CN109104750A - A kind of LTE-R method of handover based on speed triggering - Google Patents

A kind of LTE-R method of handover based on speed triggering Download PDF

Info

Publication number
CN109104750A
CN109104750A CN201810984187.1A CN201810984187A CN109104750A CN 109104750 A CN109104750 A CN 109104750A CN 201810984187 A CN201810984187 A CN 201810984187A CN 109104750 A CN109104750 A CN 109104750A
Authority
CN
China
Prior art keywords
train
speed
switching
lte
handover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810984187.1A
Other languages
Chinese (zh)
Inventor
彭艺
尹玉梅
祁俊辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kunming University of Science and Technology
Original Assignee
Kunming University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kunming University of Science and Technology filed Critical Kunming University of Science and Technology
Priority to CN201810984187.1A priority Critical patent/CN109104750A/en
Publication of CN109104750A publication Critical patent/CN109104750A/en
Pending legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/0005Control or signalling for completing the hand-off
    • H04W36/0083Determination of parameters used for hand-off, e.g. generation or modification of neighbour cell lists
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/24Reselection being triggered by specific parameters
    • H04W36/30Reselection being triggered by specific parameters by measured or perceived connection quality data
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W36/00Hand-off or reselection arrangements
    • H04W36/24Reselection being triggered by specific parameters
    • H04W36/32Reselection being triggered by specific parameters by location or mobility data, e.g. speed data

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention relates to a kind of LTE-R method of handover based on speed triggering, belong to wireless communication handoff techniques field.The measurement report that the present invention is uploaded by train mobile terminal compares the Reference Signal Received Power of Target cell and serving cell to decide whether triggering switching;Next, train present speed is compared with the speed threshold value of setting, to decide whether to start fast handover procedure, not up to speed threshold value just runs conventional changeover program;Finally, the time that the train being calculated must be reached to switching reference point is compared with the time gate limit value of setting if court verdict is operation fast handover procedure, next measurement report is waited to switch over again if the time is less than time gate limit value.This hair solve the prior art to LTE-R handover not in time, phenomena such as success rate is not high, increase train in the validity and success rate of handover between cells.

Description

A kind of LTE-R method of handover based on speed triggering
Technical field
The present invention relates to a kind of LTE-R method of handover based on speed triggering, belong to wireless communication and get over area and cut Change technical field.
Background technique
When train high-speed cruising on rail, due to excessive velocities will lead to signal in handover between cells showing not in time As occurring, therefore train quickly and efficiently can carry out signal switching in minizone, and in terms of improving Research is of great significance.
Currently, the handover for train on rail, traditional algorithm is using the joint based on RSRP and RSRQ Decision algorithm can avoid to a certain extent frequent switching and cutting off rate excessively high in this way;But when train is run with friction speed It is still made decisions using the identical sluggish and trigger delay time, is easy for causing switching too early or both of these case goes out too late It is existing.
The optimization algorithm of the handoff parameter based on movement speed characteristic is had also been proposed later, although this solves train not With the switching problem under speed, but its measurement report uploaded can reduce the accuracy of switch decision, therefore still have much room for improvement, and mention A kind of handoff algorithms rapidly and efficiently are a problem to be solved out.
Summary of the invention
The technical problem to be solved by the present invention is to be directed to the limitation and deficiency of the prior art, provide a kind of based on speed triggering LTE-R method of handover, with solve the prior art to LTE-R handover not in time, success rate is not high phenomena such as, endeavour Increase train in the validity and success rate of handover between cells in carrying out Pre-handoff after making decisions to train speed.
The technical scheme is that a kind of LTE-R method of handover based on speed triggering, mobile eventually by train The measurement report uploaded is held, compares the Reference Signal Received Power of Target cell and serving cell to decide whether that triggering is cut It changes;Next, train present speed is compared with the speed threshold value of setting, to decide whether that starting is switched fast journey Sequence, not up to speed threshold value just run conventional changeover program;Finally, if court verdict is operation fast handover procedure, it must The time that the train being calculated reaches switching reference point is compared with the time gate limit value of setting, if the time is less than the time Threshold value then waits next measurement report to switch over again;
Specific steps are as follows:
Step1: place when switching over to train carries out a large amount of measurement statistics, obtains the switching reference of an estimation Point P (x1,y1), whether start for train and be switched fast algorithm one speed threshold V_threshold of setting, to be confirmed whether to swash A switching time thresholding T_threshold is arranged in Target cell channel living;
Wireless base station eNodeB in Step2:LTE network initiates modification measurement to train mobile terminal UE, measures train Speed V, direction D, the position coordinates Q (x of current location2,y2), serving cell Reference Signal Received Power thresholding RSRPS, A3 thing Part triggers hysteresis factors H, Target cell Reference Signal Received Power thresholding RSRPT;The wherein calculation of serving cell RSRP Such as formula (1), P in formula (1)RSIt is the mean receiving power for carrying each resource particle of reference signal, PnoiseIt is carrying with reference to letter Number each resource particle average noise power;
RSRP=PRS-Pnoise (1)
Step3: when the measurement report that train mobile terminal UE measurement obtains meets reporting conditions, measurement report is uploaded to Wireless base station eNodeB in LTE network;
Step4: judging whether the Reference Signal Received Power of serving cell and Target cell meets formula (2) condition, Under the conditions of "Yes", triggering switching;Conversely, turning again to measurement report;
RSRPT > RSRPS+H (2)
Step5: under conditions of meeting formula (2), judging whether Target cell channel has activated, and sends switching if activation Order;If un-activation, conventional changeover program is run;
Step6: train present speed V is compared with the speed threshold V_threshold of setting, if train speed V Greater than speed threshold V_threshold, then starting is switched fast algorithm;Conversely, running conventional changeover program;
Step7: train is calculated to the distance S of switching reference point, such as formula (3), and obtains estimating switching time T, such as formula (4);
Step8: comparing estimation switching time T and switching time thresholding T_threshold size, if estimation switching time T Greater than the switching time thresholding T_threshold of setting, then activation Target cell channel is confirmed;Conversely, then waiting next survey Amount report, completes handoff procedure.
Further, in the Step1 and Step2, GPS system need to be installed to train, mobile station could be by train position Network is reported to measurement report with velocity information.
Further, in the Step2, current of traffic D is judged according to train number number.
Further, in the Step2, it is current service cell and consecutive target cell that A3 event, which triggers hysteresis factors H, Reference Signal Received Power RSRP difference, which can and sets itself different according to communication environment.
Further, in the Step5, conventional changeover program refers to train reactivation mesh after having carried out handover trigger Mark cell channel.
Further, in the Step6, be switched fast algorithm refer to it is just complete to Target cell channel before handover trigger At activation, i.e., according to train running speed, direction, position, just fulfil target ahead of schedule when train does not enter 2 cell overlapping region The distribution and activation of cell channel.
Further, in the Step6, setting switch speed thresholding V_threshold for high-speed mobile train and Speech will will start during switching execution and be switched fast algorithm, and train operation distance can significantly reduce, and can reduce cut in this way It changes failure rate, improve call reliability.
Further, in the Step8, setting switching time thresholding T_threshold is in order to prevent in the switching time limit It is interior, if the appearance for the case where not completing switching and causing network congestion.
The beneficial effects of the present invention are: solve the prior art to LTE-R handover not in time, success rate it is not high existing As increasing train in the validity and success rate of handover between cells.
Detailed description of the invention
Fig. 1 is flow diagram of the present invention;
Fig. 2 is handover procedure schematic diagram of the present invention.
Specific embodiment
With reference to the accompanying drawings and detailed description, the invention will be further described.
Embodiment 1: as shown in Figs. 1-2, a kind of LTE-R method of handover based on speed triggering is mobile by train The measurement report that terminal uploads compares the Reference Signal Received Power of Target cell and serving cell to decide whether that triggering is cut It changes;Next, train present speed is compared with the speed threshold value of setting, to decide whether that starting is switched fast journey Sequence, not up to speed threshold value just run conventional changeover program;Finally, if court verdict is operation fast handover procedure, it must The time that the train being calculated reaches switching reference point is compared with the time gate limit value of setting, if the time is less than the time Threshold value then waits next measurement report to switch over again;
Specific steps are as follows:
Step1: place when switching over to train carries out a large amount of measurement statistics, obtains the switching reference of an estimation Point P (x1,y1), whether start for train and be switched fast algorithm one speed threshold V_threshold of setting, to be confirmed whether to swash A switching time thresholding T_threshold is arranged in Target cell channel living;
Wireless base station eNodeB in Step2:LTE network initiates modification measurement to train mobile terminal UE, measures train Speed V, direction D, the position coordinates Q (x of current location2,y2), serving cell Reference Signal Received Power thresholding RSRPS, A3 thing Part triggers hysteresis factors H, Target cell Reference Signal Received Power thresholding RSRPT;The wherein calculation of serving cell RSRP Such as formula (1), P in formula (1)RSIt is the mean receiving power for carrying each resource particle of reference signal, PnoiseIt is carrying with reference to letter Number each resource particle average noise power;
RSRP=PRS-Pnoise (1)
Step3: when the measurement report that train mobile terminal UE measurement obtains meets reporting conditions, measurement report is uploaded to Wireless base station eNodeB in LTE network;
Step4: judging whether the Reference Signal Received Power of serving cell and Target cell meets formula (2) condition, Under the conditions of "Yes", triggering switching;Conversely, turning again to measurement report;
RSRPT > RSRPS+H (2)
Step5: under conditions of meeting formula (2), judging whether Target cell channel has activated, and sends switching if activation Order;If un-activation, conventional changeover program is run;
Step6: train present speed V is compared with the speed threshold V_threshold of setting, if train speed V Greater than speed threshold V_threshold, then starting is switched fast algorithm;Conversely, running conventional changeover program;
Step7: train is calculated to the distance S of switching reference point, such as formula (3), and obtains estimating switching time T, such as formula (4);
Step8: comparing estimation switching time T and switching time thresholding T_threshold size, if estimation switching time T Greater than the switching time thresholding T_threshold of setting, then activation Target cell channel is confirmed;Conversely, then waiting next survey Amount report, completes handoff procedure.
Further, in the Step1 and Step2, GPS system need to be installed to train, mobile station could be by train position Network is reported to measurement report with velocity information.
Further, in the Step2, current of traffic D is judged according to train number number.
Further, in the Step2, it is current service cell and consecutive target cell that A3 event, which triggers hysteresis factors H, Reference Signal Received Power RSRP difference, which can and sets itself different according to communication environment.
Further, in the Step5, conventional changeover program refers to train reactivation mesh after having carried out handover trigger Mark cell channel.
Further, in the Step6, be switched fast algorithm refer to it is just complete to Target cell channel before handover trigger At activation, i.e., according to train running speed, direction, position, just fulfil target ahead of schedule when train does not enter 2 cell overlapping region The distribution and activation of cell channel.
Further, in the Step6, setting switch speed thresholding V_threshold for high-speed mobile train and Speech will will start during switching execution and be switched fast algorithm, and train operation distance can significantly reduce, and can reduce cut in this way It changes failure rate, improve call reliability.
Further, in the Step8, setting switching time thresholding T_threshold is in order to prevent in the switching time limit It is interior, if the appearance for the case where not completing switching and causing network congestion.
In conjunction with attached drawing, the embodiment of the present invention is explained in detail above, but the present invention is not limited to above-mentioned Embodiment within the knowledge of a person skilled in the art can also be before not departing from present inventive concept Put that various changes can be made.

Claims (6)

1. a kind of LTE-R method of handover based on speed triggering, it is characterised in that: the survey uploaded by train mobile terminal Amount report compares the Reference Signal Received Power of Target cell and serving cell to decide whether triggering switching;Next, will Train present speed is compared with the speed threshold value of setting, to decide whether to start fast handover procedure, not up to speed Threshold value just runs conventional changeover program;Finally, if court verdict is operation fast handover procedure, the column that must will be calculated The time that vehicle reaches switching reference point is compared with the time gate limit value of setting, under waiting if the time is less than time gate limit value One measurement report switches over again;
Specific steps are as follows:
Step1: place when switching over to train measures statistics, obtains the switching reference point P (x of an estimation1,y1), Whether start for train and be switched fast algorithm one speed threshold V_threshold of setting, to be confirmed whether to activate Target cell A switching time thresholding T_threshold is arranged in channel;
Wireless base station eNodeB in Step2:LTE network initiates modification measurement to train mobile terminal UE, and measurement train is current Speed V, direction D, the position coordinates Q (x of position2,y2), serving cell Reference Signal Received Power thresholding RSRPS, A3 event touching Send out hysteresis factors H, Target cell Reference Signal Received Power thresholding RSRPT;The wherein calculation of serving cell RSRP such as formula (1), P in formula (1)RSIt is the mean receiving power for carrying each resource particle of reference signal, PnoiseIt is carrying reference signal The average noise power of each resource particle;
RSRP=PRS-Pnoise (1)
Step3: when the measurement report that train mobile terminal UE measurement obtains meets reporting conditions, measurement report is uploaded to LTE Wireless base station eNodeB in network;
Step4: judging whether the Reference Signal Received Power of serving cell and Target cell meets formula (2) condition, in "Yes" item Under part, triggering switching;Conversely, turning again to measurement report;
RSRPT > RSRPS+H (2)
Step5: under conditions of meeting formula (2), judging whether Target cell channel has activated, and switching life is sent if activation It enables;If un-activation, conventional changeover program is run;
Step6: train present speed V is compared with the speed threshold V_threshold of setting, if train speed V is greater than Speed threshold V_threshold, then starting is switched fast algorithm;Conversely, running conventional changeover program;
Step7: train is calculated to the distance S of switching reference point, such as formula (3), and obtains estimating switching time T, such as formula (4);
Step8: comparing estimation switching time T and switching time thresholding T_threshold size, if estimation switching time T is greater than The switching time thresholding T_threshold of setting then confirms activation Target cell channel;Conversely, next measurement is then waited to report It accuses, completes handoff procedure.
2. the LTE-R method of handover according to claim 1 based on speed triggering, it is characterised in that: the Step1 In Step2, GPS system need to be installed to train, train position and velocity information could be reported to by mobile station with measurement report Network.
3. the LTE-R method of handover according to claim 1 based on speed triggering, it is characterised in that: the Step2 In, current of traffic D is judged according to train number number.
4. the LTE-R method of handover according to claim 1 based on speed triggering, it is characterised in that: the Step2 In, A3 event triggering hysteresis factors H is the difference of the Reference Signal Received Power RSRP of current service cell and consecutive target cell Value.
5. the LTE-R method of handover according to claim 1 based on speed triggering, it is characterised in that: the Step5 In, conventional changeover program refers to train reactivation Target cell channel after having carried out handover trigger.
6. the LTE-R method of handover according to claim 1 based on speed triggering, it is characterised in that: the Step6 In, be switched fast algorithm and refer to before handover trigger and just Target cell channel is completed to activate, i.e., according to train running speed, Direction, position just fulfil the distribution and activation of Target cell channel ahead of schedule when train does not enter 2 cell overlapping region.
CN201810984187.1A 2018-08-28 2018-08-28 A kind of LTE-R method of handover based on speed triggering Pending CN109104750A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810984187.1A CN109104750A (en) 2018-08-28 2018-08-28 A kind of LTE-R method of handover based on speed triggering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810984187.1A CN109104750A (en) 2018-08-28 2018-08-28 A kind of LTE-R method of handover based on speed triggering

Publications (1)

Publication Number Publication Date
CN109104750A true CN109104750A (en) 2018-12-28

Family

ID=64851478

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810984187.1A Pending CN109104750A (en) 2018-08-28 2018-08-28 A kind of LTE-R method of handover based on speed triggering

Country Status (1)

Country Link
CN (1) CN109104750A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111277975A (en) * 2020-01-15 2020-06-12 北京锦鸿希电信息技术股份有限公司 GSM-R handover switching method and device
CN111526481A (en) * 2019-02-05 2020-08-11 丰田自动车株式会社 Vehicle-mounted communication device, communication method, and server device
WO2020192763A1 (en) * 2019-03-27 2020-10-01 华为技术有限公司 Method and device for measuring reference signal
CN113133068A (en) * 2019-12-31 2021-07-16 中国移动通信集团浙江有限公司 Same-frequency switching method and device for endangered electric quantity terminal
CN115915314A (en) * 2022-11-04 2023-04-04 苏州大学 High-speed rail mobile communication network handover parameter self-adaption method and device

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103797855A (en) * 2012-03-28 2014-05-14 日电(中国)有限公司 Method and apparatus for handover
CN108243463A (en) * 2016-12-27 2018-07-03 中国移动通信集团浙江有限公司 A kind of cell switching method of LTE high ferros

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103797855A (en) * 2012-03-28 2014-05-14 日电(中国)有限公司 Method and apparatus for handover
CN108243463A (en) * 2016-12-27 2018-07-03 中国移动通信集团浙江有限公司 A kind of cell switching method of LTE high ferros

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
吴昊等: ""一种应用于高速铁路的 GSM-R快速切换算法研究"", 《铁道工程学报》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111526481A (en) * 2019-02-05 2020-08-11 丰田自动车株式会社 Vehicle-mounted communication device, communication method, and server device
WO2020192763A1 (en) * 2019-03-27 2020-10-01 华为技术有限公司 Method and device for measuring reference signal
CN113133068A (en) * 2019-12-31 2021-07-16 中国移动通信集团浙江有限公司 Same-frequency switching method and device for endangered electric quantity terminal
CN113133068B (en) * 2019-12-31 2022-06-14 中国移动通信集团浙江有限公司 Same-frequency switching method and device for endangered electric quantity terminal
CN111277975A (en) * 2020-01-15 2020-06-12 北京锦鸿希电信息技术股份有限公司 GSM-R handover switching method and device
CN111277975B (en) * 2020-01-15 2022-08-26 北京锦鸿希电信息技术股份有限公司 GSM-R handover switching method and device
CN115915314A (en) * 2022-11-04 2023-04-04 苏州大学 High-speed rail mobile communication network handover parameter self-adaption method and device
CN115915314B (en) * 2022-11-04 2024-02-09 苏州大学 High dynamic mobile communication network handover parameter self-adapting method and device

Similar Documents

Publication Publication Date Title
CN109104750A (en) A kind of LTE-R method of handover based on speed triggering
US9980188B2 (en) User mobility control for heterogeneous wireless networks
US9474000B2 (en) Handover and reselection searching using predictive mobility
US8369857B2 (en) Speed-dependent adaptation of mobility parameters with dual speed measurement
KR101761811B1 (en) Method and system for supporting handover between macro base station and open moving relay
CN102572989A (en) Method and system capable of adjusting parameters according to moving speed of terminal
CN100461959C (en) Cell switching control method of high speed moving terminal
US20120322497A1 (en) Client side cellular handoff prediction
CN102300274A (en) Geographical-position-information-based fast handover method for time-division duplex long term evolution (TD-LTE) system
CN102271374A (en) Rapid switching method of TD-LTE (Time-division Duplex Long Term Evolution) communication system based on destination cell pre-load
CN103237324B (en) A kind of geographical location information assists the quick switch determining method of LTE system
CN106304125B (en) A kind of compound switching method under high-speed rail environment
CN103491581A (en) Optimum switching reference point selecting method based on high speed railway fixed-point switching algorithm
CN104581849A (en) Residential quarter switch method
JP2002320277A5 (en)
CN101340704B (en) Cell switch determining method
WO2017156759A1 (en) User-equipment network-migration method and access-network device
CN105208615A (en) Switching method based on adjustable prediction threshold hysteresis margin in super-dense network
WO2019007134A1 (en) Method and apparatus for switching wireless access point, and train
CN110753377B (en) Cell switching method based on position, terminal and base station
US20130084862A1 (en) Method Of Estimating Mobility Of User Equipment And A Wireless Device
CN103945479A (en) Throughput-based high-speed rail wireless special network cell switching optimal switching point determining method
CN105009515A (en) Methods and apparatuses for managing radio access node cluster
CN106792557B (en) Data scheduling method in LTE (Long term evolution) rail transit scene
CN103024845B (en) Adaptive vertical handoff method based on UMTS (universal mobile telecommunications system) and WLAN (wireless local area network)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181228

RJ01 Rejection of invention patent application after publication