CN109083402A - A kind of steel pipe column external wrapping concrete construction technology - Google Patents

A kind of steel pipe column external wrapping concrete construction technology Download PDF

Info

Publication number
CN109083402A
CN109083402A CN201810844625.4A CN201810844625A CN109083402A CN 109083402 A CN109083402 A CN 109083402A CN 201810844625 A CN201810844625 A CN 201810844625A CN 109083402 A CN109083402 A CN 109083402A
Authority
CN
China
Prior art keywords
concrete
template
steel
column
reinforcing bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810844625.4A
Other languages
Chinese (zh)
Inventor
刘甫山
叶良锐
叶莉婷
邬敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Lujiang Rong Rui Construction Engineering Co Ltd
Original Assignee
Lujiang Rong Rui Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Lujiang Rong Rui Construction Engineering Co Ltd filed Critical Lujiang Rong Rui Construction Engineering Co Ltd
Priority to CN201810844625.4A priority Critical patent/CN109083402A/en
Publication of CN109083402A publication Critical patent/CN109083402A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • E04G13/02Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor
    • E04G13/023Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor with means for modifying the sectional dimensions
    • E04G13/025Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for columns or like pillars; Special tying or clamping means therefor with means for modifying the sectional dimensions with stiff clamping means bracing the back-side of the form without penetrating the forming surface

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The invention discloses a kind of steel pipe column external wrapping concrete construction technologies, its process are as follows: surveying setting-out, the processing and fabricating of template, steel bar meter and installation, template installation, concreting, form removable and concrete curing, surveying setting-out mode is that each measurement point uses total station to carry out closure measurement, it is fixed after errorless with concrete and warning sign is installed, reinforcing bar binding uses rustless tied silk, tied silk head is towards on the inside of reinforcing bar, the circle hook pressing processing of outside tied silk, template is constructed with plank sheathing and formwork reinforcement uses sizing band steel tie, concrete placings pour mode using delivery pump, oblique operation of vibrating is carried out with plug-in type vibrating stick in concrete placings engineering, after form removable, it is wrapped using plastic foil and covers concrete, moisture-keeping maintaining, present invention process design is reasonable, there is full new breakthrough in concrete construction mode, concise in technology is convenient, have Effect reduces the difficulty of construction of operator, is worth promoting and using in concrete construction field.

Description

A kind of steel pipe column external wrapping concrete construction technology
Technical field
The present invention relates to building field, specifically a kind of steel pipe column external wrapping concrete construction technology.
Background technique
Big machinery is not available after heavy template is closed due to floor, causes heavy template installation more difficult, in order to Complete project progress by matter on time, so light-duty sizing wood cylindrical plate is selected, the work although the wooden cylindrical plate of being formed is constructed Skill is simple, but since external wrapping concrete amount is small and wall is thin, concrete pouring construction is easy to be influenced by a variety of uncertain factors, Such as reinforcing bar, preheating embedding line etc., most it is difficult to when encountering ultrahigh column, concrete one-time-concreting is to top it is difficult to ensure that concrete Quality.
The present invention is directed to create a kind of completely new steel pipe column external wrapping concrete construction technology, sizing light-duty among the above is solved The wooden cylindrical plate pours problem encountered when external wrapping concrete, the completely new steel pipe column external wrapping concrete construction technology innovation Point is unique, and practicability is stronger, is worth promoting and using in building field.
Summary of the invention
The purpose of the present invention is to provide a kind of themes, to solve the problems mentioned in the above background technology.
To achieve the above object, the invention provides the following technical scheme:
A kind of steel pipe column external wrapping concrete construction technology, comprising: surveying setting-out, the processing and fabricating of template, steel bar meter and installation, Template installation, concreting, form removable and concrete curing process, surveying setting-out mode described in (1) are that each measurement point is adopted Closure measurement is carried out with total station, is fixed after errorless with concrete and warning sign is installed;(2) steel bar meter described in requires Using rustless tied silk, tied silk head is handled towards reinforcing bar inside, the circle hook pressing of outside tied silk;(3) plank sheathing is used in the template installation described in It constructs and formwork reinforcement uses sizing band steel tie;(4) the concrete placings mode described in is that delivery pump pours and in concrete placings Oblique operation of vibrating is carried out with plug-in type vibrating stick in engineering;(5) the form removable mode described in follow first prop up tear open afterwards, rear branch it is first Tear open, first tear not bearing form open, after tear supporting part template open, from top to bottom, bracket tears vertical supporting principle open after first tearing lateral support open; (6) the concrete curing mode described in is after concrete final set using watering plastic covering film, moisture-keeping maintaining 16 days.
As a further solution of the present invention: the surveying setting-out mode are as follows:, need to be to measurement used before surveying setting-out Basic point is checked;4 angle points of steel column external wrapping concrete are released in measurement, pop up sideline with ink fountain;It carries out high process control stake and adds With protection, the high mark of external wrapping concrete calibration is carried out with red paint on steel column;Ground beam end reinforcing bar anchors into external wrapping concrete, Ground beam end reinforcing bar extend to steel column and under curved 15 °, the place of bending up is welded on steel column using single-sided welding form, outside external wrapping concrete The reserved connector of side, tension reinforcement lap joint area percentage≤50% in same jointing, is staggered 35 °, ground beam End reinforcing bar is anchored using pre-buried form, and when measurement, ground beam reserves anchor bar accurate positioning, carries out on steel column and clearly marks Note.
As a further solution of the present invention: the template processing and fabricating mode are as follows: the thickness wood for the use of panel being 18mm Template erects back cord and uses 100mm × 100mm lumps of wood, and tie is using [10 Two bors d's oeuveres channel steels, screw rod are φ 32, φ 20,16 round steel of φ. As a further solution of the present invention: the processing of the reinforcing bar and mounting means are as follows: band rust reinforcing bar is carried out before reinforcement installation Derust operation, and derusting operation mode is to keep rebar surface cleaning using brushing;After the completion of reinforcing bar, concrete is set Protective layer cushion block, cushion block with external wrapping concrete with strength mortar using being made, pad thickness 30mm, on the outside of framework of steel reinforcement with 1m × 1m spacing arranges that at least there are two cushion block, cushion block φ b0.7~1.0mm iron wires for same side sustained height in blossom type Lashing is on main reinforcement, muscle processing and installation specification: the dead size of steel bar stress overall length along the length direction allows inclined Difference is ± 10mm;The crooked place tolerance value of bent-up bar is ± 20mm;In stirrup dead size tolerance value be ± 5mm。
As a further solution of the present invention: the template mounting means are as follows: template surface is carried out before template installation Cleaning, correction and painting remover, template are sealed between gap using white glue, and template bottom uses mortar back cover, anti-leak-stopping Slurry, cleaning mode are that will be cleaned out in column film using cotton gauze, and greasy dirt and other filths must not be occupied in column film, are taken off Mould agent uses clear-water concrete remover, and remover brushing is uniform, must assure that paint film is dry before concreting;According to column mould The template position of plate design drawing is assembled, and five pieces of templates are successively sequentially inserted into the molding plum blossom column steel reinforcement cage of binding, mould The vertical joint area horizontal joint of plate keeps same horizontal line, makes Qi Jiaoquan, is consistent in same room, patch on the outside of connector slot Add 4mm thickness dry plastic foam item;After template is installed, installation template is measured on one side and corrected, use band steel with vertical line is hung Tie carries out lashing to template on one side, and wooden model transverse direction perps is avoided in tie bolt lock solid point.
As a further solution of the present invention: the concreting mode are as follows: concrete uses self-compaction-clear water coagulation Soil;The watering of concreting front template is moistened, and after moistening, still unexpanded gap is pasted with white glue and stitched in template;Concrete It is poured using delivery pump, first builds the thick mortar with concrete with proportion of 60mm in column bottom pour mold before pouring, mortar is laid with uniform;It is mixed Solidifying soil, which pours, carries out layer-by-layer distribution, along the symmetrical cloth of column surrounding;It is carried out in concreting process using plug-in type vibrating stick It vibrates, using oblique method of vibrating, vibrating spear and horizontal plane inclination angle are continuously to shake on each position when vibrating between 25 °~30 ° Dynamic 1~2min takes fast insert to pull out mode slowly, is 10s~20s, and slurries uniformly occurs in concrete surface of being subject to, when movement in a row according to Secondary advance of vibrating, overlap distance is 3~5cm between front-rear position and row and row.
As a further solution of the present invention: the form removable mode are as follows: dismounting the top template is suitable for reading first adds Gu steel pipe unclamps band steel tie from top to bottom, with rubber hammer along the uniform tapping template in column periphery, keep it naturally de- with cylinder It opens.
As a further solution of the present invention: the concrete curing mode are as follows: after form removable, using sprayer atomized water spray Moisturizing is wrapped plastic film maintenance in concrete surface, watering 4 times or more daily, to keep concrete wet, concrete curing Same with water and mixing water phase, component persistently conserves 7~14 days, mixes the concrete of retarding additive, and moisture-keeping maintaining 16 days.
Compared with prior art, the beneficial effects of the present invention are: present invention process design is reasonable, in concrete construction mode There is full new breakthrough, solves problem encountered when the wooden cylindrical plate of sizing light-duty among the above pours external wrapping concrete, institute A kind of steel pipe column external wrapping concrete construction technology stated succinctly facilitates, and effectively reduces the difficulty of construction of operator, is worth Concrete construction field is promoted and is used.
Detailed description of the invention
Fig. 1 is the formwork structure main view after the template in a kind of steel pipe column external wrapping concrete construction technology is installed.
Fig. 2 is the formwork structure top view after the template in a kind of steel pipe column external wrapping concrete construction technology is installed.
In figure: 1- erects stupefied, 2- tie, 3- screw rod.
Specific embodiment
The technical solution of the patent is explained in further detail With reference to embodiment.
A kind of steel pipe column external wrapping concrete construction technology referring to FIG. 1-2, comprising: the processing system of surveying setting-out, template Work, steel bar meter and installation, template installation, concreting, form removable and concrete curing process, the surveying setting-out side Formula is that each measurement point uses total station to carry out closure measurement, is fixed after errorless with concrete and installs warning sign;The steel Muscle processing request is using rustless tied silk, and tied silk head is handled towards reinforcing bar inside, the circle hook pressing of outside tied silk;The template installation Sizing band steel tie is used with plank sheathing construction and formwork reinforcement;The concrete placings mode is that delivery pump pours and in concrete It pours in engineering and carries out oblique operation of vibrating with plug-in type vibrating stick;The form removable mode follows first to prop up and tears open, props up afterwards afterwards First tear open, first tear not bearing form open, after tear supporting part template open, from top to bottom, bracket, which is first torn open, tears vertical supporting original after lateral support open Then;The concrete curing mode is after concrete final set using watering plastic covering film, moisture-keeping maintaining 16 days.
Step 1: surveying setting-out mode
1) before surveying setting-out, measurement basic point used need to be checked.
2) 4 angle points of steel column external wrapping concrete are released in measurement, pop up sideline with ink fountain;It carries out high process control stake and is protected Shield carries out the high mark of external wrapping concrete calibration with red paint on steel column.
3) beam end reinforcing bar anchors into external wrapping concrete, ground beam end reinforcing bar extend to steel column and under curved 15 °, the place of bending up uses Single-sided welding form is welded on steel column, the reserved connector on the outside of external wrapping concrete, the tension steel in same jointing Muscle lap joint area percentage≤50% is staggered 35 °, and ground beam end reinforcing bar is anchored using pre-buried form, and when measurement, ground beam is pre- Anchor bar accurate positioning is stayed, carries out on steel column and clearly marks.
Step 2: the processing and fabricating of template
Using panel be 18mm thick plank sheathing, erect back cord use 100mm × 100mm lumps of wood, tie using [10 Two bors d's oeuveres channel steels, Screw rod is φ 32, φ 20,16 round steel of φ.
Step 3: the processing and installation of reinforcing bar
1) derusting operation is carried out to band rust reinforcing bar before reinforcement installation, derusting operation mode is to keep reinforcing bar using brushing Surface cleaning.
2) after the completion of reinforcing bar, concrete protective layer pad is set, cushion block is used and is made with external wrapping concrete with strength mortar, Pad thickness is 30mm, arranges that same side sustained height is at least in blossom type with 1m × 1m spacing on the outside of framework of steel reinforcement Two cushion blocks, cushion block is with φ b0.7~1.0mm iron wire lashing on main reinforcement.
3) steel bar meter and installation specification: steel bar stress along the length direction overall length dead size tolerance value be ± 10mm;The crooked place tolerance value of bent-up bar is ± 20mm;Dead size tolerance value is ± 5mm in stirrup.
Step 4: template is installed
1) remover is cleaned, corrected and applied before template installation to template surface, is carried out between template gap using white glue close Envelope, template bottom use mortar back cover, mortar leakage prevention, and cleaning mode is that will be cleaned out in column film using cotton gauze, in column film Greasy dirt and other filths must not be occupied, release agent uses clear-water concrete remover, and remover brushing is uniform, concrete It must assure that paint film is dry before pouring.
2) it is assembled according to the template position of column template design drawing, it is molding that five pieces of templates is successively sequentially inserted into binding Plum blossom column steel reinforcement cage, the vertical joint area horizontal joint of template keep same horizontal line, make Qi Jiaoquan, keep in same room Unanimously, patch plus 4mm thickness dry plastic foam item on the outside of connector slot.
3) after template is installed, installation template is measured on one side and corrected, with band steel tie on one side to template with vertical line is hung Lashing is carried out, wooden model transverse direction perps is avoided in tie bolt lock solid point.
Step 5: concreting
1) concrete uses self-compaction-clear-water concrete.
2) concreting front template watering is moistened, and after moistening, still unexpanded gap is pasted with white glue and stitched in template.
3) concrete is poured using delivery pump, first builds the thick sand with concrete with proportion of 60mm in column bottom pour mold before pouring Slurry, mortar are laid with uniform.
4) concreting carries out layer-by-layer distribution, along the symmetrical cloth of column surrounding.
5) vibrated in concreting process using plug-in type vibrating stick, using oblique method of vibrating, vibrating spear with Horizontal plane inclination angle is between 25 °~30 °, when vibrating on each position 1~2min of continuous shaking, take fast insert to pull out mode slowly, For 10s~20s, uniformly there are slurries in concrete surface of being subject to, advances of in a row successively vibrating when mobile, front-rear position and row and arranges Between overlap distance be 3~5cm.
Step 6: form removable
The top template reinforcing steel pipe suitable for reading is removed first, unclamps band steel tie from top to bottom, it is equal along column periphery with rubber hammer Even tapping template disengages it naturally with cylinder.
Step 7: concrete curing
After form removable, using sprayer atomized water spray moisturizing, wrap plastic film maintenance in concrete surface, watering 4 times daily More than, to keep concrete wet, concrete curing water and mixing water phase are same, and component persistently conserves 7~14 days, mix slow The concrete of solidifying type additive, moisture-keeping maintaining 16 days.
The preferred embodiment of the patent is described in detail above, but this patent is not limited to above-mentioned embodiment party Formula within the knowledge of one of ordinary skill in the art can also be under the premise of not departing from this patent objective It makes a variety of changes.

Claims (1)

1. a kind of steel pipe column external wrapping concrete construction technology, comprising: surveying setting-out, the processing and fabricating of template, steel bar meter and peace Dress, template installation, concreting, form removable and concrete curing process, it is characterised in that: (1) the surveying setting-out side described in Formula is that each measurement point uses total station to carry out closure measurement, is fixed after errorless with concrete and installs warning sign;(2) described in Steel bar meter requires to be using rustless tied silk, and tied silk head is handled towards reinforcing bar inside, the circle hook pressing of outside tied silk;(3) mould described in Plate installation is constructed with plank sheathing and formwork reinforcement uses sizing band steel tie;(4) the concrete placings mode described in is that delivery pump pours It builds and carries out oblique operation of vibrating with plug-in type vibrating stick in concrete placings engineering;(5) the form removable mode described in follows First prop up tear open afterwards, rear branch is first torn open, first tear not bearing form open, after tear supporting part template open, from top to bottom, after bracket first tears lateral support open Tear vertical supporting principle open;(6) the concrete curing mode described in is after concrete final set using watering plastic covering film, moisture-keeping maintaining 16 days;
Step 1: surveying setting-out mode
1) before surveying setting-out, measurement basic point used need to be checked;2) 4 angle points of steel column external wrapping concrete are released in measurement, Sideline is popped up with ink fountain;It carries out high process control stake and is protected, carry out external wrapping concrete calibration with red paint on steel column High mark;3) beam end reinforcing bar anchors into external wrapping concrete, ground beam end reinforcing bar extend to steel column and under curved 15 °, the place of bending up uses Single-sided welding form is welded on steel column, the reserved connector on the outside of external wrapping concrete, the tension steel in same jointing Muscle lap joint area percentage≤50% is staggered 35 °, and ground beam end reinforcing bar is anchored using pre-buried form, and when measurement, ground beam is pre- Anchor bar accurate positioning is stayed, carries out on steel column and clearly marks;
Step 2: the processing and fabricating of template
Using panel be 18mm thick plank sheathing, erect back cord use 100mm × 100mm lumps of wood, tie using [10 Two bors d's oeuveres channel steels, Screw rod is φ 32, φ 20,16 round steel of φ;
Step 3: the processing and installation of reinforcing bar
1) derusting operation is carried out to band rust reinforcing bar before reinforcement installation, derusting operation mode is to keep reinforcing bar using brushing Surface cleaning;2) after the completion of reinforcing bar, concrete protective layer pad is set, cushion block is used with external wrapping concrete with strength mortar system At pad thickness 30mm arranges that same side sustained height is at least in blossom type with 1m × 1m spacing on the outside of framework of steel reinforcement There are two cushion blocks, and cushion block is with φ b0.7~1.0mm iron wire lashing on main reinforcement;3) steel bar meter and mounting technique are wanted Ask: steel bar stress along the length direction overall length dead size tolerance value be ± 10mm;The crooked place of bent-up bar allows inclined Difference is ± 20mm;Dead size tolerance value is ± 5mm in stirrup;
Step 4: template is installed
1) remover is cleaned, corrected and applied before template installation to template surface, is carried out between template gap using white glue close Envelope, template bottom use mortar back cover, mortar leakage prevention, and cleaning mode is that will be cleaned out in column film using cotton gauze, in column film Greasy dirt and other filths must not be occupied, release agent uses clear-water concrete remover, and remover brushing is uniform, concrete It must assure that paint film is dry before pouring;2) it is assembled according to the template position of column template design drawing, five pieces of templates are successively suitable Sequence insertion binds molding plum blossom column steel reinforcement cage, and the vertical joint area horizontal joint of template keeps same horizontal line, makes its friendship It encloses, is consistent in same room, patch plus 4mm thickness dry plastic foam item on the outside of connector slot;3) it after template is installed, uses It hangs vertical line to measure installation template on one side and correct, lashing, tie bolt lock solid point is carried out to template on one side with band steel tie Avoid wooden model transverse direction perps;
Step 5: concreting
1) concrete uses self-compaction-clear-water concrete;2) concreting front template watering is moistened, after moistening, template In still unexpanded gap with white glue paste stitch;3) concrete is poured using delivery pump, first builds 60mm thickness in column bottom pour mold before pouring With concrete with the mortar of proportion, mortar is laid with uniform;4) concreting carries out layer-by-layer distribution, along the symmetrical cloth of column surrounding; 5) it is vibrated in concreting process using plug-in type vibrating stick, using oblique method of vibrating, vibrating spear inclines with horizontal plane Angle is between 25 °~30 °, when vibrating on each position 1~2min of continuous shaking, take fast insert to pull out mode slowly, for 10s~ Uniformly there are slurries in 20s, concrete surface of being subject to, and advance of in a row successively vibrating when mobile overlaps between front-rear position and row and row Distance is 3~5cm;
Step 6: form removable
The top template reinforcing steel pipe suitable for reading is removed first, unclamps band steel tie from top to bottom, it is equal along column periphery with rubber hammer Even tapping template disengages it naturally with cylinder;
Step 7: concrete curing
After form removable, using sprayer atomized water spray moisturizing, wrap plastic film maintenance in concrete surface, watering 4 times daily More than, to keep concrete wet, concrete curing water and mixing water phase are same, and component persistently conserves 7~14 days, mix slow The concrete of solidifying type additive, moisture-keeping maintaining 16 days.
CN201810844625.4A 2018-07-27 2018-07-27 A kind of steel pipe column external wrapping concrete construction technology Pending CN109083402A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810844625.4A CN109083402A (en) 2018-07-27 2018-07-27 A kind of steel pipe column external wrapping concrete construction technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810844625.4A CN109083402A (en) 2018-07-27 2018-07-27 A kind of steel pipe column external wrapping concrete construction technology

Publications (1)

Publication Number Publication Date
CN109083402A true CN109083402A (en) 2018-12-25

Family

ID=64831238

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810844625.4A Pending CN109083402A (en) 2018-07-27 2018-07-27 A kind of steel pipe column external wrapping concrete construction technology

Country Status (1)

Country Link
CN (1) CN109083402A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565320A (en) * 2021-08-25 2021-10-29 上海宝冶集团有限公司 Construction method for wrapping fireproof concrete outside steel pipe column
CN114232786A (en) * 2021-12-30 2022-03-25 中铁四局集团第五工程有限公司 Underground structure type steel concrete inclined column construction method
CN114718315A (en) * 2022-04-15 2022-07-08 中建一局集团第三建筑有限公司 Construction process for wrapping thin bare concrete outside ultrahigh steel pipe column
CN114809381A (en) * 2022-04-21 2022-07-29 陕西建工集团股份有限公司 Construction method of fair-faced concrete
CN115288507A (en) * 2022-07-25 2022-11-04 中建八局深圳科创发展有限公司 Cast-in-situ river stone landscape column and construction method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113565320A (en) * 2021-08-25 2021-10-29 上海宝冶集团有限公司 Construction method for wrapping fireproof concrete outside steel pipe column
CN114232786A (en) * 2021-12-30 2022-03-25 中铁四局集团第五工程有限公司 Underground structure type steel concrete inclined column construction method
CN114718315A (en) * 2022-04-15 2022-07-08 中建一局集团第三建筑有限公司 Construction process for wrapping thin bare concrete outside ultrahigh steel pipe column
CN114809381A (en) * 2022-04-21 2022-07-29 陕西建工集团股份有限公司 Construction method of fair-faced concrete
CN114809381B (en) * 2022-04-21 2024-04-26 陕西建工集团股份有限公司 Construction method of facing bare concrete
CN115288507A (en) * 2022-07-25 2022-11-04 中建八局深圳科创发展有限公司 Cast-in-situ river stone landscape column and construction method thereof
CN115288507B (en) * 2022-07-25 2023-09-12 中建八局深圳科创发展有限公司 Cast-in-situ river stone landscape column and construction method thereof

Similar Documents

Publication Publication Date Title
CN109083402A (en) A kind of steel pipe column external wrapping concrete construction technology
CN107119574B (en) A kind of Cantilever Construction Method of arch rib bridge girder
CN102937027B (en) A kind of construction method of edge top arch and bottom arch of concrete pouring tunnel
CN106592426B (en) The construction method of transverse prestress overall with reinforced concrete bridge deck plate prefab-form system
CN103821364B (en) The construction method of reinforced concrete water pond
US3497579A (en) Slip forming apparatus and method
CN108677743A (en) A kind of concrete cast-in-situ box girder construction method of viaduct
CN103015717B (en) Rear superelevation steel pipe column outsourcing Construction technology of fair-faced concrete closed by a kind of floor
CN106182359A (en) The concrete list storehouse horizontal mould of pipe gallery, system and piping lane molding methods
CN108397200B (en) Back-fabricated construction method for tunnel connection section structure of subway station
CN106592810B (en) A kind of ancient building concrete structure outsourcing clear water masonry construction method
CN102691268A (en) Stretching construction process of super-long prestressed tendon
CN108330835A (en) The construction method of setting bracket
CN108004925B (en) Prestress reinforced concrete circular arch tower construction method
CN104831932B (en) A kind of construction technology of high-grade concrete suspension column
CN109537895A (en) Method for mounting beam-slab column of cast-in-place core tube structure of assembled integral frame
CN107090777A (en) A kind of T beam manufacture methods for reducing blibbing
CN105862928A (en) Post-cast strip outer wall in-advance water stopping treatment structure and construction process thereof
CN110184941A (en) A kind of bridge main tower construction method
CN110093852A (en) Shaped form bridge pier Construction technology of fair-faced concrete
CN109930455A (en) A kind of town road kerbstone mounting structure and constructing device and construction method
CN104328738A (en) Continuous steel structure construction method for bridge building
CN110219422A (en) Anti-seismic concrete staircase design method
CN110306791A (en) Superelevation clear-water concrete independence cylinder construction method
CN108360821A (en) A kind of construction method of beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181225

RJ01 Rejection of invention patent application after publication