CN109102175A - A kind of cource arrangement method for training education - Google Patents
A kind of cource arrangement method for training education Download PDFInfo
- Publication number
- CN109102175A CN109102175A CN201810829056.6A CN201810829056A CN109102175A CN 109102175 A CN109102175 A CN 109102175A CN 201810829056 A CN201810829056 A CN 201810829056A CN 109102175 A CN109102175 A CN 109102175A
- Authority
- CN
- China
- Prior art keywords
- classroom
- class
- training
- row
- project
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000012549 training Methods 0.000 title claims abstract description 78
- 238000000034 method Methods 0.000 title claims abstract description 24
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000008676 import Effects 0.000 abstract description 2
- 238000007726 management method Methods 0.000 description 16
- 238000012986 modification Methods 0.000 description 3
- 230000004048 modification Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 201000004569 Blindness Diseases 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/10—Services
- G06Q50/20—Education
- G06Q50/205—Education administration or guidance
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Economics (AREA)
- Educational Administration (AREA)
- Tourism & Hospitality (AREA)
- General Physics & Mathematics (AREA)
- Educational Technology (AREA)
- Marketing (AREA)
- Theoretical Computer Science (AREA)
- General Business, Economics & Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Physics & Mathematics (AREA)
- Quality & Reliability (AREA)
- Development Economics (AREA)
- Operations Research (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Electrically Operated Instructional Devices (AREA)
Abstract
The invention discloses a kind of cource arrangement methods for training education, are easy error to solve the problem of that manual row's class in the prior art is time-consuming and laborious.This method is to obtain the classroom type in training program table one by one after receiving the training program table that user imports, compare whether classroom type matches with the classroom type in the database of classroom;It determines the target classroom to match, judges whether number is less than or equal to the open ended maximum number in the target classroom;When number is less than or equal to the open ended maximum number in the target classroom, obtain at the beginning of the training project of the row's of waiting for class with the end time, and obtain from row's class classroom database row's class information in the target classroom;Judge whether the training time has overlapping;If so, manual curriculum scheduling;Otherwise, by the training project arrangement of the row's of waiting for class to the target classroom.The efficiency for having the beneficial effect that the work of the row's of improving class, alleviates the workload of Training Management personnel, practical function is easy to operate.
Description
Technical field
The present invention relates to computer software technical field more particularly to a kind of cource arrangement methods for training education.
Background technique
Training management is enterprise or company is the basis for increasing the talent, improving management and working efficiency.Traditional training
Instruction management method has been not suitable with the variation of current efficient work rate.With the development of the universal and network technology of information system,
Efficient information-based application is also increasingly paid attention to, and informationization brings great variety to traditional Training Management, not only to enterprise
Influence is played in the arrangement of the groundwork process of industry, while can also be challenged to the management system of present enterprise, and enterprise is pushed
Management system update.
Course Arrangement is mainly based upon the mode for running version by hand come what is considered at present, is that the training program of unit is all mostly
It is responsible for by certain staff, customizes training program using excel table or statistical report form.Hand-set mode is time-consuming to take
Power, blindness, triviality, it is error-prone the disadvantages of, it is difficult to ensure that typesetting result is best.
Based on numerous disadvantages of manual row's class, there is an urgent need to have it is a it is powerful, easy to operate, there is hommization again
Intelligent training management system, to mitigate the operating pressure of row class personnel.Training schedule aranging is the core of company's training program, is surrounded
Training program is effectively planned training overall process, is organized, is assisted according to certain training education thought and management thought
It adjusts, control, to realize the process of the efficiently training company talent.
Summary of the invention
The embodiment of the present invention provides a kind of cource arrangement method for training education, to solve row by hand in the prior art
Class is time-consuming and laborious, is easy error, and low efficiency is unable to reach the problem of training resource maximally utilizes.
The embodiment of the present invention provides a kind of cource arrangement method for training education, this method comprises:
After the training program table for receiving user's importing, the religion of the training project of class to be arranged in training program table is obtained one by one
Room type compares the classroom type in each classroom stored in the classroom type and classroom database of the training project of the row's of waiting for class
Whether match;
Determine the classroom type of the training project of the row's of waiting for class and the mesh that the classroom type in the classroom database matches
Classroom is marked, continues to judge whether the number of the training project of the row's of waiting for class is less than or equal to the open ended most adult in the target classroom
Number;
When the number for determining the training project when row's class is less than or equal to the open ended maximum number in the target classroom, obtain
Take at the beginning of the training project of the row's of waiting for class with the end time, and target religion is obtained from row's class classroom database
Row's class information of room;
Judge at the beginning of the training project of the row's of waiting for class and in row's class information in end time and the target classroom
It is overlapping whether the time started has with the end time;If so, manual curriculum scheduling;Otherwise, by the training project of the row's of waiting for class arrange to
The target classroom.
Preferably, obtaining class to be arranged in training program table one by one after the training program table for receiving user's importing
Before the classroom type of training project, further includes:
The training program table for not arranging class is judged whether it is according to the title of the training program table, is being determined as not arranging the training of class
When instructing planning chart, which is stored into training program database, includes a plurality of be somebody's turn to do in the training program database
Project name, number, classroom type, time started and the end time of the training project of class to be arranged.
Preferably, in the classroom database, comprising: classroom title, classroom type, classroom place and classroom are open ended
Maximum number.
Preferably, this row's class classroom database purchase has existing row's class information in each classroom, which includes:
The project name of the training project of row's class, number, classroom type, time started and end time.
The beneficial effect comprise that the appearance of Intelligent Course Scheduling System changes previous manual row's class mode, improve
The efficiency of row class work.System design alleviates workload of Training Management personnel during row's class, technologically advanced, function
Can be practical, it is easy to operate.The function of Intelligent Course Scheduling System be in order to shorten row class hour between, improve row's class efficiency, reduce data
Manual entry, to the reasonable disposition of teaching resource to the quality of the row's of raising class.
Detailed description of the invention
Fig. 1 is the database schema figure of Intelligent Course Scheduling System provided in an embodiment of the present invention;
Fig. 2 is the flow chart of the cource arrangement method for training education in the embodiment of the present invention.
Specific embodiment
The embodiment of the invention provides a kind of cource arrangement methods for training education, below in conjunction with Figure of description to this hair
Bright preferred embodiment is illustrated, it should be understood that and preferred embodiments described herein are only used to illustrate and explain the present invention,
It is not intended to limit the present invention.And in the absence of conflict, the features in the embodiments and the embodiments of the present application can be with
It is combined with each other.
As shown in fig.1, mainly including following several using the Intelligent Course Scheduling System of the cource arrangement method for training education
A module: class management, training program management, training Constraints Management and training course scheduling management.Separately below to four modules into
Row is discussed in detail.
Class management module includes the title for training classroom, place, maximum seating capacity and the class for training classroom
Type, the i.e. information such as classroom function, are mainly stored in classroom database.
Training program management is mainly to open the monthly project management to be giveed training, the title of training project, project
Begin time and end time, participates in the number of training, the type of training project, for matching the classroom of proper function, information is deposited
It is stored in training program database.
Train Constraints Management be mainly manage Intelligent Course Scheduling constraint condition, as Intelligent Course Scheduling System algorithm it is important according to
According to such as the galleryful in training classroom, elastic maximum galleryful train the acceptable training project type in classroom, or not
Receptible training project type, constraint condition information are stored in training binding database.
Training course scheduling management mainly passes through timetabling algorithm, and existing row's class result is stored, main comprising
The training project title that row's class is completed trains classroom, the information such as training time section.
As shown in fig.2, a kind of cource arrangement method for training education, this method comprises:
Step 200: after the training program table for receiving user's importing, obtaining the training of class to be arranged in training program table one by one
The classroom type of project compares each classroom stored in the classroom type and classroom database of the training project of the row's of waiting for class
Whether classroom type matches.
Specifically, obtaining class to be arranged in training program table one by one after the training program table for receiving user's importing
Before the classroom type of training project, further includes: judge whether it is the training meter for not arranging class according to the title of the training program table
Table is drawn to store the training program table into training program database, the training when being determined as not arranging the training program table of class
It include project name, number, classroom type, time started and the knot of a plurality of training project for being somebody's turn to do class to be arranged in plan database
The beam time.In the classroom database, comprising: classroom title, classroom type, classroom place and the open ended most adult in classroom
Number.
Step 210: the classroom type and the classroom type phase in the classroom database for determining the training project of the row's of waiting for class
Matched target classroom continues to judge whether the number of the training project of the row's of waiting for class is less than or equal to the target classroom open ended
Maximum number.
Step 220: being less than or equal to the open ended maximum in target classroom in the number for determining the training project of the row's of waiting for class
When number, obtain at the beginning of the training project of the row's of waiting for class with the end time, and obtain from row's class classroom database
Take row's class information in the target classroom.Row's class classroom database purchase has existing row's class information in each classroom, row's class for this
Information includes: the project name of the training project of row's class, number, classroom type, time started and end time.
Step 230: judging row's class at the beginning of the training project of the row's of waiting for class with end time and the target classroom
Whether have at the beginning of in information with the end time overlapping;If so, manual curriculum scheduling;Otherwise, by the training item of the row's of waiting for class
Mesh arrangement is to the target classroom.
Described in detail below this is used for the specific steps process of the cource arrangement method of training education, as follows:
Step 3001: importing training program table, verify the integrality of training program table information;
Step 3002: judging whether the title of the training program table imported is consistent with the title of last training program table;
Step 3003: inconsistent in the title for the training program table for determining to import and the title of upper primary training program table
When, which is written in training program database;
Step 3004: obtaining the classroom type in training program table, be written in the database of classroom, form classroom type column
Table, and compare classroom type, judge each project in training program table classroom type whether with it is original in the database of classroom
The classroom type of storage matches;If so, thening follow the steps 3005;Otherwise, terminate;
Step 3005: until in the classroom type matching in the database of classroom after, randomly choose matched classroom, sentence
Whether the maximum galleryful in the classroom of breaking is more than or equal to the number of participant of the project in training program table;If so, executing step
Rapid 3006;Otherwise, terminate.
Step 3006: continuing to search the classroom in the row's of being completed class database whether by row's class, if so, executing
Step 3007;Otherwise, by the project arrangement to the classroom;
Step 3007: it is whether be overlapped with the item object time of class to be arranged between the row's class hour for judging the classroom, if so, knot
Beam, otherwise, by the project arrangement to the classroom.
Obviously, various changes and modifications can be made to the invention without departing from essence of the invention by those skilled in the art
Mind and range.In this way, if these modifications and changes of the present invention belongs to the range of the claims in the present invention and its equivalent technologies
Within, then the present invention is also intended to include these modifications and variations.
Claims (4)
1. a kind of cource arrangement method for training education, which is characterized in that the described method includes:
After the training program table for receiving user's importing, the classroom class of the training project of class to be arranged in training program table is obtained one by one
Type, the classroom type for comparing each classroom stored in the classroom type and classroom database of the training project of the class to be arranged are
No matching;
Determine the classroom type of the training project of the class to be arranged and the mesh that the classroom type in the classroom database matches
Classroom is marked, continues to judge whether the number of the training project of the class to be arranged is less than or equal to the open ended maximum in target classroom
Number;
Determining described when arranging the number of training project of class open ended less than or equal to the target classroom maximum number, is obtaining
Take at the beginning of the training project of the class to be arranged with the end time, and from row's class classroom database obtain the mesh
Mark row's class information in classroom;
At the beginning of the training project of class to be arranged described in judging and in row's class information in end time and the target classroom
It is overlapping whether the time started has with the end time;If so, manual curriculum scheduling;Otherwise, by the training project arrangement of the class to be arranged
To the target classroom.
2. the method as described in claim 1, which is characterized in that after the training program table for receiving user's importing, by
It is a to obtain in training program table before the classroom type of the training project of class to be arranged, further includes:
The training program table for not arranging class is judged whether it is according to the title of the training program table, is being determined as not arranging the training of class
When planning chart, the training program table is stored into training program database, includes a plurality of in the training program database
Project name, number, classroom type, time started and the end time of the training project of the class to be arranged.
3. the method as described in claim 1, which is characterized in that in the classroom database, comprising:
Classroom title, classroom type, the open ended maximum number in classroom place and classroom.
4. the method as described in claim 1, which is characterized in that the class of row classroom database purchase has showing for each classroom
There is row's class information, row's class information includes: the project name of the training project of row's class, number, classroom type, time started
And the end time.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810829056.6A CN109102175A (en) | 2018-07-25 | 2018-07-25 | A kind of cource arrangement method for training education |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810829056.6A CN109102175A (en) | 2018-07-25 | 2018-07-25 | A kind of cource arrangement method for training education |
Publications (1)
Publication Number | Publication Date |
---|---|
CN109102175A true CN109102175A (en) | 2018-12-28 |
Family
ID=64847491
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810829056.6A Pending CN109102175A (en) | 2018-07-25 | 2018-07-25 | A kind of cource arrangement method for training education |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109102175A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114330990A (en) * | 2021-11-16 | 2022-04-12 | 国网江苏省电力有限公司管理培训中心 | Class scheduling method and electronic equipment |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030014301A1 (en) * | 2001-07-10 | 2003-01-16 | Yaffe Bruce H. | Internet-based customer information system and method |
CN104616230A (en) * | 2015-02-13 | 2015-05-13 | 福州中科迅格信息科技有限公司 | Course arrangement system used for educational training |
CN105139310A (en) * | 2015-06-26 | 2015-12-09 | 苏州点通教育科技有限公司 | Intelligent course scheduling system and method |
CN106846193A (en) * | 2016-12-26 | 2017-06-13 | 河南工业大学 | The controllable cource arrangement method of constraint granularity and system |
CN107610012A (en) * | 2017-09-22 | 2018-01-19 | 皇晓琳 | A kind of curricula-variable and Course Arrangement and its curricula-variable and cource arrangement method |
-
2018
- 2018-07-25 CN CN201810829056.6A patent/CN109102175A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20030014301A1 (en) * | 2001-07-10 | 2003-01-16 | Yaffe Bruce H. | Internet-based customer information system and method |
CN104616230A (en) * | 2015-02-13 | 2015-05-13 | 福州中科迅格信息科技有限公司 | Course arrangement system used for educational training |
CN105139310A (en) * | 2015-06-26 | 2015-12-09 | 苏州点通教育科技有限公司 | Intelligent course scheduling system and method |
CN106846193A (en) * | 2016-12-26 | 2017-06-13 | 河南工业大学 | The controllable cource arrangement method of constraint granularity and system |
CN107610012A (en) * | 2017-09-22 | 2018-01-19 | 皇晓琳 | A kind of curricula-variable and Course Arrangement and its curricula-variable and cource arrangement method |
Non-Patent Citations (2)
Title |
---|
傅桂清 等,: "高效教室排课系统的设计与实现", 《信息技术教学与研究》 * |
张博锋 等: "网络环境下高校自动排课系统中教室安排算法的设计与分析", 《计算机应用于软件》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114330990A (en) * | 2021-11-16 | 2022-04-12 | 国网江苏省电力有限公司管理培训中心 | Class scheduling method and electronic equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Bachtler et al. | EU cohesion policy in practice: what does it achieve? | |
CN103996154A (en) | Human-computer coordination heuristic course arrangement system orientated toward unified teaching resources | |
CN106682877A (en) | Method of project management | |
CN102034370A (en) | System for automated and simulated competency assessment for thermal power station | |
CN107392425A (en) | A kind of the tobacco business project implementation SOP management method and system | |
CN109947532A (en) | A kind of big data method for scheduling task in education cloud platform | |
Redaelli | American cultural policy and the rise of arts management programs: The creation of a new professional identity | |
CN110245921A (en) | The method that data service upstream and downstream link tracing function is realized based on metadata in big data improvement | |
CN107609077A (en) | Wlding approaches to IM | |
CN109102175A (en) | A kind of cource arrangement method for training education | |
CN109146172B (en) | Multi-subject modeling method for climate change coping strategy | |
CN110377827A (en) | Course Training scene method for pushing, device, medium and electronic equipment | |
Tang et al. | Chatgpt participates in traffic control as a traffic manager assistant | |
CN208903303U (en) | Standard Life cycle information data management system | |
CN115564176A (en) | Decision flow engine simplification method supporting parallel execution | |
CN112162994A (en) | SQL (structured query language) generation method and system for system entry data | |
CN111061853B (en) | Method for rapidly acquiring FAQ model training corpus | |
Elena et al. | How to improve curriculum development through processes modeling technique | |
CN105303362A (en) | Web signature process method based on storage process | |
Pulawska et al. | Applying accessibility tools to address urban and transport planning. The case of the Eurocity of Valença-Tui and the Euroregion of Galicia-Norte de Portugal | |
US20050049904A1 (en) | Process for business quality control | |
Hübner | Decarbonization and unlocking: National pathways to low carbon emission economies | |
CN106507152A (en) | Method and device for preparing and deleting program files | |
Suttmeier | The Transformation of Chinese Science | |
Nikitina et al. | Process model of software method transition |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181228 |