CN109127845A - High-strength corrosion-resistant steel gas cylinder hot spinning forming method - Google Patents

High-strength corrosion-resistant steel gas cylinder hot spinning forming method Download PDF

Info

Publication number
CN109127845A
CN109127845A CN201810873134.2A CN201810873134A CN109127845A CN 109127845 A CN109127845 A CN 109127845A CN 201810873134 A CN201810873134 A CN 201810873134A CN 109127845 A CN109127845 A CN 109127845A
Authority
CN
China
Prior art keywords
steel pipe
seamless steel
plate mold
gas cylinder
spinning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810873134.2A
Other languages
Chinese (zh)
Inventor
王飞
曾东
范国金
黄瑛
陈刘斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHENGDU GREAT HIGH PRESSURE VESSEL Co Ltd
Original Assignee
CHENGDU GREAT HIGH PRESSURE VESSEL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHENGDU GREAT HIGH PRESSURE VESSEL Co Ltd filed Critical CHENGDU GREAT HIGH PRESSURE VESSEL Co Ltd
Priority to CN201810873134.2A priority Critical patent/CN109127845A/en
Publication of CN109127845A publication Critical patent/CN109127845A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D22/00Shaping without cutting, by stamping, spinning, or deep-drawing
    • B21D22/14Spinning
    • B21D22/16Spinning over shaping mandrels or formers
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D37/00Tools as parts of machines covered by this subclass
    • B21D37/16Heating or cooling
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21DWORKING OR PROCESSING OF SHEET METAL OR METAL TUBES, RODS OR PROFILES WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21D51/00Making hollow objects
    • B21D51/16Making hollow objects characterised by the use of the objects
    • B21D51/38Making inlet or outlet arrangements of cans, tins, baths, bottles, or other vessels; Making can ends; Making closures
    • B21D51/44Making closures, e.g. caps

Abstract

The invention discloses a kind of high-strength corrosion-resistant steel gas cylinder hot spinning forming methods, include the following steps, (a) the closing in section of seamless steel pipe is heated, heating temperature is 1180-1220 DEG C, and the relationship of heated length L and outer diameter of steel pipes φ are L=φ+(100-150mm);(b) spinning machine main shaft claming seamless steel pipe, seamless steel pipe is rotated with the revolving speed of 25-29rad/s, by the working face of the plate mold of the spinning machine close to seamless steel pipe closing in section, with the slow rotary plate mold of 0.0015-0.0035rad/s revolving speed, 1/4 circle of plate mold rotation.The gas cylinder of the method for the present invention molding preparation, comprehensive performance is brilliant, successfully solves the contradiction between material superhigh intensity and high tenacity and corrosion resistance, the performance indicator of material occupies the leading level in the world.

Description

High-strength corrosion-resistant steel gas cylinder hot spinning forming method
Technical field
The invention belongs to seamless gas cylinder processing technique fields, and in particular to high-strength corrosion-resistant steel gas cylinder hot spinning molding side Method.
Background technique
Greatly developing the novel ship towards deep-sea even submarine, existing seamed high pressure gas cylinder for China cannot expire Sufficient demand.Seamless gas cylinder overcomes in conventional cylinder, discontinuous, commissure the strength reduction of weld seam, the easy embrittlement of weld seam and answers The problems such as power is concentrated greatly improves the air-tightness and pressure-resistant performance of gas cylinder.But the stress state that air bottle end socket position is born is multiple Miscellaneous, the design feature at end socket position makes the position, and there is serious stress to concentrate, and reduces the service life of gas cylinder, gas cylinder Safety and reliability it is poor.In the prior art, the end socket of gas cylinder is processed by way of rotary press modelling, after rotary press modelling End socket inner surface fold it is more, influence the service life of gas cylinder.
Summary of the invention
It is an object of the invention to: deficiency in the prior art is solved, a kind of high-strength corrosion-resistant steel gas cylinder hot spinning is provided Forming method, the gas cylinder yield strength are more than 980MPa, light weight, and sea water corrosion resistant is excellent.
To achieve the goals above, the technical solution adopted by the present invention are as follows: a kind of high-strength corrosion-resistant steel gas cylinder hot spinning at Type method, includes the following steps,
(a) the closing in section of seamless steel pipe is heated, heating temperature is 1180-1220 DEG C, heated length L and outer diameter of steel pipes φ's Relationship is L=φ+(100-150mm);
(b) spinning machine main shaft claming seamless steel pipe rotates seamless steel pipe with the revolving speed of 25-29rad/s, by the spinning machine Plate mold working face close to seamless steel pipe closing in section, with the slow rotary plate mould of 0.0015-0.0035rad/s revolving speed Tool, 1/4 circle of plate mold rotation.
Further, in the step (b), in the molding of rotary plate mold, using welding torch to closing in section concurrent heating, institute The oxygen pressure value for stating welding torch is 0.8Mpa, reduces its cooling rate.
Further, the center of the plate mold is 40mm at a distance from the spinning machine main shaft.
By adopting the above-described technical solution, the beneficial effects of the present invention are:
1. in forming method of the invention, carrying out spinning using closing in section of the rotary plate mold to seamless steel pipe, only needing Board-like template is rotated into a quarter circle, product can be obtained after a spinning, with roller type spinning phase in the prior art Than roller type spinning need to be formed by multi-pass, and operating process is complicated, and in forming method of the invention, plate mold only needs Molding can be completed in rotation a quarter circle, easy to operate.
2. in forming method of the invention, compared with roller type spinning in the prior art, board-like spinning is steady, controlled Journey is simple, and plate mold prepares simple, and manufacturing cost can be greatly lowered.
3. in the bright forming method of we, the gas cylinder prepared using method of the invention, the inner wall of the bottleneck of end socket It is sharp spherical, the defects of bottleneck internal wall transitions are smooth, corrugationless, free from flaw.
4. the use of gas cylinder yield strength prepared by method of the invention being more than 980MPa, matter in the bright forming method of we Amount is light;And sea water corrosion resistant is excellent.
Specific embodiment
Embodiment 1: a kind of high-strength corrosion-resistant steel gas cylinder hot spinning forming method includes the following steps,
(a) first by empty stove heating to 1100 DEG C, then the closing in section of seamless steel pipe is placed in heating furnace and is heated, heat nothing The closing in section of steel pipe is stitched, heating temperature is 1100 DEG C, and keeps the temperature 10 minutes at 1100 DEG C, keeps the internal and external temperature of seamless steel pipe equal Even, the relationship of heated length L and outer diameter of steel pipes φ are L=φ+(100-150mm);
(b) it discharges, one end of the seamless steel pipe after heating is fixed on spinning machine main shaft, spinning machine main shaft claw clamps Seamless steel pipe, discharging to the time clamped are no more than 45 seconds, seamless steel pipe are rotated with the revolving speed of 25-29rad/s, by the spinning The working face of the plate mold of machine is close to the other end of seamless steel pipe, i.e. closing in section, the shaft axis and spinning machine of plate mold Main shaft axis distance be 40mm, seamless steel pipe rotation while, plate mold is around its axis with 0.0015- The slow rotary plate mold of 0.0035rad/s revolving speed, spinning seamless steel pipe, during spinning, using welding torch to seamless steel Processing sections carry out concurrent heating, the oxygen pressure value of welding torch is 0.8Mpa, and when 1/4 circle of plate mold rotation, i.e., plate mold is around it Shaft is rotated by 90 °, and is completed the processing of the end socket of one end, is repeated the above steps, and is processed to the other end of no steel pipe.
In the present embodiment, when seamless steel pipe start deformation when, the contact zone of seamless steel pipe and plate mold etc. effects Change, stress, temperature highest;Mold continues to rotate, and diameter is substantially reduced at workpiece bottle neck, generates a large amount of plastic deformations, at this time bottle Equivalent strain, stress at mouth, maximum temperature, followed by molded area;After bottle neck is formed, mold backhaul spinning, bottle neck is Free end, equivalent strain, stress gradually discharge, and temperature gradually decreases, and bottleneck is in contact with mold at this time, flow of metal Degree is larger, bottleneck its equivalent strain, stress, maximum temperature;With the reduction of contact area, bottleneck equivalent stress is answered Become, temperature is gradually reduced;Finally, equivalent stress, strain level off to zero at the end of molding;In the necking stage, the flow direction of metal with Based on circumferential Plastic Flow, supplemented by axial Plastic Flow;In bottleneck formative stage, deformation be changed to be with axial Plastic Flow It is main, supplemented by circumferential Plastic Flow.The bottleneck of the gas cylinder of machine-shaping is spherical in point, and surface is smooth.
Embodiment 2:(a) first by empty stove heating to 1160 DEG C, then the closing in section of seamless steel pipe is placed in heating furnace and is added Heat heats the closing in section of seamless steel pipe, and heating temperature is 1160 DEG C, and keeps the temperature 10 minutes at 1160 DEG C, makes the interior of seamless steel pipe Outer temperature is uniform, heated length 600mm,
(b) it discharges, one end of the seamless steel pipe after heating is fixed on spinning machine main shaft, spinning machine main shaft claw clamps Seamless steel pipe, discharging to the time clamped are no more than 45 seconds, seamless steel pipe are rotated with the revolving speed of 25-29rad/s, by the spinning The working face of the plate mold of machine is close to the other end of seamless steel pipe, i.e. closing in section, the shaft axis and spinning machine of plate mold Main shaft axis distance be 40mm, seamless steel pipe rotation while, plate mold is around its axis with 0.0015- The slow rotary plate mold of 0.0035rad/s revolving speed, spinning seamless steel pipe, during spinning, using welding torch to seamless steel Processing sections carry out concurrent heating, the oxygen pressure value of welding torch is 0.8Mpa, and when 1/4 circle of plate mold rotation, i.e., plate mold is around it Shaft is rotated by 90 °, and is completed the processing of the end socket of one end, is repeated the above steps, and is processed to the other end of no steel pipe.
Embodiment 3:(a) first by empty stove heating to 1180 DEG C, then the closing in section of seamless steel pipe is placed in heating furnace and is added Heat heats the closing in section of seamless steel pipe, and heating temperature is 1180 DEG C, and keeps the temperature 10 minutes at 1180 DEG C, makes the interior of seamless steel pipe Outer temperature is uniform, heated length 600mm,
(b) it discharges, one end of the seamless steel pipe after heating is fixed on spinning machine main shaft, spinning machine main shaft claw clamps Seamless steel pipe, discharging to the time clamped are no more than 45 seconds, seamless steel pipe are rotated with the revolving speed of 25-29rad/s, by the spinning The working face of the plate mold of machine is close to the other end of seamless steel pipe, i.e. closing in section, the shaft axis and spinning machine of plate mold Main shaft axis distance be 40mm, seamless steel pipe rotation while, plate mold is around its axis with 0.0015- The slow rotary plate mold of 0.0035rad/s revolving speed, spinning seamless steel pipe, during spinning, using welding torch to seamless steel Processing sections carry out concurrent heating, the oxygen pressure value of welding torch is 0.8Mpa, and when 1/4 circle of plate mold rotation, i.e., plate mold is around it Shaft is rotated by 90 °, and is completed the processing of the end socket of one end, is repeated the above steps, and is processed to the other end of no steel pipe.
Embodiment 4:(a) first by empty stove heating to 1200 DEG C, then the closing in section of seamless steel pipe is placed in heating furnace and is added Heat heats the closing in section of seamless steel pipe, and heating temperature is 1200 DEG C, and keeps the temperature 10 minutes at 1200 DEG C, makes the interior of seamless steel pipe Outer temperature is uniform, heated length 600mm,
(b) it discharges, one end of the seamless steel pipe after heating is fixed on spinning machine main shaft, spinning machine main shaft claw clamps Seamless steel pipe, discharging to the time clamped are no more than 45 seconds, seamless steel pipe are rotated with the revolving speed of 25-29rad/s, by the spinning The working face of the plate mold of machine is close to the other end of seamless steel pipe, i.e. closing in section, the shaft axis and spinning machine of plate mold Main shaft axis distance be 40mm, seamless steel pipe rotation while, plate mold is around its axis with 0.0015- The slow rotary plate mold of 0.0035rad/s revolving speed, spinning seamless steel pipe, during spinning, using welding torch to seamless steel Processing sections carry out concurrent heating, the oxygen pressure value of welding torch is 0.8Mpa, and when 1/4 circle of plate mold rotation, i.e., plate mold is around it Shaft is rotated by 90 °, and is completed the processing of one end, is repeated the above steps, and is processed to the other end of no steel pipe.
Embodiment 5:(a) first by empty stove heating to 1220 DEG C, then the closing in section of seamless steel pipe is placed in heating furnace and is added Heat heats the closing in section of seamless steel pipe, and heating temperature is 1220 DEG C, and keeps the temperature 10 minutes at 1220 DEG C, makes the interior of seamless steel pipe Outer temperature is uniform, heated length 600mm,
(b) it discharges, one end of the seamless steel pipe after heating is fixed on spinning machine main shaft, spinning machine main shaft claw clamps Seamless steel pipe, discharging to the time clamped are no more than 45 seconds, seamless steel pipe are rotated with the revolving speed of 25-29rad/s, by the spinning The working face of the plate mold of machine is close to the other end of seamless steel pipe, i.e. closing in section, the shaft axis and spinning machine of plate mold Main shaft axis distance be 40mm, seamless steel pipe rotation while, plate mold is around its axis with 0.0015- The slow rotary plate mold of 0.0035rad/s revolving speed, spinning seamless steel pipe, during spinning, using welding torch to seamless steel Processing sections carry out concurrent heating, the oxygen pressure value of welding torch is 0.8Mpa, and when 1/4 circle of plate mold rotation, i.e., plate mold is around it Shaft is rotated by 90 °, and is completed the processing of one end, is repeated the above steps, and is processed to the other end of no steel pipe.
Embodiment 6:(a) first by empty stove heating to 1240 DEG C, then the closing in section of seamless steel pipe is placed in heating furnace and is added Heat heats the closing in section of seamless steel pipe, and heating temperature is 1240 DEG C, and keeps the temperature 10 minutes at 1240 DEG C, makes the interior of seamless steel pipe Outer temperature is uniform, heated length 640mm,
(b) it discharges, one end of the seamless steel pipe after heating is fixed on spinning machine main shaft, spinning machine main shaft claw clamps Seamless steel pipe, discharging to the time clamped are no more than 45 seconds, seamless steel pipe are rotated with the revolving speed of 25-29rad/s, by the spinning The working face of the plate mold of machine is close to the other end of seamless steel pipe, i.e. closing in section, the shaft axis and spinning machine of plate mold Main shaft axis distance be 40mm, seamless steel pipe rotation while, plate mold is around its axis with 0.0015- The slow rotary plate mold of 0.0035rad/s revolving speed, spinning seamless steel pipe, during spinning, using welding torch to seamless steel Processing sections carry out concurrent heating, the oxygen pressure value of welding torch is 0.8Mpa, and when 1/4 circle of plate mold rotation, i.e., plate mold is around it Shaft is rotated by 90 °, and is completed the processing of one end, is repeated the above steps, and is processed to the other end of no steel pipe.
To it is above-mentioned be embodiment 1-6 preparation gas cylinder end socket inner surface macroscopic analysis, wherein the shoulder quality of end socket It is examined using range estimation, the inner surface of end socket is examined using range estimation, and bottle neck penetrating inspection, the results are shown in Table 1:
To the mechanics property analysis of the end socket of upper embodiment 1-6, the style that diameter is 5mm is chosen in bottleneck, as drawing Style is stretched, is stretched in style, selection standard V-arrangement 10 × 10 × 55mm style, as impact style, the impact of test sample is tough Property;The selected directions of style are divided into: along gas cylinder axially along gas cylinder radial direction, i.e., testing the mechanical property of bottleneck axially and radially respectively Can, result is as shown in Table 2-4,
Table 2: at normal temperature, to the stretch test result of axial sample
Table 3: at normal temperature, to the stretch test result of radial sample
Table 4: at -50 DEG C, respectively to the result of the impact test of radial and axial sample
Embodiment 1 Embodiment 2 Embodiment 3 Embodiment 4 Embodiment 5 Embodiment 6
It is axial 130J 131J 132J 133J 129J 130J
It is radial 158J 157J 160J 155J 158J 162J
12000,15000 and 100000 fatigue tests are carried out respectively to the gas cylinder of the present embodiment 1-6 preparation, not There is any infiltration, leakage phenomenon.
The gas cylinder of forming method preparation of the invention, high-quality, the one-pass molding of end socket, do not need multi-pass spinning at Type, forming process is simple, and the end socket inner wall of gas cylinder is at sharp spherical, the defects of being less prone to crackle, fold, peeling of gas cylinder.Together When, which not only has high intensity, but also has good plasticity and toughness, while also possessing excellent corrosion resistance, integrates Performance is brilliant, successfully solves the contradiction between material superhigh intensity and high tenacity and corrosion resistance, and the performance indicator of material occupies The leading level in the world.

Claims (4)

1. high-strength corrosion-resistant steel gas cylinder hot spinning forming method, includes the following steps,
(a) the closing in section of seamless steel pipe is heated in gas-electric stove, heating temperature is 1180-1220 DEG C, outside heated length L and steel pipe The relationship of diameter φ is L=φ+(100-150mm);
(b) board-like spinning: the seamless steel pipe after the above-mentioned heating of spinning machine main shaft claming, it is seamless with the revolving speed rotation of 25-29rad/s Steel pipe is turned by the working face of the plate mold of the spinning machine close to seamless steel pipe closing in section with 0.0015-0.0035rad/s Fast slowly rotary plate mold, 1/4 circle of plate mold rotation.
2. high-strength stainless steel gas cylinder hot spinning forming method according to claim 1, it is characterised in that: in the step (b) in, in the molding of rotary plate mold, using welding torch to closing in section concurrent heating, the oxygen pressure value of the welding torch is 0.8Mpa.
3. high-strength stainless steel gas cylinder hot spinning forming method according to claim 1, it is characterised in that: the board-like mould The center of tool is 40mm at a distance from the spinning machine main shaft.
4. high-strength stainless steel gas cylinder hot spinning forming method according to claim 1, it is characterised in that: described is seamless Tube material is the high-strength corrosion-resistant steel that yield strength is greater than 980Mpa.
CN201810873134.2A 2018-08-02 2018-08-02 High-strength corrosion-resistant steel gas cylinder hot spinning forming method Pending CN109127845A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810873134.2A CN109127845A (en) 2018-08-02 2018-08-02 High-strength corrosion-resistant steel gas cylinder hot spinning forming method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810873134.2A CN109127845A (en) 2018-08-02 2018-08-02 High-strength corrosion-resistant steel gas cylinder hot spinning forming method

Publications (1)

Publication Number Publication Date
CN109127845A true CN109127845A (en) 2019-01-04

Family

ID=64798807

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810873134.2A Pending CN109127845A (en) 2018-08-02 2018-08-02 High-strength corrosion-resistant steel gas cylinder hot spinning forming method

Country Status (1)

Country Link
CN (1) CN109127845A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109926507A (en) * 2019-03-26 2019-06-25 浙江超力防火设备有限公司 A kind of steel bottle head molding machine and its technique
CN112157159A (en) * 2020-09-21 2021-01-01 新兴能源装备股份有限公司 Gas cylinder spinning process method
CN114147131A (en) * 2022-02-10 2022-03-08 四川大学 Homogenizing hot spinning forming method for large-diameter high-pressure gas cylinder

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011045930A (en) * 1999-02-16 2011-03-10 Vari-Form Inc Sealing method and pressing device
CN203253824U (en) * 2013-05-20 2013-10-30 浙江铁牛汽车车身有限公司 Steel tube necking mould
CN103381455A (en) * 2013-07-05 2013-11-06 江苏久维压力容器制造有限公司 Sealing machine used for closing-up of bottle neck of pressure gas bottle
CN104451419A (en) * 2014-11-28 2015-03-25 成都格瑞特高压容器有限责任公司 High-pressure seamless 10CrNi3MoV steel cylinder and manufacturing process thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011045930A (en) * 1999-02-16 2011-03-10 Vari-Form Inc Sealing method and pressing device
CN203253824U (en) * 2013-05-20 2013-10-30 浙江铁牛汽车车身有限公司 Steel tube necking mould
CN103381455A (en) * 2013-07-05 2013-11-06 江苏久维压力容器制造有限公司 Sealing machine used for closing-up of bottle neck of pressure gas bottle
CN104451419A (en) * 2014-11-28 2015-03-25 成都格瑞特高压容器有限责任公司 High-pressure seamless 10CrNi3MoV steel cylinder and manufacturing process thereof

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
曾霞文 等: "《冲压工艺及模具设计》", 30 April 2011, 北京理工大学出版社 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109926507A (en) * 2019-03-26 2019-06-25 浙江超力防火设备有限公司 A kind of steel bottle head molding machine and its technique
CN112157159A (en) * 2020-09-21 2021-01-01 新兴能源装备股份有限公司 Gas cylinder spinning process method
CN112157159B (en) * 2020-09-21 2022-07-12 新兴能源装备股份有限公司 Gas cylinder spinning process method
CN114147131A (en) * 2022-02-10 2022-03-08 四川大学 Homogenizing hot spinning forming method for large-diameter high-pressure gas cylinder
CN114147131B (en) * 2022-02-10 2022-04-29 四川大学 Homogenizing hot spinning forming method for large-diameter high-pressure gas cylinder

Similar Documents

Publication Publication Date Title
CN109127845A (en) High-strength corrosion-resistant steel gas cylinder hot spinning forming method
CN101187441B (en) Super-pressure hydrogen cylinder manufacture method
CN104451419B (en) High-pressure seamless 10CrNi3MoV steel cylinder and manufacturing process thereof
CN104894485A (en) Production method of nuclear power plant used high-temperature-resisting brittleness-resisting seamless steel tube with outer diameter of more than 508mm
CN100544879C (en) Blanking of large torpedo jar and assembly welding method
CN101706019B (en) Method for manufacturing large-caliber thick-wall seamless steel tube in vertical extrusion way
CN103182457A (en) High-speed spinning sealing process method for pipe port
CN105149372A (en) Manufacturing process of asymmetric seamless hollow profile
CN109668051B (en) Large-scale ultrahigh-pressure gas cylinder liner and manufacturing method thereof
CN104043672A (en) Manufacturing method of high-quality P92 large-aperture thick-wall seamless steel pipe of ultra-supercritical unit
CN107448771A (en) A kind of big volume titanium-alloy high-pressure seamless gas cylinder and preparation method
CN102950427B (en) The processing method of inner wall overlaying bend pipe
CN105619085A (en) Production technology for large-volume steel seamless cylinder with diameter being 914 mm
CN105057987A (en) Weldless aluminum alloy lining neck-spinning method for large-diameter composite air cylinder
CN109604407A (en) The accurate spinning processing method of minor diameter multi-step change wall thickness cylinder
CN109058753B (en) Pressure container bottle for maritime work and production method thereof
CN112372238A (en) High-pressure ultrahigh-pressure hydrogen storage bottle type container and manufacturing method thereof
CN105864427A (en) Ultrahigh pressure container and manufacturing method
CN113770647A (en) Vacuum thermoforming method for titanium alloy variable-curve bus spray pipe
CN113802041B (en) Manufacturing method of iron-nickel-based alloy seamless pipe applicable to advanced ultra-supercritical unit
CN100408905C (en) Manufacturing method of seamless steel pipe for pressure pipeline
CN105170829A (en) Aluminum alloy gas bottle shell nosing method capable of increasing wall thickness of pipe mouth
KR101170921B1 (en) Manufacturing method of a heavy single bodied crankshaft for a ship and a power generation
CN115074504A (en) Method for manufacturing large-caliber thick-wall seamless steel pipe of 630 ℃ ultra-supercritical unit G115
CN113446510A (en) Large-diameter seamless steel inner container circumferential winding gas cylinder and manufacturing method thereof

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20190104

RJ01 Rejection of invention patent application after publication