CN109116672A - A kind of underwater lifting projecting subassembly and the projection arrangement using the component - Google Patents
A kind of underwater lifting projecting subassembly and the projection arrangement using the component Download PDFInfo
- Publication number
- CN109116672A CN109116672A CN201811225411.5A CN201811225411A CN109116672A CN 109116672 A CN109116672 A CN 109116672A CN 201811225411 A CN201811225411 A CN 201811225411A CN 109116672 A CN109116672 A CN 109116672A
- Authority
- CN
- China
- Prior art keywords
- projection screen
- projection
- channel steel
- underwater
- projecting subassembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000003028 elevating effect Effects 0.000 claims abstract description 34
- 230000007246 mechanism Effects 0.000 claims abstract description 33
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 28
- 229910000831 Steel Inorganic materials 0.000 claims description 61
- 239000010959 steel Substances 0.000 claims description 61
- 238000000034 method Methods 0.000 abstract description 12
- 230000008569 process Effects 0.000 abstract description 9
- 238000010586 diagram Methods 0.000 description 4
- 230000000694 effects Effects 0.000 description 4
- 230000007423 decrease Effects 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 230000000630 rising effect Effects 0.000 description 2
- 230000005484 gravity Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 235000015110 jellies Nutrition 0.000 description 1
- 239000008274 jelly Substances 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 1
- 238000004080 punching Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Classifications
-
- G—PHYSICS
- G03—PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
- G03B—APPARATUS OR ARRANGEMENTS FOR TAKING PHOTOGRAPHS OR FOR PROJECTING OR VIEWING THEM; APPARATUS OR ARRANGEMENTS EMPLOYING ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ACCESSORIES THEREFOR
- G03B21/00—Projectors or projection-type viewers; Accessories therefor
- G03B21/54—Accessories
- G03B21/56—Projection screens
- G03B21/58—Projection screens collapsible, e.g. foldable; of variable area
-
- G—PHYSICS
- G03—PHOTOGRAPHY; CINEMATOGRAPHY; ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ELECTROGRAPHY; HOLOGRAPHY
- G03B—APPARATUS OR ARRANGEMENTS FOR TAKING PHOTOGRAPHS OR FOR PROJECTING OR VIEWING THEM; APPARATUS OR ARRANGEMENTS EMPLOYING ANALOGOUS TECHNIQUES USING WAVES OTHER THAN OPTICAL WAVES; ACCESSORIES THEREFOR
- G03B21/00—Projectors or projection-type viewers; Accessories therefor
- G03B21/54—Accessories
- G03B21/56—Projection screens
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Overhead Projectors And Projection Screens (AREA)
Abstract
The present invention relates to Fountain Waterscape engineering device technique fields, in particular to the projection arrangement of a kind of underwater lifting projecting subassembly and the application component includes foundation pit and the projection screen that is set in foundation pit dug in underwater, and the projection screen includes the first projection screen and is slidably connected to the first projection screen and accommodates to the second projection screen in the first projection screen;It further include the water surface or being hidden to underwater elevating mechanism for controlling the second projection screen and stretching out or be contracted in the first projection screen and control the stretching of the first projection screen, when needing projection screen to carry out projection waterborne performance, the projection screen for being hidden in underwater is risen from into the water surface by elevating mechanism, for being normally carried out for projection waterborne;When completion projection performance waterborne needs for projection screen to be hidden, drive projection screen is mobile to receive to the foundation pit of underwater by elevating mechanism, and since projection screen is elevating movement, so needing to overcome the resistance of water to greatly reduce in lifting process, to also reduce the equipment requirement to elevating mechanism.
Description
Technical field
The present invention relates to Fountain Waterscape engineering device technique fields, in particular to a kind of to go up and down projecting subassembly under water and apply the group
The projection arrangement of part.
Background technique
As the improvement of people's living standards, communal facility gradual perfection.Art construction with ornamental value is increasingly
More presentations in people's lives, such as fountain, projection waterborne etc., and general construction is in park or various scenic spots.
A projection screen is generally fixed in projection waterborne on the water surface, is then projected projected picture to projection by projection arrangement
The display of picture is carried out on screen and is showed, still, current projection screen can not be moved on fixed underwater pedestal,
And projection waterborne is not to carry out always, generally guarantee drop shadow effect can be carried out at night using so that on daytime
When without projection, projection screen, which also protrudes from water surface setting, can then seem very lofty, especially the north in the cold jelly phase, water
Face can be used as ice rink after icing, and the water freezed carry out projection waterborne can not, protrude from the projection screen of the water surface at this time
More water surface space is occupied, to cause the waste in space.
The Chinese patent that notification number is CN205581509U discloses the throwing of projection screen assembly and the application projection screen assembly
Image device, including projection screen, the driving mechanism fixed with projection screen and projection screen is driven to rotate in perpendicular, the projection
The pivot center of screen is located at one end of projection screen;The projection screen is typically mounted in lake, when carrying out projection waterborne, driving machine
Structure drives projection screen rotation to stretch out the water surface, and when projection waterborne stops, driving mechanism drives projection screen rotation to hide to water
Under face, to realize the hiding of projection screen and appear.
But this projection screen, when being hidden, projection screen is to lie low to be placed under water, and work as and need to appear projection screen
When, then need driving mechanism to drive projection screen rotation to erect to be worked normally, still, since projection screen is usual
During area is larger, and driving mechanism drives projection plate to erect, need projection screen that the resistance of water is overcome to realize rotation, and throw
Torque is very big during rotation for shadow screen, so being further improved when projection screen is in setting by compared with big limitation.
Summary of the invention
The first purpose of the invention is to provide a kind of underwater lifting projecting subassemblies, reduce the limitation to projection screen, just
In the hiding of realization projection screen and appear.
Above-mentioned technical purpose of the invention has the technical scheme that
A kind of underwater lifting projecting subassembly, including digging foundation pit and the projection screen that is set in foundation pit in underwater, the throwing
Shadow screen includes the first projection screen and is slidably connected to the first projection screen and accommodates to the second projection screen in the first projection screen;Also wrap
It includes and is used to control the stretching of the second projection screen or is contracted in the first projection screen and controls the first projection screen stretching water surface or hide
To underwater elevating mechanism.
Through the above technical solutions, will be hidden in when needing projection screen to carry out projection waterborne performance by elevating mechanism
The projection screen of underwater rises from the water surface, for being normally carried out for projection waterborne;It needs when completing projection performance waterborne by projection screen
When being hidden, drive projection screen is mobile to receive to the foundation pit of underwater by elevating mechanism, and since projection screen is lifting fortune
It is dynamic, so needing to overcome the resistance of water to greatly reduce in lifting process, to also reach the equipment requirement to elevating mechanism.
First projection screen with receiving relationship and the second projection screen are set by projection screen, and is realized by elevating mechanism
Elevating movement of second projection screen relative to the first projection screen is further reduced when projection screen is hidden in underwater because of base
Cheat limitation of the depth to projection screen.
The present invention is further arranged to: being provided in the foundation pit and is defined for the lift path to the first projection screen
The first limit assembly, be provided with second be defined for the lift path to the second projection screen on first projection screen
Limit assembly.
Through the above technical solutions, being projected by the first limit assembly and the second limit assembly to the first projection screen and second
The lift path of curtain is defined, and improves the moving stability in projection screen lifting process, and convenient for the first projection screen and the
The adjustable height of two projection screens is controlled, and the descending operation convenience of projection screen is improved.
The present invention is further arranged to: first limit assembly includes multiple truss being fixedly connected in foundation pit, consolidates
Surely the first channel steel for being connected on truss multiple are fixedly connected on the non-projection side of the first projection screen and are connected to corresponding first
The two sides of channel steel are fixedly connected on first channel steel for moving horizontally the second channel steel limited to the first projection screen
There is the first limited block, is fixedly connected on second channel steel and is connected to the first limited block for the first projection screen lifting height
The second limited block being defined.
Through the above technical solutions, carrying out elevating movement relative to foundation pit in the first projection screen to stretch out the water surface or hiding water
When under face, the horizontal jitter of the first projection screen is reduced by the first channel steel and the cooperation of the second channel steel, so that the first projection screen is only sent out
Raw vertical lifting movement.
The present invention is further arranged to: second channel steel is extended downwardly along foundation pit bottom surface direction.
Through the above technical solutions, by the second channel steel for being extended downwardly along foundation pit bottom surface direction realize to projection screen into
Elevating mechanism is reduced while row is hidden to the rising height of the first projection screen, reduces the requirement to elevating mechanism.
The present invention is further arranged to: second limit assembly includes being fixedly connected on the non-projection surface side of the second projection screen
Third channel steel on wall is correspondingly connected in first projection screen and is connected to third channel steel two sides for the water to third channel steel
Translation is dynamic to be limited the 4th channel steel to drive the second projection screen that vertical motion occurs only with respect to the first projection screen, and described the
It is fixedly connected in four channel steels for being limited to the second projection screen with respect to the third that the lifting height of the first projection screen is defined
Block is fixedly connected in the third channel steel and abuts to limit the 4th of the second projection screen lifting height for third limited block
Limited block.
Through the above technical solutions, being realized by third channel steel and the cooperation of the 4th channel steel in the second projection screen lifting process
The limitation moved horizontally, and realize that the wicking height of the second projection screen limits by the cooperation of third limited block and the 4th limited block
System reduces the phenomenon that the second projection screen is detached from the first projection screen and occurs, and further decreases the difficulty of projection screen lifting manipulation.
The present invention is further arranged to: the third channel steel is extended to along foundation pit bottom surface direction through the first projection screen, institute
State the liter that the distance that third channel steel stretches out the first projection screen when the second projection screen is accommodated to the first projection screen is equal to the second projection screen
Height.
Through the above technical solutions, the second projection screen is reduced to the pressure of the first projection screen by extended third channel steel,
To further decrease the requirement that elevating mechanism goes up and down the second projection screen.
The present invention is further arranged to: the elevating mechanism includes the first hoist and the second elevator for being installed on waterfront side
Machine is wound with the first wirerope that one end is fixedly connected on the first projection screen, the first hoist and institute in first hoist
It states and is provided with several the first directive wheels between the first projection screen;It is wound with one end in second hoist and is fixedly connected on the second throwing
Second wirerope of shadow curtain is provided with several second directive wheels between the second hoist and second projection screen.
Through the above technical solutions, being realized by first hoist and second hoist to the first wirerope and the second steel wire
The folding and unfolding of rope;And the commutation to wirerope is realized by the first directive wheel and the second directive wheel, while realizing to the first wirerope
With the positioning of the second wirerope, reduces and rub in the first wirerope and the second wirerope moving process, to reduce lifting device
The resistance that first projection screen and the second projection screen are gone up and down.
The present invention is further arranged to: the projection screen selects punched-plate.
Through the above technical solutions, punched-plate structural strength with higher while reducing projection hot spot, and pass through
Punched-plate can be also further reduced and the resistance in water relative movement thereof.
A second object of the present invention is to provide a kind of underwater lifting projection arrangements, reduce the limitation to projection screen, just
In the hiding of realization projection screen and appear.
A kind of underwater lifting projection arrangement, including the underwater projecting subassembly described in several.
The present invention is further arranged to: several described underwater projecting subassemblies are set as multiple rows of.
Through the above technical solutions, improving ornamental value convenient for further dynamic effect is presented.
In conclusion elevating mechanism is required to reduce the invention has the following advantages: the configuration of the present invention is simple, and
Stability when projection screen lifting is improved, projection screen lifting is driven by elevating mechanism, so that projection screen is hidden when not working
In underwater.
Detailed description of the invention
Fig. 1 is the overall structure diagram of embodiment 1;
Fig. 2 is partial sectional view in embodiment 1, mainly shows the structure of the first limit assembly;
Fig. 3 is the enlarged drawing of A in Fig. 2;
Fig. 4 mainly shows the position of through hole in embodiment 1;
Fig. 5 mainly shows projection screen folded state schematic diagram in embodiment 1;
Fig. 6 shows the displaying arrangement schematic diagram of projection screen in embodiment 2.
Appended drawing reference: 1, projection screen;2, the first projection screen;3, the second projection screen;4, cavity;5, elevating mechanism;6, first
Limit assembly;7, the second limit assembly;8, truss;9, the first channel steel;10, the second channel steel;11, foundation pit;12, the second limited block;
13, third channel steel;14, the 4th channel steel;15, through hole;17, the 4th limited block;18, feed-through collar;20, first hoist;21,
Two hoist engines;22, the first wirerope;23, the second wirerope.
Specific embodiment
Below in conjunction with attached drawing, invention is further described in detail.
Embodiment 1:
A kind of underwater lifting projecting subassembly, as shown in Figure 1, include dig in underwater foundation pit 11 and be set in foundation pit 11
Projection screen 1, the picture of projection device is shown and is showed by projection screen 1, and in the present embodiment, projection screen 1 uses punching
Plate production, and projection screen 1 may be configured as abnormity.Punched-plate structural strength with higher while reducing projection hot spot, and
It can be also further reduced and the resistance in water relative movement thereof by punched-plate.
Projection screen 1 includes the first projection screen 2 and the second projection screen 3, is provided with cavity 4 in the first projection screen 2, cavity 4 passes through
The upper surface of the first projection screen 2 is worn, the second projection screen 3 is contained in cavity 4.
Underwater lifting projecting subassembly further includes elevating mechanism 5, and elevating mechanism 5 is for controlling the stretching of the second projection screen 3 or receiving
It is reduced in the first projection screen 2 and the first projection screen 2 of control stretches out the water surface or hides to underwater.
When needing projection screen 1 to carry out projection waterborne performance, the projection screen 1 of underwater will be hidden in by elevating mechanism 5
The water surface is risen from, for being normally carried out for projection waterborne;
When completion projection performance waterborne needs for projection screen 1 to be hidden, passes through elevating mechanism 5 and drive projection screen 1 is mobile to receive
To the foundation pit 11 of underwater, and since projection screen 1 is elevating movement, so needing to overcome the resistance of water big in lifting process
It is big to reduce, to also reach the equipment requirement to elevating mechanism 5.
First projection screen 2 with receiving relationship and the second projection screen 3 are set by projection screen 1, and passes through elevating mechanism 5
Realize that elevating movement of second projection screen 3 relative to the first projection screen 2 is further reduced when projection screen 1 is hidden in underwater
Because of limitation of 11 depth of foundation pit to projection screen 1.
In the lifting process that elevating mechanism 5 drives the first projection screen 2 and the second projection screen 3, the is provided in foundation pit 11
One limit assembly 6, the second limit assembly 7 is provided on the first projection screen 2, and the first limit assembly 6 is used for the first projection screen 2
Lift path is defined;Second limit assembly 7 is for being defined the lift path of the second projection screen 3.To improve throwing
The moving stability in 1 lifting process of shadow screen, and convenient for being slapped to the adjustable height of the first projection screen 2 and the second projection screen 3
Control improves the descending operation convenience of projection screen 1.
As shown in Fig. 2, the first limit assembly 6, which includes two, is fixedly connected on the truss 8 in foundation pit 11, purlin by built-in fitting
Frame 8 is fixedly connected with the first channel steel 9 close to the end of projection screen 1, is symmetrically fixedly connected on the non-perspective plane of the first projection screen 2
Two the second channel steels 10, the second channel steel 10 are coated on outside the first channel steel 9, and the first channel steel 9 and the cooperation of the second channel steel 10 are realized to the
The limitation that one projection screen 2 moves horizontally.
Second channel steel 10 is extended downwardly along 11 bottom surface direction of foundation pit, so set, projection screen 1 is hidden in realization
Elevating mechanism 5 is reduced simultaneously to the rising height of the first projection screen 2, reduces the requirement to elevating mechanism 5.
And first is fixedly connected with the first limited block (not shown) on channel steel 9, is fixedly connected on the second channel steel 10
It is connected to second limited block 12 of first limited block for being defined to 2 lifting height of the first projection screen.
As shown in figure 3, the second limit assembly 7, which includes two, is symmetrically fixedly connected on the non-perspective plane side wall of the second projection screen 3
On third channel steel 13, be correspondingly connected with that there are two be connected to 13 two sides of third channel steel for third channel steel in the first projection screen 2
The 4th slot that 13 move horizontally is limited to drive the second projection screen 3 that vertical motion occurs only with respect to the first projection screen 2
Steel 14, wherein the perspective plane of the second projection screen 3 is connected to the cavity wall of cavity 4.
As shown in figure 4, third channel steel 13 extends along 11 bottom surface direction of foundation pit, corresponded on the first projection screen 2 there are two opening up
Through hole 15, through hole 15 are communicated with cavity 4, and third channel steel 13 passes through corresponding through hole 15 and prolongs towards close to 11 bottom surface direction of foundation pit
It stretches, the distance that third channel steel 13 stretches out the first projection screen 2 when the receiving of the second projection screen 3 is to the first projection screen 2 is equal to the second projection
The wicking height of curtain 3.The second projection screen 3 is reduced to the pressure of the first projection screen 2, thus into one by extended third channel steel 13
Step reduces the requirement that elevating mechanism 5 goes up and down the second projection screen 3.
As shown in figure 3, being fixedly connected in the 4th channel steel 14 for opposite first projection screen 2 of the second projection screen 3
The third limited block (not shown) that rise is defined is fixedly connected in third channel steel 13 and supports for third limited block
It connects to the 4th limited block 17 of limitation 3 lifting height of the second projection screen.
As shown in Figure 1, elevating mechanism 5 include be respectively fixedly connected in two the second channel steels 10 first pull block and
It is respectively fixedly connected with and pulls block in second in two third channel steels 13;
Waterfront side is equipped with first hoist 20 and second hoist 21, and two first wirerope are wound in first hoist 20
22, one end of two first wirerope 22 is fixedly connected in first hoist 20, the other end point of two first wirerope 22
It is not fixed on two first pulling blocks, the first wirerope 22 passes through the first limited block and the second limit when being connected to the first pulling block
Position block 12.And the fixation to realize 22 position of the first wirerope, it is provided between first hoist 20 and the first projection screen 2 several
A first directive wheel, and the quantity of the first directive wheel and position are determined according to the distance and position of actual place, herein not
It is specifically limited;
Two second wirerope 23 are wound in second hoist 21, one end of two second wirerope 23 is fixedly connected on second
On hoist engine 21, the other end of two second wirerope 23 is individually fixed in two second pulling blocks, and to realize the first steel wire
It restricts the fixations of 22 positions, several second directive wheels, and the second guiding is provided between second hoist 21 and the second projection screen 3
The quantity of wheel and position are determined according to the distance and position of actual place, are not specifically limited herein.
As shown in Figure 3, wherein to reduce the friction between the second wirerope 23 and the first projection screen 2, the first projection screen 2
Upper surface is fixedly connected there are two feed-through collar 18, and the second wirerope 23 is fixedly connected on the second pulling block after passing through feed-through collar 18
On.
The folding and unfolding to the first wirerope 22 and the second wirerope 23 is realized by first hoist 20 and second hoist 21,
When second hoist 21 loosens the second wirerope 23, the second projection screen 3 realizes decline under the effect of gravity, as shown in figure 5, being
The schematic diagram of projection screen 1 when in the receiving to the first projection screen 2 of the second projection screen 3;And pass through the first directive wheel and the second directive wheel
It realizes the commutation to wirerope, while realizing the positioning to the first wirerope 22 and the second wirerope 23, reduce by the first wirerope
22 and 23 moving process of the second wirerope in rub, the first projection screen 2 and the second projection screen 3 are gone up and down to reduce lifting device
Resistance.
Embodiment 2:
A kind of underwater lifting projection arrangement, as shown in fig. 6, including five such as underwater projecting subassemblies in embodiment 1, and five dry
Foundation pit 11 communicates, and in five foundation pits communicated 11, five dry underwater projecting subassemblies are set to two rows, so set, just
In further dynamic effect is presented, ornamental value is improved.
This specific embodiment is only explanation of the invention, is not limitation of the present invention, those skilled in the art
Member can according to need the modification that not creative contribution is made to the present embodiment after reading this specification, but as long as at this
All by the protection of Patent Law in the scope of the claims of invention.
Claims (10)
1. a kind of underwater lifting projecting subassembly, it is characterised in that: including dig in underwater foundation pit (11) and be set to foundation pit
(11) projection screen (1) in, the projection screen (1) include the first projection screen (2) and are slidably connected to the first projection screen (2) and receive
Hold to the second projection screen (3) in the first projection screen (2);It further include stretching out or being contracted to for controlling the second projection screen (3)
In one projection screen (2) and control the first projection screen (2) is stretched out the water surface or is hidden to underwater elevating mechanism (5).
2. a kind of underwater lifting projecting subassembly according to claim 1, it is characterised in that: be provided in the foundation pit (11)
For the first limit assembly (6) that the lift path to the first projection screen (2) is defined, set on first projection screen (2)
It is equipped with the second limit assembly (7) being defined for the lift path to the second projection screen (3).
3. a kind of underwater lifting projecting subassembly according to claim 2, it is characterised in that: first limit assembly (6)
Including multiple truss (8) being fixedly connected in foundation pit (11), the first channel steel (9), the Duo Gegu that are fixedly connected on truss (8)
Surely it is connected on the non-projection side of the first projection screen (2) and the two sides for being connected to corresponding first channel steel (9) is used to project to first
Curtain (2) moves horizontally the second channel steel (10) limited, and is fixedly connected with the first limited block on first channel steel (9),
It is fixedly connected on second channel steel (10) and is connected to the first limited block for limiting the first projection screen (2) lifting height
Fixed the second limited block (12).
4. a kind of underwater lifting projecting subassembly according to claim 3, it is characterised in that: second channel steel (10) is along base
Hole (11) bottom surface direction extends downwardly.
5. a kind of underwater lifting projecting subassembly according to claim 4, it is characterised in that: second limit assembly (7)
It is right in first projection screen (2) including the third channel steel (13) being fixedly connected on the non-perspective plane side wall of the second projection screen (3)
It should be connected with and be connected to third channel steel (13) two sides for being limited moving horizontally for third channel steel (13) to drive second
4th channel steel (14) of vertical motion occurs only with respect to the first projection screen (2) for projection screen (3), consolidates in the 4th channel steel (14)
Surely the third limited block being defined for the lifting height to the second projection screen (3) opposite first projection screen (2), institute are connected with
It states to be fixedly connected in third channel steel (13) and abuts to limit the of the second projection screen (3) lifting height for third limited block
Four limited blocks (17).
6. a kind of underwater lifting projecting subassembly according to claim 5, it is characterised in that: the third channel steel (13) is along base
Hole (11) bottom surface direction is extended to through the first projection screen (2), when the second projection screen (3) receiving to the first projection screen (2)
The distance that third channel steel (13) stretches out the first projection screen (2) is equal to the wicking height of the second projection screen (3).
7. a kind of underwater lifting projecting subassembly according to claim 5, it is characterised in that: the elevating mechanism (5) includes
It is installed on the first hoist (20) and second hoist (21) on waterfront side, the fixed company in one end is wound in first hoist (20)
It is connected to the first wirerope (22) of the first projection screen (2), is set between the first hoist (20) and first projection screen (2)
It is equipped with several the first directive wheels;One end is fixedly connected on the second projection screen (3) second is wound in second hoist (21)
Wirerope (23) is provided with several the second directive wheels between the second hoist (21) and second projection screen (3).
8. one kind described in -7 any one goes up and down projecting subassembly under water according to claim 1, it is characterised in that: the projection screen
(1) punched-plate is selected.
9. a kind of underwater lifting projection arrangement, it is characterised in that: including several water as described in claim 1-8 any one
Lower projecting subassembly.
10. a kind of underwater lifting projecting subassembly according to claim 9, it is characterised in that: several described underwater projections
Component is set as multiple rows of.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811225411.5A CN109116672B (en) | 2018-10-20 | 2018-10-20 | Underwater lifting projection assembly and projection device using same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811225411.5A CN109116672B (en) | 2018-10-20 | 2018-10-20 | Underwater lifting projection assembly and projection device using same |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109116672A true CN109116672A (en) | 2019-01-01 |
CN109116672B CN109116672B (en) | 2024-01-30 |
Family
ID=64855087
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811225411.5A Active CN109116672B (en) | 2018-10-20 | 2018-10-20 | Underwater lifting projection assembly and projection device using same |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109116672B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110989283A (en) * | 2019-11-26 | 2020-04-10 | 张翔 | Virtual-real combined large-scale overwater light and shadow show system |
CN111006113A (en) * | 2019-12-10 | 2020-04-14 | 杭州友邦演艺设备有限公司 | Shallow foundation pit large-stroke lifting screen |
CN114153120A (en) * | 2021-11-05 | 2022-03-08 | 广州励丰文化科技股份有限公司 | Projection imaging system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06175227A (en) * | 1992-12-09 | 1994-06-24 | Toho Eizo Bijutsu:Kk | Peacock screen device |
US20140078409A1 (en) * | 2012-09-14 | 2014-03-20 | Scienstry, Inc. | Underwater Projection |
CN208937899U (en) * | 2018-10-20 | 2019-06-04 | 杭州西湖喷泉设备成套有限公司 | A kind of underwater lifting projecting subassembly and the projection arrangement using the component |
-
2018
- 2018-10-20 CN CN201811225411.5A patent/CN109116672B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06175227A (en) * | 1992-12-09 | 1994-06-24 | Toho Eizo Bijutsu:Kk | Peacock screen device |
US20140078409A1 (en) * | 2012-09-14 | 2014-03-20 | Scienstry, Inc. | Underwater Projection |
CN208937899U (en) * | 2018-10-20 | 2019-06-04 | 杭州西湖喷泉设备成套有限公司 | A kind of underwater lifting projecting subassembly and the projection arrangement using the component |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110989283A (en) * | 2019-11-26 | 2020-04-10 | 张翔 | Virtual-real combined large-scale overwater light and shadow show system |
CN111006113A (en) * | 2019-12-10 | 2020-04-14 | 杭州友邦演艺设备有限公司 | Shallow foundation pit large-stroke lifting screen |
CN114153120A (en) * | 2021-11-05 | 2022-03-08 | 广州励丰文化科技股份有限公司 | Projection imaging system |
CN114153120B (en) * | 2021-11-05 | 2024-04-30 | 广州励丰文化科技股份有限公司 | Projection imaging system |
Also Published As
Publication number | Publication date |
---|---|
CN109116672B (en) | 2024-01-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109116672A (en) | A kind of underwater lifting projecting subassembly and the projection arrangement using the component | |
CN108331318A (en) | A kind of interior decoration operating platform | |
CN208937899U (en) | A kind of underwater lifting projecting subassembly and the projection arrangement using the component | |
CN207499524U (en) | A kind of novel water curtain lifting display vehicle | |
CN208673027U (en) | Multi-funcitonal hanging optical projection system | |
CN201953143U (en) | Tent capable of adjusting lifting of roof | |
CN206499877U (en) | Tutor's stage railroad of student is selected based on sound | |
CN110897356A (en) | Outdoor rain-shielding folding dining table equipment | |
CN205611314U (en) | Multi -functional gardens pergola | |
CN214527517U (en) | Tower crane pedestrian passageway device | |
CN109629998A (en) | A kind of half screen curtain opened from bottom to top | |
CN211574694U (en) | Shallow foundation pit large-stroke lifting screen | |
US3404494A (en) | Theatre and stage construction | |
CN111006113A (en) | Shallow foundation pit large-stroke lifting screen | |
CN210295732U (en) | Rotatory magic cube post of LED with rain-proof function | |
CN208310337U (en) | parking device | |
CN206026961U (en) | Elevation structure of treadmill mesa | |
CN208280877U (en) | A kind of horizontal roof roller blind door and window | |
CN101725260A (en) | Music reflection room | |
CN211548462U (en) | Outdoor double-open awning system for high-low roofs | |
CN110786688A (en) | Display system for planar design | |
CN218167528U (en) | Fountain landscape building | |
CN209173396U (en) | Air show dynamic state curve device | |
KR100424876B1 (en) | The Desk Having Partion Structure | |
CN208762090U (en) | A kind of spindle galvanizing rig |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |