Prior art keywords
construction
platform
operation platform
area
peat soil
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201811010277.7A
Other languages
Chinese (zh)
Other versions
CN109083122B (en
Inventor
马国志
苗闫闫
刘金凤
朱松
张佳健
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201811010277.7A priority Critical patent/CN109083122B/en
Publication of CN109083122A publication Critical patent/CN109083122A/en
Application granted granted Critical
Publication of CN109083122B publication Critical patent/CN109083122B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures

Abstract

The present invention provides a kind of construction methods of deep peat soil area construction operation platform, include the following steps: D: in the range of the horn of the digging machine, excavating roadbed slot;E: geotextiles are laid in the roadbed trench bottom;F: backfilling sea sand into the roadbed slot, forms primary platform;G: the digging machine is moved on previous step primary platform obtained;H: repeating step D ~ G, until completing primary platform whole in the construction area;Wherein, in steph, after every primary platform for completing the first specific range length, sea sand is backfilled above primary platform and is compacted, construction operation platform is formed.Construction method provided by the invention, permeable, the reinforcement for making full use of sea sand resources and geotextiles enhance base bearing capacity, guarantee that construction equipment normally passes in and out field and operation, mechanical equipment construction error caused by avoiding because of differential settlement, the construction for subsequent basement process provide reliable guarantee.

Description

The construction method of deep peat soil area construction operation platform
Technical field
The present invention relates to technical field of building construction, especially a kind of construction of deep peat soil area construction operation platform Method.
Background technique
To reduce destruction to land resource and demolition work, highway route largely selection marshland, lagoon area, The few area of building.These areas are mostly deep peat soil geology, peat soil geology big, natural hole with natural moisture content Gap is than the features such as big, compressibility is high, infiltration coefficient is big, the problems such as there are Lack of support, differential settlement when as ground, meeting It causes large-scale construction equipment that cannot march into the arena, influences the constructing operation of basement process, a construction behaviour must be built before basement process Make platform, is just able to satisfy large-scale construction equipment disengaging field and normal operating operation.
To solve this problem, construction operation platform need to be established and guarantee that field can be passed in and out and operate normally by carrying out construction machinery.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of construction method of deep peat soil area construction operation platform, Construction operation platform is established, guarantees that field can be passed in and out and operate normally by carrying out construction machinery.
The present invention provides a kind of construction methods of deep peat soil area construction operation platform, include the following steps:
A: hard ground at one is found in deep peat soil area, the hard ground can bear the weight of digging machine;
B: the construction area of construction operation platform delimited between the hard ground and construction point;
C: the digging machine is moved on the hard ground;
D: in the range of the horn of the digging machine, roadbed slot is excavated along the path of the construction area;
E: geotextiles are laid in the roadbed trench bottom;
F: backfilling sea sand into the roadbed slot, forms primary platform, and the primary platform can bear the weight of the digging machine;
G: the digging machine is moved on previous step primary platform obtained;
H: repeating step D ~ G, until completing primary platform whole in the construction area;
Wherein, in steph, after every primary platform for completing the first specific range length, sea sand is backfilled above primary platform And be compacted, form construction operation platform.
Further, first specific range is 40 ~ 60m.
Further, further include following steps:
I: monitoring the absolute altitude of construction operation platform, when its absolute altitude is lower than the second specific range of elevation control, backfills sea sand and presses In fact, up to the absolute altitude of operating platform to elevation control;
J: repeating step I, until engineering terminates.
Further, second specific range is 20cm.
Further, further include following steps after step J:
K: after engineering, excavating construction operation platform, and restores deep peat soil area original place looks.
Further, further include following steps between the step B and C:
S1: multiple control stakes are arranged along the path of the construction area, also, the multiple control stake is distributed in the construction area The two sides in domain.
Further, in the step S1: along the path direction of the construction area, the two neighboring control stake spacing For third specific range.
Further, in the step S1: if the path of the construction area is straightway, the third specific range For 20m, if the path of the construction area is curved section, the third specific range is 10m.
Further, in the step H, after every primary platform for completing the first specific range length, on primary platform Side backfills sea sand several times and is compacted, until reaching elevation control, forms construction operation platform.
The construction method of deep peat soil area construction operation platform provided by the invention, makes full use of sea sand resources and soil Permeable, the reinforcement of work cloth enhance base bearing capacity, guarantee that construction equipment normally passes in and out field and operation, avoid because uneven Mechanical equipment construction error caused by sedimentation, the construction for subsequent basement process provide reliable guarantee.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of Construction State of the present invention;
Fig. 2 is the A-A cross-sectional view in Fig. 1.
In figure, 1. deep peat soil areas, 2. roadbed slots, 3. geotextiles, 4. sea sands, 5. digging machines, 6. control stakes.
Specific embodiment
The present invention will be further explained below with reference to the attached drawings and specific examples, so that those skilled in the art can be with It more fully understands the present invention and can be practiced, but illustrated embodiment is not as a limitation of the invention.
A kind of construction method of deep peat soil area construction operation platform includes the following steps: with reference to Fig. 1 and Fig. 2
A: hard ground at one is found in deep peat soil area 1, the hard ground can bear the weight of digging machine 5.Deep mud 1 soil property of charcoal soil area is soft, it is necessary first to look for starting point of the one piece of ground as operation.
B: delimiting the construction area of construction operation platform between the hard ground and construction point, and construction point, that is, engineering is applied Building site point, such as the pile foundation construction point of bridge, in this case, construction operation platform is the channel into construction point, and construction area is applied The contour line of work operating platform.
S1: arranging multiple control stakes 6 along the path of the construction area, also, described in the multiple control stake 6 is distributed in The two sides of construction area, along the path direction of the construction area, two neighboring 6 spacing of control stake be third it is specific away from From, if the path of the construction area is straightway, the third specific range is 20m, if, the path of the construction area For curved section, the third specific range is 10m.
C: the digging machine 5 is moved on the hard ground.
D: in the range of the horn of the digging machine 5, usually 3 ~ 4m, excavates roadbed slot along the path of the construction area 2, namely remove the regional 1 surface soil layer of deep peat soil, big trees and tree root, weeds etc..
E: geotextiles 3 are laid in 2 bottom of roadbed slot, marshland section can overlay one layer of geotextiles 3, an excavation After the completion of job step, geotextiles 3 carry out tunneling boring laying along job step.
F: backfilling sea sand into the roadbed slot 2, forms primary platform, and the primary platform can bear the digging machine 5 Weight, herein primary platform be only facilitate the continuation of digging machine 5 to move along the path of the construction area, so, returned in this step Fill out the amount of sea sand and little.
G: the digging machine 5 is moved on previous step primary platform obtained;
H: repeating step D ~ G, until completing primary platform whole in the construction area;
Wherein, in steph, after every primary platform for completing the first specific range length, sea sand is backfilled above primary platform And be compacted, form construction operation platform.First specific range is 40 ~ 60m, it is preferable that the first specific range is 50mm.
Specifically, digging machine 5 excavates foundation trench 2 and is formed primary platform and digging so that digging machine 5 moves in front While machine 5 works, rear is synchronous to carry out backfilling working, and backfilling working all uses sea sand 4, and primary platform forms certain After length, such as above-mentioned 50m, the sea sand 4 backfilled above it is compacted, and forms construction operation platform.Construction operation platform is formed In the process, backfill and compacting can be performed in multiple times, until being backfilling and compacted elevation control, guarantee the mechanical equipment energy of basement process Enough normal disengaging fields and operation.Elevation control is to be higher than existing Swampy Areas water level or the above 50cm(of original ground absolute altitude as guarantee machine Tool normal operation, if it is necessary, construction operation platform filling height can be adjusted according to the actual situation) it is standard, and controlling Mark is carried out in stake 6.
I: monitoring the absolute altitude of construction operation platform, and when its absolute altitude is lower than the second specific range of elevation control, second is specific Distance can be 20cm, and backfill sea sand is simultaneously compacted, until the absolute altitude of operating platform is to elevation control.
J: repeating step I, until engineering terminates.
K: after engineering, excavating construction operation platform, and restores the regional 1 original place looks of deep peat soil, does not influence original The function of flood discharge water storage.
The scope of protection of the present invention is not limited to this.Those skilled in the art are made equivalent on the basis of the present invention Substitution or transformation, it is within the scope of the present invention.Protection scope of the present invention is subject to claims.

Claims (9)

1. a kind of construction method of deep peat soil area construction operation platform, which comprises the steps of:
A: hard ground at one is found in deep peat soil area, the hard ground can bear the weight of digging machine;
B: the construction area of construction operation platform delimited between the hard ground and construction point;
C: the digging machine is moved on the hard ground;
D: in the range of the horn of the digging machine, roadbed slot is excavated along the path of the construction area;
E: geotextiles are laid in the roadbed trench bottom;
F: backfilling sea sand into the roadbed slot, forms primary platform, and the primary platform can bear the weight of the digging machine;
G: the digging machine is moved on previous step primary platform obtained;
H: repeating step D ~ G, until completing primary platform whole in the construction area;
Wherein, in steph, after every primary platform for completing the first specific range length, sea sand is backfilled above primary platform And be compacted, form construction operation platform.
2. the construction method of deep peat soil area construction operation platform as described in claim 1, which is characterized in that described the One specific range is 40 ~ 60m.
3. the construction method of deep peat soil area as described in claim 1 construction operation platform, which is characterized in that further include Following steps:
I: monitoring the absolute altitude of construction operation platform, when its absolute altitude is lower than the second specific range of elevation control, backfills sea sand and presses In fact, up to the absolute altitude of operating platform to elevation control;
J: repeating step I, until engineering terminates.
4. the construction method of deep peat soil area construction operation platform as claimed in claim 3, which is characterized in that described the Two specific ranges are 20cm.
5. the construction method of deep peat soil area as claimed in claim 3 construction operation platform, which is characterized in that step J Later further include following steps:
K: after engineering, excavating construction operation platform, and restores deep peat soil area original place looks.
6. the construction method of deep peat soil area as described in claim 1 construction operation platform, which is characterized in that the step Further include following steps between rapid B and C:
S1: multiple control stakes are arranged along the path of the construction area, also, the multiple control stake is distributed in the construction area The two sides in domain.
7. the construction method of deep peat soil area as claimed in claim 6 construction operation platform, which is characterized in that the step In rapid S1: along the path direction of the construction area, the two neighboring control stake spacing is third specific range.
8. the construction method of deep peat soil area as claimed in claim 7 construction operation platform, which is characterized in that the step In rapid S1: if the path of the construction area is straightway, the third specific range is 20m, if, the construction area Path is curved section, and the third specific range is 10m.
9. the construction method of deep peat soil area as described in claim 1 construction operation platform, which is characterized in that the step In rapid H, after every primary platform for completing the first specific range length, backfills sea sand several times above primary platform and is compacted, Until reaching elevation control, construction operation platform is formed.
CN201811010277.7A 2018-08-31 2018-08-31 Construction method of construction operation platform in deep peat soil region Active CN109083122B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201811010277.7A CN109083122B (en) 2018-08-31 2018-08-31 Construction method of construction operation platform in deep peat soil region

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201811010277.7A CN109083122B (en) 2018-08-31 2018-08-31 Construction method of construction operation platform in deep peat soil region

Publications (2)

Publication Number Publication Date
CN109083122A true CN109083122A (en) 2018-12-25
CN109083122B CN109083122B (en) 2020-03-27

Family

ID=64840598

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201811010277.7A Active CN109083122B (en) 2018-08-31 2018-08-31 Construction method of construction operation platform in deep peat soil region

Country Status (1)

Country Link
CN (1) CN109083122B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930608A (en) * 2019-03-05 2019-06-25 云南建投第十二建设有限公司 A kind of pit earthwork excavation method of peat matter weak soil

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161109A (en) * 2011-12-13 2013-06-19 中国二十冶集团有限公司 Method for subgrade filling of peat soil subgrade by sea sand
CN104775415A (en) * 2015-04-03 2015-07-15 重庆大学 Working platform for rapidly reinforcing hydraulic reclamation super-soft soil foundation and construction method
CN106836175A (en) * 2017-03-28 2017-06-13 罗淮东 It is a kind of suitable for rainy season during cluster well platform construction method
CN107675693A (en) * 2017-09-27 2018-02-09 中国二十冶集团有限公司 The soft base comprehensive processing method of road peat soil

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161109A (en) * 2011-12-13 2013-06-19 中国二十冶集团有限公司 Method for subgrade filling of peat soil subgrade by sea sand
CN104775415A (en) * 2015-04-03 2015-07-15 重庆大学 Working platform for rapidly reinforcing hydraulic reclamation super-soft soil foundation and construction method
CN106836175A (en) * 2017-03-28 2017-06-13 罗淮东 It is a kind of suitable for rainy season during cluster well platform construction method
CN107675693A (en) * 2017-09-27 2018-02-09 中国二十冶集团有限公司 The soft base comprehensive processing method of road peat soil

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109930608A (en) * 2019-03-05 2019-06-25 云南建投第十二建设有限公司 A kind of pit earthwork excavation method of peat matter weak soil

Also Published As

Publication number Publication date
CN109083122B (en) 2020-03-27

Similar Documents

Publication Publication Date Title
CN103669399B (en) Concrete slab reinforced soil retaining wall and construction method thereof
CN102383413B (en) Method for constructing strengthened saturated-flow plastic silt soft soil foundation
CN105887889B (en) A kind of ultra-wide hyposmosis mud method of excavation of deep foundation pit
CN103882884A (en) Anchor rope geogrid retaining structure and method for constructing same
CN109898520A (en) A kind of heavy wall construction method
CN109024458B (en) Construction method for landscape revetment and underwater seepage prevention of coal mining subsidence land
CN111139840B (en) Ecological restoration method for tableland slope of fixed ditch in gully region of loess plateau of longdong
CN102535289B (en) Variable-cross-section structure for deep sewer of roadbed and construction method thereof
CN108457277A (en) A kind of a wide range of deep & thick silt excavation construction method
CN106522244B (en) A kind of embankment combination binding structure and its construction method
CN102587385A (en) Foundation pit supporting method for sludge-exchanged and filled soft soil
CN106320368A (en) Construction method applicable to open-excavation pipeline at compound stratum
CN109113045A (en) A kind of soft-soil foundation treatment method
CN101748735A (en) Foundation ditch excavation method for reducing pile deflection in soft soil area
CN102425179B (en) Structure of reinforced soil sewer supported by bored concrete piles of mini steel tubes
CN109083122A (en) The construction method of deep peat soil area construction operation platform
CN209412838U (en) A kind of Cut Slopes of Expansive Soil structure
CN101597903B (en) Construction method of cylindrical slurry core pile for retaining and protecting foundation pit
CN110924407A (en) Construction method for maintaining water and soil on lower slope without disturbance
CN108797609A (en) Environmentally protective steel pipe steel plate combination construction method for supporting
KR101525942B1 (en) Method for slope reinforcement construction using the ground improvement product
CN204435321U (en) A kind of steam power station water intaking open channel
CN103774698B (en) Soil engineering drainage-free construction method
CN103306291B (en) Oblique pull concrete pile solid protection wide-angle abrupt slope device
CN106149736A (en) The construction method stable based on cutting draining holding hillside fields bury excavation slope

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant