CN109086032B - 一种全适应一体化电源监控方法和装置 - Google Patents
一种全适应一体化电源监控方法和装置 Download PDFInfo
- Publication number
- CN109086032B CN109086032B CN201810689655.2A CN201810689655A CN109086032B CN 109086032 B CN109086032 B CN 109086032B CN 201810689655 A CN201810689655 A CN 201810689655A CN 109086032 B CN109086032 B CN 109086032B
- Authority
- CN
- China
- Prior art keywords
- power supply
- communication
- alternating current
- direct current
- ups
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000000034 method Methods 0.000 title claims abstract description 25
- 238000012544 monitoring process Methods 0.000 title claims abstract description 22
- 238000004891 communication Methods 0.000 claims abstract description 59
- 238000004806 packaging method and process Methods 0.000 claims abstract description 7
- 230000011664 signaling Effects 0.000 claims description 17
- 238000013515 script Methods 0.000 claims description 12
- 238000007689 inspection Methods 0.000 claims description 9
- 238000009413 insulation Methods 0.000 claims description 6
- 230000003044 adaptive effect Effects 0.000 claims description 4
- 238000001514 detection method Methods 0.000 claims description 3
- 238000005070 sampling Methods 0.000 claims description 3
- 238000012423 maintenance Methods 0.000 description 4
- 230000007547 defect Effects 0.000 description 2
- 238000012856 packing Methods 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/20—Software design
- G06F8/24—Object-oriented
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/40—Transformation of program code
- G06F8/41—Compilation
- G06F8/44—Encoding
- G06F8/447—Target code generation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F8/00—Arrangements for software engineering
- G06F8/60—Software deployment
- G06F8/61—Installation
Landscapes
- Engineering & Computer Science (AREA)
- General Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Software Systems (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
- Stand-By Power Supply Arrangements (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810689655.2A CN109086032B (zh) | 2018-06-28 | 2018-06-28 | 一种全适应一体化电源监控方法和装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810689655.2A CN109086032B (zh) | 2018-06-28 | 2018-06-28 | 一种全适应一体化电源监控方法和装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN109086032A CN109086032A (zh) | 2018-12-25 |
CN109086032B true CN109086032B (zh) | 2022-02-25 |
Family
ID=64834787
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810689655.2A Active CN109086032B (zh) | 2018-06-28 | 2018-06-28 | 一种全适应一体化电源监控方法和装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN109086032B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116032021B (zh) * | 2023-03-30 | 2023-08-25 | 西安热工研究院有限公司 | 新能源场站一体化监控方法、系统、设备及存储介质 |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5650936A (en) * | 1994-12-30 | 1997-07-22 | Cd Power Measurement Limited | Power monitor apparatus and method with object oriented structure |
CN101594001A (zh) * | 2009-07-04 | 2009-12-02 | 安徽省电力公司淮北供电公司 | 变电站站用电源装置 |
CN102799115A (zh) * | 2011-05-23 | 2012-11-28 | 中兴通讯股份有限公司 | 组合电源管理方法及装置 |
CN103412520A (zh) * | 2013-05-20 | 2013-11-27 | 浙江新能量科技有限公司 | 多种能源集中监测系统及其监测方法 |
CN104485749A (zh) * | 2015-01-07 | 2015-04-01 | 山东鲁能智能技术有限公司 | 一种变电站一体化电源监控辅助对测点设置方法 |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4580389B2 (ja) * | 2003-08-21 | 2010-11-10 | マイクロソフト コーポレーション | 仲介ファイルシステム共有または仲介デバイスを介してコンピュータシステムを同期させるためのシステムおよび方法 |
US7668709B2 (en) * | 2006-05-11 | 2010-02-23 | Theresa Wall | Globalization component |
CN106844153B (zh) * | 2017-01-20 | 2020-02-11 | 北京奇虎科技有限公司 | 应用程序运行监控方法、装置以及终端 |
-
2018
- 2018-06-28 CN CN201810689655.2A patent/CN109086032B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5650936A (en) * | 1994-12-30 | 1997-07-22 | Cd Power Measurement Limited | Power monitor apparatus and method with object oriented structure |
CN101594001A (zh) * | 2009-07-04 | 2009-12-02 | 安徽省电力公司淮北供电公司 | 变电站站用电源装置 |
CN102799115A (zh) * | 2011-05-23 | 2012-11-28 | 中兴通讯股份有限公司 | 组合电源管理方法及装置 |
CN103412520A (zh) * | 2013-05-20 | 2013-11-27 | 浙江新能量科技有限公司 | 多种能源集中监测系统及其监测方法 |
CN104485749A (zh) * | 2015-01-07 | 2015-04-01 | 山东鲁能智能技术有限公司 | 一种变电站一体化电源监控辅助对测点设置方法 |
Non-Patent Citations (4)
Title |
---|
Applying object-orientation and component technology to architecture design of power system monitoring;Xiaobing Qiu 等;《owerCon 2000. 2000 International Conference on Power System Technology. Proceedings (Cat. No.00EX409)》;20001207;第2卷(第2期);589-594 * |
基于中间件技术的网管系统通信电源协议适配池的研究与应用;冯春阳;《中国优秀硕士学位论文全文数据库 信息科技辑》;20081115(第11期);I136-36 * |
智能化变电站站用电源监控系统的设计与实现;杨宁 等;《安徽电力》;20100630(第2期);41-44 * |
智能变电站一体化电源监控系统;吴博 等;《山东工业技术》;20160715(第14期);15-16 * |
Also Published As
Publication number | Publication date |
---|---|
CN109086032A (zh) | 2018-12-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109980776A (zh) | 一种智能配变系统和该系统的应用方法 | |
CN109684036A (zh) | 一种容器集群管理方法、存储介质、电子设备及系统 | |
US20140143419A1 (en) | Control of networks | |
CN103428051A (zh) | 一种通信设备的测试系统及方法 | |
US20150148917A1 (en) | Dynamic Facility Management System | |
WO2015037802A1 (ko) | 메타모델링 통합시스템 | |
CN111399979A (zh) | 一种配电智能终端架构 | |
CN104485748B (zh) | 一种变电站ups电源监控系统及方法 | |
US11262733B2 (en) | Method, device, and computer program for configuring an intelligent electronic device | |
US20160092604A1 (en) | Method for metamodeling unification | |
CN109086032B (zh) | 一种全适应一体化电源监控方法和装置 | |
CN104505947A (zh) | 一种变电站直流电源监控系统及方法 | |
CN104578419B (zh) | 一种变电站通信电源监控系统及方法 | |
CN115102277A (zh) | 物联网低压智能断路器及其物联系统 | |
CN111061741A (zh) | 一种电力测试数据管理方法、系统、终端及存储介质 | |
KR101397379B1 (ko) | 메타 모델링 변환시스템 | |
CN116108740A (zh) | 一种电力设备的建模方法及装置 | |
Raczka et al. | A novel software applications rollout and monitoring strategy for enabling the transition to electromobility in future smart grids | |
Saleem et al. | Integrated multi-agent testbed for decentralized control of active distribution networks | |
CN112003727A (zh) | 一种多节点服务器电源测试方法、系统、终端及存储介质 | |
Wang et al. | The analysis of relay protection communication mechanism based on IEC61850 | |
CN110912741A (zh) | 一种基于逆向解析的智能标签生成方法及装置 | |
CN114422346B (zh) | 数据通信网关机的通信配置方法、装置、设备及介质 | |
CN203387522U (zh) | 一种有线传输数据业务定时接口服务器 | |
CN114398302B (zh) | Poe供电的自适应协议嵌入式空管设备数据采集单元 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 250101 block B, Yinhe building, 2008 Xinjie street, hi tech Zone, Ji'nan, Shandong. Applicant after: Shandong Luneng Intelligent Technology Co., Ltd. Address before: 250101 Yinhe Daxia B Block 2008 Xinlu Street, Jinan High-tech Zone, Shandong Province Applicant before: Shandong Luneng Intelligent Technology Co., Ltd. |
|
CB02 | Change of applicant information | ||
CB02 | Change of applicant information | ||
CB02 | Change of applicant information |
Address after: 250101 Electric Power Intelligent Robot Production Project 101 in Jinan City, Shandong Province, South of Feiyue Avenue and East of No. 26 Road (ICT Industrial Park) Applicant after: National Network Intelligent Technology Co., Ltd. Address before: 250101 block B, Yinhe building, 2008 Xinjie street, hi tech Zone, Ji'nan, Shandong. Applicant before: Shandong Luneng Intelligent Technology Co., Ltd. |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20201214 Address after: Room 902, 9 / F, block B, Yinhe building, 2008 Xinluo street, hi tech Zone, Jinan City, Shandong Province Applicant after: Shandong Luneng Software Technology Co.,Ltd. intelligent electrical branch Address before: 250101 power intelligent robot production project 101 south of Feiyue Avenue and east of No.26 Road (in ICT Industrial Park) in Suncun District of Gaoxin, Jinan City, Shandong Province Applicant before: National Network Intelligent Technology Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
CB02 | Change of applicant information |
Address after: Room 902, 9 / F, block B, Yinhe building, 2008 Xinluo street, hi tech Zone, Jinan City, Shandong Province Applicant after: Shandong luruan Digital Technology Co.,Ltd. smart energy branch Address before: Room 902, 9 / F, block B, Yinhe building, 2008 Xinluo street, hi tech Zone, Jinan City, Shandong Province Applicant before: Shandong Luneng Software Technology Co.,Ltd. intelligent electrical branch |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |