CN109115278A - A kind of fine early warning system of GIS power grid based on cable sensor - Google Patents
A kind of fine early warning system of GIS power grid based on cable sensor Download PDFInfo
- Publication number
- CN109115278A CN109115278A CN201811216955.5A CN201811216955A CN109115278A CN 109115278 A CN109115278 A CN 109115278A CN 201811216955 A CN201811216955 A CN 201811216955A CN 109115278 A CN109115278 A CN 109115278A
- Authority
- CN
- China
- Prior art keywords
- module
- cable
- data
- gis
- sensor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000032683 aging Effects 0.000 claims abstract description 41
- 230000005540 biological transmission Effects 0.000 claims abstract description 40
- 101100454355 Rattus norvegicus Slc7a8 gene Proteins 0.000 claims description 12
- 101150095230 SLC7A8 gene Proteins 0.000 claims description 12
- 101150044140 Slc7a5 gene Proteins 0.000 claims description 12
- 101150085091 lat-2 gene Proteins 0.000 claims description 12
- 238000000034 method Methods 0.000 claims description 7
- 238000001514 detection method Methods 0.000 claims description 6
- 238000005259 measurement Methods 0.000 claims description 6
- 238000004364 calculation method Methods 0.000 claims description 3
- 229910052739 hydrogen Inorganic materials 0.000 claims description 3
- 238000012417 linear regression Methods 0.000 claims description 3
- 230000007935 neutral effect Effects 0.000 claims description 3
- 238000012360 testing method Methods 0.000 claims description 3
- 230000005611 electricity Effects 0.000 abstract description 8
- 230000000694 effects Effects 0.000 abstract description 2
- 238000003483 aging Methods 0.000 description 16
- 238000010586 diagram Methods 0.000 description 3
- 238000011160 research Methods 0.000 description 3
- 239000000758 substrate Substances 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000000465 moulding Methods 0.000 description 2
- 238000003786 synthesis reaction Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 1
- 238000011156 evaluation Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 230000001131 transforming effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01D—MEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
- G01D21/00—Measuring or testing not otherwise provided for
- G01D21/02—Measuring two or more variables by means not covered by a single other subclass
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/29—Geographical information databases
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A90/00—Technologies having an indirect contribution to adaptation to climate change
- Y02A90/10—Information and communication technologies [ICT] supporting adaptation to climate change, e.g. for weather forecasting or climate simulation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- Entrepreneurship & Innovation (AREA)
- Marketing (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Game Theory and Decision Science (AREA)
- Databases & Information Systems (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Health & Medical Sciences (AREA)
- Educational Administration (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Public Health (AREA)
- Remote Sensing (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Electric Cable Installation (AREA)
- Arrangements For Transmission Of Measured Signals (AREA)
Abstract
The invention belongs to electric power network fields, are related to a kind of fine early warning system of GIS power grid based on cable sensor.Including GIS server, GIS database module, weather warning module, base station control module, comprehensive pre-warning module, multiple base station modules and multiple cable sensor modules;Display is on its display screen after data in GIS database module are carried out integrated treatment by comprehensive pre-warning module.Can be with the ageing rate of on-line determination cable, while having no effect on the transmission of electricity of cable;The high-precision early warning for the cable of different aging conditions can be provided in conjunction with cable ageing rate.
Description
Technical field
The invention belongs to electric power network field, it is related to GIS power grid early warning system, more particularly to a kind of based on cable sensor
The fine early warning system of GIS power grid.
Background technique
In recent years, state's net electric power network power transmission and transforming equipment prevent and reduce natural disasters National Key Laboratory adhere to power grid security production drive
The research ideas of dynamic innovation, closely surrounds power grid and prevents and reduces natural disasters and conduct a research, and has carried out a large amount of novelties at the anti-icing aspect of power grid
Research work especially made breakthrough progress in hazard prediction warning aspect.Strong wind disaster is to influence electric power safety
One of principal element, strong wind are likely to result in the fracture of power transmission cable, directly affect transmission of electricity, and caused by be affected, restore
Time is longer.
When power transmission cable aging, its breaking tension is reduced, and cable aging can greatly improve the transmission of electricity wind of strong wind hazard weather
Danger, thus it is imperative for cable aging progress early warning.
Application number: 201520290157.2 schemes disclose a kind of cable fixer, and it is solid to disclose a kind of cable
Determine device, including fixed substrate, for the middle concave part of fixed substrate at cable fixing groove, the two sides of fixed substrate form fin institute
It states and is equipped with multiple through-holes in cable fixing groove, each through-hole is equipped with the buckle for engaging cable, and cable is fixed simple,
And there are gap between each cable, more cables will not twist together, prevent from interfering with each other, and are also prevented from cable aging and occur not
Full accident reduces the risk of cable aging, simultaneously although its disclosed structure can delay cable aging to a certain extent
It is not suitable for large-scale power transmission cable.
Application number: 201711316455.4 disclose transmission line galloping prediction technique based on inversion algorithm, system and
Storage medium, to be applied to the fining waved caused by the factors such as icing prediction.Computation model and correspondence are predicted according to waving
Input element slightly predict the Regional Distribution of Registered of transmission line galloping;It is to wave in thick prediction result according to power grid GIS information
Region in search for electric power line pole tower, and record the inverting information of searched out electric power line pole tower;According to inverting information
Line each section of associated shaft tower in transmission line of electricity both ends in space generates and waves the transmission line of electricity that index waits for secondary fining prediction;It is right
To each pixel on the transmission line of electricity of secondary fining prediction, carry out waving the two of index based on meteorological element Spatial Interpolation Method
Secondary fining prediction, and according to the preset corresponding relationship for waving index and color value, prediction result is intuitively shown.Its
Specific aim prediction cannot be carried out for cable aging, and it only discloses display prediction result, but with no specific disclosure of its calculating
With the process of early warning and display.
It is badly in need of a kind of electric power GIS early warning that fine early warning can be carried out for strong wind hazard weather and cable ageing rate at present
System.
Summary of the invention
The purpose of the present invention is what is be achieved through the following technical solutions.
For above content, to solve disadvantages described above, it is fine that the present invention provides a kind of GIS power grid based on cable sensor
Early warning system, it is characterised in that including GIS server, GIS database module, weather warning module, base station control module, synthesis
Warning module, multiple base station modules and multiple cable sensor modules;GIS database module, weather warning module, base station control
Molding block, comprehensive pre-warning module respectively with GIS server data connection;GIS server collects weather warning module and base station control
The data of molding block, and be stored in GIS database module;Comprehensive pre-warning module carries out the data in GIS database module
It is shown in after integrated treatment to show on screen.
Store the map datum comprising altitude information in the GIS database module, data format be (Lng1,
Lat1, H), wherein Lng1 is longitude, and Lat1 is latitude, and H is height above sea level.
The weather warning module is wind-force warning module, and the wind-force in 24-72 hours future is obtained from meteorological data center
Warning data;The wind-force warning data be the wind data comprising latitude and longitude information, data format be (Lng2, Lat2, F,
T);Wherein Lng2 is longitude, and Lat2 is latitude, and F is wind-force, and T is the moment.
The base station control module connects multiple base station modules, and switching or the transformer of power transmission cable is arranged in base station module
In equipment;Base station module connection cables sensor module, cable sensor are arranged on power transmission cable, and cable sensor module is received
Collect the pulling force thermal resistance data of cable, data format is (Lng3, Lat3, D, R), and wherein Lng3 is where cable sensor module
Longitude, Lat3 are the latitude where cable sensor module, and D is pulling force, and R is thermal resistance.
The GIS server collects the data of each cable sensor by base station control module, and stores it in GIS
In database module;Be stored with cable Ageing Model in GIS database module, the cable Ageing Model by test in advance with
The aging data of practical power transmission cable same model cable measures corresponding tensile fracture under different thermal resistances;And heat is established with this
The function model of resistance and tensile fracture.
The cable sensor includes sensor control block (1), stringing module, loose ends module;Sensor control block
Controller chip, wireless transceiver and relay switch are included, the wireless transceiver is used to communicate with base station module realization, after
Electric switch has third gear, first grade of connection stringing, second gear neutral gear, third gear connection loose ends;Stringing module includes rechargeable battery
(2), from belt switch in battery;Stringing module includes two opposite sensor groups (3), and sensor group (3) measures electric current, pressure
It drops, temperature, connects stringing (4) between sensor group (3), the specification of stringing (4) is identical as practical power transmission cable (7);Loose ends mould
Block includes detection sensor (5), for detecting loose ends on-state, connects loose ends (6) between detection sensor (5), loose ends (6)
Length it is longer than stringing (4);In actual use, sensor control block (1) both ends connect practical power transmission cable (7), pass simultaneously
Sensor control module is fixedly connected with stringing module and loose ends module, keeps the pulling force on stringing (4) identical as power transmission cable, loose ends
(6) upper pulling force is unrelated with power transmission cable.
The stringing wired in parallel rechargeable battery, rechargeable battery charge when stringing module is connected, and rechargeable battery exists
Power supply is provided when loose ends module is connected for the sensor group of stringing module.
GIS server saves the wind data of collection and pulling force thermal resistance data to GIS database module;Comprehensive pre-warning mould
Block converts tensile fracture data D for thermal resistance data R according to cable Ageing Model for pulling force thermal resistance datab;Comprehensive pre-warning module
The data of GIS database module are integrated, i.e., as (Lng3, Lat3, D, Db) with (Lng2, Lat2, F, T) and (Lng1,
Lat1, H) longitude and latitude it is identical when, merge into (Lng4, Lat4, D, Db, F, T, H), and save into warning data, Lng4 is equal to
Lng3 as Lng3=Lng2=Lng1, Lat4 are equal to the Lat3 as Lat3=Lat2=Lat1;
Comprehensive pre-warning module is according to warning data calculation risk rate V=(D/Db)×(F/Fb)×(H/Hb);Wherein DbIt is disconnected
Split pulling force data, FbFor wind-force threshold value, HbFor elevation threshold;Comprehensive pre-warning module regenerates risk data, and risk data format is
(Lng4, Lat4, V, T).
The background for showing screen is map background, and risk data is shown the map in display screen by comprehensive pre-warning module
In background, wherein showing the coordinate for determining display according to Lng4, Lat4, show that the color of various concentration, V value get over great Yan according to V
Color is deeper, the time shaft according to T as time change, Dynamically Announce.
The establishment process of cable Ageing Model are as follows:
1) 1000 sections being cut into the cable of practical power transmission cable same model, every section of length is 50-100cm, as
Sample to be tested;
2) sample to be tested is subjected to aging under conditions of different pH value solution, cold and hot variation respectively;
3) sample to be tested after aging is subjected to thermo-resistance measurement, obtains thermal resistance value, carry out pulling force measurement later, it is disconnected to obtain it
Split pulling force;
4) thermal resistance-tensile fracture curve is established according to the data that step 3) obtains;
5) linear regression is carried out to the curve of step 4) and obtains cable Ageing Model.
The present invention has the advantages that
The present invention provides a kind of cable sensors, can be with the ageing rate of on-line determination cable, while having no effect on cable
Transmission of electricity;The early warning of early warning system of the invention based on cable ageing rate and wind-force, strong wind can cause heavy losses to transmission of electricity, knot
Zygonema cable ageing rate can provide the high-precision early warning for the cable of different aging conditions;The present invention provides the surveys of ageing rate
Determine mode, can be applied to the evaluation of other cable agings;The present invention by early warning as the result is shown on the display screen, due to collecting
Data collected only for the coordinate of base station location, therefore be that a red dot, red dot are shown with base station location in display
Size show according to the transmission power of base station determine, the risk class for the early warning that can intuitively withdraw deposit.
Detailed description of the invention
By reading the following detailed description of the preferred embodiment, various other advantages and benefits are common for this field
Technical staff will become clear.The drawings are only for the purpose of illustrating a preferred embodiment, and is not considered as to the present invention
Limitation.And throughout the drawings, the same reference numbers will be used to refer to the same parts.In the accompanying drawings:
Attached drawing 1 shows the system structure diagram of embodiment according to the present invention;
Attached drawing 2 shows the cable sensor structural schematic diagram of embodiment according to the present invention;
Attached drawing 3 shows the cable sensor connection schematic diagram of embodiment according to the present invention.
Specific embodiment
The illustrative embodiments of the disclosure are more fully described below with reference to accompanying drawings.Although showing this public affairs in attached drawing
The illustrative embodiments opened, it being understood, however, that may be realized in various forms the disclosure without the reality that should be illustrated here
The mode of applying is limited.It is to be able to thoroughly understand the disclosure on the contrary, providing these embodiments, and can be by this public affairs
The range opened is fully disclosed to those skilled in the art.
Embodiment according to the present invention proposes a kind of fine early warning system of GIS power grid based on cable sensor, special
Sign is to include GIS server, is GIS database module, weather warning module, base station control module, comprehensive pre-warning module, multiple
Base station module and multiple cable sensor modules;GIS database module, weather warning module, base station control module, synthesis are pre-
Alert module respectively with GIS server data connection;GIS server collects the data of weather warning module and base station control module,
And it is stored in GIS database module;Comprehensive pre-warning module is shown after the data in GIS database module are carried out integrated treatment
On its display screen.
Store the map datum comprising altitude information in the GIS database module, data format be (Lng1,
Lat1, H), wherein Lng1 is longitude, and Lat1 is latitude, and H is height above sea level.
The weather warning module is wind-force warning module, and the wind-force in 24-72 hours future is obtained from meteorological data center
Warning data;The wind-force warning data be the wind data comprising latitude and longitude information, data format be (Lng2, Lat2, F,
T);Wherein Lng2 is longitude, and Lat2 is latitude, and F is wind-force, and T is the moment.
The base station control module connects multiple base station modules, and switching or the transformer of power transmission cable is arranged in base station module
In equipment;Base station module connection cables sensor module, cable sensor are arranged on power transmission cable, and cable sensor module is received
Collect the pulling force thermal resistance data of cable, data format is (Lng3, Lat3, D, R), and wherein Lng3 is where cable sensor module
Longitude, Lat3 are the latitude where cable sensor module, and D is pulling force, and R is thermal resistance.
The GIS server collects the data of each cable sensor by base station control module, and stores it in GIS
In database module;Be stored with cable Ageing Model in GIS database module, the cable Ageing Model by test in advance with
The aging data of practical power transmission cable same model cable measures corresponding tensile fracture under different thermal resistances;And heat is established with this
The function model of resistance and tensile fracture.
The cable sensor includes sensor control block (1), stringing module, loose ends module;Sensor control block
Controller chip, wireless transceiver and relay switch are included, the wireless transceiver is used to communicate with base station module realization, after
Electric switch has third gear, first grade of connection stringing, second gear neutral gear, third gear connection loose ends;Stringing module includes rechargeable battery
(2), from belt switch in battery;Stringing module includes two opposite sensor groups (3), and sensor group (3) measures electric current, pressure
It drops, temperature, connects stringing (4) between sensor group (3), the specification of stringing (4) is identical as practical power transmission cable (7);Loose ends mould
Block includes detection sensor (5), for detecting loose ends on-state, connects loose ends (6) between detection sensor (5), loose ends (6)
Length it is longer than stringing (4);In actual use, sensor control block (1) both ends connect practical power transmission cable (7), pass simultaneously
Sensor control module is fixedly connected with stringing module and loose ends module, keeps the pulling force on stringing (4) identical as power transmission cable, loose ends
(6) upper pulling force is unrelated with power transmission cable.
The stringing wired in parallel rechargeable battery, rechargeable battery charge when stringing module is connected, and rechargeable battery exists
Power supply is provided when loose ends module is connected for the sensor group of stringing module.
GIS server saves the wind data of collection and pulling force thermal resistance data to GIS database module;Comprehensive pre-warning mould
Block converts tensile fracture data D for thermal resistance data R according to cable Ageing Model for pulling force thermal resistance datab;Comprehensive pre-warning module
The data of GIS database module are integrated, i.e., as (Lng3, Lat3, D, Db) with (Lng2, Lat2, F, T) and (Lng1,
Lat1, H) longitude and latitude it is identical when, merge into (Lng4, Lat4, D, Db, F, T, H), and save into warning data, Lng4 is equal to
Lng3 as Lng3=Lng2=Lng1, Lat4 are equal to the Lat3 as Lat3=Lat2=Lat1;
Comprehensive pre-warning module is according to warning data calculation risk rate V=(D/Db)×(F/Fb)×(H/Hb);Wherein DbIt is disconnected
Split pulling force data, FbFor wind-force threshold value, HbFor elevation threshold;Comprehensive pre-warning module regenerates risk data, and risk data format is
(Lng4, Lat4, V, T).
The background for showing screen is map background, and risk data is shown the map in display screen by comprehensive pre-warning module
In background, wherein showing the coordinate for determining display according to Lng4, Lat4, show that the color of various concentration, V value get over great Yan according to V
Color is deeper, the time shaft according to T as time change, Dynamically Announce.
The establishment process of cable Ageing Model are as follows:
1) 1000 sections being cut into the cable of practical power transmission cable same model, every section of length is 50-100cm, as
Sample to be tested;
2) sample to be tested is subjected to aging under conditions of different pH value solution, cold and hot variation respectively;
3) sample to be tested after aging is subjected to thermo-resistance measurement, obtains thermal resistance value, carry out pulling force measurement later, it is disconnected to obtain it
Split pulling force;
4) thermal resistance-tensile fracture curve is established according to the data that step 3) obtains;
5) linear regression is carried out to the curve of step 4) and obtains cable Ageing Model.
When showing risk data on the display screen, the position of each base station shows a circle, and circle color is according to V
Show the color of various concentration, V value is bigger, and color is deeper.The diameter of circle is determining according to the transmission power of respective base station, power
The diameter of more great circle is bigger, to intuitively show the risk of base station and coverage.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
In the technical scope disclosed by the present invention, any changes or substitutions that can be easily thought of by anyone skilled in the art,
It should be covered by the protection scope of the present invention.Therefore, protection scope of the present invention should be with the protection model of the claim
Subject to enclosing.
Claims (10)
1. a kind of fine early warning system of GIS power grid based on cable sensor, it is characterised in that including GIS server, GIS data
Library module, weather warning module, base station control module, comprehensive pre-warning module, multiple base station modules and multiple cable sensors
Module;GIS database module, weather warning module, base station control module, comprehensive pre-warning module respectively with GIS server data
Connection;GIS server collects the data of weather warning module and base station control module, and is stored in GIS database module;It is comprehensive
It closes after the data in GIS database module are carried out integrated treatment by warning module and shows on its display screen.
2. the GIS power grid fine early warning system according to claim 1 based on cable sensor, it is characterised in that: described
The map datum comprising altitude information is stored in GIS database module, data format is (Lng1, Lat1, H), wherein
Lng1 is longitude, and Lat1 is latitude, and H is height above sea level.
3. the GIS power grid fine early warning system according to claim 2 based on cable sensor, it is characterised in that: described
Weather warning module is wind-force warning module, and the wind-force warning data in 24-72 hours future is obtained from meteorological data center;It is described
Wind-force warning data is the wind data comprising latitude and longitude information, and data format is (Lng2, Lat2, F, T);Wherein Lng2 is warp
Degree, Lat2 is latitude, and F is wind-force, and T is the moment.
4. the GIS power grid fine early warning system according to claim 3 based on cable sensor, it is characterised in that: described
Base station control module connects multiple base station modules, and base station module is arranged in the switching or transformer equipment of power transmission cable;Base station
Module connection cables sensor module, cable sensor are arranged on power transmission cable, the drawing of cable sensor module collection cable
Power thermal resistance data, data format are (Lng3, Lat3, D, R), and wherein Lng3 is the longitude where cable sensor module, Lat3
For the latitude where cable sensor module, D is pulling force, and R is thermal resistance.
5. the GIS power grid fine early warning system according to claim 4 based on cable sensor, it is characterised in that: described
GIS server collects the data of each cable sensor by base station control module, and stores it in GIS database module
In;It is stored with cable Ageing Model in GIS database module, the cable Ageing Model by testing with practical power transmission line in advance
The aging data of cable same model cable measures corresponding tensile fracture under different thermal resistances;And thermal resistance and fracture drawing are established with this
The function model of power.
6. the GIS power grid fine early warning system according to claim 5 based on cable sensor, it is characterised in that: described
Cable sensor includes sensor control block (1), stringing module, loose ends module;Sensor control block includes controller core
Piece, wireless transceiver and relay switch, the wireless transceiver are used to communicate with base station module realization, and relay switch has three
Shelves, first grade of connection stringing, second gear neutral gear, third gear connect loose ends;Stringing module includes rechargeable battery (2), and battery is interior certainly
Belt switch;Stringing module includes two opposite sensor groups (3), and sensor group (3) measures electric current, pressure drop, temperature, sensor
Stringing (4) are connected between group (3), the specification of stringing (4) is identical as practical power transmission cable (7);Loose ends module includes detection sensing
Device (5) connects loose ends (6) between detection sensor (5), the length of loose ends (6) compares stringing for detecting loose ends on-state
(4) long;In actual use, sensor control block (1) both ends connect practical power transmission cable (7), while sensor control block
Be fixedly connected with stringing module and loose ends module, keep the pulling force on stringing (4) identical as power transmission cable, loose ends (6) upper pulling force with
Power transmission cable is unrelated.
7. the GIS power grid fine early warning system according to claim 6 based on cable sensor, it is characterised in that: described
Stringing wired in parallel rechargeable battery, rechargeable battery charge when stringing module is connected, and rechargeable battery is connected in loose ends module
When for the sensor group of stringing module provide power supply.
8. the GIS power grid fine early warning system according to claim 7 based on cable sensor, it is characterised in that: GIS clothes
Business device saves the wind data of collection and pulling force thermal resistance data to GIS database module;Comprehensive pre-warning module is by pulling force thermal resistance
Data convert tensile fracture data D for thermal resistance data R according to cable Ageing Modelb;Comprehensive pre-warning module is by GIS database mould
The data of block are integrated, i.e., as (Lng3, Lat3, D, Db) with the longitude and latitude of (Lng2, Lat2, F, T) and (Lng1, Lat1, H)
When identical, (Lng4, Lat4, D, D are merged intob, F, T, H), and save into warning data, Lng4 is equal to and works as Lng3=Lng2=
Lng3 when Lng1, Lat4 are equal to the Lat3 as Lat3=Lat2=Lat1;
Comprehensive pre-warning module is according to warning data calculation risk rate V=(D/Db)×(F/Fb)×(H/Hb);Wherein DbIt is drawn for fracture
Force data, FbFor wind-force threshold value, HbFor elevation threshold;Comprehensive pre-warning module regenerates risk data, and risk data format is
(Lng4, Lat4, V, T).
9. the GIS power grid fine early warning system according to claim 8 based on cable sensor, it is characterised in that: display
The background of screen is map background, and comprehensive pre-warning module shows risk data on the map background of display screen, wherein
Display determines the coordinate of display according to Lng4, Lat4, the color of various concentration is shown according to V, V value is bigger, and color is deeper, according to T
As the time shaft of time change, Dynamically Announce.
10. the GIS power grid fine early warning system according to claim 8 based on cable sensor, it is characterised in that: cable
The establishment process of Ageing Model are as follows:
1) 1000 sections will be cut into the cable of practical power transmission cable same model, every section of length is 50-100cm, as to be measured
Sample;
2) sample to be tested is subjected to aging under conditions of different pH value solution, cold and hot variation respectively;
3) sample to be tested after aging is subjected to thermo-resistance measurement, obtains thermal resistance value, carry out pulling force measurement later, obtained its fracture and draw
Power;
4) thermal resistance-tensile fracture curve is established according to the data that step 3) obtains;
5) linear regression is carried out to the curve of step 4) and obtains cable Ageing Model.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201911048572.6A CN110864727B (en) | 2018-10-18 | 2018-10-18 | GIS power grid fine early warning system based on cable sensor |
CN201811216955.5A CN109115278B (en) | 2018-10-18 | 2018-10-18 | A kind of fine early warning system of GIS power grid based on cable sensor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811216955.5A CN109115278B (en) | 2018-10-18 | 2018-10-18 | A kind of fine early warning system of GIS power grid based on cable sensor |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911048572.6A Division CN110864727B (en) | 2018-10-18 | 2018-10-18 | GIS power grid fine early warning system based on cable sensor |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109115278A true CN109115278A (en) | 2019-01-01 |
CN109115278B CN109115278B (en) | 2019-11-05 |
Family
ID=64854913
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811216955.5A Active CN109115278B (en) | 2018-10-18 | 2018-10-18 | A kind of fine early warning system of GIS power grid based on cable sensor |
CN201911048572.6A Active CN110864727B (en) | 2018-10-18 | 2018-10-18 | GIS power grid fine early warning system based on cable sensor |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201911048572.6A Active CN110864727B (en) | 2018-10-18 | 2018-10-18 | GIS power grid fine early warning system based on cable sensor |
Country Status (1)
Country | Link |
---|---|
CN (2) | CN109115278B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110864727A (en) * | 2018-10-18 | 2020-03-06 | 国网山东省电力公司应急管理中心 | GIS power grid fine early warning system based on cable sensor |
CN116153019A (en) * | 2023-02-13 | 2023-05-23 | 深圳崎点数据有限公司 | Cloud computing-based power grid disaster early warning system |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101603850A (en) * | 2009-06-29 | 2009-12-16 | 中国电力工程顾问集团中南电力设计院 | A kind of extra high voltage transmission line online monitoring system |
CN102279084A (en) * | 2011-05-03 | 2011-12-14 | 西安工程大学 | Transmission line oscillation positioning system and method based on micro inertial measurement combination |
CN102818590A (en) * | 2012-07-29 | 2012-12-12 | 江苏大学 | Wireless sensor network-based transmission lines icing on-line monitoring system |
CN103017828A (en) * | 2012-12-12 | 2013-04-03 | 宝鸡供电局 | On-line monitoring system of fatigue damage to electric transmission line conductor by breeze vibration |
CN103439611A (en) * | 2013-08-31 | 2013-12-11 | 安徽省电力科学研究院 | Electric wire and cable conductivity, tensile strength and aging comprehensive testing device |
CN203572514U (en) * | 2013-11-07 | 2014-04-30 | 南方电网科学研究院有限责任公司 | Comprehensive on-line monitoring device for power transmission line based on RS485 bus |
CN105300557A (en) * | 2015-11-11 | 2016-02-03 | 德信东源智能科技(北京)有限公司 | Cable conductor temperature measuring device and method |
CN107248784A (en) * | 2017-08-02 | 2017-10-13 | 新疆信息产业有限责任公司 | Transmission line of electricity running status automated watch-keeping facility and its monitoring method |
Family Cites Families (21)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3568626A (en) * | 1967-11-08 | 1971-03-09 | Bell Telephone Labor Inc | Identifying means for buried utilities |
JP2875944B2 (en) * | 1993-12-15 | 1999-03-31 | 東京電力株式会社 | Apparatus for calculating the amount of snow accumulation on transmission lines |
CN101038186A (en) * | 2006-06-10 | 2007-09-19 | 伊仁图太 | Device for online warning freezing and swing of transmission line |
CN101586971A (en) * | 2009-06-19 | 2009-11-25 | 国网电力科学研究院武汉南瑞有限责任公司 | Transmission line ice-coating pre-warning and dynamic compatibilization system on-line monitoring device |
US8855830B2 (en) * | 2009-08-21 | 2014-10-07 | Allure Energy, Inc. | Energy management system and method |
CN101900779B (en) * | 2010-07-28 | 2012-10-17 | 西南交通大学 | Method for measuring lightning shielding failure trip-out rate of high-voltage power transmission line by combining topography |
CN104950349A (en) * | 2014-09-04 | 2015-09-30 | 国网山东省电力公司应急管理中心 | Power-grid-GIS-based real-time early warning method and apparatus of satellite cloud picture |
CN104951992B (en) * | 2014-09-04 | 2016-11-09 | 国网山东省电力公司应急管理中心 | The longitudinal correlating method of electric power based on GIS-meteorology and system |
CN104266681A (en) * | 2014-10-11 | 2015-01-07 | 国网河南省电力公司南阳供电公司 | Electric cable well state safety monitoring system based on Internet of Things and GIS |
CN104951857A (en) * | 2014-11-27 | 2015-09-30 | 国网山东省电力公司应急管理中心 | Power-grid-GIS-based meteorological data invoking and pretreatment method and system |
CN104951492B (en) * | 2014-11-27 | 2017-09-15 | 国网山东省电力公司应急管理中心 | Based on the monitoring of power grid GIS wind power plant Professional Meteorological and method for early warning and system |
CN104834992A (en) * | 2015-04-15 | 2015-08-12 | 国家电网公司 | Emergency command auxiliary decision-making system based on the power grid GIS platform |
CN204559021U (en) * | 2015-05-07 | 2015-08-12 | 德阳旌特线缆有限公司 | A kind of cable fixer |
KR101692638B1 (en) * | 2015-09-10 | 2017-01-03 | 주식회사 건원 | Cable connector for detecting deterioration of cross link self-contraction type |
CN105243520A (en) * | 2015-11-18 | 2016-01-13 | 国网上海市电力公司 | Full life-cycle cost evaluation method based on power cable heat transfer model |
CN105403250A (en) * | 2015-12-04 | 2016-03-16 | 国网辽宁省电力有限公司技能培训中心 | Electric disaster prevention and early warning system |
CN105868443B (en) * | 2016-03-22 | 2020-04-28 | 国网安徽省电力公司电力科学研究院 | Construction method of micro-terrain microclimate element field |
CN105699827A (en) * | 2016-04-26 | 2016-06-22 | 国网河南省电力公司电力科学研究院 | Intelligent power transmission line comprehensive monitoring and analysis and integrated operation and maintenance system |
CN106707372A (en) * | 2016-12-30 | 2017-05-24 | 山东鲁能软件技术有限公司 | Fine weather forecast method based on power grid GIS |
CN107958312B (en) * | 2017-12-12 | 2021-08-31 | 国网湖南省电力有限公司 | Electric transmission line galloping prediction method and system based on inversion algorithm and storage medium |
CN109115278B (en) * | 2018-10-18 | 2019-11-05 | 国网山东省电力公司应急管理中心 | A kind of fine early warning system of GIS power grid based on cable sensor |
-
2018
- 2018-10-18 CN CN201811216955.5A patent/CN109115278B/en active Active
- 2018-10-18 CN CN201911048572.6A patent/CN110864727B/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101603850A (en) * | 2009-06-29 | 2009-12-16 | 中国电力工程顾问集团中南电力设计院 | A kind of extra high voltage transmission line online monitoring system |
CN102279084A (en) * | 2011-05-03 | 2011-12-14 | 西安工程大学 | Transmission line oscillation positioning system and method based on micro inertial measurement combination |
CN102818590A (en) * | 2012-07-29 | 2012-12-12 | 江苏大学 | Wireless sensor network-based transmission lines icing on-line monitoring system |
CN103017828A (en) * | 2012-12-12 | 2013-04-03 | 宝鸡供电局 | On-line monitoring system of fatigue damage to electric transmission line conductor by breeze vibration |
CN103439611A (en) * | 2013-08-31 | 2013-12-11 | 安徽省电力科学研究院 | Electric wire and cable conductivity, tensile strength and aging comprehensive testing device |
CN203572514U (en) * | 2013-11-07 | 2014-04-30 | 南方电网科学研究院有限责任公司 | Comprehensive on-line monitoring device for power transmission line based on RS485 bus |
CN105300557A (en) * | 2015-11-11 | 2016-02-03 | 德信东源智能科技(北京)有限公司 | Cable conductor temperature measuring device and method |
CN107248784A (en) * | 2017-08-02 | 2017-10-13 | 新疆信息产业有限责任公司 | Transmission line of electricity running status automated watch-keeping facility and its monitoring method |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110864727A (en) * | 2018-10-18 | 2020-03-06 | 国网山东省电力公司应急管理中心 | GIS power grid fine early warning system based on cable sensor |
CN116153019A (en) * | 2023-02-13 | 2023-05-23 | 深圳崎点数据有限公司 | Cloud computing-based power grid disaster early warning system |
CN116153019B (en) * | 2023-02-13 | 2023-08-22 | 深圳崎点数据有限公司 | Cloud computing-based power grid disaster early warning system |
Also Published As
Publication number | Publication date |
---|---|
CN110864727A (en) | 2020-03-06 |
CN109115278B (en) | 2019-11-05 |
CN110864727B (en) | 2021-09-17 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102938021B (en) | A kind of powerline ice-covering load quantitative is estimated and Forecasting Methodology | |
CN103604464B (en) | A kind of environment parameter monitoring system of radio communication electric power transmission line and method | |
CN109115278B (en) | A kind of fine early warning system of GIS power grid based on cable sensor | |
CN107843285B (en) | Wind-driven force effect remote monitoring system of power transmission tower line and application | |
CN109632122B (en) | Automatic temperature measurement system for rope strands of suspension bridge and temperature measurement and control platform of Internet of things comprising automatic temperature measurement and control system | |
CN106600460A (en) | Transmission line dynamic capacity increase method based on environmental change probability model | |
CN104167076B (en) | A kind of icing transmission line of electricity weak link method for early warning | |
CN104835102B (en) | Train speed measurement scheme evaluation method and device | |
CN104390710A (en) | Power transmission line conductive wire temperature online detection system and method | |
CN115565118B (en) | Method for identifying single hanging point and single string of cross crossing point of power transmission line | |
CN108629118B (en) | Windproof monitoring method, device and system for transmission tower structure | |
CN203605975U (en) | System for monitoring environmental parameters of wireless communication electric power transmission line | |
CN104457594B (en) | The distributed icing monitoring method of a kind of transmission line of electricity | |
CN103018793B (en) | Cloud early warning system and method of wires under extreme meteorological conditions | |
CN115809586A (en) | Battery system temperature prediction method based on virtual sensor | |
CN104463442A (en) | Detection method of town and country construction clustering | |
CN107328994A (en) | Insulation Resistance of Transformer experimental rig and method | |
CN106885603A (en) | A kind of civil engineering structure health detecting system | |
CN103698071B (en) | The data-driven method of Suo Li course identification is become during drag-line based on monitoring acceleration | |
CN208508614U (en) | A kind of icing monitoring and warning system | |
CN114676540B (en) | Overhead transmission line icing galloping prediction method based on multi-information fusion | |
CN111273100A (en) | Power transformer winding state evaluation method based on vibration phase | |
CN108195418A (en) | A kind of Health Monitoring for Civil Engineering system and method | |
CN206223383U (en) | A kind of auto monitoring and measurement system of bridge pad deformation | |
CN108053053A (en) | The non-commuting travel forecasting approaches of electric bicycle based on space autoregression model |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |