CN109113420A - A kind of construction partition guardrail - Google Patents
A kind of construction partition guardrail Download PDFInfo
- Publication number
- CN109113420A CN109113420A CN201811140474.0A CN201811140474A CN109113420A CN 109113420 A CN109113420 A CN 109113420A CN 201811140474 A CN201811140474 A CN 201811140474A CN 109113420 A CN109113420 A CN 109113420A
- Authority
- CN
- China
- Prior art keywords
- supporting beam
- threaded rod
- block
- support post
- welded
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H17/00—Fencing, e.g. fences, enclosures, corrals
- E04H17/14—Fences constructed of rigid elements, e.g. with additional wire fillings or with posts
- E04H17/20—Posts therefor
- E04H17/22—Anchoring means therefor, e.g. specially-shaped parts entering the ground; Struts or the like
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The invention discloses a kind of construction partition guardrails, including No.1 support post, No.1 support post upper end is rotatably connected to rotating ring, the inside of the No.1 support post opens up hole, the interior welds that the lower end of the rotating ring is located at hole have swingle, the lower end of the swingle is welded with limited block, and the lower end of the limited block is welded with threaded rod, and the side surface cover of the threaded rod is equipped with insertion bar.There are rotating ring, swingle, threaded rod, insertion bar, No.1 link block, crushing block by design, crushing block is driven to be pushed so as to step on No.1 link block by foot, rotating rotating ring again drives swingle to be rotated, threaded rod carries out transfer, to which threaded rod rotates in insertion bar, lead to be embedded in bar as the rotation of threaded rod slowly moves downward, so as to carry out embedded placement well, its guardrail will not be made arbitrarily to be blown over by the wind.
Description
Technical field
The present invention relates to a kind of partition guardrail, specifically a kind of construction partition guardrail.
Background technique
Guardrail is mainly used in the occasions such as house, highway, shopping centre, public place the guarantor to personal safety and installations and facilities
Shield and protection.Guardrail is visible everywhere in we live.For guardrail according to the difference of height, the price of every meter of length also can be different.
Existing guardrail be uneven in soil cannot stable placement well, its guardrail is blown down so as to cause when blowing,
Partition in guardrail cannot be pushed and pulled well, thus need to dismantle guardrail when needing interim disengaging, because
This, those skilled in the art provide a kind of construction partition guardrail, to solve the problems mentioned in the above background technology.
Summary of the invention
It is mentioned above in the background art to solve the purpose of the present invention is to provide a kind of construction partition guardrail
Problem.
To achieve the above object, the invention provides the following technical scheme:
A kind of construction partition guardrail, including No.1 support post, the rotation connection of No.1 support post upper end
There is rotating ring, the inside of the No.1 support post opens up hole, and the lower end of the rotating ring is located at the interior welds of hole
There is swingle, the lower end of the swingle is welded with limited block, and the lower end of the limited block is welded with threaded rod, the threaded rod
Side surface cover be equipped with insertion bar, it is described insertion bar lower end be welded with No.1 connecting block, the lower end of the No.1 support post
It is welded with crushing block, all sides of the crushing block are welded with No.1 link block,
No.1 support post side surface cover is connected to No.1 supporting beam and No. two supporting beams, and the No.1 supporting beam is located at
The top of No. two supporting beams, the No.1 supporting beam and No. two supporting beam one end are socketed with No. two support posts, the No.1 branch
Open up fluted inside support beam and No. two supporting beams, the upper end of the No.1 supporting beam slidably connects limited cap, the limit
The lower thread of position cap is connected with sliding bar, and sliding bar side surface cover is connected to joining piece, the No.1 supporting beam and No. two
Supporting beam both ends are rotatably connected to shaft, the shaft week side be rotatably connected to lantern ring, the lantern ring threaded one end connection
There is connection sheet.
As a further solution of the present invention: described lantern ring one end offers No.1 hole, institute close to No.1 bolt side
It states No.1 supporting beam and No. two supporting beam both ends offers No. two holes.
As further scheme of the invention: the crushing block bottom end offers circular port, and the extruding is block-shaped to be
Taper.
As further scheme of the invention: offering round thread hole, the round thread inside the insertion bar
Bore dia is equal with screw thread shank diameter.
As further scheme of the invention: the block-shaped No.1 linking is taper, and the No.1 connecting block is steel
Iron component.
As further scheme of the invention: the connection sheet nose threads are connected with No.1 bolt and No. two bolts,
The No.1 bolt is located at the side of No. two bolts.
Compared with prior art, the beneficial effects of the present invention are:
1, there are rotating ring, swingle, threaded rod, insertion bar, No.1 link block, crushing block by design, so as to pass through
Foot step on No.1 link block drive crushing block pushed, then rotate rotating ring drive swingle rotated, threaded rod carry out with
Turn, so that threaded rod rotates in insertion bar, leads to be embedded in bar as the rotation of threaded rod slowly moves downward, so as to fine
The embedded placement of carry out, its guardrail will not be made arbitrarily to be blown over by the wind.
2, connected so that sliding bar is connected to inside grooves by limited cap by designing fluted, limited cap, sliding bar
It connects sliding bar to be limited, moves in parallel its sliding bar by the way that limited cap can be moved in a groove, it can be well by it
It is pushed and pulled.
Detailed description of the invention
Fig. 1 is the structural schematic diagram that a kind of construction separates guardrail;
Fig. 2 is the structural schematic diagram that a kind of construction separates No.1 support post in guardrail;
Fig. 3 is the structural schematic diagram that a kind of construction separates No.1 supporting beam and No. two supporting beams in guardrail;
Fig. 4 separates enlarged drawing at the A in Fig. 3 of guardrail for a kind of construction.
In figure: 1- No.1 support post, No. bis- support posts of 2-, 3- No.1 supporting beam, No. bis- supporting beams of 4-, 5- rotation
Ring, 6- swingle, 7- hole, 8- limited block, 9- threaded rod, 10- crushing block, 11- No.1 link block, 12- are embedded in bar, 13- mono-
Number connecting block, 14- groove, 15- limited cap, 16- sliding bar, 17- joining piece, 18- shaft, 19- lantern ring, 20- connection sheet, 21-
No. bis- No.1 bolt, 22- bolts.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
Please refer to Fig. 1~4, in the embodiment of the present invention, a kind of construction partition guardrail, including No.1 support post 1,
1 upper end of No.1 support post is rotatably connected to rotating ring 5, and the inside of the No.1 support post 1 opens up hole 7, institute
The interior welds that the lower end for stating rotating ring 5 is located at hole 7 have swingle 6, and the lower end of the swingle 6 is welded with limited block 8, institute
The lower end for stating limited block 8 is welded with threaded rod 9, and the side surface cover of the threaded rod 9 is equipped with insertion bar 12, the insertion bar 12
Lower end is welded with No.1 connecting block 13, and the lower end of the No.1 support post 1 is welded with crushing block 10, the week of the crushing block 10
Side is welded with No.1 link block 11,
The 1 side surface cover of No.1 support post is connected to No.1 supporting beam 3 and No. two supporting beams 4, the No.1 supporting beam 3
Positioned at the top of No. two supporting beams 4, the No.1 supporting beam 3 and No. two 4 one end of supporting beam are socketed with No. two support posts 2, institute
It states and opens up fluted 14 inside No.1 supporting beam 3 and No. two supporting beams 4, the upper end of the No.1 supporting beam 3 slidably connects
Limited cap 15, the lower thread of the limited cap 15 are connected with sliding bar 16, and the 16 side surface cover of sliding bar is connected to joining piece
17, the No.1 supporting beam 3 and No. two 4 both ends of supporting beam are rotatably connected to shaft 18, and shaft side rotation in 18 weeks connects
It is connected to lantern ring 19,19 threaded one end of lantern ring is connected with connection sheet 20.
Described 19 one end of lantern ring offers No.1 hole close to 21 side of No.1 bolt, the No.1 supporting beam 3 and No. two
4 both ends of supporting beam offer No. two holes.
10 bottom end of crushing block offers circular port, and 10 shape of crushing block is taper.
Round thread hole is offered inside the insertion bar 12, the round thread bore dia is equal with 9 diameter of threaded rod.
13 shape of No.1 connecting block is taper, and the No.1 connecting block 13 is steel component.
20 nose threads of connection sheet are connected with No.1 bolt 21 and No. two bolts 22, and the No.1 bolt 21 is located at two
The side of number bolt 22.
The working principle of the invention is:
Staff, first can be by a placement of crushing block 10 in No.1 support post 1 when installation separates guardrail
On soil, hand steered No.1 support post 1 is stepped on downwards its No.1 link block 11 with foot, to keep its crushing block 10 embedding
Enter in soil, then make it that swingle 6 be driven to be rotated by rotating rotating ring 5, so that swingle 6 drives limited block 8 to carry out
Rotation, limited block 8 play position-limiting action, and limited block 8 is forced that threaded rod 9 is driven to be rotated, so that threaded rod 9 is in insertion bar 12
In rotated, be embedded in bar 12 and be provided with screw thread, to be embedded into bar 12 by rotation and slowly squeezed downwards, No.1
13 shape of connecting block is taper, soil can be conveniently broken, so that the fixation of No.1 support post 1 is completed, by identical method pair
Secondly number support post 2 is fixed, then it can be made by its No.1 supporting beam 3 and No. two supporting beams 4 by opening lantern ring 19
Shaft 18 is rotated, so that lantern ring 19 coats No.1 support post 1 and No. two support posts 2, finally again by No.1 spiral shell
Bolt 21 and No. two bolts 22 are fixed, and complete to fix, can be clamped its sliding bar 16 into No.1 supporting beam 3 and No. two supporting beams
In 4, sliding bar 16 is tightened by limited cap 15 and is fixed, so that staff can move limited cap 15 with rubber sleeve, forces sliding
Bar 16 is moved in parallel, convenient to fold to joining piece 17.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto,
Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its
Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.
Claims (6)
1. a kind of construction partition guardrail, including No.1 support post (1), which is characterized in that the No.1 support post
(1) upper end is rotatably connected to rotating ring (5), and the inside of the No.1 support post (1) opens up hole (7), the rotating ring
(5) interior welds that lower end is located at hole (7) have swingle (6), and the lower end of the swingle (6) is welded with limited block (8),
The lower end of the limited block (8) is welded with threaded rod (9), and the side surface cover of the threaded rod (9) is equipped with insertion bar (12), described
The lower end of insertion bar (12) is welded with No.1 connecting block (13), and the lower end of the No.1 support post (1) is welded with crushing block
(10), all sides of the crushing block (10) are welded with No.1 link block (11),
No.1 support post (1) side surface cover is connected to No.1 supporting beam (3) and No. two supporting beams (4), the No.1 support
Beam (3) is located at the top of No. two supporting beams (4), and the No.1 supporting beam (3) and No. two supporting beam (4) one end are socketed with No. two branch
It supports column (2), is opened up fluted (14) inside the No.1 supporting beam (3) and No. two supporting beams (4), the No.1 supporting beam
(3) upper end slidably connects limited cap (15), and the lower thread of the limited cap (15) is connected with sliding bar (16), the cunning
Lever (16) side surface cover is connected to joining piece (17), and the No.1 supporting beam (3) and No. two supporting beam (4) both ends are rotatablely connected
Have shaft (18), all sides of the shaft (18) are rotatably connected to lantern ring (19), and lantern ring (19) threaded one end is connected with
Contact pin (20).
2. a kind of construction according to claim 1 partition guardrail, which is characterized in that described lantern ring (19) one end is leaned on
Nearly No.1 bolt (21) side offers No.1 hole, and the No.1 supporting beam (3) and No. two supporting beam (4) both ends offer
No. two holes.
3. a kind of construction according to claim 1 partition guardrail, which is characterized in that crushing block (10) bottom end
Circular port is offered, crushing block (10) shape is taper.
4. a kind of construction according to claim 1 partition guardrail, which is characterized in that the insertion bar (12) is internal
Round thread hole is offered, the round thread bore dia is equal with threaded rod (9) diameter.
5. a kind of construction according to claim 1 partition guardrail, which is characterized in that the No.1 connecting block (13)
Shape is taper, and the No.1 connecting block (13) is steel component.
6. a kind of construction according to claim 1 partition guardrail, which is characterized in that connection sheet (20) front end
It is threaded with No.1 bolt (21) and No. two bolts (22), the No.1 bolt (21) is located at the side of No. two bolts (22).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811140474.0A CN109113420A (en) | 2018-09-28 | 2018-09-28 | A kind of construction partition guardrail |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201811140474.0A CN109113420A (en) | 2018-09-28 | 2018-09-28 | A kind of construction partition guardrail |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109113420A true CN109113420A (en) | 2019-01-01 |
Family
ID=64857086
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201811140474.0A Pending CN109113420A (en) | 2018-09-28 | 2018-09-28 | A kind of construction partition guardrail |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109113420A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110016927A (en) * | 2019-05-13 | 2019-07-16 | 应舍美居(深圳)科技有限公司 | Ground fixed system and nail puller |
CN110174097A (en) * | 2019-06-17 | 2019-08-27 | 江西应用技术职业学院 | A kind of land management measurement point setter |
CN112302414A (en) * | 2020-10-23 | 2021-02-02 | 梁宇 | Safety protection device for building engineering and use method thereof |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202008003773U1 (en) * | 2008-03-18 | 2008-06-12 | Brühl, Hans Georg | mounting tab |
CN201176705Y (en) * | 2008-04-14 | 2009-01-07 | 江苏广宇建设集团有限公司 | Adjusting device of scaffoldings in vertical direction |
KR100927156B1 (en) * | 2009-05-22 | 2009-11-24 | 주식회사 건보엔지니어링종합건축사사무소 | Multi-functional balcony railing |
US20170159322A1 (en) * | 2015-02-20 | 2017-06-08 | Kelly Presti | Modular privacy fence with individually replaceable pickets |
CN206917596U (en) * | 2017-06-29 | 2018-01-23 | 李建新 | A kind of municipal construction folding ladder |
CN108055924A (en) * | 2017-12-01 | 2018-05-22 | 凤台县余跃蔬菜专业合作社 | A kind of sugarcane packing apparatus |
CN207469890U (en) * | 2017-09-14 | 2018-06-08 | 河南五建建设集团有限公司 | A kind of foundation pit guardrail of construction |
CN108278038A (en) * | 2017-12-19 | 2018-07-13 | 合肥草木蕃景生态科技有限公司 | A kind of garden landscape plant guardrail and its installation method |
-
2018
- 2018-09-28 CN CN201811140474.0A patent/CN109113420A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE202008003773U1 (en) * | 2008-03-18 | 2008-06-12 | Brühl, Hans Georg | mounting tab |
CN201176705Y (en) * | 2008-04-14 | 2009-01-07 | 江苏广宇建设集团有限公司 | Adjusting device of scaffoldings in vertical direction |
KR100927156B1 (en) * | 2009-05-22 | 2009-11-24 | 주식회사 건보엔지니어링종합건축사사무소 | Multi-functional balcony railing |
US20170159322A1 (en) * | 2015-02-20 | 2017-06-08 | Kelly Presti | Modular privacy fence with individually replaceable pickets |
CN206917596U (en) * | 2017-06-29 | 2018-01-23 | 李建新 | A kind of municipal construction folding ladder |
CN207469890U (en) * | 2017-09-14 | 2018-06-08 | 河南五建建设集团有限公司 | A kind of foundation pit guardrail of construction |
CN108055924A (en) * | 2017-12-01 | 2018-05-22 | 凤台县余跃蔬菜专业合作社 | A kind of sugarcane packing apparatus |
CN108278038A (en) * | 2017-12-19 | 2018-07-13 | 合肥草木蕃景生态科技有限公司 | A kind of garden landscape plant guardrail and its installation method |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110016927A (en) * | 2019-05-13 | 2019-07-16 | 应舍美居(深圳)科技有限公司 | Ground fixed system and nail puller |
CN110016927B (en) * | 2019-05-13 | 2023-10-31 | 应舍美居(深圳)科技有限公司 | Ground fixing system |
CN110174097A (en) * | 2019-06-17 | 2019-08-27 | 江西应用技术职业学院 | A kind of land management measurement point setter |
CN110174097B (en) * | 2019-06-17 | 2021-06-25 | 江西应用技术职业学院 | Soil management is fixed point ware for measurement |
CN112302414A (en) * | 2020-10-23 | 2021-02-02 | 梁宇 | Safety protection device for building engineering and use method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109113420A (en) | A kind of construction partition guardrail | |
CN103526827B (en) | A kind of curtain-wall stand-column and building body attachment structure | |
CN108049704A (en) | A kind of municipal works fence that can adjust height | |
CN208594878U (en) | Oil-water well well head jacks erection device | |
CN207653145U (en) | A kind of municipal administration greening tree erecting device | |
CN208747581U (en) | A kind of transmission line high-altitude operation self-powered platform | |
CN208670268U (en) | Convenient for the natural gas line support construction of adjusting | |
CN208816999U (en) | A kind of constructing road engineering fugitive dust monitor | |
CN206873887U (en) | A kind of adjustable construction scaffold | |
CN206407850U (en) | A kind of two-stage telescopic arm mechanical arm | |
CN106639642B (en) | A kind of electric power apparatus examination guard rail rod | |
CN209494305U (en) | A kind of municipal works lift fence | |
CN108252569A (en) | A kind of Rapid Combination enclosing and construction method | |
CN205871280U (en) | Cylinder drive swing strutting arrangement and oil press | |
CN205039755U (en) | Unipolar antithetical couplet movable support prevents submerged fixed mounting structure of base to one side | |
CN208650797U (en) | A kind of geological mapping drilling rig | |
CN206554249U (en) | A kind of new steel structure column braces | |
CN209145418U (en) | A kind of combined type can relocation housing build construction protection column | |
CN209293553U (en) | A kind of engineering construction safe fence | |
CN207176919U (en) | A kind of skyscraper steel beam structure | |
CN106438842A (en) | Steel wire rope universal adjustment structure for casino equipment | |
CN219080162U (en) | Urban road greening anti-crossing fence | |
CN206128837U (en) | Stake of dual -purpose hook | |
CN112252821A (en) | Security protection device for construction | |
CN221052956U (en) | Anti-drop structure of building curtain |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
AD01 | Patent right deemed abandoned |
Effective date of abandoning: 20201222 |
|
AD01 | Patent right deemed abandoned |