CN109081223A - elevator door pocket - Google Patents

elevator door pocket Download PDF

Info

Publication number
CN109081223A
CN109081223A CN201710443400.3A CN201710443400A CN109081223A CN 109081223 A CN109081223 A CN 109081223A CN 201710443400 A CN201710443400 A CN 201710443400A CN 109081223 A CN109081223 A CN 109081223A
Authority
CN
China
Prior art keywords
column
elevator door
door pocket
crossbeam
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710443400.3A
Other languages
Chinese (zh)
Inventor
高纪年
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Liaocheng Gaoli Metal Materials Co Ltd
Original Assignee
Liaocheng Gaoli Metal Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Liaocheng Gaoli Metal Materials Co Ltd filed Critical Liaocheng Gaoli Metal Materials Co Ltd
Priority to CN201710443400.3A priority Critical patent/CN109081223A/en
Publication of CN109081223A publication Critical patent/CN109081223A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B13/00Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
    • B66B13/30Constructional features of doors or gates
    • B66B13/306Details of door jambs
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B13/00Doors, gates, or other apparatus controlling access to, or exit from, cages or lift well landings
    • B66B13/30Constructional features of doors or gates

Landscapes

  • Elevator Door Apparatuses (AREA)

Abstract

The present invention provides a kind of elevator door pocket, is especially to provide a kind of box-like elevator door pocket of steel stone complex group.At least part of the skeleton part of the elevator door pocket is made of metal material, and the part that the elevator door pocket can be viewed by a user in a state of use is made of the material other than metal material.Elevator door pocket of the invention had both remained the texture of elevator door pocket made of stone material, time and labour needed for capable of also saving processing, while also having longer service life.

Description

Elevator door pocket
Technical field
This application involves a kind of elevator door pocket more particularly to a kind of combination elevator door pockets.
Background technique
Elevator door pocket is the structure in building around elevator door, and the wall being installed on around elevator doorway plays protection With the effect of decoration elevator door and wall.In the prior art, elevator door pocket is usually made using stone material.When production, generally Stone material can be prefabricated into advance with certain thickness stone material board member (plate), then in elevator door pocket erecting bed by stone material Board member is cut into the size and shape of needs, and is installed on wall, is assembled into elevator door pocket.
However, there is following problems for elevator door pocket made of stone material.
Firstly, elevator door pocket made of stone material is time-consuming and laborious in processing.The shape processing of stone material is difficult, often to use Monolith stone material could be cut into the board member of predetermined shape and thickness by large-scale cutting equipment, and can not be in the peace of elevator door pocket Dress scene is by monolith processing of stone at required tabular component.And in assembling if necessary to be carried out to component made of stone material It modifies also highly difficult.Therefore it in the stone material board member according to needed for the dimensioned elevator door pocket around elevator door, can expend Many working hours and labour.
Secondly as the poor ductility of stone material itself and frangible, is not easy to drill or set on the tabular component made of stone material Connection structure is set, therefore when stone material installation to be fixed on the wall around elevator door, often uses bonding way by stone material Board member is directly bonded on wall.But stone material and the materials such as cement, brick that constitute wall is bonding by stone material, cement And the influence of the physical characteristic of the materials itself such as brick, durability is not good enough, by regular hour (such as several years) it Afterwards, the part that cement or brick surface layer are permeated by bonding agent is easy to appear peeling, causes viscous between stone material and wall Relay decline.Elevator door pocket made of such stone material is easy to appear door pocket and falls off.
Again, stone material itself is frangible, in order to guarantee that the stone material board member as elevator door pocket has enough intensity to resist The impact that stone material board member is subject in processing, installation and use needs to guarantee that stone material board member has certain minimum thickness (such as thickness of 20mm).The area of monolithic stone material board member is bigger, and minimum thickness is thicker.The density of stone material is high, therefore The weight of its unit volume is big.The thickness of stone material board member is thicker to mean that monolithic stone material board member is heavier.Therefore in stone material Door pocket is more easier to fall off when bonding force between wall declines.Moreover, the stone material to fall off is also easy to smash ground or injure by a crashing object Pedestrian.In addition, the considerations of for easy to process and transport, being installed on the stone materials of elevator door two sides usually will in the up-down direction one It is divided into two, in this way, the stone part of entire elevator door pocket is just divided into top, each two parts in left and right, five part in total, this is allowed for Installation work-hour further increases.
In view of this, the applicant once proposed in CN 204661101U, CN 204661102U and to be manufactured with metal Elevator door pocket, and propose the concept of modular combination elevator door pocket.After field survey and design, by with modularization Each section of elevator door pocket is precast, then assembles at the scene, can greatly shorten work by the mode of production in factory Phase significantly reduces installation cost.
However, on actual market, because user to the perception of elevator door pocket, sense of touch, tap when the texture such as sense of hearing in terms of Requirement, metal manufacture elevator door pocket application be very limited.Especially in such as high-grade office building and high-end residential building Deng the place that the dicoration to elevator door pocket has higher requirements, people still like making to highlight the luxurious atmosphere in building The stone material such as marble expensive, that installation cost is high is used as the material of elevator door pocket, is at least not intended to using example The elevator door pocket as made of the metal material of steel or aluminium etc..This allows for the advantage of the effort research and development result of the applicant without body of laws It is existing.
Summary of the invention
Problems to be solved by the invention
The purpose of the present invention is to provide a kind of elevator door pockets, have both remained the texture of elevator door pocket made of stone material, Also time and labour needed for processing can be saved, while also there is longer service life.
The solution to the problem
The present invention provides a kind of elevator door pocket, and at least part of the skeleton part of the elevator door pocket is by metal material structure At the part that the elevator door pocket can be viewed by a user in a state of use is made of the material other than metal material.It is excellent Selection of land in the part that can be viewed by a user, is made of stone material at least partially.
Using the material other than metal material, metal-like can be experienced to avoid user, to meet the requirement of user. Especially when using stone material as material other than metal material, the appearance tactile impression and touch texture of stone material can be retained.Packet The skeleton part of metal-containing material is easy installation and is fixed to wall, working hour and labour when can significantly save in-site installation Power.Stone material will be much higher than stone material board member and wall with the bonding firmness of the skeleton part comprising metal material and durability The firmness and durability being directly bonded, thus be not easy to fall.
Preferably, the skeleton part includes the left column positioned at left side, the right column positioned at right side and is located above Crossbeam, the left column, the right column and the crossbeam to each other pass through assembling engagement.
Have the advantages that be easily installed by the skeleton part of left column, right column and crossbeam formation assembled with one another, it can To complete to install in the erecting bed fast power-saving of elevator door pocket.
Preferably, the left column, the right column and the crossbeam are each attached to wall.Preferably, the left column Wall is installed on by bolt, expansion bolt or welding with the right column.
Each building block of skeleton part is all installed to wall, and can improve skeleton part and wall firmly installs journey Degree guarantees that any building block of skeleton part is all not easy to fall off from wall.
Preferably, the crossbeam includes crossbeam vertical plate and crossbeam transverse slat, which is located at the front surface of the crossbeam, Plate-like in the up-down direction, which is located at the lower surface of the crossbeam, plate-like in the longitudinal direction, the crossbeam The lower end of vertical plate is connected with the front end of the crossbeam transverse slat, so that making the crossbeam overall structure be longitudinal section is substantially in L The shape of shape.
Preferably, the left column includes left column panel and left column side plate, which is located at described left vertical The front surface of column, plate-like in the up-down direction, which is located at the side surface of the left column, in the longitudinal direction Plate-like, the right part of the left column panel is connected with the front end of the left column side plate, to keep the left column whole Body is configured to the substantially L-shaped shape in cross section, which is located at the front surface of the right column, in the up-down direction Plate-like, which is located at the side surface of the right column, plate-like in the longitudinal direction, the right column panel Left part is connected with the front end of the right column side plate, so that the right column overall structure be made to be that cross section is substantially L-shaped Shape.
Preferably, it is all provided at the bending part of the substantially L-shaped part of the crossbeam, the left column and the right column It is equipped with the spatial portion by being repeatedly bent to form.
Preferably, the part that can be viewed by a user at least through the mode of bonding be incorporated into the left column, At least one of the right column and the crossbeam.
Preferably, the part that can be viewed by a user be plate-like members, the plate-like members with a thickness of 8mm to 14mm, the part of the skeleton part being made of metal material with a thickness of 6mm to 10mm.It is highly preferred that described flat Tabular component with a thickness of 10mm to 12mm, the part of the skeleton part being made of metal material with a thickness of 7mm extremely 9mm。
Elevator door pocket of the invention had both remained the texture of elevator door pocket made of stone material, can also save needed for processing Time and labour, while also there is longer service life.
Detailed description of the invention
Fig. 1 is the main view of elevator door pocket of the invention in the assembled state.
Fig. 2 is the schematic diagram of the connected structure between the crossbeam of steel skeleton and column.
Fig. 3 is the front stereogram for schematically showing the elevator door pocket after removing a part of decorative panel.
Fig. 4 schematically shows the cross sections of the right column part of elevator door pocket.
Description of symbols
101, the first column;102, the second column;103, first crossbeam;104, second cross beam;106, rivet;107, it engages Pressing plate;201, the first decorative panel;202, the second decorative panel;203, third decorative panel;204, the 4th decorative panel;501, the first liner Plate;N, trim moulding.
Specific embodiment
A specific embodiment of the invention is illustrated referring to the drawings.
It should be noted that the term " on " as used in the present invention for indicating direction, "lower", "left", "right" difference Refer to "upper", "lower", "left", "right" in the main view (Fig. 1) of elevator door pocket of the invention;In addition, being made in the present invention Indicate that the term "front", "rear" in direction refers in the state that elevator door pocket of the invention is installed on elevator door towards elevator Direction outside compartment and towards the direction inside cage.
Attached drawing in the present invention is schematically, in the dimension scale of each component in each attached drawing and same attached drawing respectively The dimension scale of component is also schematical.Each attached drawing only explanatory diagram of structure of the invention for ease of understanding, rather than with any Mode limits the specific size of each component in figure.
As shown in Figure 1 to Figure 3, the elevator door pocket of present embodiment is that a kind of box-like elevator door pocket of steel stone complex group is (following Referred to as elevator door pocket).The elevator door pocket is constituted by steel skeleton and stone decoration board are compound.Be formed from steel multiple groups of steel skeleton It is formed at Component composition, for installing to wall.Stone decoration board forms electricity for being installed by way of bonding to steel skeleton The appearance of terraced door pocket.
Fig. 2 schematically shows the connected structures between the crossbeam of steel skeleton and column.Fig. 2 is after elevator door pocket The upper left side observation of side, show the connected structure between the left end of crossbeam and the upper end of left column.Steel skeleton is left and right pair The structure of title, therefore, although it is not shown, still shown in the connected structure and Fig. 2 between the right end of crossbeam and the upper end of right column Structure it is similar, difference is only the difference caused by bilateral symmetry on direction.To illustrate below mainly in combination with Fig. 2 left column and The left end of crossbeam repeats no more the right end of right column and crossbeam.
First column 101 is the example of column side plate of the invention, and the second column 102 is showing for column panel of the invention Example, first crossbeam 103 is the example of crossbeam vertical plate of the invention, and second cross beam 104 is the example of crossbeam transverse slat of the invention.The One column 101 and the second column 102 are mounted on wall.In addition, first crossbeam 103 and second cross beam 104 can also be installed on Wall, to enhance the engagement firmness of steel skeleton and wall.Mentioned herein is installed on wall, both includes being directly mounted at The case where wall, also includes the case where being installed on wall via other components with auxiliary installation function.For example, can pass through First column 101, the second column 102, first crossbeam 103 and second cross beam 104 are fixed to wall by expansion bolt.In another example It can be by the way that the first column 101, the second column 102, first crossbeam 103 and second cross beam 104 to be soldered to and be preset in wall The steel constructions such as reinforcing bar, steel plate and be fixed to wall.
First column 101, the second column 102, first crossbeam 103 and second cross beam 104 shown in Fig. 2 are by steel system At, such as can be made of stainless steel.Left column includes as the first column 101 of column panel and as column side plate Second column 102.First column 101 of left column is located at the left-hand face of left column, plate-like in the longitudinal direction.Left column The second column 102 be located at the front surface of left column, it is plate-like in the up-down direction.The right end of second column 102 of left column Portion is connected with the front end of the first column 101 of left column, so that left column overall structure be made to be cross section (i.e., perpendicular to upper The section in lower direction) substantially L-shaped shape.
When viewed from above, the second column 102 positioned at left side is on the left of the front direction of the first column 101 for being located at left side Extend, and the plate face of the two is substantially perpendicular to each other.Right part positioned at second column 102 in left side and first positioned at left side The front end of column 101 is connected, so that left column overall structure be made to be cross section (section of horizontal direction) substantially L-shaped shape Shape.Right column also has similar structure, therefore repeats no more.
Crossbeam includes the first crossbeam 103 as crossbeam vertical plate and the second cross beam 104 as crossbeam transverse slat.First crossbeam 103 are located at the front surface of crossbeam, plate-like in the up-down direction.Second cross beam 104 is located at the lower surface of crossbeam, in front-rear direction It is upper plate-like.First crossbeam 103 is located at the top of the second column 102 of the left and right sides, and first crossbeam 103 for installing The plate face of decorative panel also towards front side so that 102 three of the second column of first crossbeam 103 and the left and right sides towards front side Plate face is substantially in approximately the same plane.In this way, the second column 102 for being installed on first crossbeam 103 and the left and right sides can be made Decorative panel is generally in approximately the same plane, avoids the visual whole defect that is uneven.First crossbeam 103 and left and right Second column 102 of two sides can interconnect, to enhance the intensity of entire steel skeleton.
Second cross beam 104 is located at the top of the first column 101 of the left and right sides, and second cross beam 104 for installing The plate face of decorative panel is downward.The front and back of size (i.e. width) and the first column 101 on the front-rear direction of second cross beam 104 Size on direction is roughly the same.Second cross beam 104 and the first column 101 of the left and right sides can interconnect, with Just enhance the intensity of entire steel skeleton.
The lower end of first crossbeam 103 is connected with the front end of second cross beam 104, so that crossbeam overall structure be made to cut to be vertical The substantially L-shaped shape in face (i.e., perpendicular to the section of left and right directions).
Be advantageous in that using steel skeleton: steel have excellent machinability, can easily be processed into required stand The components such as column, crossbeam, and be easy to steel skeleton being fixed to wall;By means such as bolt, expansion bolt or welding, not only Steel skeleton easily can be fixed to wall, additionally it is possible to ensure that there is sufficiently high bonding strength between steel skeleton and wall; The size that steel skeleton can be made using the profile with predetermined cross-sectional shape, therefore be can according to need, profile is added in advance Then work assembles at the scene at the component for the size for meeting elevator door pocket, is fixed, this can save a large amount of machining period and labor Power can very significantly save machining period especially in the erecting bed of elevator door pocket.
As described above, in the place that the dicoration to elevator door pocket has higher requirements, people are not intended to see elevator Metal material is used on door pocket.Therefore, it is necessary to be sheltered from above-mentioned steel skeleton completely using decorative panel.
Illustrate each decorative panel referring to Fig. 1 and Fig. 3.
In present embodiment, the first decorative panel 201, the second decorative panel 202, third decorative panel made of stone material are used 203 and the 4th decorative panel 204 block steel skeleton, to meet demand of the people to the appearance of elevator door pocket.First decorative panel 201 For blocking the first column 101 of the left and right sides, the second decorative panel 202 is used to block the second column 102 of the left and right sides, third Decorative panel 203 is used to block the first crossbeam 103 of top, and the 4th decorative panel 204 is used to block the second cross beam 104 of top.Respectively Decorative panel 201 to 204 can be installed together using bonding way with steel skeleton.
Illustrate the connection structure between each composition component of steel skeleton referring to Fig. 2.
The enlarged drawing of the part of the rear left upper of steel skeleton shown in FIG. 1 is shown in Fig. 2, which is to be located at a left side Between first column 101 of side and the upper end and first crossbeam 103 and the left end of second cross beam 104 of the second column 102 mutually The position of connection.As shown in Fig. 2, in upper end and the first crossbeam of the first column 101 and the second column 102 for being located at left side 103 and the left end of second cross beam 104 be provided with engagement pressing plate 107, by rivet 106 by two pieces of adjacent engagement pressing plates 107 It links together.
Engaging pressing plate 107 can be corresponding with steel skeleton to form structure using the various means such as welding, bonding, crimping Part is fixed together.Engagement pressing plate 107 shown in Figure 2 is the plate of rectangle, and a line has bead structure, this has volume The side length of a line of side structure is slightly shorter than the width of second cross beam 104.Engagement pressing plate positioned at the left end of second cross beam 104 107 with bead structure on one side positioned at the right side of the engagement pressing plate 107 and bead structure is towards upside.It is vertical positioned at first The a line with bead structure of the engagement pressing plate 107 of the upper end of column 101 is located at upside and the crimping of the engagement pressing plate 107 Structure is towards right side.It is set to the left side of the engagement pressing plate 107 of the left end of second cross beam and is set to the upper of the first column 101 The hole for dummy rivet 106 is offered in the bead structure of the upper side edge of the engagement pressing plate 107 at end.It, will by rivet 106 This two pieces of engagement pressing plates 107 link together.
It, can be with it should be noted that adjacent engagement pressing plate 107 is not limited by the mode that rivet 106 is attached It is to be attached by screw or bolt, or be attached by welding or being bonded.As long as in addition, can will be in steel skeleton The adjacent end of composition component is securely attached together, and can use any of means, and is not limited to this embodiment party Content in formula.
In addition, engagement pressing plate 107 is it is not always necessary that column or crossbeam with steel skeleton are fixed together.With in Fig. 2 For one column 101 and second cross beam 104, two engagement pressing plates 107 will form substantially after being linked together by rivet 106 90 ° of position limiting structure can generate positioning action to the first column 101 and the position interconnected of second cross beam 104.
In addition, though it is not shown, but can be in the side of steel skeleton being bonded with metope with any amount and arbitrary shape Reinforcing rib is arranged in shape, and effect is to enhance the intensity of resistance distortion, bending or impact phenomenon of steel skeleton etc., to further change The service life of kind elevator door pocket.
It, can be as shown in figure 3, by decorative panel made of stone material in view of stone material own wt is big and the characteristics of being difficult to It is designed as split type structure.The difficulty of processing of masonry slab can be reduced in this way.The second decoration of right column is illustrated only in Fig. 3 The case where plate 202 is split type structure, and for the ease of observation, the upper half of the second decorative panel 202 of right column is omitted The diagram divided, also removes the first decorative panel of a part 201 of right column.It is readily appreciated that, the first decorative panel 201, third decoration Plate 203 and the 4th decorative panel 204 can also adopt a split structure, and the split type structure of each decorative panel 201 to 204 is unlimited In be divided into two pieces the case where, it is further divided into more muti-piece.It, can be by decorative panel by taking the second decorative panel 202 of right column as an example Stitching position design is ramp-like, to make spliced seam crossing seem more attractive.It is readily appreciated that, it can also be by splice bits It sets and is designed to other shapes.
In addition, the difference of the cross section of the right column of the steel skeleton of elevator door pocket according to the present invention is shown in FIG. 4 Embodiment.It is readily appreciated that, the cross-sectional structure of the left column of steel skeleton and the cross-sectional structure of crossbeam also can have similar Construction.Therefore, although being illustrated in conjunction with right column of the Fig. 4 to steel skeleton, each embodiment in Fig. 4 is equally applicable In the left column and crossbeam of steel skeleton.When being used for crossbeam, the second column 102 in Fig. 4 corresponds to first crossbeam 103, and first Column 101 corresponds to second cross beam 104, is all consistent in the hope of the front towards user.Section of the same race can be used as a result, Profile makes steel skeleton, only need to take different length, thus can reduce manufacturing cost.
In (A) of Fig. 4, the surface for cooperating with decorative panel of the first column 101 and the second column 102 is flat Face.First decorative panel 201 is flat structure, is pasted on the surface of the first column 101.The appearance of second decorative panel 202 Face has for example arc-shaped protrusion for decoration, and the second decorative panel 202 is pasted on the surface of the second column 102.
In (B) of Fig. 4, the first column 101 and the second column 101 are provided with the groove knot for accommodating decorative panel Structure.First decorative panel 201 is mounted in the groove structure of the first column 101 by bonding.Second decorative panel 202 passes through bonding peace In the groove structure of the second column 102.Outside the groove structure of the appearance of first decorative panel 201 and the first column 101 Appearance is substantially concordant, is suspended to the people of disengaging elevator or object to avoid because the first decorative panel 201 is prominent from groove structure.The Two decorative panels 202 are suspended to people or the object of disengaging elevator due to being not easy, it is possible to be designed as the appearance of the second decorative panel 202 In arc-shaped protrusion it is prominent relative to the appearance face forward outside the groove structure of the second column 102, to obtain more Good decorative effect.In addition, the inside dimension of the groove structure of the first column 101 and the second column 102 is slightly larger than corresponding dress The outer dimension of plaque 201 or 202, so as between the first column 101 and the first decorative panel 201 and in the second column 102 and the first installed position between decorative panel 202 reserve gap.In this way, when steel skeleton is installed to wall, Bu Huiyin For steel skeleton stress deformation and decorative panel can not be installed in the groove structure of steel skeleton.
In (C) of Fig. 4, the place different from (B) of Fig. 4 is, the appearance of the second decorative panel 202 is also plane, And it is substantially concordant with the appearance outside the groove structure of the second column 102.
In (D) of Fig. 4, the second column 102 arc is not formed to have by a part that the second decorative panel 202 covers The cross section structure of shape curved surface, and a part of the second decorative panel 202 is formed as into arch cross section structure.First column, 101 He First decorative panel 201 is similar with the situation in (B) of Fig. 4.
In (E) of Fig. 4, the place different from (D) of Fig. 4 is, the second column 102 not by the second decorative panel 202 A part of covering is formed to have the cross section structure as made of plane and incline configuration, and the appearance of the second decorative panel 202 Face has towards front decorative arc-shaped protrusion outstanding, rather than the cross section structure of arched surface.
In (F) of Fig. 4, the place different from (A) of Fig. 4 is, the first column 101 is provided with for making the first decoration The surface of the step structure that plate 201 positions in the longitudinal direction, the front end of the first decorative panel 201 and the second column 102 is substantially flat Together, the left end of the second decorative panel 202 and the surface of the first column 101 are substantially concordant, and in the first decorative panel 201 and the second dress The bonding station of plaque 202 is provided with trim moulding N.The shape of trim moulding N is unrestricted, as long as can satisfy decoration demand ?.The material of trim moulding N is also unrestricted, for example, it may be by one of porcelain, stone material, plastics, timber, glass or A variety of compositions.
In (G) of Fig. 4, the place different from (C) of Fig. 4 is, the first column 101 and the second column 102 are each other simultaneously It does not contact, but is respectively arranged in wall, in addition, the cross sectional shape of the first column 101 is generally c-shaped channel-shaped, be provided with First interior lining panel 501, the surface for installing the first decorative panel 201 of the first column 101 are plane.First interior lining panel 501 is used It is issued in the chamber portion that the channel-shaped section for filling the first column 101 is formed, when preventing someone from tapping the column of elevator door pocket empty Hole sound.
In (H) of Fig. 4, the place different from (E) of Fig. 4 is, the second decorative panel 202 is shown in (B) with Fig. 4 Mode be installed on the second column 102.
In (I) of Fig. 4, the place different from (C) of Fig. 4 is, the first column 101 and the second column 102 are each other simultaneously It does not contact, but is respectively arranged in wall, and the second decorative panel 202 is installed on second in a manner of shown in (B) with Fig. 4 Column 102.
In (J) of Fig. 4, the place different from (I) of Fig. 4 is, between the first column 101 and the second column 102 with Mode shown in (D) with Fig. 4 links together.
In (B)~(E), (G)~(J) in figure 4 above, the bending part of the substantially L-shaped steel skeleton right column in section Place is provided with the spatial portion by being repeatedly bent to form, and therefore, the part repeatedly bent herein has certain distortion allowance, In this way, even if dimensional accuracy at the wall of elevator door or at doorframe there are certain error, can also should by distortion allowance Error absorbs, so as to which installation is effectively performed.It can also forming steel material in the corner of the appearance parts of door pocket It intersperses, aesthetics is promoted.In addition, the shape about the spatial portion being repeatedly bent to form, can be (B), (C), (G), (I) such substantially rectangular in, it is also possible to (E), such generally trapezoidal or (D) in (H), such with circular arc in (J) Shape, in a word can according to specific needs and design take on a different shape.
The elevator door pocket of present embodiment has the advantages that.
Firstly, the service life of elevator door pocket can be improved.
When on the materials such as previous cement or the brick for using bonding agent that stone material is bonded to composition wall, due to cement, brick The part on block surface layer is easily peeled off under the double action that the prolonged permeation and stone material of bonding agent are self-possessed, so there are stone doors Cover the risk to fall off.If stone decoration board is adhered on steel skeleton using bonding agent, since the surface layer of steel will not be because of The influence of prolonged permeation and the stone material self weight of bonding agent and remove, even if so the stone decoration board that is bonded on steel skeleton is long Phase use will not fall off from steel skeleton.
Secondly, the cost of elevator door pocket can be saved.
In view of steel skeleton itself supports entire elevator door pocket with enough intensity and resists the distortion being subject to, bending Or impact etc., therefore reduce the intensity requirement to each decorative panel 201 to 204 made of stone material.It so, can will be each The board thickness design of decorative panel 201 to 204 obtain it is thinner, as long as guarantee each decorative panel 201 to 204 will not because of itself weight and There is rupture.For example, the stone material with a thickness of 8mm to 14mm, preferably 10mm to 12mm, particularly preferably 10mm can be used Plate is made each decorative panel 201 to 204, and the various pieces of steel skeleton with a thickness of 6mm to 10mm, preferably 7mm to 9mm, Particularly preferably 8mm.The reduction of stone material plate thickness by the direct difficulty of processing for reducing stone plate when being cut and it is required plus Therefore work working hour can not only save the material cost of stone plate, additionally it is possible to save machining period cost and human cost.
Steel skeleton be it is knockdown, steel skeleton and stone decoration board are compounded to form elevator door pocket each other, therefore of the invention The installation fixation of elevator door pocket at the scene is very time saving.Under similar circumstances, elevator door pocket of the invention is from beginning preparing material The used time for expecting final installation completion is only about 1st/1st to five/10th of pure stone material door pocket, therefore can be saved a large amount of Time cost.Although the profile needs that steel skeleton uses additionally pay die cost, elevator door pocket is manufactured in high-volume In the case where, it still is able to realize excellent saving cost effectiveness.
In addition, it is necessary to explanation, protection scope of the present invention is not limited to specific illustrated by above-mentioned specific embodiment Embodiment, those skilled in the art can carry out various reasonable modifications to technical solution of the present invention within the scope of the invention With the combination of feature.
For example, can be glued by steel skeleton and stone decoration board when steel skeleton is fixed to wall using expansion bolt After connecing, through-hole is outputed on decorative panel and steel skeleton, is fixed to wall after expansion bolt is then passed through the through-hole.In this way may be used Further to save the field erected used time.
The material that skeleton part in elevator door pocket of the invention uses is not limited to steel, can also be other metal materials. In the above specific embodiment, as metal material, this homogenous material of steel is used, but unquestionably, can also be used more The combination of kind metal material.On the other hand, as the material other than metal material, this homogenous material of stone material, but milli are used It, can also be using the combination of other nonmetallic materials or a variety of nonmetallic materials without query.

Claims (11)

1. a kind of elevator door pocket, which is characterized in that
At least part of the skeleton part of the elevator door pocket is made of metal material, and the elevator door pocket is in a state of use The part that can be viewed by a user is made of the material other than metal material.
2. elevator door pocket according to claim 1, which is characterized in that
In the part that can be viewed by a user, it is made of at least partially stone material.
3. elevator door pocket according to claim 1 or 2, which is characterized in that
The skeleton part includes the left column positioned at left side, the right column positioned at right side and the crossbeam that is located above, described Left column, the right column and the crossbeam are engaged by assembling to each other.
4. elevator door pocket according to claim 3, which is characterized in that
The left column, the right column and the crossbeam are each attached to wall.
5. elevator door pocket according to claim 3, which is characterized in that
The left column and the right column pass through bolt, expansion bolt or welding and are installed on wall.
6. elevator door pocket according to claim 3, which is characterized in that
The crossbeam includes crossbeam vertical plate and crossbeam transverse slat,
The crossbeam vertical plate is located at the front surface of the crossbeam, plate-like in the up-down direction,
The crossbeam transverse slat is located at the lower surface of the crossbeam, plate-like in the longitudinal direction,
The lower end of the crossbeam vertical plate is connected with the front end of the crossbeam transverse slat, so that the crossbeam overall structure be made to be vertical The substantially L-shaped shape in section.
7. elevator door pocket according to claim 3, which is characterized in that
The left column includes left column panel and left column side plate,
The left column panel is located at the front surface of the left column, plate-like in the up-down direction,
The left column side plate is located at the side surface of the left column, plate-like in the longitudinal direction,
The right part of the left column panel is connected with the front end of the left column side plate, to make the left column entirety structure The shape substantially L-shaped as cross section,
The right column panel is located at the front surface of the right column, plate-like in the up-down direction,
The right column side plate is located at the side surface of the right column, plate-like in the longitudinal direction,
The left part of the right column panel is connected with the front end of the right column side plate, to make the right column entirety structure The shape substantially L-shaped as cross section.
8. elevator door pocket according to claim 6 or 7, which is characterized in that
It is provided at the bending part of the substantially L-shaped part of the crossbeam, the left column and the right column by more The secondary spatial portion being bent to form.
9. elevator door pocket according to claim 5, which is characterized in that
The part that can be viewed by a user at least through the mode of bonding be incorporated into the left column, the right column and At least one of described crossbeam.
10. elevator door pocket according to claim 9, which is characterized in that
The part that can be viewed by a user be plate-like members, the plate-like members with a thickness of 8mm to 14mm, institute State the part of skeleton part being made of metal material with a thickness of 6mm to 10mm.
11. elevator door pocket according to claim 10, which is characterized in that
The plate-like members with a thickness of 10mm to 12mm, the thickness for the part of the skeleton part being made of metal material For 7mm to 9mm.
CN201710443400.3A 2017-06-13 2017-06-13 elevator door pocket Pending CN109081223A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710443400.3A CN109081223A (en) 2017-06-13 2017-06-13 elevator door pocket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710443400.3A CN109081223A (en) 2017-06-13 2017-06-13 elevator door pocket

Publications (1)

Publication Number Publication Date
CN109081223A true CN109081223A (en) 2018-12-25

Family

ID=64838685

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710443400.3A Pending CN109081223A (en) 2017-06-13 2017-06-13 elevator door pocket

Country Status (1)

Country Link
CN (1) CN109081223A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111377343A (en) * 2020-02-14 2020-07-07 聊城市高力金属材料有限公司 Assembling type stone elevator door pocket and mounting method of stone elevator door pocket

Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08245151A (en) * 1995-03-15 1996-09-24 Iwai Kinzoku Kogyo Kk Jamb of elevator entrance
CN2680822Y (en) * 2003-12-08 2005-02-23 胡更然 Steel and wood composite doorframe
CN2703845Y (en) * 2004-05-20 2005-06-08 周先庆 Embedded aluminium door-window section bar
JP2005247447A (en) * 2004-03-01 2005-09-15 Toshiba Elevator Co Ltd Jamb of elevator
CN1793596A (en) * 2005-12-26 2006-06-28 葛铁岭 Ceramic window frame and mfg. method thereof
CN200992899Y (en) * 2006-12-31 2007-12-19 刘建朝 Stainless steel composite decorative profile
CN201771338U (en) * 2010-08-16 2011-03-23 成都大前门业有限公司 Door pocket with adjustable depth
CN201771382U (en) * 2010-08-16 2011-03-23 成都大前门业有限公司 Anti-theft suit door
CN201771348U (en) * 2010-08-16 2011-03-23 成都大前门业有限公司 Door frame with wallboard connector
CN201865489U (en) * 2010-08-16 2011-06-15 成都大前门业有限公司 Complete door with adjustable height, width and thickness
CN202754671U (en) * 2012-08-31 2013-02-27 北京升华电梯有限公司 Lift car wall decorated by stone and steel in mixed mode
CN202882398U (en) * 2012-11-15 2013-04-17 福建安厦新型建筑模板制造有限公司 Profile for processing template steel frame and steel frame template
CN202899898U (en) * 2012-09-29 2013-04-24 王承孝 Combined metal section bar
CN203022280U (en) * 2013-01-16 2013-06-26 苏州苏明装饰股份有限公司 Connecting structure of expansion joint for decorating top surface
CN103711206A (en) * 2013-12-11 2014-04-09 深圳市建筑设计研究总院有限公司 Waterproof connection belt and manufacturing method, as well as building and construction method
CN203686563U (en) * 2014-01-21 2014-07-02 中冶华天工程技术有限公司 Thin oil sealing type gas holder bottom plate
CN204661102U (en) * 2015-05-11 2015-09-23 聊城市高力金属材料有限公司 Combination elevator door pocket
CN205840661U (en) * 2016-07-22 2016-12-28 林治国 A kind of many materials assembly door

Patent Citations (18)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08245151A (en) * 1995-03-15 1996-09-24 Iwai Kinzoku Kogyo Kk Jamb of elevator entrance
CN2680822Y (en) * 2003-12-08 2005-02-23 胡更然 Steel and wood composite doorframe
JP2005247447A (en) * 2004-03-01 2005-09-15 Toshiba Elevator Co Ltd Jamb of elevator
CN2703845Y (en) * 2004-05-20 2005-06-08 周先庆 Embedded aluminium door-window section bar
CN1793596A (en) * 2005-12-26 2006-06-28 葛铁岭 Ceramic window frame and mfg. method thereof
CN200992899Y (en) * 2006-12-31 2007-12-19 刘建朝 Stainless steel composite decorative profile
CN201771348U (en) * 2010-08-16 2011-03-23 成都大前门业有限公司 Door frame with wallboard connector
CN201771382U (en) * 2010-08-16 2011-03-23 成都大前门业有限公司 Anti-theft suit door
CN201771338U (en) * 2010-08-16 2011-03-23 成都大前门业有限公司 Door pocket with adjustable depth
CN201865489U (en) * 2010-08-16 2011-06-15 成都大前门业有限公司 Complete door with adjustable height, width and thickness
CN202754671U (en) * 2012-08-31 2013-02-27 北京升华电梯有限公司 Lift car wall decorated by stone and steel in mixed mode
CN202899898U (en) * 2012-09-29 2013-04-24 王承孝 Combined metal section bar
CN202882398U (en) * 2012-11-15 2013-04-17 福建安厦新型建筑模板制造有限公司 Profile for processing template steel frame and steel frame template
CN203022280U (en) * 2013-01-16 2013-06-26 苏州苏明装饰股份有限公司 Connecting structure of expansion joint for decorating top surface
CN103711206A (en) * 2013-12-11 2014-04-09 深圳市建筑设计研究总院有限公司 Waterproof connection belt and manufacturing method, as well as building and construction method
CN203686563U (en) * 2014-01-21 2014-07-02 中冶华天工程技术有限公司 Thin oil sealing type gas holder bottom plate
CN204661102U (en) * 2015-05-11 2015-09-23 聊城市高力金属材料有限公司 Combination elevator door pocket
CN205840661U (en) * 2016-07-22 2016-12-28 林治国 A kind of many materials assembly door

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111377343A (en) * 2020-02-14 2020-07-07 聊城市高力金属材料有限公司 Assembling type stone elevator door pocket and mounting method of stone elevator door pocket
CN111377343B (en) * 2020-02-14 2024-06-14 聊城市高力金属材料有限公司 Assembled stone elevator door pocket and installation method of stone elevator door pocket

Similar Documents

Publication Publication Date Title
WO2004042163A3 (en) Wire mesh screed
GB2493664A (en) Pre-fabricated building structure
CN102084080A (en) Sliding wall
CN109081223A (en) elevator door pocket
CN104769195A (en) Combined wall body and construction method thereof
CN207361579U (en) Elevator door pocket
CN109081226A (en) elevator door pocket
JP2004183244A (en) Wall construction body
CN109081225A (en) elevator door pocket
CN109081224A (en) elevator door pocket
CN111719743B (en) Connecting structure between glass curtain wall and stone column
CN106337521A (en) Glass curtain wall capable of integrating trim strips, stand columns and cross beams
EP1229206B1 (en) Modular doors
PL1975334T3 (en) Prefabricated panel for wall construction
CN113700243B (en) Manufacturing and mounting method of multifunctional external wall panel
KR102198571B1 (en) A prefabrication wall manufacturing method of HANOK and a wall construction method of HANOK using the same
WO2018227392A1 (en) Elevator door jamb
CN214034293U (en) Novel concrete curtain wall connecting device
JPS626169Y2 (en)
EP1681428A1 (en) A structural assembly for sliding doors which can be recessed into the wall of a building
JP4079829B2 (en) curtain wall
CN217759557U (en) Prefabricated concrete composite wall panel of prefabricated building construction
CN216406001U (en) Heat-insulation decorative structure plate mounting system
JPS6029560Y2 (en) architectural exterior wall structure
CN206606905U (en) Combination elevator door pocket

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination