CN109130052A - High-Voltage Electrical Appliances silica gel sleeve pipe workpiece removing method and particular manufacturing craft from compacting tool set - Google Patents

High-Voltage Electrical Appliances silica gel sleeve pipe workpiece removing method and particular manufacturing craft from compacting tool set Download PDF

Info

Publication number
CN109130052A
CN109130052A CN201811098499.9A CN201811098499A CN109130052A CN 109130052 A CN109130052 A CN 109130052A CN 201811098499 A CN201811098499 A CN 201811098499A CN 109130052 A CN109130052 A CN 109130052A
Authority
CN
China
Prior art keywords
silica gel
sleeve pipe
electrical appliances
voltage electrical
gel sleeve
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201811098499.9A
Other languages
Chinese (zh)
Inventor
刘广斧
铁韧
肖明华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENYANG HUADE HIGH-TECH ELECTRIC Co Ltd
Original Assignee
SHENYANG HUADE HIGH-TECH ELECTRIC Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENYANG HUADE HIGH-TECH ELECTRIC Co Ltd filed Critical SHENYANG HUADE HIGH-TECH ELECTRIC Co Ltd
Priority to CN201811098499.9A priority Critical patent/CN109130052A/en
Publication of CN109130052A publication Critical patent/CN109130052A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/36Moulds for making articles of definite length, i.e. discrete articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/36Moulds for making articles of definite length, i.e. discrete articles
    • B29C43/3607Moulds for making articles of definite length, i.e. discrete articles with sealing means or the like
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/50Removing moulded articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/50Removing moulded articles
    • B29C2043/5007Removing moulded articles using cores, i.e. the cores forming part of the mould cavity
    • B29C2043/5023Removing moulded articles using cores, i.e. the cores forming part of the mould cavity moving away
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C43/00Compression moulding, i.e. applying external pressure to flow the moulding material; Apparatus therefor
    • B29C43/32Component parts, details or accessories; Auxiliary operations
    • B29C43/50Removing moulded articles
    • B29C2043/5046Removing moulded articles using vacuum
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29LINDEXING SCHEME ASSOCIATED WITH SUBCLASS B29C, RELATING TO PARTICULAR ARTICLES
    • B29L2023/00Tubular articles
    • B29L2023/005Hoses, i.e. flexible

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Silicon Compounds (AREA)

Abstract

High-Voltage Electrical Appliances silica gel sleeve pipe workpiece removing method and particular manufacturing craft from compacting tool set, it overcomes prior art High-Voltage Electrical Appliances silica gel sleeve pipe workpiece and takes out the problem that difficulty is larger and workpiece accuracy is low from compacting tool set, it is characterized in including High-Voltage Electrical Appliances silica gel sleeve pipe production mold, High-Voltage Electrical Appliances silica gel sleeve pipe workpiece takes out mold and High-Voltage Electrical Appliances silica gel sleeve pipe the workpiece removing method from compacting tool set, beneficial effect is that High-Voltage Electrical Appliances silica gel sleeve pipe production mold and High-Voltage Electrical Appliances silica gel sleeve pipe workpiece taking-up mould structure are simple, the method that High-Voltage Electrical Appliances silica gel sleeve pipe workpiece takes out from compacting tool set utilizes the characteristic of silica gel, workpiece is taken out by way of vacuumizing and stopping vacuumizing, solve the problems, such as that the larger workpiece of silica gel sheath tubing intermediate sizes takes out from compacting tool set, High-Voltage Electrical Appliances silica gel sleeve pipe workpiece can be facilitated into taking-up from compacting tool set, To High-Voltage Electrical Appliances silica gel sleeve pipe workpiece without any damage during taking-up, work efficiency is high, workpiece accuracy is high and rejection rate is low.

Description

High-Voltage Electrical Appliances silica gel sleeve pipe workpiece removing method and particular manufacturing craft from compacting tool set
Technical field
The invention belongs to high voltage electrical apparatus technical field, in particular to High-Voltage Electrical Appliances silica gel sleeve pipe workpiece takes from compacting tool set Method and particular manufacturing craft out.
Background technique
High voltage electric appliance, especially Cubicle Gas-Insulated Switchgear, the conductive connection between equipment and equipment Much all using silica gel sleeve pipe as major insulation body, as shown in Figure 1, since the shape both ends of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece are Rotary table 101, and small bore, in upper and lower ends, upper and lower ends excircle is circular conical surface 103, and centre is for cylindrical body and outside cylindrical body The centre of circumference is equipped with 2 intermediate projections 102, which is that the maximum of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece is outer Diameter, so, the intermediate sizes of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece are big compared with upper and lower ends, therefore the High-Voltage Electrical Appliances silicon after compression moulding It is a big problem that gum cover tube workpiece takes out from compacting tool set;Especially, as shown in Fig. 2, the High-Voltage Electrical Appliances of the prior art The compacting tool set of silica gel sleeve pipe workpiece uses packaging structure, in order to by High-Voltage Electrical Appliances silica gel sleeve pipe workpiece from compacting tool set It is taken out in main mould chamber, the die main body of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece compacting tool set is by upper mold 201, middle mould 202 and lower die 203 Three parts are spliced, and mold main mould chamber is by upper mold die cavity 207, middle mould die cavity 208, lower die die cavity 209 and compacting die mandrel 204 It collectively constitutes, is organized on press integral, upper mold supporting plate 205 is installed in upper mold 201, be equipped on middle mould 202 Die shoe plate 206 needs first when taking out High-Voltage Electrical Appliances silica gel sleeve pipe workpiece after molding from compacting tool set by upper mold 201 It is removed with lower die 203 from the both ends of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece, the upper and lower ends of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece are sudden and violent It is exposed at outside mold, then will be taken out in High-Voltage Electrical Appliances silica gel sleeve pipe workpiece therefrom mould 202 by way of pulling, although can take Out, but due to the maximum outside diameter that High-Voltage Electrical Appliances silica gel sleeve pipe workpiece centre two protrusions 102 are workpiece, taking-up difficulty is larger, and And take out High-Voltage Electrical Appliances silica gel sleeve pipe workpiece when caused by workpiece damage ratio it is also larger, remaining workpiece is also had in die cavity Surface layer is cleared up, and entire technical process is extremely complex, and working efficiency is low and workpiece accuracy is low.
Summary of the invention
The technical problem to be solved by the present invention is in place of overcome the deficiencies in the prior art, providing one kind can be by shape It is rotary table for upper and lower ends, the intermediate size High-Voltage Electrical Appliances silica gel sleeve pipe workpiece big compared with upper and lower ends is convenient from compacting tool set It takes out, without any difficulty and to High-Voltage Electrical Appliances silica gel sleeve pipe workpiece without any in taking out High-Voltage Electrical Appliances silica gel sleeve pipe workpiece fabrication Damage, High-Voltage Electrical Appliances silica gel sleeve pipe workpiece removing method and particular manufacturing craft from compacting tool set high-efficient and with high accuracy.
The present invention includes High-Voltage Electrical Appliances silica gel sleeve pipe production mold, High-Voltage Electrical Appliances silica gel sleeve pipe workpiece taking-up mold and high pressure Electric appliance silica gel sleeve pipe workpiece removing method from compacting tool set.
A kind of High-Voltage Electrical Appliances silica gel sleeve pipe of the present invention makes mold, including die main body, upper cover plate, lower cover plate and mould Has plug, the die main body is a cuboid, is equipped on the cross-section center position of the die main body of cuboid longitudinal The main mould chamber of perforation adapted to High-Voltage Electrical Appliances silica gel sleeve pipe workpiece shapes, the upper and lower ends of the main mould chamber are set as circular platform type Chamber, and small bore is equipped with 2 annular grooves, the upper and lower ends inner circle of the main mould chamber at the middle part of main mould chamber in upper and lower ends Week is internal conical surface, stepped hole is machined on the upper cover plate, and install in the stepped hole and longitudinally through main mould chamber Die mandrel.
A kind of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece of the present invention takes out mold, including die main body, the die main body For a cuboid, it is equipped in the cross-section center position of the die main body of cuboid longitudinally through with High-Voltage Electrical Appliances silica gel sheath The main mould chamber that tube workpiece shape adapts to, has the High-Voltage Electrical Appliances silica gel sleeve pipe workpiece of form, in high pressure in main mould chamber Aluminum pipe is installed in electric appliance silica gel sleeve pipe workpiece, correspond to the lower mouth installation lower cover of main mould chamber in the lower surface of die main body and will be led The lower mouth of die cavity seals, and corresponds to the installation upper end cover suitable for reading of main mould chamber in the upper surface of die main body, and will answer the upper of main mould chamber Mouth sealing, is machined with stepped hole, and double-threaded screw is equipped in the stepped hole, the outer diameter of the aluminum pipe is less than on upper end cover The internal diameter of High-Voltage Electrical Appliances silica gel sleeve pipe inner hole of workpiece forms high pressure between the inner hole and aluminum pipe of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece The deformation gap of electric appliance silica gel sleeve pipe workpiece.
A kind of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece removing method from compacting tool set of the present invention includes the following steps:
Step 1, prepare silica gel sleeve pipe: the step assemble High-Voltage Electrical Appliances silica gel sleeve pipe first and makes mold and by the High-Voltage Electrical Appliances Silica gel sleeve pipe production mold is mounted on press, is then heated by process flow and requirement to die main body, is passed through silicon Glue injection device prepares High-Voltage Electrical Appliances silica gel sleeve pipe workpiece in the intracavitary silica gel injected before vulcanizing of main mould, heat preservation solidification;
Step 2, dismantle upper cover plate, lower cover plate and die mandrel: the step is when High-Voltage Electrical Appliances silica gel sleeve pipe workpiece reaches solidification Between after, disassembly upper cover plate is run up by press, while extracting die mandrel out, during this, the lower surface of die main body The lower cover plate of installation is retained on press naturally;
Step 3, more mold exchange: the step first by dismantled upper cover plate, lower cover plate and extracted out die mandrel with high pressure The die main body of electric appliance silica gel sleeve pipe workpiece is moved out on press auxiliary frame, is adjusted to suitable with High-Voltage Electrical Appliances silica gel sleeve pipe workpiece Then the height answered installs lower cover and by High-Voltage Electrical Appliances silica gel sleeve pipe under the inner hole of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece in mouth The lower mouth of inner hole of workpiece seals, and aluminum pipe is put by the inner hole of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece is suitable for reading, in High-Voltage Electrical Appliances silica gel sheath The inner hole of tube workpiece middle installation upper end cover suitable for reading, and by the sealing suitable for reading of the inner hole of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece, in upper end It covers and double-threaded screw is installed in the stepped hole of end face, the air flue for processing double-threaded screw center is connected to aluminum pipe;Due to the aluminium The outer diameter of pipe is less than the bore inner diameter of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece, in the inner hole and aluminum pipe of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece Between formed High-Voltage Electrical Appliances silica gel sleeve pipe workpiece deformation gap;
Step 4, vacuum pump is connected: on the upper terminal screw for the double-threaded screw that the step is installed in the stepped hole of upper end cover upper surface Ventilation nut is installed, air flue is machined in nut of ventilating and is connected to by snorkel with vacuum pump;
Step 5, it vacuumizes, take out High-Voltage Electrical Appliances silica gel sleeve pipe workpiece, aluminum pipe, upper end cover and lower cover plate: the step first turns on The vacuum pump connected by snorkel, under the action of vacuum pump vacuumizes, High-Voltage Electrical Appliances silica gel sleeve pipe workpiece moment is generated Deformation, radial dimension reduce, and the inner surface and aluminum pipe of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece are held tightly, and outer diameter reaches technique requirement Size, less than the minimum dimension of main mould chamber, the upper surface of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece and upper end cover are held tightly, High-Voltage Electrical Appliances The lower surface of silica gel sleeve pipe workpiece and lower cover are held tightly, can together with High-Voltage Electrical Appliances silica gel sleeve pipe workpiece, aluminum pipe, upper end cover and under End cap takes out from main mould chamber together;
Step 6, stop vacuumizing, take out High-Voltage Electrical Appliances silica gel sleeve pipe workpiece: the step is as taking-up High-Voltage Electrical Appliances silica gel sheath plumber After part, aluminum pipe, upper end cover and lower cover, after stopping vacuumizes, High-Voltage Electrical Appliances silica gel sleeve pipe workpiece affranchises ruler in air Very little, High-Voltage Electrical Appliances silica gel sleeve pipe workpiece is automatically separated with aluminum pipe, upper end cover and lower cover, can be by High-Voltage Electrical Appliances silica gel sleeve pipe Workpiece facilitates taking-up from compacting tool set.
Compared with prior art, the beneficial effects of the present invention are:
(1) the present invention provides the particular manufacturing crafts of production High-Voltage Electrical Appliances silica gel sleeve pipe, including High-Voltage Electrical Appliances silica gel sleeve pipe to make mould Tool and High-Voltage Electrical Appliances silica gel sleeve pipe workpiece take out mold, make mold and High-Voltage Electrical Appliances silica gel sleeve pipe in High-Voltage Electrical Appliances silica gel sleeve pipe The cross-section center position that workpiece takes out the die main body of the general cuboid of mold is equipped with longitudinally through and High-Voltage Electrical Appliances The main mould chamber that silica gel sleeve pipe workpiece shapes adapt to, as long as the lower cover plate of High-Voltage Electrical Appliances silica gel sleeve pipe production mold is replaced with lower end High-Voltage Electrical Appliances silica gel sleeve pipe production mold upper cover plate is replaced with upper end cover, the high pressure of form in main mould chamber by lid Aluminum pipe is installed in electric appliance silica gel sleeve pipe workpiece, double-threaded screw is installed in upper end cover, High-Voltage Electrical Appliances silica gel sheath plumber can be become Part takes out mold, and structure is simple, and middle/high-voltage electrical appliance silica gel sleeve pipe makes mold and High-Voltage Electrical Appliances silica gel sleeve pipe workpiece takes out mould For tool using the die main body of general cuboid, versatility is good, at low cost;
(2) the present invention provides one kind High-Voltage Electrical Appliances silica gel sleeve pipe workpiece can be facilitated taking-up from compacting tool set, is taking out Without any difficulty and to High-Voltage Electrical Appliances silica gel sleeve pipe workpiece without any damage, this method in High-Voltage Electrical Appliances silica gel sleeve pipe workpiece fabrication Using the characteristic of silica gel, workpiece is taken out by way of vacuumizing and stopping vacuumizing, and solves silica gel sheath tubing intermediate sizes The problem that larger workpiece takes out from compacting tool set, and work efficiency is high, workpiece accuracy is high and rejection rate is low, is applicable not only to height Piezoelectricity device silica gel sleeve pipe workpiece facilitates taking-up from compacting tool set, is also applied for the general larger workpiece of silica gel sheath tubing intermediate sizes It is taken out from compacting tool set;
(3) it is general to take out mold for High-Voltage Electrical Appliances silica gel sleeve pipe production mold and High-Voltage Electrical Appliances silica gel sleeve pipe workpiece of the present invention Main mould chamber designs for integral type, can a cavity per mould or a multi-cavity mold open cope plate, lower template and pumping after the completion of workpiece compacting Plug out, lower end are blocked with lower cover, are packed into having a size of the aluminum pipe specially designed, and double-threaded screw is installed in upper end on upper end cover, With being docked with vacuum pump by the nut of piping connection, nut and screw after connecting to starting to vacuumize, at this moment high-voltage electricity Device silica gel sleeve pipe workpiece moment is deformed, and radial dimension reduces, and inner surface and aluminum pipe are held tightly, and outer diameter reaches technique requirement Size, less than the minimum dimension of mold main mould chamber, together with High-Voltage Electrical Appliances silica gel sleeve pipe workpiece, aluminum pipe, upper end cover and lower cover It is taken out from main mould chamber together, after stopping vacuumizes, High-Voltage Electrical Appliances silica gel sleeve pipe workpiece affranchises size in air, high pressure Electric appliance silica gel sleeve pipe workpiece is automatically separated with aluminum pipe, upper end cover and lower cover, that is, completes High-Voltage Electrical Appliances silica gel sleeve pipe workpiece from pressure This process is taken out in molding jig.
Detailed description of the invention
Fig. 1 is High-Voltage Electrical Appliances silica gel sleeve pipe schematic diagram,
Fig. 2 is the structural schematic diagram of background technique mold closed condition,
In figure:
101. rotary table,
102. intermediate projections,
103. circular conical surface,
201. upper molds,
Mould in 202.,
203. lower die
204. compacting die mandrels,
205. upper mold supporting plates,
Die shoe plate in 206.
207. upper mold die cavitys,
Mould die cavity in 208.,
209. lower die die cavitys.
Fig. 3 is the structural schematic diagram of High-Voltage Electrical Appliances silica gel sleeve pipe production mold of the present invention,
Fig. 4 is the A-A cross-sectional view of Fig. 3,
Fig. 5 is the structural schematic diagram of High-Voltage Electrical Appliances silica gel sleeve pipe production mold closed condition of the present invention,
Fig. 6 is the B-B cross-sectional view of Fig. 5,
Fig. 7 is the structural schematic diagram that High-Voltage Electrical Appliances silica gel sleeve pipe workpiece of the present invention takes out mold,
Fig. 8 is the C-C cross-sectional view of Fig. 7,
Fig. 9 is the structural schematic diagram of use state of the present invention.
In figure:
100. High-Voltage Electrical Appliances silica gel sleeve pipe workpiece
1. main mould chamber,
2. die main body,
2-1. circular platform type chamber,
2-2. annular groove,
2-3. internal conical surface,
3. upper cover plate,
4. die mandrel,
5. lower cover plate,
6. upper end cover supporting plate,
7. die main body supporting plate,
8. aluminum pipe,
9. upper end cover,
10. lower cover,
11. double-threaded screw,
12. nut of ventilating,
13. snorkel,
14. vacuum pump,
15. deformation gap.
Specific embodiment
The present invention include High-Voltage Electrical Appliances silica gel sleeve pipe production mold and High-Voltage Electrical Appliances silica gel sleeve pipe workpiece take out mold and The method that High-Voltage Electrical Appliances silica gel sleeve pipe workpiece takes out from compacting tool set.
Specific embodiment 1
As shown in Figure 3 and Figure 4, silica gel sleeve pipe production mold of the present invention includes die main body 2, and the die main body 2 is one long Cube is equipped with longitudinally through with High-Voltage Electrical Appliances silica gel sheath plumber in the cross-section center position of the die main body 2 of the cuboid The main mould chamber 1 that part shape adapts to, die mandrel 4 is equipped in main mould chamber 1, is set as circular platform type in the upper and lower ends of main mould chamber 1 Chamber 2-1, and small bore is in upper and lower ends is equipped with 2 annular groove 2-2 at the middle part of main mould chamber 1, the main mould chamber 1 up and down Both ends inner periphery is internal conical surface 2-3, die main body supporting plate 7 is equipped in the left and right sides of die main body 2, in die main body 2 Upper surface upper cover plate 3 is installed, stepped hole, and the installation mold plug 4 in the stepped hole are machined on upper cover plate 3, The left and right sides of upper cover plate 3 is equipped with upper cover plate supporting plate 6, is equipped with lower cover plate 5 in the lower surface of die main body 2.
Specific embodiment 2
As shown in Figure 7 and Figure 8, it includes logical with silica gel sleeve pipe production mold that High-Voltage Electrical Appliances silica gel sleeve pipe workpiece of the present invention, which takes out mold, Die main body 2, the die main body 2 is a cuboid, in the cross-section center position of the die main body 2 of the cuboid Equipped with the longitudinally through main mould chamber 1 adapted to High-Voltage Electrical Appliances silica gel sleeve pipe workpiece shapes, has in main mould chamber 1 and be perfused into The High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 of type installs aluminum pipe 8, in die main body 2 in High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 The left and right sides die main body supporting plate 7 is installed, the lower surface of die main body 2 correspond to main mould chamber 1 lower mouth install lower cover 10 and the lower mouth of main mould chamber 1 is sealed, correspond to the installation upper end cover 9 suitable for reading of main mould chamber 1 in the upper surface of die main body 2, and general The sealing suitable for reading for answering main mould chamber 1 is machined with stepped hole on upper end cover 9, and is equipped with double-threaded screw 11 in the stepped hole, institute The outer diameter for stating aluminum pipe 8 is less than the internal diameter of 100 inner hole of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece, in High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 Inner hole and aluminum pipe 8 between formed High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 deformation gap 15.
Specific embodiment 3
High-Voltage Electrical Appliances silica gel sleeve pipe workpiece removing method from compacting tool set of the present invention includes the following steps:
Step 1, prepare silica gel sleeve pipe 1: as shown in Fig. 3~Fig. 6, which assembles High-Voltage Electrical Appliances silica gel sleeve pipe production mold first And High-Voltage Electrical Appliances silica gel sleeve pipe production mold is mounted on press, then by process flow and requirement to die main body 2 are heated, and silica gel, heat preservation solidification before injecting vulcanization in main mould chamber 1 by silica gel injection device prepare High-Voltage Electrical Appliances silicon Gum cover tube workpiece 100;
Step 2, dismantle upper cover plate 3, lower cover plate 5 and die mandrel 4: the step reaches in High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 After curing time, disassembly upper cover plate 3 is run up by press, while extracting die mandrel 4 out, during this, die main body 2 Lower surface installation lower cover plate 5 be retained on press naturally;
Step 3, more mold exchange: as shown in Figure 7 and Figure 8, which will dismantle upper cover plate 3, lower cover plate 5 first and extract mould out Tool plug 4 the die main body 2 with High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 be moved out on press auxiliary frame, be adjusted to and The height that High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 adapts to, then pacifies in mouth under the inner hole of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 It loads end cap 10 and seals the lower mouth of 100 inner hole of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece, by High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 Inner hole it is suitable for reading be put into aluminum pipe 8, in the inner hole of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 middle installation upper end cover 9 suitable for reading, and by high pressure The sealing suitable for reading of the inner hole of electric appliance silica gel sleeve pipe workpiece 100 is installed double-threaded screw 11 in the stepped hole above upper end cover 9, is made The air flue of 11 center of double-threaded screw processing is connected to aluminum pipe 8;Since the outer diameter of the aluminum pipe 8 is less than High-Voltage Electrical Appliances silica gel sheath plumber The bore inner diameter of part 100 forms High-Voltage Electrical Appliances silica gel sheath between the inner hole and aluminum pipe 8 of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 The deformation gap 15 of tube workpiece 100;
Step 4, vacuum pump is connected: as shown in figure 9, the double-threaded screw 11 that the step is installed in the stepped hole above upper end cover 9 Upper terminal screw installation ventilation nut 12, be machined with air flue in nut 12 of ventilating and be connected to vacuum pump 14 by snorkel 13;
Step 5, it vacuumizes, take out High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100, aluminum pipe 8, upper end cover 9 and lower cover plate 10: the step is first It first opens and has passed through the vacuum pump 12 that snorkel 13 connects, under the action of vacuum pump 12 vacuumizes, High-Voltage Electrical Appliances silica gel sleeve pipe Workpiece 100 is deformed, and radial dimension reduces, and the inner surface and aluminum pipe 8 of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 are held tightly, outer diameter The size that size reaches technique requirement can take out High-Voltage Electrical Appliances silica gel sleeve pipe workpiece less than the minimum dimension of main mould chamber 1 upwards 100, in this process, vacuumizes and completed with the deformation moment of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100, at this point, due to high pressure The inner surface and aluminum pipe 8 of electric appliance silica gel sleeve pipe workpiece 100 are held tightly, the upper surface and upper end of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 Lid 9 is held tightly, and the lower surface of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 and lower cover 10 are held tightly, so together with High-Voltage Electrical Appliances silica gel sheath Tube workpiece 100, aluminum pipe 8 and upper end cover 9 take out from main mould chamber 1 together with lower cover 10;
Step 6, stop vacuumizing, take out High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100: the step is when taking-up High-Voltage Electrical Appliances silica gel sleeve pipe After workpiece 100, aluminum pipe 8 and upper end cover 9, stop vacuumizing, High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 affranchises ruler in air Very little, High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 is automatically separated with aluminum pipe 8, upper end cover 9 and lower cover 10, can be by High-Voltage Electrical Appliances Silica gel sleeve pipe workpiece 100 facilitates taking-up from compacting tool set, and during taking out High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 Without any difficulty and to High-Voltage Electrical Appliances silica gel sleeve pipe workpiece 100 without any damage, high-efficient and precision is high;Whole process is all complete At then being cleared up mold, mold the preparation for carrying out next High-Voltage Electrical Appliances silica gel sleeve pipe.

Claims (3)

1. a kind of High-Voltage Electrical Appliances silica gel sleeve pipe makes mold, including die main body (2), upper cover plate (3), lower cover plate (5) and mold Plug (4), the die main body (2) are a cuboid, which is characterized in that in the cross section of the die main body (2) of cuboid Center is equipped with the longitudinally through main mould chamber (1) adapted to High-Voltage Electrical Appliances silica gel sleeve pipe workpiece shapes, the main mould chamber (1) upper and lower ends are set as circular platform type chamber (2-1), and small bore is equipped with 2 rings at the middle part of main mould chamber (1) in upper and lower ends Connected in star (2-2), the upper and lower ends inner periphery of the main mould chamber (1) are internal conical surface (2-3), are added on the upper cover plate (3) Work has stepped hole, and the installation mold plug (4) in the stepped hole and longitudinally through main mould chamber (1).
2. a kind of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece takes out mold, including die main body (2), which is characterized in that the mold master Body (2) is a cuboid, is equipped with longitudinally through and high-voltage electricity in the cross-section center position of the die main body (2) of cuboid The main mould chamber (1) that device silica gel sleeve pipe workpiece shapes adapt to, there is the High-Voltage Electrical Appliances silica gel sheath of form in main mould chamber (1) Tube workpiece (100) installs aluminum pipe (8) in High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100), in the lower surface pair of die main body (2) Answer the lower mouth of main mould chamber (1) that lower cover (10) are installed and seal the lower mouth of main mould chamber (1), in the upper surface of die main body (2) The installation upper end cover (9) suitable for reading of corresponding main mould chamber (1), and the sealing suitable for reading of main mould chamber (1) will be answered, it is processed on upper end cover (9) There is stepped hole, and double-threaded screw (11) are installed in the stepped hole, the outer diameter of the aluminum pipe (8) is less than High-Voltage Electrical Appliances silica gel sheath The internal diameter of tube workpiece (100) inner hole forms high pressure between the inner hole and aluminum pipe (8) of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100) The deformation gap (15) of electric appliance silica gel sleeve pipe workpiece (100).
3. a kind of method that High-Voltage Electrical Appliances silica gel sleeve pipe workpiece takes out from compacting tool set, it is characterised in that include the following steps:
Step 1, prepare silica gel sleeve pipe 1: the step assembles High-Voltage Electrical Appliances silica gel sleeve pipe production mould as described in claim 1 first Have and High-Voltage Electrical Appliances silica gel sleeve pipe production mold is mounted on press, then by process flow and requirement to mold master Body (2) is heated, and silica gel, heat preservation solidification before injecting vulcanization in main mould chamber 1 by silica gel injection device prepare high-voltage electricity Device silica gel sleeve pipe workpiece (100);
Step 2, dismantle upper cover plate (3), lower cover plate (5) and die mandrel (4): the step is in High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100) after reaching curing time, disassembly upper cover plate (3) is run up by press, while extracting die mandrel (4), this mistake out The lower cover plate (5) of Cheng Zhong, the lower surface installation of die main body (2) are retained on press naturally;
Step 3, more mold exchange: the step will dismantle upper cover plate (3), lower cover plate (5) first and extract die mandrel (4) out Die main body (2) with High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100) is moved out on press auxiliary frame, is adjusted to and high-voltage electricity The height that device silica gel sleeve pipe workpiece (100) adapts to, is then installed in mouth under the inner hole of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100) Lower cover (10) simultaneously seals the lower mouth of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100) inner hole, by High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100) inner hole is suitable for reading to be put into aluminum pipe (8), in the inner hole of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100) middle installation upper end cover suitable for reading (9), and by the sealing suitable for reading of the inner hole of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100), in the stepped hole of upper end cover (9) upper surface It installs double-threaded screw (11), the air flue for processing double-threaded screw (11) center is connected to aluminum pipe (8);
Step 4, vacuum pump (14) are connected: the double-threaded screw (11) that the step is installed in the stepped hole of upper end cover (9) upper surface Upper terminal screw on installation ventilation nut (12), be machined with air flue in ventilation nut (12) and by snorkel (13) and vacuum pump (14) it is connected to;
Step 5, it vacuumizes, takes out High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100), aluminum pipe (8), upper end cover (9) and lower cover plate (10): The step first turns on the vacuum pump (12) for having passed through snorkel (13) connection, high under the action of vacuum pump (12) vacuumizes Piezoelectricity device silica gel sleeve pipe workpiece (100) moment is deformed, and radial dimension reduces, High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100) Inner surface and aluminum pipe (8) are held tightly, and outer diameter reaches the size of technique requirement, are less than the minimum dimension of main mould chamber (1), high-voltage electricity The upper surface and upper end cover (9) of device silica gel sleeve pipe workpiece (100) are held tightly, the lower surface of High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100) It is held tightly with lower cover (10), it can be together with High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100), aluminum pipe (8), upper end cover (9) and lower cover (10) it is taken out from main mould chamber (1) together;
Step 6, stop vacuumizing, take out High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100): the step is when taking-up High-Voltage Electrical Appliances silica gel sheath After tube workpiece (100), aluminum pipe (8) upper end cover (9) and lower cover (10), stop vacuumizing, High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100) affranchise size in air, High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100) and aluminum pipe (8), upper end cover (9) and lower end Lid (10) is automatically separated, and High-Voltage Electrical Appliances silica gel sleeve pipe workpiece (100) can be facilitated taking-up from compacting tool set.
CN201811098499.9A 2018-09-20 2018-09-20 High-Voltage Electrical Appliances silica gel sleeve pipe workpiece removing method and particular manufacturing craft from compacting tool set Pending CN109130052A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811098499.9A CN109130052A (en) 2018-09-20 2018-09-20 High-Voltage Electrical Appliances silica gel sleeve pipe workpiece removing method and particular manufacturing craft from compacting tool set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811098499.9A CN109130052A (en) 2018-09-20 2018-09-20 High-Voltage Electrical Appliances silica gel sleeve pipe workpiece removing method and particular manufacturing craft from compacting tool set

Publications (1)

Publication Number Publication Date
CN109130052A true CN109130052A (en) 2019-01-04

Family

ID=64815189

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811098499.9A Pending CN109130052A (en) 2018-09-20 2018-09-20 High-Voltage Electrical Appliances silica gel sleeve pipe workpiece removing method and particular manufacturing craft from compacting tool set

Country Status (1)

Country Link
CN (1) CN109130052A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111873284A (en) * 2020-07-07 2020-11-03 如皋佳百塑料制品有限公司 One-step compression molding method of pure tetrafluoroethylene nozzle and special mold thereof

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1281583A (en) * 1969-07-02 1972-07-12 British Insulated Callenders Improvements in or relating to electric insulators
JP2004058545A (en) * 2002-07-31 2004-02-26 Mitsuboshi Belting Ltd Mold device for driving belt
CN209095853U (en) * 2018-09-20 2019-07-12 沈阳华德海泰电器有限公司 High-Voltage Electrical Appliances silica gel sleeve pipe makes mold and High-Voltage Electrical Appliances silica gel sleeve pipe takes out mold

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB1281583A (en) * 1969-07-02 1972-07-12 British Insulated Callenders Improvements in or relating to electric insulators
JP2004058545A (en) * 2002-07-31 2004-02-26 Mitsuboshi Belting Ltd Mold device for driving belt
CN209095853U (en) * 2018-09-20 2019-07-12 沈阳华德海泰电器有限公司 High-Voltage Electrical Appliances silica gel sleeve pipe makes mold and High-Voltage Electrical Appliances silica gel sleeve pipe takes out mold

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111873284A (en) * 2020-07-07 2020-11-03 如皋佳百塑料制品有限公司 One-step compression molding method of pure tetrafluoroethylene nozzle and special mold thereof

Similar Documents

Publication Publication Date Title
CN209095853U (en) High-Voltage Electrical Appliances silica gel sleeve pipe makes mold and High-Voltage Electrical Appliances silica gel sleeve pipe takes out mold
CN210552556U (en) Silica gel forming die
CN109130052A (en) High-Voltage Electrical Appliances silica gel sleeve pipe workpiece removing method and particular manufacturing craft from compacting tool set
CN103692685A (en) Environment-friendly easily-demolded compression molding device and use thereof
CN207154699U (en) A kind of three station cold-box core making machines
CN209775436U (en) Vacuumizing rapid exhaust injection mold structure
CN217395487U (en) Epoxy mould with pneumatic demoulding structure
CN206983063U (en) One kind vacuumizes split two halves mould
CN209304399U (en) A kind of inflatable epoxy pouring tooling
CN110421875B (en) Composite material forming die and sealing method for separating surface of die
CN211521568U (en) Split type area pressure embedment system suitable for various viscosity
CN209755826U (en) Exhaust device of mould
CN203125803U (en) Capsule clamping device of vulcanizing machine mold
CN206779455U (en) A kind of neodymium iron boron magnetic body forming processing device
CN207642267U (en) A kind of copper coin die device
CN210733030U (en) Core mold tool for processing hollow composite insulator
CN207529786U (en) Liquid immersion type power equipment epoxy resin bushing
CN109333410A (en) A kind of inflatable epoxy pouring tooling
CN203440717U (en) Full-equal-pressure pressurization device of wet insulation forming piece
CN212310740U (en) Copper pipe joint extrusion forming facility
CN201522896U (en) Shaping die for manufacturing high voltage cable accessory insulating part
CN219486331U (en) Lengthening die for die-pressing flanging of steel lining tetrafluoro pipe fitting
CN209365243U (en) A kind of combined type facsimile machine plastic shell mold injection mold
CN219705960U (en) Improved demoulding structure
CN211440763U (en) Exhaust device of thin-wall deep-cavity precision mold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20190104