrip 40 of the U-typed of 38 movable end end of second hydraulic cylinder 37 and third hydraulic cylinder in quasi- melt pit 1, so that entire rubbish Library is more accurate during assembling use.36 positioning component of third cross bar when in use, when cabinet 2 is not put into melt pit completely When 1, the second positive stop hook 66 is located at the extreme lower position in the second slideway 6849 of the second limited block 65 under gravity, at this time Cross bar 36 is hooked in the second hook portion 70 by the second hook portion 70 of the second positive stop hook 66, thus the position of fixed transverse rod 36, works as case During the slow decline of body 2 is put into melt pit 1, second block 71 at 70 top of the second hook portion of the second positive stop hook 66 is pressed with second Briquetting 67 is engaged, and the second positive stop hook 66 is fixed on certain height and is not being declined, and cabinet 2 continues to decline at this time, and second Positive stop hook 66 moves up in the second slideway 6849 in the second limited block 65 relative to the second limited block 65, the second positive stop hook 66 Two hook portion and cross bar 36 is slowly detached from, and cross bar 36 is fallen into the handgrip 40 of U-typed, completes cross bar 36 and handgrip 40 with this Cross bar 36 only need to be pushed into second by second hydraulic cylinder 37 and third hydraulic cylinder 38 after cabinet 2 fills rubbish by perfect combination 66 lower section of positive stop hook, by cabinet 2 toward moving up, cross bar 36 cooperates with the second hook of the second positive stop hook 66 again realizes determining for cross bar 36 Position.
As shown in attached drawing 9,10, it includes two 36 positioning components of third cross bar that the rubbish, which is bulldozed mechanism, and two described the Three cross bars, 36 positioning component is oppositely arranged and is located at the side of two strip gab ends.In the two side walls of cabinet 2 Respectively one 36 positioning component of third cross bar of setting can make the both ends of the cross bar 36 when cabinet 2 is not put into melt pit 1 completely all It is fixed, so that the positioning of cross bar 36 is more firm, so that cross bar 36 can be more accurate when cabinet 2 is put into melt pit 1 Put handgrip 40 into ground.
As shown in Fig. 2, the bottom outside the cabinet 2 is equipped with waterproof plug 34, is equipped with electric power storage inside the cabinet 2 Pond, 1 side wall of melt pit are equipped with the waterproof socket 35 cooperated with waterproof plug 34, the battery and gravity sensor, body Product detector, waterproof plug 34 are electrically connected.It is that gravity sensor and volume detector are powered that battery is arranged in cabinet 2, Bottom outside cabinet 2 is equipped with waterproof plug 34, and the waterproof socket 35 cooperated with waterproof plug 34 is equipped on 1 side wall of melt pit, When wanting cleanup crew that cabinet 2 is put into melt pit 1, because battery is electrically connected with waterproof plug 34, first plug and socket are connected It connects, as storage battery power supply, gravity sensor and volume detector is constantly operated normally, using waterproof plug 34 and waterproof socket 35 make whole equipment use it is safer and durable.
The present invention is not limited to above-mentioned optional embodiment, anyone can obtain other shapes under the inspiration of the present invention The product of formula, however, doing any variation in its shape or structure, all present invention that falls into weigh the skill required in confining spectrum Art scheme, is within the scope of the present invention.

Claims (18)

1. a kind of underground garbage storage, it is characterised in that: including waste deposit component and control assembly, the waste deposit component packet Melt pit, the cabinet in melt pit and the lifting support below cabinet are included, the top of the box is equipped with cover board, the cover board Upper side wall be equipped with and feed intake channel, the cabinet is equipped with discharge gate perpendicular to the side wall of cover board, is hinged on the discharge gate Discharge door, the lifting support include first hydraulic cylinder, the first strut, the second strut, sliding rail and load-bearing panel, and described first The middle part of bar and the middle part of the second strut are hinged, and the lower end of first strut and the piston end of hydraulic cylinder are hinged, and described The lower end of two struts and the fixing end of hydraulic cylinder are hinged, and the sliding rail is parallel to first hydraulic cylinder and is fixed on load-bearing panel On lower panel, respectively with sliding rail pivot bush unit, the control assembly includes control for the upper end of first strut and the second strut The hydraulic power control cabinet of first hydraulic cylinder, the hydraulic power control cabinet are built-in with hydraulic station.
2. underground garbage storage according to claim 1, it is characterised in that: the control assembly further include data control cabinet and Data controlling terminal, the data control cabinet are built-in with controller and battery, and the front side wall top of the data control cabinet is also Equipped with signal projector and signal receiver;The controller and battery electrical connection, the controller also respectively with hydraulic station, Signal projector and signal receiver electrical connection, the controller are whole by signal projector and signal receiver and data control End communication connection.
3. underground garbage storage according to claim 2, it is characterised in that: the melt pit bottom is to having liquid-accumulating trough, institute State and be equipped with liquid level detector and draining pump in liquid-accumulating trough, the liquid level detector, draining pump respectively with the control in data control cabinet Device electrical connection processed.
4. underground garbage storage according to claim 2, it is characterised in that: the front side wall of the data control cabinet is equipped with wide Display screen is accused, the ad display screen is electrically connected with the controller, and the controller is built-in with screen decoder.
5. underground garbage storage according to claim 2, it is characterised in that: the front side wall top of the data control cabinet is equipped with For the camera and speech player of monitoring, the camera and speech player are electrically connected with the controller, the control Device is built-in with storage chip, and the controller is built-in with Voice decoder.
6. underground garbage storage according to claim 2, it is characterised in that: the front side wall top of the data control cabinet is equipped with One or more LED light, the LED light are electrically connected with the controller.
7. underground garbage storage according to claim 1, it is characterised in that: be also built-in with hand in the hydraulic power control cabinet Hydrodynamic press pump.
8. underground garbage storage according to claim 1, it is characterised in that: the cabinet on the side wall of cover board perpendicular to setting There is pull ring, the bottom of box is equipped with pulley, and the cabinet passes through pulley and load-bearing plate contact, the pulley and cabinet bottom Gravity sensor is equipped between portion.
9. underground garbage storage according to claim 1, it is characterised in that: bottom is equipped with relative in cabinet in the cabinet The inner bottom surface of cabinet is fixed in the panel of inclined bottom surface, the side in the panel opposite sides, in the panel opposite sides The other side be fixed on the discharge gate of cabinet.
10. underground garbage storage according to claim 1, it is characterised in that: the channel roof that feeds intake is equipped with feeding cover, Sealing ring is equipped between the feeding cover and the channel roof that feeds intake.
11. underground garbage storage according to claim 1, it is characterised in that: it is described feed intake channel perpendicular to cover board side Side enabling is equipped on wall.
12. underground garbage storage according to claim 1, it is characterised in that: be equipped with volume in the channel that feeds intake and detect Device.
13. the underground garbage storage according to claim 8 or 12, it is characterised in that: bottom is equipped with wireless charging in the cabinet The receiver and battery of electricity, the melt pit side wall are equipped with the charging of the wireless charging cooperated with the receiver of wireless charging Device, the battery are electrically connected with the receiver of gravity sensor, volume detector, wireless charging respectively.
14. underground garbage storage according to claim 1, it is characterised in that: the upper side wall of the cover board is equipped with several A channel that feeds intake.
15. underground garbage storage according to claim 1, it is characterised in that: the waste deposit component further includes that rubbish pushes away Flattening mechanism, it includes cross bar, second hydraulic cylinder and third hydraulic cylinder, the front side wall and rear side of the cabinet that the rubbish, which is bulldozed mechanism, Opposite on wall to set there are two strip through-hole, the both ends of the cross bar are each passed through a strip through-hole, the first hydraulic cylinder and Second hydraulic cylinder is each attached on the side wall of melt pit, and the movable end end of the second hydraulic cylinder and third hydraulic cylinder is respectively provided with one The handgrip of the U-typed of a opening upwards, the both ends that the cross bar stretches out cabinet are fastened on respectively in a handgrip.
16. underground garbage storage according to claim 15, it is characterised in that: it further includes being bulldozed that the rubbish, which is bulldozed mechanism, Plate, the plate that is bulldozed are located in the box body portion, and described a side for being bulldozed plate is radially fixed on cross bar along cross bar.
17. underground garbage storage according to claim 16, it is characterised in that: it further includes the first cross that the rubbish, which is bulldozed mechanism, Bar positioning component, the first crossbar positioning component include the first limited block, the first positive stop hook, the first spring, the first fixed block With the first briquetting, first limited block is set to the side of strip gab end and is fixed on along the length direction of strip gab On cabinet lateral wall, first positive stop hook is set to the inside of the first limited block, and the inside of first limited block, which is equipped with, to be used for First slideway of the first positive stop hook sliding, first positive stop hook include for the first hook portion of fixed transverse rod and for connecting the The straight portion of the first of one spring one end, first hook portion are located at the top in the first straight portion, the other end connection of first spring First fixed block, first fixed block are set to below the first positive stop hook and are fixed on cabinet lateral wall, first pressing Block is set to below strip gab and is fixed on the inner sidewall of melt pit, and the straight subordinate portion of the first of first positive stop hook is equipped with and the The first block that one briquetting is engaged.
18. underground garbage storage according to claim 1, it is characterised in that: the side edge thereof is to extending outside cabinet, institute The water-swellable sealing strip that water-stop is met with side edge thereof is equipped at the top of the melt pit stated, the water-swellable sealing strip is set to cover board Below edge.
CN201811094671.3A 2018-09-19 2018-09-19 Underground garbage warehouse Active CN109132279B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811094671.3A CN109132279B (en) 2018-09-19 2018-09-19 Underground garbage warehouse

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811094671.3A CN109132279B (en) 2018-09-19 2018-09-19 Underground garbage warehouse

Publications (2)

Publication Number Publication Date
CN109132279A true CN109132279A (en) 2019-01-04
CN109132279B CN109132279B (en) 2024-01-26

Family

ID=64815167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811094671.3A Active CN109132279B (en) 2018-09-19 2018-09-19 Underground garbage warehouse

Country Status (1)

Country Link
CN (1) CN109132279B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110214707A (en) * 2019-06-05 2019-09-10 中原工学院 Large-scale pig farm intelligence fecal collecting device
CN111319894A (en) * 2020-03-25 2020-06-23 江苏天楹环保能源成套设备有限公司 Bury formula intelligence rubbish recovery system

Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6296132B1 (en) * 1999-10-27 2001-10-02 Nathan L. Pickler Universal dumpster
DE102004001336A1 (en) * 2003-01-22 2004-08-05 Roland Kohler Collector system for utilizable materials comprises a elevatable cage with top and bottom plates which respectively serve as a chamber lid when the cage is in its bottom and top end positions
DE102005019404A1 (en) * 2005-04-25 2006-10-26 Korn, Reinhard, Dipl.-Ing. Safety platform is powered by gas springs mounted in upper area of scissor lift with further lift spring in lower area to assist lifting action
CN201142024Y (en) * 2008-01-18 2008-10-29 张俊杰 Control system of intelligent garbage transfer station
CN201367227Y (en) * 2008-07-30 2009-12-23 张俊杰 Pit and totally-closed container type automatic compressing and unloading refuse transfer equipment
JP2013023361A (en) * 2011-07-22 2013-02-04 Yutaka Takahashi Garbage containing vessel
CN204713832U (en) * 2015-06-19 2015-10-21 乌鲁木齐华普永辉工贸有限公司 A kind of buried type garbage categorised collection system
CN105438692A (en) * 2014-09-18 2016-03-30 王正刚 Novel intelligent solar automatic rubbish-compressing station
CN206278550U (en) * 2016-10-26 2017-06-27 广西玉柴专用汽车有限公司 A kind of intelligent garbage gathering station
CN206569567U (en) * 2017-02-14 2017-10-20 青岛宝利建设有限公司 It is a kind of to be convenient to clean the residual dirty civil engineering work waste treatment device of rubbish
CN206915095U (en) * 2017-06-27 2018-01-23 常德湘沅实业有限公司 A kind of buried horizontal compression dustbin
CN207107555U (en) * 2017-09-08 2018-03-16 乌鲁木齐亿能达机械制造有限公司 The buried lifting garbage collecting box of intelligence
CN108100519A (en) * 2017-12-23 2018-06-01 何景洲 A kind of multifunctional garbage can
CN108381966A (en) * 2018-04-03 2018-08-10 徐州徐工环境技术有限公司 A kind of buried compressor
CN209177332U (en) * 2018-09-19 2019-07-30 成都盛荣公用设施有限公司 A kind of underground garbage storage

Patent Citations (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6296132B1 (en) * 1999-10-27 2001-10-02 Nathan L. Pickler Universal dumpster
DE102004001336A1 (en) * 2003-01-22 2004-08-05 Roland Kohler Collector system for utilizable materials comprises a elevatable cage with top and bottom plates which respectively serve as a chamber lid when the cage is in its bottom and top end positions
DE102005019404A1 (en) * 2005-04-25 2006-10-26 Korn, Reinhard, Dipl.-Ing. Safety platform is powered by gas springs mounted in upper area of scissor lift with further lift spring in lower area to assist lifting action
CN201142024Y (en) * 2008-01-18 2008-10-29 张俊杰 Control system of intelligent garbage transfer station
CN201367227Y (en) * 2008-07-30 2009-12-23 张俊杰 Pit and totally-closed container type automatic compressing and unloading refuse transfer equipment
JP2013023361A (en) * 2011-07-22 2013-02-04 Yutaka Takahashi Garbage containing vessel
CN105438692A (en) * 2014-09-18 2016-03-30 王正刚 Novel intelligent solar automatic rubbish-compressing station
CN204713832U (en) * 2015-06-19 2015-10-21 乌鲁木齐华普永辉工贸有限公司 A kind of buried type garbage categorised collection system
CN206278550U (en) * 2016-10-26 2017-06-27 广西玉柴专用汽车有限公司 A kind of intelligent garbage gathering station
CN206569567U (en) * 2017-02-14 2017-10-20 青岛宝利建设有限公司 It is a kind of to be convenient to clean the residual dirty civil engineering work waste treatment device of rubbish
CN206915095U (en) * 2017-06-27 2018-01-23 常德湘沅实业有限公司 A kind of buried horizontal compression dustbin
CN207107555U (en) * 2017-09-08 2018-03-16 乌鲁木齐亿能达机械制造有限公司 The buried lifting garbage collecting box of intelligence
CN108100519A (en) * 2017-12-23 2018-06-01 何景洲 A kind of multifunctional garbage can
CN108381966A (en) * 2018-04-03 2018-08-10 徐州徐工环境技术有限公司 A kind of buried compressor
CN209177332U (en) * 2018-09-19 2019-07-30 成都盛荣公用设施有限公司 A kind of underground garbage storage

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110214707A (en) * 2019-06-05 2019-09-10 中原工学院 Large-scale pig farm intelligence fecal collecting device
CN111319894A (en) * 2020-03-25 2020-06-23 江苏天楹环保能源成套设备有限公司 Bury formula intelligence rubbish recovery system

Also Published As

Publication number Publication date
CN109132279B (en) 2024-01-26

Similar Documents

Publication Publication Date Title
CN101670928B (en) Intelligent electric compression dustbin
CN206187747U (en) Intelligence waste classification system with wifi function
CN2851184Y (en) Intelligent open-close cover type environment-friendly garbage can
CN109132279A (en) A kind of underground garbage storage
CN206579176U (en) A kind of garbage compression system
CN205661911U (en) Intelligent solar energy classification garbage
CN209177332U (en) A kind of underground garbage storage
CN204713835U (en) Separate waste collection and mobile vertical compression equipment
CN109335414A (en) A kind of intelligent dustbin system and its application method
CN110550343A (en) Language and image recognition-based garbage classification device
CN108372991B (en) Intelligent public formula garbage bin convenient to collect and pour out
CN206798324U (en) It is a kind of have fluorescence night vision function from compression dustbin
CN113998345B (en) Garbage truck regulation and control system
CN213140091U (en) Intelligent garbage classification throwing station
CN209522123U (en) A kind of underground dustbin
CN214877352U (en) Intelligent garbage accurate classification equipment
CN206050634U (en) A kind of Intelligent dustbin with GPS location detection means
CN208666153U (en) Underground closed garbage station
CN209177331U (en) A kind of lifting type dustbin
CN209038317U (en) A kind of litterbin for being convenient for changing refuse bag of environmental protection
CN110077762A (en) A kind of intelligent garbage bin
CN210028755U (en) Compression type garbage can
CN205397096U (en) Bury formula solar energy dustbin
CN210681934U (en) Photovoltaic cloud intelligence waste classification collection station
CN210823818U (en) Buried dustbin

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant