CN109083309A - Partition wall and its assembly method - Google Patents

Partition wall and its assembly method Download PDF

Info

Publication number
CN109083309A
CN109083309A CN201810836460.6A CN201810836460A CN109083309A CN 109083309 A CN109083309 A CN 109083309A CN 201810836460 A CN201810836460 A CN 201810836460A CN 109083309 A CN109083309 A CN 109083309A
Authority
CN
China
Prior art keywords
plate
wall
partition plate
partition
card slot
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810836460.6A
Other languages
Chinese (zh)
Other versions
CN109083309B (en
Inventor
丁泽成
王文广
周东珊
陈奕阊
钟诚
武鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201810836460.6A priority Critical patent/CN109083309B/en
Publication of CN109083309A publication Critical patent/CN109083309A/en
Application granted granted Critical
Publication of CN109083309B publication Critical patent/CN109083309B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/76Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal
    • E04B2/78Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal characterised by special cross-section of the frame members as far as important for securing wall panels to a framework with or without the help of cover-strips
    • E04B2/7854Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal characterised by special cross-section of the frame members as far as important for securing wall panels to a framework with or without the help of cover-strips of open profile
    • E04B2/7872Removable non-load-bearing partitions; Partitions with a free upper edge with framework or posts of metal characterised by special cross-section of the frame members as far as important for securing wall panels to a framework with or without the help of cover-strips of open profile of substantially H - section with flanges perpendicular to plane of partition
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B2/00Walls, e.g. partitions, for buildings; Wall construction with regard to insulation; Connections specially adapted to walls
    • E04B2/74Removable non-load-bearing partitions; Partitions with a free upper edge
    • E04B2/82Removable non-load-bearing partitions; Partitions with a free upper edge characterised by the manner in which edges are connected to the building; Means therefor; Special details of easily-removable partitions as far as related to the connection with other parts of the building
    • E04B2/828Connections between partitions and structural walls

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Building Environments (AREA)

Abstract

The embodiment of the invention discloses a kind of partition wall and its assembly methods, it includes side seal edge pieces, first wall and installation keel, side seal edge pieces includes side seal board, the first clamping portion and the second clamping portion are provided on side seal board, at least two first clamping joints are provided on installation keel, first wall includes the first partition plate and the second partition plate being oppositely arranged, the first card slot and the second card slot are respectively arranged on first partition plate and the identical two sides of the second partition plate extending direction, first card slot of the first clamping portion and the first partition plate is clamped, first card slot of the second clamping portion and the second partition plate is clamped, second card slot of the first partition plate and the second card slot of the second partition plate are clamped with the first clamping joint respectively.It is not necessarily to install according to fixed using the embodiment of the present invention, is not only substantially shorter the construction period, improve construction efficiency, realize the fast industrialization installation of partition wall.

Description

Partition wall and its assembly method
Technical field
The present invention relates to construction and decoration technical fields, and in particular to a kind of partition wall and its assembly method.
Background technique
Male falcon slot and female falcon slot are respectively arranged on the identical two sides of existing light partition wall extending direction.It is built in partition wall In the process, it is necessary to it is installed according to male falcon slot and female falcon slot direction, installation direction is fixed, and cause speed of application that can not improve, Installation effectiveness is low.
Summary of the invention
In view of this, the embodiment of the present invention proposes a kind of partition wall and its assembly method, to solve the above technical problems.
The embodiment of the present invention proposes a kind of partition wall comprising: side seal edge pieces, the first wall and installation keel, the side seal Edge pieces includes side seal board, and the first clamping portion and the second clamping portion are provided on the side seal board, is provided on the installation keel At least two first clamping joints, first wall include the first partition plate and the second partition plate being oppositely arranged, and described first The first card slot and the second card slot, first card are respectively arranged on partition plate and the identical two sides of the second partition plate extending direction First card slot of socket part and first partition plate is clamped, the first card slot card of second clamping portion and second partition plate Connect, the second card slot of the second card slot of first partition plate and second partition plate respectively with the first clamping joint card It connects.
Optionally, first clamping portion and second clamping portion are hollow, and is provided on first clamping portion One opening, is provided with the second opening on second clamping portion, first opening, the second opening towards side seal board first Plate face.
It optionally, further include sound-insulation strip, the sound-insulation strip is separately mounted in the first opening and the second opening.
Optionally, reinforcer is provided in first plate face, the reinforcer is located at first clamping portion and second Between clamping portion.
Optionally, the quantity at least two of the reinforcer, two reinforcers are connected by dowel, two institutes Reinforcer is stated to bear against on the inner plate surface of first partition plate and the second partition plate.
Optionally, the second clamping joint is additionally provided on the installation keel, second clamping joint is used for and the second wall Clamping, the installation keel are between the first wall and the second wall.
Optionally, the installation keel include installation ontology, and the installation ontology has the first mounting surface being oppositely arranged With the second mounting surface, the first mounting plate is extended in the direction that first mounting surface is directed away from second mounting surface, described Extend the second mounting plate, first mounting plate and the second peace in the direction that second mounting surface is directed away from first mounting surface The first clamping joint and the second clamping joint are respectively arranged in loading board.
Optionally, first mounting surface is abutted with the inner plate surface of first partition plate, second mounting surface and institute The inner panel for stating the second partition plate abuts.
Optionally, first clamping joint and second clamping joint are hollow, and is provided on first clamping joint One installing port, first installing port towards first wall the second card slot slot bottom;It is arranged on second clamping joint There is the second installing port, first installing port and the second installing port are towards the first mounting plate or the second mounting plate.
The embodiment of the present invention also provides a kind of partition wall assembly method based on above-mentioned partition wall comprising: by the first wall First partition plate is fixed;Second partition plate of the first wall is fixed, the second partition plate is oppositely arranged with the first partition plate;By side Edge sealing member and installation keel are clamped with the first partition plate and the second partition plate respectively.
The embodiment of the present invention propose partition wall and its assembly method by by partition wall be set as side seal edge pieces, the first wall and Keel are installed, passes through between each component and the installation that partition wall can be realized is simply assembled, without install according to fixed, no It is only substantially shorter the construction period, improves construction efficiency, realizes the fast industrialization installation of partition wall, but also it is each to reduce partition wall Partial volume further improves installation effectiveness convenient for the transport and installation of partition wall, in addition, all components can be in factory Industrialized production carries out fabricated construction at finishing scene, avoids the messy situation in traditional fitment operation scene, noise Small, pollution is small, economic and environment-friendly;And scene is constructed without masterful technique worker, reduces installation cost.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the side seal edge pieces of the embodiment of the present invention.
Fig. 2 is the scheme of installation of the side seal edge pieces of the embodiment of the present invention.
Fig. 3 is the structural schematic diagram of the adapter of the embodiment of the present invention.
Fig. 4 is the structural schematic diagram of the adapter assembly of the embodiment of the present invention.
Fig. 5 is the top view of the partition wall door opening component of the embodiment of the present invention.
Fig. 6 is the main view of the partition wall door opening component of the embodiment of the present invention.
Fig. 7 is the side view of the partition wall door opening component of the embodiment of the present invention.
Fig. 8 is the structural schematic diagram of the installation keel of the embodiment of the present invention.
Fig. 9 is the structural schematic diagram of the partition wall top plate connection component of the embodiment of the present invention.
Figure 10 is the structural schematic diagram of the partition wall of one embodiment of the invention.
Figure 11 is the structural schematic diagram of the metope connection component of the embodiment of the present invention.
Figure 12 is the structural schematic diagram of the regulating part of the embodiment of the present invention.
Figure 13 is the structural schematic diagram of the partition wall of another embodiment of the present invention.
Figure 14 is the structural schematic diagram of the first partition plate of the embodiment of the present invention.
Figure 15 is the structural schematic diagram of the partition wall side closing component of the embodiment of the present invention.
Figure 16 is the structural schematic diagram of the side keel of the embodiment of the present invention.
Figure 17 is the flow chart of the partition wall assembly method of the embodiment of the present invention.
Specific embodiment
Below in conjunction with attached drawing and specific embodiment, technical solution of the present invention is described in detail.It is wherein identical Components are presented with like reference characters.It should be noted that word "front", "rear" used in the following description, " left side ", " right side ", "up" and "down" refer to that the direction in attached drawing, word "inner" and "outside" are referred respectively to towards or away from particular elements The direction of geometric center.
Fig. 1 shows the structural schematic diagram of the side seal edge pieces of the embodiment of the present invention.As shown in Figure 1, the embodiment of the present invention mentions The side seal edge pieces 1 of confession comprising: side seal board is provided with the first clamping portion 101 and the second card in the first plate face of the side seal board Socket part 102.First clamping portion 101 and the second clamping portion 102 are located at the two sides of the first plate face length direction.
As shown in Fig. 2, there is the first card slot 2011 on the first side of the first partition plate 201, the first of the second partition plate 202 There is the first card slot 2021 on side.The first card slot 2011 clamping on first clamping portion 101 and the first partition plate 201, the second card The first card slot 2021 clamping in socket part 102 and the second partition plate 202.
When side seal edge pieces is assembled, directly by side seal board the first clamping portion 101 and the second clamping portion 102 be inserted into the respectively In one card slot 2011 and the first card slot 2021.
Side seal edge pieces provided in an embodiment of the present invention by the way that the first clamping portion and the second clamping portion are arranged on side seal board, and It is clamped by the first clamping portion and the first partition plate, the second clamping portion and the clamping of the second partition plate are realized at the closing of partition wall side Reason, can be improved the treatment effeciency of partition wall side, quick for installation, save artificial, greatly shorten construction period, at the same can also beautify every User experience is improved in wall side;And all components are produced in factory industry metaplasia, are carried out fabricated construction at finishing scene, are kept away The messy situation in traditional fitment operation scene is exempted from, noise is small, and pollution is small, economic and environment-friendly;And scene is not necessarily to skilled skill Art worker construction, reduces installation cost.
Further, first clamping portion 101 is hollow, is provided with the first opening for installing sound-insulation strip 103, First opening, first plate face of direction.By setting hollow for the first clamping portion 101, and it is arranged for installing sound-insulation strip First opening can increase the soundproof effect of side seal edge pieces 1 while side seal 1 loss of weight of edge pieces.
The internal diameter of first opening is equal with the outer diameter of sound-insulation strip 103, and sound-insulation strip 103 is clamped in the first opening.
Similarly, second clamping portion 102 is hollow, is provided with the second opening for installing sound-insulation strip, described Second opening improves soundproof effect towards first plate face with preferably pressure bulkhead side.
As shown in Figure 1, equal the first plate face of face of the first opening and the second opening, it is respectively mounted in the first opening and the second opening There is sound-insulation strip 103, to improve the soundproof effect between side seal edge pieces and partition plate.
Preferably, being provided with reinforcer 104 in first plate face, the reinforcer 104 is located at first clamping portion 101 and second between clamping portion 102, to increase the intensity of side seal board.
Further, it is provided with guide groove 1041 on side of the reinforcer 104 far from first plate face, is bored with facilitating Enter fastener and side seal edge pieces is installed into fixation.Wherein, fastener can be using screw etc..
In the embodiment in figure 1, guide groove 1041 is V-groove, is had on the back side of 1041 place reinforcer of guide groove, 104 side Protrusion, protrusion is formed by the recess of guide groove 1041, to guarantee that the wall thickness of reinforcer 104 everywhere is equal, guarantees the strong of reinforcer 104 Degree.
Further, the reinforcer 104 is hollow, to mitigate the weight of side seal edge pieces.
As shown in Figure 1, the shape of the first clamping portion 101, the second clamping portion 102 and reinforcer 104 is substantially rectangular.
Preferably, it is provided in the second plate face of first plate face for installing sound-insulation strip on the side seal board 103 filleting slot 107, filleting slot 107 and the reinforcer 104 correspond, and the filleting slot 107 is located at the reinforcer In 104.
As shown in Fig. 2, the second plate face is light-exposed face, mountable sound-insulation strip 103 in filleting slot 107, to increase side seal edge pieces Installation leakproofness, avoid noise by passing through between side seal board and original wall, preferably raising soundproof effect.
As shown in Figure 1, filleting slot 107 is semi-circular groove, to facilitate sound-insulation strip 103 to be mounted in filleting slot 107.
Further, positioning region 106, first clamping portion 101 and the second clamping portion are provided in second plate face 102 are symmetrically disposed in the two sides of the positioning region 106.It can avoid the installation inclination of side seal edge pieces 1 by the way that positioning region 106 is arranged, It improves side seal edge pieces 1 and fixed accuracy is installed, avoid repeating installation question caused by inclination is installed because of side seal edge pieces 1, improve Installation effectiveness.In the present embodiment, positioning region 106 is protrusion.
Optionally, the quantity at least two of the reinforcer 104, it is described fixed that two reinforcers 104 are symmetrically disposed in The two sides in position portion 106, two reinforcers 104 are connected by dowel 105, can further improve the intensity of side seal edge pieces 1.
Further, dowel 105 is connect with the first plate face by vertical plate, to improve the intensity of dowel 105.
The embodiment of the present invention also provides a kind of partition wall system comprising above-mentioned side seal edge pieces.As shown in Fig. 2, in partition wall Both ends on be separately installed with side seal edge pieces 1.
There is the second card slot 2012 in second side of first partition plate 201, have the in second side of the second partition plate 202 Two draw-in groove 2022, the second card slot 2012 and the second card slot 2022 respectively in Fig. 2 right side side seal edge pieces 1 on the first clamping portion 101 and second clamping portion 102 be clamped.Wherein, the first side and second side are the two sides of partition plate length direction.
As shown in Figure 3 and Figure 4, partition wall system further include: adapter assembly, adapter assembly include adapter 3 and at least two Side seal edge pieces 1.
The adapter includes switching ontology, and the switching ontology has at least two adapter surfaces.Adapter surface and side sealing Part 1 connects one to one, i.e., a side seal edge pieces 1 is installed on each adapter surface.
The side seal edge pieces 1 includes side seal board, and first for being clamped with wall is provided in the first plate face of side seal board Second plate face of clamping portion 101, the side seal board is fixed on the adapter surface.
It is first that adapter 3 is fixed when adapter assembly assembles, then at least two side seal edge pieces 1 are separately mounted to accordingly On adapter surface, wall is connect again with side seal edge pieces 1 then, the switching of wall can be realized.
By setting adapter and at least two side seal edge pieces, at least two side seal edge pieces are separately mounted to turn adapter assembly On the adapter surface of fitting, the switching of wall can be realized, working procedure can be simplified, greatly shorten the construction period, improve wall and turn Efficiency is connect, and all components are produced in factory industry metaplasia, carries out fabricated construction at finishing scene, avoid tradition finishing and make The messy situation in industry scene, noise is small, and pollution is small, economic and environment-friendly;And scene is constructed without masterful technique worker, is reduced Installation cost.
As shown in figure 3, being provided with the embedded groove 3011 for installing sound-insulation strip 103 on the adapter surface of switching ontology.
Adapter 3 in use, is directly fixed on the position for needing to transfer, by the first wall and the second wall point by adapter It is not connect with adapter.
By setting switching ontology, and it is provided with embedded groove on the adapter surface of switching ontology, wall can not only be facilitated to turn It connects, saves manually, greatly shorten the construction period, it is also ensured that the soundproof effect at via-wall.
As shown in figure 4, the first partition plate 201 is towards being provided with deadening felt 203 on the inner plate surface of the second partition plate 202, with Improve the soundproof effect of partition wall.
Further, acoustical cotton 205 is installed on deadening felt 203, to further improve the heat preservation and soundproof effect of partition wall. Mineral wool can be used in acoustical cotton 205.
Preferably, acoustical cotton 205 and deadening felt 203 are fixed on the inner panel of the first partition plate 201 by bar for line 204 together On face.
Further, there is air layer between acoustical cotton 205 and the second partition plate 202, sound insulation effect can be further improved Fruit.
Preferably, column jacket 301 is hollow as shown in figure 3, the switching ontology includes: column jacket 301 and inner prop 302.It is described outer Column 301 is set on inner prop 302, and the column jacket 301 is connect with inner prop 302 by reinforcing rib 303.Pass through the ontology setting that will transfer It is connect with inner prop 302 by reinforcing rib 303 for column jacket 301, the self weight of adapter 3 can be reduced, facilitate installation.
As shown in figure 3, embedded groove 3011 is arranged on column jacket 301.Column jacket 301 and inner prop 302 are square column, in order to It is coupled with partition plate.
Be provided with embedded groove 3011 on four sides of column jacket 301, it is ensured that wall any angle transfer when every Audio fruit.Embedded groove 3011 is semi-circular groove.
As shown in figure 4, fastener sequentially passes through guide groove 1041, reinforcer 104, filleting slot 107, sound-insulation strip 103, embedded groove 3011, it is pierced by by the second lug boss 3012, side seal edge pieces 1 is fixed on adapter 3.
Embedded groove 3011 and filleting slot 107 correspond, and the two forms installation space, and sound-insulation strip 103 is arranged in the installation In space, to facilitate the installation of sound-insulation strip 103.
Further, the quantity of the reinforcing rib 303 is more, week of the more reinforcing ribs 303 along the inner prop 302 To being uniformly distributed, to facilitate the manufacture of adapter 3, production cost is reduced.In the present embodiment, the quantity of reinforcing rib 303 is eight Root.
Further, the inner prop 302 is hollow, can not only reduce the use of material, reduces cost, can also further drop The self weight of low adapter.
Preferably, being provided with the locating slot 3013 cooperated with positioning region 106 on adapter surface, setting for screw can be facilitated, Improve the assembly efficiency of adapter 3 and wall.Positioning region 106 is inserted into locating slot 3013, it can be achieved that side seal edge pieces and adapter Positioning, improve installation accuracy.
Further, the first lug boss 3014 is provided on the back side of adapter surface, first lug boss 3014 is by institute It states the recess of locating slot 3013 to be formed, to guarantee the side wall of column jacket 301 consistency of thickness everywhere, improves the intensity of adapter 3.
Optionally, the quantity equal at least two of the embedded groove 3011, two embedded grooves 3011 are symmetrically disposed in institute The two sides of locating slot 3013 are stated, preferably to improve soundproof effect.
Further, the second lug boss 3012 is provided on the back side of adapter surface, second lug boss 3012 is by institute It states the recess of embedded groove 3011 to be formed, to guarantee the side wall of column jacket 301 consistency of thickness everywhere, improves the intensity of adapter 3.
As illustrated in figs. 5-7, partition wall system further includes partition wall door opening component comprising first adapter, the first side seal edge pieces, First load-bearing part, partition wall 2, the second adapter, second side edge sealing member and the second load-bearing part.
Wherein, in fig. 5 and fig., the adapter 3 in left side is first adapter, and the load-bearing part 208 in left side is the first carrying Part;The adapter 3 on right side is the second adapter, and the load-bearing part 208 on right side is the second load-bearing part.
It is the first side seal edge pieces in the side seal edge pieces 1 of Fig. 2, Fig. 5, Fig. 6, Tu10Zhong, left side, the side seal edge pieces 1 on right side is Second side edge sealing member.
Adapter surface is all had on the first adapter and the second adapter.
The first side seal edge pieces is mounted on the adapter surface of first adapter, and second side edge sealing member is mounted on the second switching On the adapter surface of part, the first clamping portion 101, partition wall extension side are provided in the first side seal edge pieces and second side edge sealing member Be respectively arranged with the first card slot and the second card slot on identical two sides, the first clamping portion 101 of the first side seal edge pieces with The clamping of first card slot, the first clamping portion 101 and second card slot of second side edge sealing member are clamped.
First load-bearing part is connect with the partition wall 2 and the first adapter respectively, the second load-bearing part difference It is connect with the partition wall 2 and the second adapter, first load-bearing part and the second load-bearing part carry the partition wall 2.
When partition wall door opening component is installed, first adapter and the second adapter are first fixed to predetermined position, then by first Side seal edge pieces is mounted in first adapter, and second side edge sealing member is mounted on the second adapter.Then, then by partition wall 2 and first Adapter and the clamping of the second adapter, then by the first load-bearing part and the second load-bearing part respectively with partition wall 2, first adapter, second Adapter is fixed.
Partition wall door opening component passes through setting first adapter, the first side seal edge pieces, the first load-bearing part, partition wall, the second switching Part, second side edge sealing member and the second load-bearing part can by the way that the overlap joint that partition wall door opening can be realized is simply assembled between each component The construction period is greatly shortened, construction efficiency is improved, can also be achieved the fast industrialization installation of partition wall door opening component;And all portions Part can be produced in factory industry metaplasia, and construction quality is unified, and avoiding traditional fitment operation on-site cutting leads to construction site ratio Dirtier situation, noise is small, and pollution is small, is good for the environment;And scene is constructed without masterful technique worker, reduces installation Cost.
Preferably, the partition wall 2 includes the first wall, installation keel 4 and the second wall.First wall and the second wall Body extending direction is respectively arranged with the first card slot and the second card slot on identical two sides.
As shown in figure 8, the first clamping joint 401 and the second clamping joint 402 are provided on the installation keel 4, described first Second card slot of clamping joint 401 and first wall is clamped, and the first of the first card slot of the first wall and the first side seal edge pieces Clamping portion 101 is clamped.
Second clamping joint 402 and the first card slot of second wall are clamped, the second card slot of the second wall and the First clamping portion 101 of two side seal edge pieces is clamped.
By setting the first wall, installation keel 4 and the second wall for partition wall 2, the installation of partition wall can be facilitated, improve peace Fill efficiency.
Further, as shown in figure 5, first wall and the second wall include the first partition plate 201 and second every Wallboard 202.
First partition plate 201 and the second partition plate 201 are oppositely arranged.First partition plate, the 201 extending direction phase The first card slot 2011 and the second card slot 2012 are respectively arranged on same two sides.
Second partition plate, 202 extending direction is respectively arranged with the first card slot 2021 and the second card slot on identical two sides 2022。
Wherein, the first card slot 2021 of the first card slot 2011 of the first partition plate 201 and the second partition plate 202 is located at same Side, the second card slot 2012 of the first partition plate 201 and the second card slot 2022 of the second partition plate 202 are located at ipsilateral.
First clamping portion 101 of the first side seal edge pieces and the first card slot 2011 of the first partition plate 201 are clamped, the second clamping The clamping of first card slot 2021 of portion 102 and the second partition plate 202.
By setting the first partition plate 201 and the second partition plate 202 for wall, it can not only further mitigate wall Weight, and the inside and outside plate face of partition plate is plane, can conveniently stack, be readily transported.
Further, the first wall and the second wall further include connection keel 206, are arranged on the connection keel 206 There are the first plug division and the second plug division.
First partition plate 201 towards being provided with the first slot 2013 on the inner plate surface of the second partition plate 202, described second every Wallboard 202 is towards being provided with the second slot 2023 on the inner plate surface of the first partition plate 201.
First plug division and the first slot 2013 are clamped, and second plug division and the second slot 2023 are clamped.It is logical It crosses and sets two partition plates by connection keel connection for wall, wall can be produced as a whole, when installation is not required to Wall is assembled again, directly installs entire wall to predetermined position, and wall installation effectiveness can be improved;And pass through connection Keel 206 connect two partition plates, and the intensity of wall also can be improved.
In a preferred embodiment of the invention, as shown in figure 5, connection keel 206 are hollow rectangular slab, rectangular slab The first plug division and the second plug division are provided on two sides along its length.
Lug boss is provided on two opposite internal groove side walls of first slot 2013, on the first plug division and the second plug division It is provided with and realizes clamping with the one-to-one recessed portion of the lug boss, lug boss and recessed portion cooperation.
As shown in figure 8, the installation keel 4 include installation ontology 403, the installation ontology 403 has disposed in parallel First mounting surface and the second mounting surface.
The first mounting plate 4031 is extended in the direction that first mounting surface is directed away from second mounting surface, and described Extend the second mounting plate 4032,4031 He of the first mounting plate in the direction that two mounting surfaces are directed away from first mounting surface The first clamping joint 401 and the second clamping joint 402 are respectively arranged in two plate faces of the second mounting plate 4032.
The first clamping joint 401 and the second clamping joint 402 on first mounting plate 4031 respectively with the first of the first wall every First card slot 2011 of the first partition plate 201 of the second card slot 2012 and the second wall of wallboard 201 is clamped.
Similarly, the first clamping joint 401 on the second mounting plate 4032 and the second clamping joint 402 respectively with the first wall First card slot 2021 of the second partition plate 202 of the second card slot 2022 and the second wall of the second partition plate 202 is clamped.
Further, installation ontology 403 is hollow, to mitigate the self weight of installation keel 4, while can also form sound lock, improve Soundproof effect.
Preferably, installation ontology 403 is internally provided with stiffening plate, and stiffening plate is parallel with the first mounting surface, to increase installation The intensity of ontology 403.
Preferably, the first clamping joint 401 is hollow, further mitigate the self weight of installation keel.
Further, first for installing sound-insulation strip is provided on the first clamping joint 401 on the first mounting plate 4031 Installing port, the first installing port the first mounting plate 4031 of direction.Sound-insulation strip is clamped in mounting hole, it is possible to increase between adjacent partition wall Soundproof effect.
Similarly, the second clamping joint 402 on the first mounting plate 4031 is hollow, is provided with for clamping sound-insulation strip Second installing port, the second installing port is towards the first mounting plate 4031.
Correspondingly, the first installing port of the first clamping joint 401 on the second mounting plate 4032, the second clamping joint 402 Two installing ports direction and the second mounting plate 4032.
As shown in Figure 10, it is provided with sound-insulation strip 103 in the first installing port and the second installing port, to improve soundproof effect.
Keel are installed while connecting neighboring walls, the first mounting surface and the first partition plate 201 are towards the second partition plate 202 inner plate surface abuts, and the second mounting surface abuts with the inner plate surface of the second partition plate 202 towards the first partition plate 201, not only may be used Reinforce the connection between partition plate, can also play a supporting role to partition plate, increase the intensity of wall, so that wall is more stable It is solid, while materials can be also reduced, reduce cost.
Preferably, the first partition plate 201, the second partition plate 202 and installation keel 4 are extrusion profile, are further dropped Low production cost.
In a preferred embodiment of the invention, the first clamping joint 401, the second clamping joint 402, the first clamping portion 101 It include straight panel and bending plate with the second clamping portion 102, straight panel and bending plate are oppositely arranged, and are had between straight panel and bending plate Gap, to form the opening or installing port of installation sound-insulation strip.
Lug boss, the first clamping are provided on two opposite internal groove side walls of the first card slot 2011 and the second card slot 2012 It is provided on portion 101, the second clamping portion 102, the first clamping joint 401 and the second clamping joint 402 one-to-one with lug boss Recess is realized with raised portion fits by recess and is clamped.
Further, as shown in fig. 6, partition wall door opening component further include: U-shaped keel 207, the partition wall pass through described U-shaped Keel 207 are connect with the first load-bearing part and the second load-bearing part, preferably to support partition wall, increase the installation jail of partition wall door opening component Solidity.The bottom of partition wall is inserted into U-shaped keel 207.
Preferably, as shown in Figure 6 and Figure 7, partition wall door opening component further includes apical grafting keel 209, the first adapter, Side edge sealing member, partition wall 2, the second adapter, second side edge sealing member pass through the apical grafting keel 209 and connect with ceiling, no It can only facilitate partition wall door opening component to connect with ceiling, may also function as the gap between pressure bulkhead door opening component and ceiling, Preferably sound insulation.
Further, apical grafting keel 209 are internally provided with mineral wool 2092, first adapter, the first side seal edge pieces, partition wall 2, the second adapter, second side edge sealing member are connected on mineral wool 2092, so as to preferably sound insulation.
In embodiments of the present invention, apical grafting keel 209 can be U-shaped keel, can also be L-type keel.First load-bearing part and Corner brace can be used in second load-bearing part.
As shown in figure 9, partition wall system further includes partition wall top plate connection component comprising the first apical grafting keel are (on the left of in Fig. 9 Apical grafting keel 209), the second apical grafting keel apical grafting keel 209 of right side (in Fig. 9) and partition wall 2.
First apical grafting keel, the second apical grafting keel are L-type keel.
L-type keel include that lateral fixed plate and longitudinally fixed plate, lateral fixed plate connected vertically pass through expansion assembly 2091 fix on the ceiling, and longitudinally fixed plate is connect by screw with partition wall.
Partition wall 2 is fixedly connected with the longitudinally fixed plate of the first apical grafting keel and the second apical grafting keel respectively.
The lateral fixed plate of first apical grafting keel is fixed on the ceiling by expansion assembly.
The lateral fixed plate of second apical grafting keel can also be fixed on the ceiling by expansion assembly.In the present embodiment, Existing plastic expansion component can be used in expansion assembly.
Partition wall top plate connection component then will in use, first by the first apical grafting keel installation on top plate (i.e. ceiling) Partition wall 2 is pushed into the first apical grafting keel, and partition wall 2 is connected with the first apical grafting keel.The second apical grafting keel are connected with partition wall 2 again It connects.
By the way that partition wall top plate connection component is arranged to the first apical grafting keel, the second apical grafting keel and partition wall 2, partition wall 2 is logical It crosses two apical grafting keel installations on the ceiling, will not influence the shock resistance of partition wall entirety, partition wall and original after partition wall installation Crack is not present between beginning wall, constructs without repeating, decoration cost is low;And partition wall can directly be pushed into the first apical grafting keel It is interior, the labor intensity of installation is greatly reduced, installation effectiveness is improved.
As shown in figure 9, being also equipped with mineral wool 2092 in the first apical grafting keel, partition wall 2 is connected on mineral wool 2092, with Improve the heat preservation and soundproof effect of partition wall top plate connection component.
In a preferred embodiment of the present invention, as shown in Figure 10, partition wall can include: the first side seal edge pieces, the first wall, Keel, the second wall and second side edge sealing member are installed.
The first clamping portion 101 is all had in first side seal edge pieces and second side edge sealing member, the first wall and the second wall prolong It stretches and is provided with the first card slot and the second card slot on the identical two sides in direction, install and be provided with 401 He of the first clamping joint on keel 4 Second clamping joint 402.
First clamping portion 101 of the first side seal edge pieces and the first card slot of the first wall are clamped, the second card of the first wall Slot and the first clamping joint 401 are clamped, and the first card slot of the second clamping joint 402 and the second wall is clamped, the second card of the second wall First clamping portion 101 of slot and second side edge sealing member is clamped.
When installation, the first wall and the second wall are first fixed on predetermined position, then again by the first side seal edge pieces and the Installation keel are distinguished the first wall and the second wall are clamped, the second wall and second side edge sealing member are clamped by the clamping of one wall. The partition wall can be used as an entirety factory, be directly installed on predetermined position.
By the way that partition wall is arranged to the first side seal edge pieces, the first wall, the second wall and second side edge sealing member, each component it Between by the way that the installation that partition wall can be realized is simply assembled, not only can be significantly without being installed according to fixed installation direction Shorten the construction period, improve construction efficiency, realize the fast industrialization installation of partition wall, but also the body of partition wall each section can be reduced Product, convenient for the transport and installation of partition wall, further improves installation effectiveness.
Further, as shown in Figure 10, the reinforcer in the first side seal edge pieces and second side edge sealing member is born against On the inner plate surface of one partition plate 201 and the second partition plate 202, it can not only reinforce the connection between partition plate, it can also be to partition plate Play a supporting role so that wall more stablize it is solid.
Optionally, as shown in figure 11, partition wall system further includes a kind of metope connection component comprising: for connecting with partition wall 2 The side seal edge pieces 1 connect and the leveling part 5 for being connect with metope.
As shown in figure 12, the leveling part 5 includes adjustment portion 502 and pedestal 501, and the adjustment portion 502 adjusts the base The spacing of seat 501 and metope, the side seal edge pieces 1 and adjustment portion 502 are separately mounted on the pedestal 501.
When metope connection component is installed, first leveling part 5 is mounted on predetermined metope, operates adjustment portion 502, adjusts pedestal 501 with the spacing of metope, metope is levelling.
After metope is levelling, side seal edge pieces 1 is installed on pedestal 501.Partition wall 2 is connect with side seal edge pieces 1 again.
Metope connection component is by setting side seal edge pieces and leveling part, by control and regulation portion, adjusts pedestal and metope Spacing provides the levelling influence to overcome wall smoothness of metope to concordant support for the installation of other component, and all Component can carry out industrialized production in factory, only need simply to be assembled at finishing scene, installation process is without skilled Skilled worker complete, without the too many construction time, realize rapid construction, and avoid traditional fitment operation scene Dirty and messy situation, noise is small, and pollution is few, economic and environment-friendly.
In a preferred embodiment of the invention, it is provided with screw hole on the pedestal 501, is set in the adjustment portion 502 It is equipped with external screw thread, adjustment portion 502 is spirally connected by external screw thread and the screw hole.
There is first through hole, first through hole runs through adjustment portion 502 in the adjustment portion 502.Fastener passes through screw hole and the The regulating part 5 is mounted on the wall by one through-hole.Adjustment portion 502 is spirally connected with pedestal 501, not only conveniently adjusted portion and pedestal Fixation, can also facilitate the adjustment of pedestal Yu metope spacing, improve partition wall installation effectiveness.
Further, metope connection component further include: centre keel 503, the centre keel include support plate and from the branch The side wall that fagging opposite sides edge extends, two side walls and the support plate are enclosed groove body, the leveling part 5 In the groove body, the second through-hole corresponding with first through hole is provided in the support plate, the fastener passes through second Regulating part 5 and centre keel 503 are fixed on metope by through-hole, screw hole and first through hole, and the side seal edge pieces 1 is mounted on support plate Outer plate surface on.By the way that centre keel 503 is arranged, side seal edge pieces 1 can be facilitated to connect with regulating part 5, regulating part 5 can be also blocked, mention Height finishing effect.
Optionally, the equal fold inward in the edge of two side walls forms U-type groove 5031, and the slot bottom of U-type groove 5031 is plane, U The slot bottom of type groove 5031 is resisted against on metope, and the mounting stability of centre keel 503 Yu metope can be improved.
Further, as shown in figure 11, the quantity at least two of regulating part 5, each 503 one tune of interior setting of centre keel Save part 5.Two regulating parts 5 are disposed side by side on metope, and have gap between two regulating parts 5.
The positioning region 106 of side seal edge pieces 1 is inserted into the gap, is positioned with opposite side edge sealing member 1, improves the accurate of installation Degree.
As shown in figure 11, fastener sequentially passes through guide groove, filleting slot, sound-insulation strip, centre keel, and side seal edge pieces and pedestal are connected It connects.
As shown in figure 13, the embodiment of the present invention also provides a kind of partition wall comprising: side seal edge pieces 1, the first wall and installation Keel 4.
As shown in Figure 1, side seal edge pieces 1 includes side seal board, the first clamping portion 101 and the second card are provided on the side seal board Socket part 102.
As shown in figure 8, being provided at least two first clamping joints 401 on installation keel 4.Two the first clamping joints 401 In the ipsilateral of installation keel 4.
As shown in Figure 10, first wall includes the first partition plate 201 and the second partition plate 202 being oppositely arranged.
First partition plate, 201 extending direction is respectively arranged with the first card slot 2011 and the second card slot on identical two sides 2012。
Second partition plate, 202 extending direction is respectively arranged with the first card slot 2021 and the second card slot on identical two sides 2022。
First clamping portion 101 and the first card slot 2011 of first partition plate 201 are clamped, second clamping portion 102 are clamped with the first card slot 2021 of second partition plate 202, the second card slot 2012 of first partition plate 201 and institute The second card slot 2022 for stating the second partition plate 202 is clamped with first clamping joint 401 respectively.
It is first that the first partition plate 201 is fixed when assembling, it is then that the second partition plate 202 is fixed.Again by 1 He of side seal edge pieces Keel 4 are installed to be clamped with the first partition plate 201 and the second partition plate 202 respectively.
By setting side seal edge pieces, the first wall and installation keel for partition wall, passes through between each component and be simply assembled The installation that partition wall can be realized not only is substantially shorter the construction period, improves construction effect without install according to fixed Rate, realizes the fast industrialization installation of partition wall, but also can reduce the volume of partition wall each section, convenient for the transport and peace of partition wall Dress, further improves installation effectiveness.
In a preferred embodiment of the invention, the first partition plate 201 is consistent with the structure of the second partition plate 202.It is existing Illustrate its structure by taking the first partition plate 201 as an example.
As shown in figure 14, the first partition plate 201 is hollow, and multiple securing plates 2014, securing plate 2014 and is arranged inside Two inner walls of one partition plate 201 are fixedly connected, and multiple securing plates 2014 are between the first card slot 2011 and the second card slot 2012 Uniformly arrangement, so as to the identical cavity of multiple sizes be formed inside the first partition plate 201, to improve the soundproof effect of partition plate.
Further, the angle of two inner walls of securing plate 2014 and the first partition plate 201 is chamfering, is reinforced with increasing Plate 2014 improves the intensity of partition plate to the enabling capabilities of partition plate.
Preferably, two cell walls of the first slot 2013 are coplanar with two neighboring securing plate 2014, guaranteeing the first slot While 2013 intensity, soundproof effect is further improved.
As shown in figure 14, chamfering is circular arc chamfering, can further improve enabling capabilities.
Further, as shown in figure 15, partition wall system also provides a kind of partition wall side closing component comprising side seal edge pieces 1 and side keel 6.
As shown in figure 16, side keel 6, including the first keel ontology 61 and the second keel ontology 62.
The first keel ontology 61 includes the first substrate 611 for connecting with to attachment, the first substrate 611 The first side plate 612 and the first holding section 613 are respectively arranged on the identical two sides of extending direction.
First side plate 612 and the first holding section 613 are located on the two sides of 611 length direction of first substrate.
The second keel ontology 62 includes the second substrate 621, on the identical two sides of 621 extending direction of the second substrate It is respectively arranged with the second side plate 622 and the second holding section 623.
First side plate 612 and the second side plate 622 are oppositely arranged, first holding section 613 and the second holding section 623 Clamping.Side seal edge pieces 1 is placed in side keel 6, between the first side plate 612 and the second side plate 622.
When partition wall side connection component assembles, the first keel ontology 61 is first mounted on original wall by first substrate 611 On face.
As shown in figure 15, first substrate 611 is mounted on original metope by expansion assembly 2091.
Side seal edge pieces 1 with wall by being fixed in side keel 6.Side sealing is inserted into the second holding section 623 again In gap between part 1 and original metope, and it is clamped with the first holding section 613.
Partition wall side connection component is located in the keel of side by setting side seal edge pieces and side keel, side seal edge pieces, side Keelson is blocked the gap between side seal edge pieces and original metope by the first holding section and the clamping assembling of the second holding section, Partition plate, side seal edge pieces do not need to connect with side keel, can simplify installation procedure, improve installation effectiveness, while fitting up effect Fruit is good;And all components can be produced in factory industry metaplasia, and construction quality is unified, avoids traditional fitment operation on-site cutting Lead to the situation that construction site is messy, noise is small, and pollution is small, is good for the environment;And scene is not necessarily to masterful technique worker Construction, reduces installation cost.
Further, the first holding section 613 is in bending, including the first card adapter plate 6131 and the second card adapter plate 6132, institute It states the identical two sides of 6131 extending direction of the first card adapter plate to connect with first substrate 611 and the second card adapter plate 6132 respectively, first Card adapter plate 6131 and the second card adapter plate 6132 form the first bayonet.
Second holding section 623 is also in bending, including third card adapter plate 6231 and the 4th card adapter plate 6232, the third card The identical two sides of 6231 extending direction of fishplate bar are connect with the first side of the 4th card adapter plate 6232 and the second substrate 621 respectively, third Card adapter plate 6231 and the 4th card adapter plate 6232 form the second bayonet.
First bayonet and the second bayonet are towards described to attachment (such as original metope), second holding section 623 are connected to first holding section 613 and to which between attachment, the second holding section 623 is located at the first of the first holding section 613 In bayonet.By setting bending, and the first bayonet and the second bayonet for the first holding section 613 and the second holding section 623 Towards to attachment (such as metope), the structure of the first keel ontology 61 and the second keel ontology 62 can be not only simplified, is reduced Production cost can also facilitate the installation of the second keel ontology 62, improve installation effectiveness.
Further, the first angle of first card adapter plate 6131 and the second card adapter plate 6132 is greater than third clamping portion 6231 and the 4th card adapter plate 6232 the second angle, guarantee the second holding section 623 be connected to first holding section 613 with to In the case where between attachment, the second holding section 623 is facilitated to be inserted into the first holding section 613 and to improve assembly between attachment Efficiency.In the present embodiment, the first angle and the second angle are between 135-150 °.
Preferably, first side plate 612 is parallel with the second side plate 622, convenient for preferably cooperating with partition wall, finishing is improved Effect.As shown in figure 15, the first side plate 612 is parallel with the first partition plate 201 and the second partition plate 202 with the second side plate 622.
Further, the first substrate 611 is parallel with the second substrate 622, to facilitate the second holding section 623 to be inserted into first Holding section 613 and between attachment.
Preferably, first side plate 612 is vertical with first substrate 611, and the second side plate 622 is vertical with the second substrate 621, In order to the production of the first keel ontology 61 and the second keel ontology 62, production cost is reduced.
Preferably, the spacing of the first side plate 612 and the first holding section 613 is greater than the second side plate 622 and the second holding section 623 Between spacing, guarantee be clamped intensity in the case where, reduce the second holding section 623 insertion depth, improve assembly efficiency.
Further, the outside plate of the end face 6233 of second side of the 4th card adapter plate 6232 and the second substrate 622 Face is coplanar, to facilitate the second holding section 623 to be inserted between the first holding section 613 and metope.
Optionally, the outer corners of end face of first side plate 612 far from the first substrate 611 are set as chamfering, no It only can be improved finishing effect, when also can avoid installation, burr hurts installation personnel.
Accordingly, the outer corners of end face of second side plate 622 far from the second substrate 621 are also configured as chamfering. Chamfering is circular arc chamfering.
Further, the first keel ontology 61 and the second keel ontology 62 are integrally formed, to reduce production cost.
Optionally, it is also equipped with mineral wool 2092 in side keel 6, to improve between side keel 6 and side seal edge pieces 1 Soundproof effect.
Based on above-mentioned partition wall system or partition wall, the embodiment of the present invention also provides a kind of partition wall assembly method comprising:
S110 fixes the first partition plate of the first wall;
Before the second partition plate for installing the first wall, also deadening felt, mineral wool can be fixed on first by bar for line On the inner plate surface of partition plate the second partition plate of direction.
S120 fixes the second partition plate of the first wall, and the second partition plate is oppositely arranged with the first partition plate;
Side seal edge pieces and installation keel are clamped with the first partition plate and the second partition plate by S130 respectively.
The partition wall assembly method that the embodiment of the present invention proposes is by setting side seal edge pieces, the first wall and installation for partition wall Keel, without install according to fixed, not only may be used by the way that the installation that partition wall can be realized is simply assembled between each component The construction period is greatly shortened, construction efficiency is improved, realizes the fast industrialization installation of partition wall, but also partition wall each section can be reduced Volume further improve installation effectiveness convenient for the transport and installation of partition wall, in addition, all components can be in factory industry Metaplasia produces, and carries out fabricated construction at finishing scene, avoids the messy situation in traditional fitment operation scene, noise is small, dirty Contaminate it is small, it is economic and environment-friendly;And scene is constructed without masterful technique worker, reduces installation cost.
More than, technical solution of the present invention is described in detail in conjunction with specific embodiments, described specific implementation Example is used to help understand thought of the invention.The derivation that those skilled in the art make on the basis of the specific embodiment of the invention It is also belonged within the scope of the present invention with modification.

Claims (10)

1. a kind of partition wall characterized by comprising side seal edge pieces, the first wall and installation keel, the side seal edge pieces includes side Sealing plate is provided with the first clamping portion and the second clamping portion on the side seal board, at least two is provided on the installation keel One clamping joint, first wall include the first partition plate and the second partition plate being oppositely arranged, first partition plate and Be respectively arranged with the first card slot and the second card slot on the identical two sides of two partition plate extending directions, first clamping portion with it is described First card slot of the first partition plate is clamped, and the first card slot of second clamping portion and second partition plate is clamped, and described the Second card slot of the second card slot of one partition plate and second partition plate is clamped with first clamping joint respectively.
2. partition wall as described in claim 1, which is characterized in that first clamping portion and second clamping portion are hollow, It is provided with the first opening on first clamping portion, is provided with the second opening on second clamping portion, first opening, the Two openings are towards the first plate face of side seal board.
3. partition wall wall as claimed in claim 2, which is characterized in that further include sound-insulation strip, the sound-insulation strip is separately mounted to In the first opening and the second opening.
4. partition wall as claimed in claim 2, which is characterized in that be provided with reinforcer, the reinforcer in first plate face Between first clamping portion and the second clamping portion.
5. partition wall as claimed in claim 4, which is characterized in that the quantity at least two of the reinforcer adds described in two Strong part is connected by dowel, and two reinforcers bear against the inner plate surface in first partition plate and the second partition plate On.
6. partition wall a method as claimed in any one of claims 1 to 5, which is characterized in that be additionally provided with the second clamping on the installation keel Head, second clamping joint are used to be clamped with the second wall, and the installation keel are between the first wall and the second wall.
7. partition wall as claimed in claim 6, which is characterized in that the installation keel include installation ontology, the installation ontology With the first mounting surface and the second mounting surface being oppositely arranged, first mounting surface is directed away from the side of second mounting surface To the first mounting plate is extended, the second installation is extended in the direction that second mounting surface is directed away from first mounting surface Plate is respectively arranged with the first clamping joint and the second clamping joint on first mounting plate and the second mounting plate.
8. partition wall as claimed in claim 7, which is characterized in that the inner plate surface of first mounting surface and first partition plate It abuts, second mounting surface is abutted with the inner panel of second partition plate.
9. partition wall as claimed in claim 7, which is characterized in that first clamping joint and second clamping joint are hollow, Be provided with the first installing port on first clamping joint, first installing port towards first wall the second card slot slot Bottom;The second installing port is provided on second clamping joint, first installing port and the second installing port are installed towards first Plate or the second mounting plate.
10. a kind of partition wall assembly method based on any partition wall of claim 1-9 characterized by comprising
First partition plate of the first wall is fixed;
Second partition plate of the first wall is fixed, the second partition plate is oppositely arranged with the first partition plate;
Side seal edge pieces and installation keel are clamped with the first partition plate and the second partition plate respectively.
CN201810836460.6A 2018-07-26 2018-07-26 Partition wall and method for assembling the same Active CN109083309B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810836460.6A CN109083309B (en) 2018-07-26 2018-07-26 Partition wall and method for assembling the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810836460.6A CN109083309B (en) 2018-07-26 2018-07-26 Partition wall and method for assembling the same

Publications (2)

Publication Number Publication Date
CN109083309A true CN109083309A (en) 2018-12-25
CN109083309B CN109083309B (en) 2023-12-22

Family

ID=64830838

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810836460.6A Active CN109083309B (en) 2018-07-26 2018-07-26 Partition wall and method for assembling the same

Country Status (1)

Country Link
CN (1) CN109083309B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112095854A (en) * 2020-10-16 2020-12-18 浙江亚厦装饰股份有限公司 Assembly type decoration integrated partition wall system assembly and installation method
CN112112327A (en) * 2020-10-16 2020-12-22 浙江亚厦装饰股份有限公司 Integrated partition wall top integrated device is decorated to assembled

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH417021A (en) * 1964-10-05 1966-07-15 Koller Ernst Wall posts
NL8801950A (en) * 1988-08-04 1990-03-01 Sypla Systeem Planning B V Partition-supporting structure - has column of plate material bent along lengthwise edge to form recess
CN1115821A (en) * 1994-03-10 1996-01-31 普拉斯科尔股份有限公司 Wall system
CN1233306A (en) * 1996-10-11 1999-10-27 迪考瑞·鲁达克 Building elements
CN203559509U (en) * 2013-10-31 2014-04-23 北京华天幕墙工程有限公司 Aluminum alloy glass partition grounding member
CN204662722U (en) * 2015-04-29 2015-09-23 浙江未来加电子商务有限公司 A kind of eccentric bridge cut-off lightgage steel joist
CN205063050U (en) * 2015-09-23 2016-03-02 河北林宏建材科技有限公司 Partition wall body coupling frame
CN205976095U (en) * 2016-07-13 2017-02-22 厦门联合优盛墙体材料有限公司 A device for wall cuts off
CN206267360U (en) * 2016-10-12 2017-06-20 涂冬辉 Partition wall ground joist
CN207314597U (en) * 2017-07-24 2018-05-04 上海皓京实业股份有限公司 All steel section bar fastening piece type partition-type structures
CN108301536A (en) * 2017-12-30 2018-07-20 浙江亚厦装饰股份有限公司 Partition wall and its installation method
CN211396129U (en) * 2018-07-26 2020-09-01 浙江亚厦装饰股份有限公司 Partition wall

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH417021A (en) * 1964-10-05 1966-07-15 Koller Ernst Wall posts
NL8801950A (en) * 1988-08-04 1990-03-01 Sypla Systeem Planning B V Partition-supporting structure - has column of plate material bent along lengthwise edge to form recess
CN1115821A (en) * 1994-03-10 1996-01-31 普拉斯科尔股份有限公司 Wall system
CN1233306A (en) * 1996-10-11 1999-10-27 迪考瑞·鲁达克 Building elements
CN203559509U (en) * 2013-10-31 2014-04-23 北京华天幕墙工程有限公司 Aluminum alloy glass partition grounding member
CN204662722U (en) * 2015-04-29 2015-09-23 浙江未来加电子商务有限公司 A kind of eccentric bridge cut-off lightgage steel joist
CN205063050U (en) * 2015-09-23 2016-03-02 河北林宏建材科技有限公司 Partition wall body coupling frame
CN205976095U (en) * 2016-07-13 2017-02-22 厦门联合优盛墙体材料有限公司 A device for wall cuts off
CN206267360U (en) * 2016-10-12 2017-06-20 涂冬辉 Partition wall ground joist
CN207314597U (en) * 2017-07-24 2018-05-04 上海皓京实业股份有限公司 All steel section bar fastening piece type partition-type structures
CN108301536A (en) * 2017-12-30 2018-07-20 浙江亚厦装饰股份有限公司 Partition wall and its installation method
CN211396129U (en) * 2018-07-26 2020-09-01 浙江亚厦装饰股份有限公司 Partition wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112095854A (en) * 2020-10-16 2020-12-18 浙江亚厦装饰股份有限公司 Assembly type decoration integrated partition wall system assembly and installation method
CN112112327A (en) * 2020-10-16 2020-12-22 浙江亚厦装饰股份有限公司 Integrated partition wall top integrated device is decorated to assembled

Also Published As

Publication number Publication date
CN109083309B (en) 2023-12-22

Similar Documents

Publication Publication Date Title
CN109057095A (en) Partition wall top plate connection component and partition wall system
CN109057093A (en) Partition wall side closing in component and method
CN109083309A (en) Partition wall and its assembly method
CN108867941A (en) Side seal edge pieces and partition wall system
CN109024996A (en) Metope connection component and method
CN109057096A (en) Adapter assembly and partition wall system
CN109057094A (en) Partition wall door opening component and partition wall system
CN113152831A (en) Leveling fixed support component and leveling device
CN109024995A (en) Partition wall and its installation method
CN110200422B (en) Built-in cabinet mounting structure of buckle formula operating room
CN209837533U (en) Fine setting flat fast-assembling wallboard reentrant corner mounting structure
CN112854547A (en) Wall body mounting structure
CN209975934U (en) Flat fast-assembling wallboard straight angle mounting structure of fine setting
CN207988230U (en) Partition wall
CN208280390U (en) Partition wall
CN216360795U (en) Partition plate connecting piece
CN213897893U (en) Wallboard internal corner structure of making level
CN207974281U (en) Partition wall door opening component
CN211396129U (en) Partition wall
CN207974286U (en) Partition wall door opening component
CN220555855U (en) Light brick wall stone curtain wall
CN112459313A (en) Corner-free vertical frame unit curtain wall system
CN113123548A (en) Decorative plate mounting structure and mounting method
CN211396118U (en) Switching subassembly and partition wall system
CN210857823U (en) One-way plug-in components and wallboard concatenation subassembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant